Loading...
HomeMy WebLinkAbout20110755 Ver 1_More Info Received_20110817Transmittal Sheet DAVIS & FLOYD, INC. 1305 North Center Street, Hickory, NC 28601 T 828.322.2290 F 828.322.3129 a[9@P=9W19 P AU G 1 7 2011 UENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH To: NCDWQ 401/Wetlands Unit- Laurie Dennison 1650 Mail Service Center Raleigh, NC 27699-1650 We are sending you I copies of the following enumerated ?Prints ?Sepias ?Shop Drawing ?Samples ?Brochures ?Cat. Cuts ? Application 01-efters El Specifications 1- Siqnature Paqe Our Comment: Please see signature page enclosed. Distribution For Your ®Action ?Corrections ?General Information 1. ?Request ?Resubmission ? 2. 3. 4. 5. Davis & Floyd Transmitted By ?Mail Signature ®UPS Name Josh J nes ? Title Staff Engineer Date 8-16-2011 DAVIS n&D RE: Reidsville Ops Center-Moss Street Entrance Project No. 012829.02 Phase: 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes Q No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act Q Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Contact and Website 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes © No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? hftp:ljbcaan.floridamadne.org/eftl_coralAms/vehw.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes N No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http:Uwww.hpo.dcr.state.nc.us 8. Flood Zone Designation (Corps Requirement) 8a. Wiii this project occur in a FEMA-designated 100-year floodplain? ? Yes Q No Bb. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Maps / Existing Conditions Surrey (Firm Map 3710799500J/Panel 7995) t Applicant/Agent's Printed Name App i gent's ure Date (Agent's signature is valid an authorization letter from the a icant is provided.) 19@00FRI AUG 1 7 2011 Page 14 of 10 DENR. WATER OUALITy "'A 'AND "ORMWATER BRANCH