Loading...
HomeMy WebLinkAbout20110844 Ver 1_Application_20110901 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office 3331 Heritage Trade Drive Suite 105 Wake Forest, NC 27587 ATTN: Mr. Monte Matthews NCDOT Coordinator Dear Sir: August 24, 2011 S,cp ?D ?o? os ?0 // EUGENE A. CONTI, JR. SECRETARY 11 0844 Subject: Application for an Individual Section 404 and Section 401 Water Quality Certification for SR 1001 (Connelly Springs Road) from US 321A (Norwood Street) to SR 1712 (Starcross Road) in Caldwell County. Federal Aid Project No. MA-STP-7533(2), Division 11, TIP No. U-221 1B. Debit $570 from WBS 34783.1.1. The North Carolina Department of Transportation (NCDOT) proposes to extend SR 1001 (Connelly Springs Road) on new location with the realignment of SR 1178 (Hibriten Drive) in Lenoir, Caldwell County. The project begins west of US 321A (Norwood Street) and ends approximately 650 feet east of SR 1712 (Starcross Road). The project also includes the construction of a half-clover interchange at US 321. The project will eliminate a portion of SR 1178 (Hibriten Drive) including the existing bridge over US 321. The proposed facility is a four-lane, curb & gutter, median-divided roadway and will provide two 12-foot lanes in each direction, a 17.5-foot median and 10-foot berms. U-221 1B is one part of the two-part TIP project U-2211. U-2211A was completed in 2003 and was the widening and new location portion of SR 1001 (Connelly Springs Road) from SR 1933 (Southwest Boulevard "loop") to US 321A in Lenoir, Caldwell County. MAILING ADDRESS: TELEPHONE: 919-717-6100 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-212-5785 PROTECT DEVELOPMENTAND ENVIRONMENTAL ANALYSTS 1020 BIRCH RIDGE DRIVE 1598 MAIL SERVICECENTER WEBSITE: WWH(DON.DOLSTATE.NC.US RALEIGH NC, 27610-4328 RALEIGHNC 27699-1598 Please see the enclosed ENG 4345, Ecosystem Enhancement Program (EEP) mitigation acceptance letter, permit drawing review minutes (Concurrence Points 413 and 4C), Rapanos jurisdictional determination form, State Stormwater Management Plan (SMP), permit drawings and design plans for the above referenced project. Purpose and Need: Existing Connelly Springs Road is characterized by a substandard roadway width and poor sight distance. Congestion occurs along Connelly Springs Road and along US 321A (Norwood Street). The accident rate for the existing facility is over two times the statewide average for similar roadways. The proposed improvements for U-2211 will alleviate congestion by widening the roadway and extending Connelly Springs Road to connect with US 321 (Hickory Boulevard) and SR 1178 (Hibriten Drive). The project will improve the traffic flow and safety along the facility. In addition, it will help relieve some congestion on US 321A in the downtown area going toward NC 18 by connecting with Hibriten Drive as an additional route to NC 18. The project implements a portion of the Lenoir Thoroughfare Plan and will function as an urban connector improving access between Lenoir and the Cajah Mountain area. Summary of Jurisdictional Impacts: The project will permanently impact 0.24 acre of wetlands, 1,252 linear feet of streams, and temporarily impact 0.01 acre (73 linear feet) of streams. Summary of Utility Impacts: There will be no temporary or permanent impacts to jurisdictional resources due to utility relocations on U-2211B. Summary of Mitigation: The project has been designed to avoid and minimize impacts to jurisdictional areas throughout the National Environmental Policy Act (NEPA) and design processes. However, project impacts will necessitate compensatory mitigation for the unavoidable impacts. Detailed descriptions of these actions are presented in the mitigation portion of this application. The EEP will provide compensatory mitigation for 1,252 linear feet of stream impacts. Compensatory mitigation for 0.24 acre of wetland impacts will be provided by debiting the Long Creek Mitigation Site in Mecklenburg County. NEPA DOCUMENT STATUS An Environmental Assessment (EA) was prepared for U-2211 in February 1995. A Finding of No Significant Impact (FONSI) was prepared in November 1995. A Reevaluation of the EA/FONSI for U-2211B was completed in 2007 (after U-2211A was completed in 2003). Additional copies will be provided upon request. In compliance with the NEPA/404 Merger Process, Concurrence Points 413 and 4C were reached for U-221113 on January 23, 2008 and May 13, 2009, respectively (meeting minutes attached). U-2211 B Individual Permit Application Page 2 of 10 INDEPENDENT UTILITY The subject project is in compliance with 23 CFR Part 771.111(f) which lists the Federal Highway Administration (FHWA) characteristics of independent utility of a project: (1) The project connects logical termini and is of sufficient length to address environmental matters on a broad scope, (2) The project is usable and a reasonable expenditure, even if no additional transportation improvements are made in the area; (3) The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. RESOURCE STATUS Waters within the project area are located in the Upper Catawba Drainage Basin (HUC 03050101 of the Catawba River Basin within subbasin 03-08-32). No designated Outstanding Resource Waters (ORW), High Quality Waters (HQW), Water Supply (WS-1 or WS-II) waters or 303(d) impaired waters occur within 1.0 mile of the project area. Wetland and stream determinations within U-2211B were conducted using the field delineation method outlined in the 1987 Corps of Engineers Wetland Delineation Manual. Mr. John Thomas of the U.S. Army Corps of Engineers (USACE) field verified the wetland and surface waters and issued a signed jurisdictional determination (JD) on May 5, 2006. This verification was verbally confirmed by Monte Matthews of the USACE on March 1, 2008. As this verification expires before the current let date for this project, a Rapanos jurisdictional determination form has been included with this application for the relevant water resources impacted by U-221 1B. The NCDOT requests an updated final JD for this project. IMPACTS TO WATERS OF THE U.S. Tables IA and 113 summarize the impacts to jurisdictional water resources. Site numbers correspond with the permit (hydraulic) drawings included in this application. The stream names correspond to the 2007 NEPA document. A brief description of each impact site will follow the tables. Tahln 1 A _ I1-2211 R Wetland Imnaety. Site 2 Wetlands Number W l Wetland Size (ac) 0.24 *Permanent F Min, - Wetlands(ac) 0.24 FVMechantzed ??m x Cleazmgi(ac),, 0 Tem rarytF I > (ac)s 0 tMttigation , ._ ¢Requlredi(ac). 0.24 Total Impacts 0.24 0 0 0.24* • Wetland impacted is riparian U-2211B 1ndividual Permit Application Page 3 of 10 _I 1 - All streams are Class C waters with a DWQ Index Number of 11-55-(0.5) 2 - Mitigation for bank stabilization impacts required by DWQ- not required by USACE 3 - UT2 was determined by the USACE in March 2008 to be an intermittent, unimportant stream (not requiring mitigation from USACE). Since that time, DWQ has changed its policy regarding mitigating for intermittent streams, therefore it now requires mitigation from DWQ at a 1:1 ratio. 4 - Values are based on rounding, due to some of the individual impacts being <0.01 acre 5 - Mitigation proposed by NCDOT (based on mitigation required by the USACE exceeding the amount required by DWQ) StremName & ermient o e' :: a _ IN. Iinpact Type ?p act Te p a y' acts ? tN-RKfftir#9',o' equ mbert ? a ei re} feet) n(acres) hne rf UTl to Perm. fill 922 USACE & DWQ 1 Gunpowder UTl Bank Stabilization 78 DWQ' Creek (P) Temp. fill -- <0.01 N/A (wetland 2 only) - -- UTl to Perm. fill -- 3 Gunpowder UTl Bank Stabilization 16 DWQ' Creek (P) Temp. fill -- UTl to Perm. fill 42 USACE & DWQ 4 Gunpowder UTl Bank Stabilization 41 DWQ' Creek (P) Temp. fill -- <0.01 UT2 LM Perm. fill 153 DWQ' 5 Gunpowder UT2 Bank Stabilization -- -- Creek (I)3 Temp. fill <0.01 - „ .. ? ?"??= ??,, ??« 7,? Total Tem ora , rlm acts: ri'Wa 0:01° Km ''70-0. Permanent Imp acts Perm . Fill + Bank Stabilization : 1,252 -- - Permanent Impacts Requiring DW Miti ation 1:1): . 1,252 - -- Permanent Impacts Requiring USACE Mitigation 2:1 : 964 - -- Total Impacts Requiring Mitigation (2:1): [ 964 - 1,928 Table 1B - U-2211B Stream m pacts. Permit Site 1: The reach of UTl that extends under the proposed interchange footprint will be culverted. A 7' x 7' reinforced concrete box culvert (RCBC) will be used on the inlet side of US 321, and will be 646 feet in length. This new 7' x 7' RCBC will connect to the existing 7' x 7' RCBC under US 321. The existing culvert is 212 feet in length. The outlet side of the existing culvert will be extended with a 7' x 8' RCBC 214 feet in length. The total culvert length (including the existing section) will be 1,072 feet. This culvert extension on both sides of US 321 will result in 922 linear feet of permanent impacts to UTl . Additionally, there will be <0.01 acre (34 linear feet) of temporary impacts associated with culvert installation and 78 total linear feet of bank stabilization impacts at the inlet and outlet ends of the extension. Permit Site 2: Wetland W l is located entirely within the footprint of the new interchange and all 0.24 acre of W1 will be permanently impacted from the new roadway. Permit Site 3: The existing 12" reinforced concrete pipe (RCP) will be replaced with a new 24" RCP. The rip rap at the outlet end of the new RCP will result in 16 linear feet of bank stabilization to UTI. U-2211 B Individual Permit Application Page 4 of 10 Permit Site 4: The existing 72" corrugated metal pipe (CMP), approximately 40' in length, that carries UTl under Starcross Road (SR 1712) will be replaced with an 8 x 8 RCBC. This RCBC will be slightly longer (64'3") to accommodate the widened portion of Starcross Road, but will be on a better alignment for the stream than the existing CMP. The pipe replacement will result in 42 linear feet of permanent impacts to UTI. Additionally, there will be <0.01 acre (29 linear feet) of temporary impacts associated with culvert installation and 41 linear feet of bank stabilization impacts at the inlet and outlet ends of the new culvert. Permit Site 5: The existing 24" CMP, approximately 36' in length, that carries UT2 under Hibriten Drive will be removed and replaced with a 54" RCP to accommodate the widened roadway in this location. A portion of the channel on the inlet side of the new pipe will be lined with rip rap for stabilization purposes. This pipe replacement and upstream rip rap will result in 153 linear feet of permanent impacts to UT2. There will also be <0.01 acre (10 linear feet) of temporary stream impacts associated with pipe installation. MORATORIUM No moratoria are required by the U.S. Fish and Wildlife Service (USFWS) or were proposed in a letter from the North Carolina Wildlife Resources Commission (NCWRC) dated March 9, 2004. FEDERALLY PROTECTED SPECIES Plants and animals with Federal classification of Endangered (E) or Threatened (T) are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973, as amended. As of September 22, 2010, the USFWS lists six federally protected species for Caldwell County (Table 2). Table 2 _ Federally protected species listed for Caldwell Countv. t cientifWNimeF A " C oName aw M vFederal'3 Habitat v ea sr 3? gical ? : ' ? - Present usio Clemm s muhlenber ii Bo turtle T S/A No uired Glaucomys sabrinus Carolina northern flying E No ffect T coloratus s uirrel Corynorhinus Virginia big-eared bat E No ffect No townsendii vii inianus Microhexura montiva a Spruce-fir moss spider E No No Effect Hexas lis nani ora Dwarf-flowered heartleaf T Yes No Effect Liatris helleri Heller's blazing star T No No Effect T(S/A) - Threatened due to similarity of appearance E - Endangered T - Threatened The only species with habitat present within the project area is the dwarf-flowered heartleaf. The entire project area was surveyed for suitable dwarf-flowered heartleaf habitat. All potential habitat was surveyed in April 2008 by walking visual plant-by-plant surveys. No dwarf-flowered heartleaf plants were found, therefore this project will have "No Effect" on U-111 1B Individual Permit Application Page 5 of 10 this species. The bog turtle is listed due to similarity of appearance and does not require a biological conclusion. However, per communication with Dennis Herman (NCDOT Biological Surveys Group) the wetland located within the project area is not considered a bog and likely would not provide suitable habitat for bog turtles. INDIRECT CUMULATIVE IMPACT ANALYSIS Existing rules for the 401 Water Quality Certification Program (15A NCAC 2H.0506(b)(4) require that the DWQ determine that a project "does not result in cumulative impacts, based on past or reasonably anticipated future impacts, that cause or will cause a violation of downstream water quality standards." An Indirect and Cumulative Effects Assessment (ICE) was completed for this project in 2005. Copies of this report are available upon request. This report concluded the following: Indirect and Cumulative Effects to the Human Environment The project is not expected to result in major induced growthiland changes or substantially contribute to cumulative impacts in the area. The proposed project is located in a mature and stable area of the City south of the downtown urban core. Contingent upon access, the likelihood of development is contained to the few available parcels in the immediate vicinity of the proposed project. Given that the project will result in new access, commercial infill development is most likely to occur, particularly in the vacant parcels that were converted from residential to commercial uses within the last five years. This project could influence the timing or status of the development likely to occur on these parcels, but only if access is allowed. The type of commercial development likely to occur is small businesses, fast food, or other small-scale commercial uses. With regard to transitioning existing residential land uses to higher intensity uses, there is the potential for U-2211B to induce land use changes along the US 321 corridor. This is probable because of the corridor's connection with other urban/commercial strips and because it is located close to downtown Lenoir. The project has the potential for limited cumulative effect resulting from the incremental effects of the proposed interchange with other past project and current and future development activities in the project region. Non-transportation development projects in the area are few, and are limited to infill development of parcels along the US 321 corridor. There is the potential for existing residential parcels to convert to commercial uses, particularly those fronting US 321 north and south of the project. However, this is not necessarily a result of this project, but rather because of the nature of US 321 as a major commercial corridor within the City of Lenoir and through the region. The project will directly alter the street network by upgrading a portion of Hibriten Drive as part of interchange construction. Although this upgrade will not significantly alter the street U-2211 B Individual Permit Application Page 6 of 10 network, volumes will increase on this local street as a result of this project. There is the potential for some homes in the Whitnel neighborhood to convert to home-based businesses. According to the City, the project will not likely alter the stable and cohesive nature of this neighborhood. Indirect and Cumulative Effects to the Natural Environment Habitat fragmentation already exists in the study area as the project is located in a suburban area in Lenoir. The project will result in the direct removal of upland habitat. However, it is not anticipated that the project will produce substantial changes in the ecological makeup of the study area. The interchange will impact two unnamed tributaries to Gunpowder Creek and a small wetland. In combination with TIP Project U-2211A, there is the potential for cumulative effect to the creek system. It is anticipated that the project will not indirectly induce new development that will promote negative cumulative effects in the study area. Potential adverse effect to surface waters will be minimized through implementation of NCDOT's Best Management Practices for Protection of Surface Waters, as applicable, during the construction phase of the project to avoid construction impacts to aquatic communities where construction activity occurs as well as to downstream communities. CULTURAL RESOURCES Historical Structures: The State Historic Preservation Office (HPO) requested surveys for historic structures in their memos to NCDOT dated August 17, 2004 and September 2, 2004. A field survey of the Area of Potential Effects (APE) was conducted in January 2005 and July 2006 by an NCDOT architectural historian and eighty structures over fifty years of age within the APE were recorded. The photographs of these properties along with their evaluations were shown to the HPO in three separate meetings: February 22, 2005, May 31, 2005 and August 16, 2006. At those meetings, HPO staff concurred that all eighty properties were not eligible for the National Register and forms were signed that reflect these findings (and were included in the 2007 EA/FONSI Reevaluation). Therefore, there are no National Register-listed or National Register-eligible properties within the APE for this project. On June 28, 2007, NCDOT met with the property owner of 1318 Hibriten Drive about a tunnel on their property. NCDOT researched the tunnel to see if it was part of an important event and discussed with the state agency (HPO). On August 1, 2007 the HPO agreed that the tunnel was probably not eligible, but they recommended documentation during utility relocation or construction and NCDOT agreed. Archaeoloav: The NCDOT conducted an archaeological survey of the project area. The majority of the project area was determined to be disturbed from previous residential and commercial development. No archaeological sites were recorded, and no evidence of cultural use or occupation of the project area was encountered during the survey. This work was done in U-221IB Individual Permit Application Page 7 of 10 compliance with Section 106 of the National Historic Preservation Act and the guidelines issued by the Advisory Council on Historic Preservation. No further compliance is required. SECTION 4(f) There are no section 4(1) properties affected by this project. FEMA COMPLIANCE The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local floodway regulations. WILD AND SCENIC RIVER SYSTEM The project will not impact any designated Wild and Scenic Rivers or any rivers included in the list of study rivers (Public Law 90-542, as amended). MITIGATION OPTIONS The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the planning and NEPA compliance stages; minimization measures were incorporated as part of the project design. Avoidance and Minimization: NCDOT has avoided impacting wetlands and streams and reduced impacts to wetlands and streams to the greatest extent practicable. Specific examples of avoidance and minimization measures include: • Multiple baffles will be utilized within the downstream portion of the culvert extension at Site 1 to provide energy dissipation within the culvert. • A 60" floodplain pipe along the culvert extension under US 321 at Site 1 will be required to meet FEMA requirements. • At Site 1, a benched channel at the inlet and outlet will be utilized to maintain low flow. • The interior of Loop C of the new interchange will be utilized as a dry-extended detention pond to provide treatment of stormwater runoff prior to discharging into the proposed box culvert extension at Site 1. • Rip rap pads and preformed scour holes will be used in order to dissipate energy and reduce velocities at stormwater pipe outlets near Site 3. • Riprap used for outlet protection will be placed on banks only and will not be placed in the streambed. U-21118 Individual Permit Application Page 8 of 10 • Though the majority of roadside ditches were unable to obtain a 3:1 slope or flatter due to the physical constraints of the mountainous topography, most ditches on the project will be lined with rip rap in order to control erosion. Compensation: The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent practicable as described above. This project will permanently impact 0.24 acre of wetlands, 1,252 linear feet of streams, and temporarily impact 0.01 acre (73 linear feet) of streams. Of the 1,252 linear feet of permanent stream impacts, 964 linear feet are permanent impacts to a perennial stream, 135 linear feet are bank stabilization impacts to this same perennial stream and 153 linear feet are permanent impacts to an intermittent, unimportant stream. Therefore, all 1,252 linear feet of permanent stream impacts require mitigation by DWQ at a ratio of 1:1. A total of 964 linear feet of permanent stream impacts require mitigation by USACE at a ratio of 2:1. Mitigation for the 0.24 acre of wetland impacts will be provided by debiting the Long Creek Mitigation Site at a ratio of 1:1. Located in Mecklenburg County, the Long Creek Mitigation Site encompasses approximately 156 acres. It is situated off of Beatties Ford Road (SR 2074) and was bisected by I-485. This site provided compensatory mitigation for wetland impacts associated with sections of the Charlotte Outer Loop. The Long Creek Site is designed to restore a bottomland hardwood forest wetland. It was originally constructed in December of 1996, with 37 acres of the planting occurring in 1997. A 5 acre portion, consisting of the former haul roads, was planted in early 1998. Groundwater, surface water, and rain gauges were installed in early 1998. 2001 is the fourth year of hydrologic monitoring and the fifth year of vegetation monitoring for the site. To offset 0.24 acres of unavoidable wetland impacts, associated with T.I.P U-2211B, the Long Creek Mitigation Site will be debited 0.24 acre. Table 3 shows the mitigation that has been debited from the Long Creek Site to date. Table 3 - Lane Creek Mitigation Site Debits. i i 1 Mitig hon TYRE?? * . Riverine Wetland Restoration DEBI? xAMOUNT. ac 7.2 TIP Projects ti R-21 1,R-2123, R-2248 2 Riverine Wetland Restoration 15 R-2123 AB/BA/BB/CB 3 Riverine Wetland Restoration 9.8 U-2506 4 Riverine Wetland Restoration 2.54 R-2248 AB/BA 5 Riverine Wetland Restoration 1.6 R-2123 6 Riverine Wetland Restoration 5.12 R-2248AC/ADBA 7 Riverine Wetland Restoration 0.24 U-2211B U-1211 B Individual Permit Application Page 9 of 10 The USACE stream mitigation requirement is 1,928 ft (964 ft @ 2:1). The DWQ stream mitigation requirement is 1,252 ft (1,252 ft @ 1:1). Please reference Table 1B in this application for further breakdown of impacts and mitigation requirements. Therefore, the NCDOT proposes to mitigate for the larger of these mitigation requirements, 1,928 ft, by utilizing the EEP (see attached acceptance letter). PROJECT SCHEDULE U-2211B calls for a May 15, 2012 let date, and a review date of March 27, 2012. This application provides final design and impacts for the project. REGULATORY APPROVALS Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the above-described activities.. Section 401: We are hereby requesting a 401 Water Quality Certification from the N. C. Division of Water Quality. In compliance with Section 143 215.3D(e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit application previously noted in this application (see Subject line). We are providing five (5) copies of this application to the NCDWQ for their review and approval. This project is located in a trout county, therefore comments from the NCWRC will be required prior to authorization by the Corps of Engineers. By copy of this letter and attachment, NCDOT hereby requests NCWRC Review. NCDOT requests that NCWRC forward their comments to the Corps of Engineers and the NCDOT within 30 calendar days of receipt of this application. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Erin Cheely at ekcheely@ncdot.gov or (919) 707-6108. A copy of this permit application and its distribution list will be posted on the NCDOT website at http://www.ncdot.org/doh/preconstruct/pe/neu/permit.html Sincerely orY X.Thorpe, Ph.D., Branch Manager Project Development and Environmental Analysis Branch cc: NCDOT Permit Application Standard Distribution List. U-2211 B Individual Permit Application Page 10 of 10 APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL NO. 0710-0003 (33 CFR 325) EXPIRES: 31 August 2012 Public ropor" burden fix this wr adio n of udomlabrin is estimated to average 11 hours per response, including the time Tor reviewing instructions, searching ennsta ng data sources, gathering and maudaaung the data needed. and completing and MVONffg the collection of bdornabon. Sod cormnens regarding the burden estimate or any other aspect of this collection of bdartretion, including suggestions for reducing this burden. to Deparbnerd of Defense, Washington Headquarters, Executive Services and Cannwil®lors Directorate, Information Management DNsaon and to the Office of Manager nend and Budget, Papervpk Reduction Propd (0710-0003). Resporldens should be avrare that notwithstanding any other provision of law, no person shag be subject lo any penalty for fal6g to cornpy with a collection of udormatian if it does not display a crTently valid OMB control number. Please DO NOT RETURN your form to either of those addresses- Canrpleted applications Trust be subaneted tu the Distinct Engineer having jursdiction over the location of the proposed autrvfy. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Ad, Section 10, 33 USC 403; Clem Water Act, Section 404,33 USC 1344; Marine Protection, Research, and Sanctuaries Ad, Section 103,33 USC 1413, Regulatory Prograrus of the Corps of Engineers, Final Rule 33 CFR 320-332. Principal Purpose: hdamalon provided on this farm will be used in evahnaing the application (or a pemdL Routine Uses: This Irdamatim may be stored with the Deparlinerd of Justice and other federal, state, and local govenmrert agencies, and the public and may be made available as part of a public notice as required by Federal lax. Submission of rested information is voluntary, however, f adomal in is not provided the pernit application cannot be evaluated nor can a pemtit be saved. One sat of original drawings or good reproducible copies which show the location and character of the proposed activity must be aftached to this application (see sample drawings and instructions) and be sbrattad la the Dsbrd Egrneer having jurisdiction over the location of the proposed activity- An application dud is not corrploted in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (HEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANTS NAME: 6. AUTHORED AGENTS NAME AND TITLE (alt agent is rot required) First- WMme- last- First- Mxldle- Last - Cerpay- Haut.cr.,.oy.odTwwarm,-wgec n.*w.r a e. m.Mrw,*y Conpany- E-mal Address- E4nad Address- 6. APPLICANTS ADDRESS. 9. AGENTS ADDRESS Address - 1548 Mee Servka Cerra Address - City- wary, State- wen Cwa Zap- 21OW154 COuntry- city- State- zip - Country- 7- APPLICANTS PHONE NOS WIAREA CODE 10- AGENTS PHONE NOS. WIAREA CODE a. Residence b. Business c Fax a. Residence b. Bustriess, c. I= 919-707-6100 919-212-6785 STATEMENT OF AUTHORIZATION 11.1 hereby authorize, to act in ay behalf as nny aged in the prooesirhg of this application and to kxroh, upon requesk yupgnnertal mfwnotion in support of this pemd application. APPLICANTS SIGNATURE DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12 PROJECT NAME OR TITLE pee irsinddbw U-221IB 13. NAME OF WATERBODY, IF KNOWN or accurate) 14. PROJECT STREET ADDRESS (twpeobia) IJTs to Gunpowder Creek Address 15. LOCATION OF PROJECT Lahlade-'N waxiiis City _ State- Zp- Lerxjbde: 'W a,emr 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (se, bennxaxn) Slade Tax Parcel ID Maricipahty section- Town"- Reroe- 17. DIRECTIONS TO THE SITE Please see attached vicinity map and cover letter. ENG FORM 4345, SEPT 2009 EDITION OF OCT 2004 IS OBSOLETE Proponent CECW-OR 19. Nature of Adiviy (0oalpem a prided Maude a hseees) The project will extend SR 1001 (Connelly Springs Road) on new location and realign SR 1178 (Hibrlten Drive) in Lenoir. The project also Indudes constn)cbon of a hat-dower Intercharge st US 321. I twill eltminate a portion of SR 1178, including the existing bridge over US 321. 19. Project Paposc Blmeaeettw remm apeposeatm ROp0. am Fabucdots) The propose of dots poiea Is to eBetiae onpmrin by%4dwft me roods" SW ertl etderWg Candy Sprkge Rnedtommna wah US 321. The papa wall tr"a traffic flow ad eatery done ft Ially and reBae same mgesBOn an LIS 321A In the dwrarom acne gohg tow®d NC 1B by oomteahg wah Hbr ten Odve m m eddNaral rood m NC 1B. The props hrgkrrewds a paten of are Lame Thaaghta, Plan snows kmcUar m an abet oameaa hnpa+hrg eu>ma betwmmi Lenoir and am Ceish Maodeh rm. USE BLOCKS 20-231F DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Disdtage Impacts will result from widening the roadway and shoulders, constructing a new half-clover interchange and lengthening/replacing hydraulic structures within the project area. 21. Type(s) of Material Being Do dharged and the Amamt of Eadr Type in 0 1bic Yards: Type Type Type Ann unt in Cubic Yards Amood on Cubic Yards Amount in C bhc Yards See attached cover titer 22 Swfa Amain Acres d Wetlands o Othw Wafers Figed pm M nxth m) Acres See attached cover facer or Urer Feet 23. Dewipbm of Avoidartce, M aanama iat, and Cmgernabon lees amudbe) See attached cover letter 24. Is Any Poison of the Work Already Complete? Yes 0 No IZI IF YES, DESCRIBE THE COMPLETED WORK( No work associated with U-2211 B has been completed. The A section (U-2211A) was completed in 2003 and was the widening and now bcadon portion of SR 1001 from SR 1933 (Southwest Badevard'loop') to US 321A in Lenoir. 25. Addresses of Adpitl g Properly Dieters, Lessees, Etc, Whose PmpertyA*=Cie Waterbody N none mat rn be adored hose. pies emdta empbnr+a M Address- Please see adjacent properly landowners page in the permit drawing package city- state- Sp- 26. Lai of Other Certifications a ApproralstDerstls Received from other Federal, Sate, or Local Agencies for Work Described "m Ties Appfiwsort. AGENCY TYPE APPROVAL' IDENTIFICATION NUMBER DATEAPPUED DATE APPROVED DATE DENIED ' Wald htrlude buts not rest&.ted m marg. Witting. and rood plain pernuts 27. Application is hereby made for a ponmt or permits to authorize to work described in Uts apptcalim- I certify that the irdommLon in this application is complete and amtate. 1 it~ taffy that I possess the authority to Undertake to work described heron or am acting as the dtdy authorized agent of the applicant- USIGIIIATUPE OF APPLICANT r v pA r E413NATURE PAGFW ec) I I DATE The application mat be signed by the person who desires to Undertake the proposed activity (applicant) or it may be signed by a duly, aauthorized agent if the statement in block 11 has been flied out and sighed. 18 U.S.C. Section 1001 provides that Whoever, in any manner within to Orisddbn of any department or agency dthe United States knowingly and willfully falsifies, toroeels, or covers up any trick, sdeme, or disguises a material fad or makes any false, fictilims or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fiditola or fmUdulont statements or entry, stall be feed not mere than $10,000 or krprismed not more than five yews or both. ENG FORM 4345, SEPT 2009 rI'*-- July 19, 2011 Mr. Gregory J. Thorpe, Ph.D. Manager, Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Dr. Thorpe: Subject: EEP Mitigation Acceptance Letter. U-221 1B, SR 1001 (Hibriten Drive) from US 321A (Norwood Street) to SR 1712 (Oak Hill School Road), Caldwell County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the subject project Based on the information supplied by you on July 14, 2011, the impacts are located in CU 03050101 of the Catawba River Basin in the Northern Mountains (NM) Eco-Region, and are as follows: Catawba Stream Wetlands Buffer (Sq. Ft.) 03050101 Cold Cool Warm Riparian Nn- o Coastal h M Zone 1 Zone 2 NM Rim ars Impacts 0 0 1,252 1 0 0 0 0 0 (feet/acres EEP commits to implementing sufficient compensatory stream mitigation credits to offset the impacts associated with this project in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. If you have any questions or need additional information, please contact Ms. Beth Hannon at 919-715- 1929. Sincerely, ( EEP Deputy Director cc: Mr. Monte Matthews, USACE - Raleigh Regulatory Field Office Mr. Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File: U-221 iB Protectzit? Ow Stag -Aa North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 /www.neeep.net Minutes for Hydraulic Design Review Meeting U-2211B State Project 34783.1.1 SR 101 (Connelly Springs Road) From US 321A (Norwood Street) to SR 11783 (Starcross Road) Caldwell County, Division 11 A Hydraulic Design Review Meeting was held on Wednesday, January 23, 2008 in the Hydraulics Conference Room at the NCDOT Century Center Complex, Raleigh. Team Members: Andrew Nottingham-Hydraulics (Present) Monte Matthews-USACE (Present) Marella Buncick-USFWS (Present) Marla Chambers-NCWRC (Present) Amy Euliss-NCDWQ (Absent) Brian Wrenn-NCDWQ (Absent) Chris Militscher-EPA (Absent) Kathy Matthews-EPA (Absent) Donnie Brew- FHWA (Present) Davis Harris-REU (Absent) Gary Lovering-Roadway Design (Present) Betsy Cox-Structures (Absent) Charles Cox: PDEA (Absent) Carla Dagnino: NEU (Present) Trent Beaver: Division 11 (Present) Participants: Doug Petrey-Structures Michele James-PDEA Erin Cheely-NEU Jennifer Harrod-NEU David Wainwright-NCDWQ Troy Wilson-USFWS David Bocker-Mulkey, Inc. Joe Dudeck-Mulkey, Inc. The meeting began at 11:00 a.m. with introductions initiated by Andrew Notthingham (NCDOT Hydraulics). David Bocker (Mulkey, Inc.) proceeded with the review of the project as follows: General Items • All waters within the project are Class `C' (suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture). • Project falls within the Catawba River Basin; but since the project is not on the main stem of the Catawba River riparian buffer rules are not applicable. • Grass Swale treatment will occur throughout the project in the median and in areas where flat slopes can be maintained. • Pre-formed scour holes will also be utilized as treatment measures where feasible. • Proposed culverts will be buried 1 ft to provide for fish passage. Cross pipes in jurisdictional intermittent streams will be buried lft culverts greater than 48 inches and 20% of the pipe diameter for culvert less than 48 inches in diameter. Sheet 4 No jurisdictional streams or wetlands; therefore, no impacts Sheet 5 • Proposed design will tie into existing 42" Storm Drainage system that directly discharges into Gunpowder Creek @ the 12'x8' RCBC under Norwood St. At that point, most of this drainage basin is impervious, therefore widening of the existing roads should not adversely impact the jurisdictional waters at the outlet of this system. Sheet 6 • Wetland impacts; total take is unavoidable due to roadway alignment/intersection/interchange. • Stream impacts - Upstream/Downstream of Culvert Extension @ -Y5- U.S. 321 through -Y4- Berkley St. as well as under Loop C & Ramp C. There will be several direct discharges points into the proposed culvert extension in the interchange area. • Several concerns from NCWRC about the added storm water from the interchange added to culvert. Currently, the area is heavily wooded; the proposed interchange will change to pavement & grass surfaces resulting in changes to the water quality of the creek. • The use of multiple baffles within the culvert and up-sizing culvert (7'x8') to accommodate was discussed to provide energy dissipation within the culvert. • Having one long culvert from loop "C" to "Y4" was agreed to be a viable option and will be pursued during the design phase. • Mulkey will investigate use of stormwater detention in loops prior to discharge into the proposed culvert (Gunpowder Creek). Sheet 7 • Stream impacts - Upstream and Downstream of existing culvert under -Y9- Starcross Rd. culvert replacement necessary due to intersection improvements. • Intermittent Stream Impacts - Upstream of existing 24" CMP, due to roadway widening. • Concern of stability at the outlet of the proposed 54" RCP was expressed, it was explained that the pipe outlet will be located at the stream bed elevation. The current 24" CMP outlet is 3-4 feet above the creek bank. It was also explained that a head ditch would be required on the upstream end of the proposed 54" RCP due to the cross pipe layout and grade of the roadway in this location. • NEU mentioned that they would further investigate whether or not this is a jurisdictional stream. Sheets 8, 9, & 10 • No jurisdictional streams or wetlands, therefore, no impacts. Sheet 11 • Stream Impacts -Downstream of Culvert Extension @ -Y5- U.S. 321 and -Y4- (Berkley St.) due to roadway realignment. • No jurisdictional stream or wetlands; therefore, no impacts. Minutes for Permit Drawing Review Meeting U-2211B State Project 34783.1.1 SR 1001 (Connelly Springs Road) From US 321A (Norwood Street) to SR 1783 (Starcross Road) Caldwell County, Division 11 A 4C Permit Drawing Review Meeting was held on Wednesday, May 13, 2009 in the Hydraulics Conference Room at the NCDOT Century Center Complex, Raleigh. Team Members: Andrew Nottingham - Hydraulics (Present) Monte Matthews - USACE (Present) Marella Buncick - USFWS (Conference Call) Marla Chambers - NCWRC (Conference Call) Amy Euliss - NCDWQ (Present) Kathy Matthews -EPA (Absent) Jake Riggsbee - FHWA (Absent) David Hams - REU (Absent) Gary Lovering - Roadway (Absent) Betsy Cox - Structures (Present) Charles Cox - PDEA (Absent) Carla Dagnino - NEU (Absent) Trent Beaver - Division 11 (Present) Participants: Chris Militscher - EPA Donnie Brew - FHWA Ron McCollum - Roadway Tina Snell - Roadway Christy Alford - Structures Erin Cheely - NEU Michael Turchy - NEU Mark Staley - REU David Bocker - Mulkey, Inc. The meeting began at 11:00 a.m. with introductions initiated by Andrew Nottingham (NCDOT Hydraulics). David Bocker (Mulkey, Inc.) proceeded with the review of the project as follows: General Items • All waters within the project are Class `C' (suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture). • Project falls within the Catawba River Basin; but since the project is not on the main stem of the Catawba River riparian buffer rules are not applicable. Sheet 6 • Wetland impacts; total take is unavoidable due to proposed roadway alignment/intersection/interchange. • Stream impacts - Upstream/Downstream of Culvert Extension @ -YS- U.S. 321 through -Y4- Berkley St. as well as under Loop C & Ramp C. • In addition to the culvert extension, a 60" floodplain pipe is required to meet FEMA requirements. The 60" pipe inlet is located within the channel on a proposed bench to the left of the box culvert inlet (looking downstream). • A dry-detention pond has been provided within Loop C to provide treatment of stormwater runoff prior to discharge into the proposed culvert extension. • It was found that the gore area and loop on the west side of US 321 are not conducive to detention ponds due to the steep grades. Sheet 7 • Stream impacts - Upstream and Downstream of existing culvert under -Y9- Starcross Rd. culvert replacement necessary due to intersection improvements. • The proposed culvert under Starcross Rd. was aligned to minimize the bend in UTI to Gunpowder Creek which will improve bank stability. • Intermittent Stream Impacts - Upstream of existing 24" CMP (UT2 to Gunpowder Creek), due to roadway widening. • Pre-formed scour holes have been utilized at the outlet of several storm drainage systems to provide treatment prior to discharge into UTI to Gunpowder Creek. • Concern was expressed regarding the proposed head ditch upstream (within the intermittent stream - UT2 to Gunpowder Creek) of the proposed 54" RCP and placement of Class `B' riprap in the bed of the channel. It was explained that the riprap was utilized due to the steep slope of the head ditch (4.8%) and to prevent possible "head-cutting" and long-term erosion that would require future stabilization by DOT maintenance staff. It was agreed to retain the proposed design utilizing Class `B' riprap. Sheet 11 Stream Impacts - Downstream of Culvert Extension @ -YS- U.S. 321 and -Y4- (Berkley St.) due to roadway realignment. The downstream extension of the existing 7'x7' box culvert under US 321 consists of a 7'x8' box culvert utilizing 1 ft high sills spaced @ 20' intervals to provide energy dissipation within the proposed culvert extension thus reducing the velocity and subsequently reducing potential erosion at the culvert outlet. It was requested that "alternating" baffles be utilized to promote fish passage. Alternating sills would consist of a V high sill for half the width of the culvert and 0.5' high sill for the other half of the width of the culvert. These different heights will be alternated at each sill. The design of the box culvert extension will be modified to reflect these alternating sills as requested. The 60" floodplain pipe outlet is located within the channel on a proposed bench to the left of the box culvert inlet (looking downstream). APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): B. DISTRICT OFFICE, FILE NAME, AND NUMBER: C. PROJECT LOCATION AND BACKGROUND INFORMATION: State: North Carolina County/parish/borough: Caldwell City: Lenoir Center coordinates of site (lat/long in degree decimal format): Lat. 35.89068° ff Long. -81.519780 jR,. Universal Transverse Mercator: Name of nearest waterbody: Gunpowder Creek Name of nearest Traditional Navigable Water G NW) into which the aquatic resource flows: Catawba River/Lake Hickory Name of watershed or Hydrologic Unit Code (HUC): 03050101 Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request. Check if other sites (e.g., offsite mitigation sites, disposal sites, etc...) are associated with this action and are recorded on a different JD form. D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): Q Office (Desk) Determination. Date: Q Field Determination. Date(s): SECTION II: SUMMARY OF FINDINGS A. RHA SECTION 10 DETERMINATION OF JURISDICTION. Therer °`a" "navigable waters of the US." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the review area. [Required] Waters subject to the ebb and flow of the tide. Waters are presently used, or have been used in the past, or maybe susceptible for use to transport interstate or foreign commerce. Explain: B. CWA SECTION 404 DETERMINATION OF JURISDICTION. There rr "waters ofthe US" within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required] 1. Waters of the U.S. a. Indicate presence of waters of U.S. in review area (check all that apply):' ct TNWs, including territorial seas u Wetlands adjacent toTNWs Relatively permanent waters= (RPWs) that flow directly or indirectly into TNWs rP Non-RPWs that flow directly or indirectly into TNWs Wetlands directly abutting RPWs that flow directly or indirectly into TNWs Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs t: Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs Impoundments of jurisdictional waters ae Isolated (interstate or intrastate) waters, including isolated wetlands b. Identify (estimate) size of waters of the U.S. in the review area: Non-wetland waters: 3,350 linear feet: 2-10 width (ft) and/or acres. Wetlands: 0.24 acres. c. Limits (boundaries) of jurisdiction based on: jEsta IishedW0 Elevation of established OHWM (if known): 2. Non-regulated waters/wetlands (check if applicable):3 Q Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional. Explain: Boxes checked below shall be supported by completing ihe appropriate sections in Section III below. ' For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least "seasonally" (e.g., typically 3 montts). ' Supporting documentation is presented in Section III.F. SECTION 111: CWA ANALYSIS A. TNWs AND WETLANDS ADJACENT TO TNWs The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete Section III.A.1 and Section III.D.I. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections III.A.1 and 2 and Section III.D.1.; otherwise, see Section HIM below. 1. TNW Identify TNW: Summarize rationale supporting determination: 2. Wetland adjacent to TNW Summarize rationale supporting conclusion that wetland is "adjacent": B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY): This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps determine whether or not the standards for jurisdiction established under Rapenos have been met. The agencies will assert jurisdiction over non-navigable tributaries of TNWs where the tributaries are "relatively permanent waters" (RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3 months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round (perennial) flow, skip to Section III.D.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow, skip to Section III.D.4. A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and EPA regions will include in the record any available information that documents the existence of a significant nexus between a relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even though a significant nexus finding is not required as a matter of law. If the waterbody is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section IH.B.I for the tributary, Section IH.B.2 for any onsite wetlands, and Section III.B.3 for all wetlands adjacent to that tributary, both onsite and offsite. The determination whether a significant nexus exists is determined in Section IILC below. 1. Characteristics of non-TNWs that flow directly or indirectly into TNW (i) General Area Conditions: Watershed size: Is Drainage area: Average annual rainfall: inches Average annual snowfall: inches (ii) Physical Characteristics: (a) Relationship with TNW: ? Tributary flows directly into TNW. ? Tributary flows through ,iekISi tributaries before entering TNW. Project waters are Pi)cklc;„. river miles from TNW. Project waters are river miles from RPW. Project waters are ®R' aerial (straight) miles from TNW. Project waters are aerial (straight) miles from RPW. Project waters cross or serve as state boundaries. Explain: Identify flow route to TNWs: Tributary stream order, if known: ' Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the avid West. I Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into trbutary b, which then flows into TNW. (b) General Tributary Characteristics (check all that aoolv): Tributary is: ? Natural ? Artificial (man-made). Explain: ? Manipulated (man-altered). Explain: Tributary properties with respect to top of bank (estimate): Average width: feet Average depth: feet Average side slopes: Piek:Lis Primary tributary substrate composition (check all that apply): ? Silts ? Sands ? Concrete ? Cobbles ? Gravel ? Muck ? Bedrock ? Vegetation. Type/0/6 cover: ? Other. Explain: Tributary condition/stability [e.g., highly eroding, sloughing banks]. Explain: Presence of run/riffle/ op of complexes. Explain: Tributary geometry: ek+IIi Tributary gradient (approximate average slope): % (c) Flow: Tributary provides for: -tek Estimate average number of flow events in review area/yew: Describe flow regime: Other information on duration and volume: Surface flow is: iekt =is . Characteristics: Subsurface flow: c i t. Explain findings: ? Dye (or other) test performed: Tributary has (check all that apply): ? Bed and banks ? OHWM6 (check all indicators that apply): ? clear, natural line impressed on the bank ? ? changes in the character of soil ? ? shelving ? ? vegetation matted down, bent, or absent ? ? leaf litter disturbed or washed away ? ? sediment deposition ? ? water staining ? ? other (list): the presence of litter and debris destruction of terrestrial vegetation the presence of wrack line sediment sorting scour multiple observed or predicted flow events abrupt change in plant community ? Discontinuous OHWM.r Explain: If factors other than the OHWM were used to der= El High Tide Line indicated by: ? oil or scum line along shore objects ? fine shell or debris deposits (foreshore) ? physical markings/characteristics ? tidal gauges ? other (list): ne lateral extent of CWA jurisdiction (check all that apply) Mean High Water Mark indicated by: ? survey to available datum; ? physical markings; ? vegetation lines/changes in vegetation types. (iii) Chemical Characteristics: Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed characteristics, etc.). Explain: Identify specific pollutants, if known: "A natural or man-made discontinuity in the OHWM does not necessarily severjurisdiction (e.g., where the stream temporarily flaws underground, or where the OHWM has been removed by development or agriculLral practices). Where there is a break in the OHWM that is unrelated to the waterbody's flow regime (e.g., flow over a rock otacrop or through a culvert), the agencies will look for indicators of flow above and below the break 7Ibid. (iv) Biological Characteristics. Channel supports (check all that apply): ? Riparian corridor. Characteristics (type, average width): ? Wetland fringe. Characteristics: . ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatic/wildlife diversity. Explain findings: 2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW (i) Physical Characteristics: (a) General Wetland Characteristics: Properties: Wetland size: acres Wetland type. Explain: Wetland quality. Explain: Project wetlands cross or serve as state boundaries. Explain: (b) General Flow Relationship with Non-TNW: Flow is. lRNW. Explain: Surface flow is: EON Characteristics: Subsurface flow: . ffi. Explain findings: ? Dye (or other) test performed: (c) Wetland Adiacencv Determination with Non-TNW: ? Directly abutting ? Not directly abutting ? Discrete wetland hydrologic connection. Explain: ? Ecological connection. Explain: ? Separated by berm/barrier. Explain: (d) Proximity (Relationship) to TNW Project wetlands are , river miles from TNW. Project waters are aerial (straight) miles from TNW. Flow is from: Estimate approximate location of wetland as within the MEM floodplain. (ii) Chemical Characteristics: Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed characteristics; etc.). Explain: Identify specific pollutants, if known: (iii) Biological Characteristics. Wetland supports (check all that apply): ? Riparian buffer. Characteristics (type, average width): ? Vegetation type/percent cover. Explain: ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatidwildlife diversity. Explain findings: 3. Characteristics of all wetlands adjacent to the tributary (if an All wetland(s) being considered in the cumulative analysis: Approximately ( ) acres in total are being considered in the cumulative analysis. For each wetland, specify the following: Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres) Summarize overall biological, chemical and physical functions being performed: C. SIGNIFICANT NEXUS DETERMINATION A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW. Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a tributary and its adjacent wetland or between a tributary and the TNW).,Similarly, the fact an adjacent wetland lies within or outside of a floodplain is not solely determinative of significant nexus. Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and discussed in the Instructional Guidebook Factors to consider include, for example: • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to TNWs, or to reduce the amount of pollutants or flood waters reaching a TNW? • Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW? • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that support downstream foodwebs? • Does the tributary, in combination with its adjacent wetlands (if arty), have other relationships to the physical, chemical, or biological integrity of the TNW? Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented below: 1. Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section IB.D: 2. Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section III.D: 3. Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section ID.D: D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL THAT APPLY): 1. TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area: [oil TNWs: li near feet width (ft), Or, acres. ft Wetlands adjacent toTNWs: acres. 2. RPWs that flow directly or indirectly into TNWs. ® Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that tributary is perennial: UTI scored >30 on NCDWQ Stream ID form. Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g., typically three months each year) are jurisdictional. Data supporting this conclusion is provided at Section III.B. Provide rationale indicating that tributary flows seasonally: UT2 scored >19 and <30 on NCDWQ Stream ID form.. Provide estimates for jurisdictional waters in the review area (check all that apply): ® Tributary waters: 3,350 linear feet 2-10 width (ft). Other non-wetland waters: acres. Identify type(s) of waters: 3. Non-RPWs° that flow directly or indirectly into TNWs. El Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has asignificant nexus with a TNW is jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional waters within the review area (check all that apply): Q Tributary waters: linear feet width (ft). 0 Other non-wetland waters: acres. Identify type(s) of waters: 4. Wetlands directly abutting an RPW that flow directly or indirectly into TNWs. ta Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands. ® Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Located along the floodplain of UTI. Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is seasonal in Section III.B and rationale in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Provide acreage estimates for jurisdictional wetlands in the review area: 0.24 acres. 5. Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TNWs. QQ Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisddcctional. Data supporting this conclusion is provided at Section III.C. Provide acreage estimates for jurisdictional wetlands in the review area: acres. 6. Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs. Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional wetlands in the review area: acres. 7. Impoundments of jurisdictional waters! As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional. Demonstrate that impoundment was created from "Seaters of the U.S.," or o Demonstrate that water meets the criteria for one of the categories presented above (1-6), or A Demonstrate that water is isolated with a nexus to commerce (see E below). E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE, DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY SUCH WATERS (CHECK ALL THAT APPLY):10 which are or could be used by interstate or foreign travelers for recreational or other purposes. sa from which fish or shellfish are or could be taken and sold in interstate or foreign commerce. R which are or could be used for industrial purposes by industries in interstate commerce. c Interstate isolated waters. Explain: Other factors. Explain: Identify water body and summarize rationale supporting determination: 'See Footnote N 3. To complete the analysis refer to the key in Section III.D.6 of the Instructional Guidebook. 10 Prior to asserting or declining CWA jurisdiction based witty on this category, Corps Districts will elevate the action to Corps and EPA HQ for review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Following Rapanos. Provide estimates for jurisdictional waters in the review area (check all that apply): Tributary waters: linear feet widt It (ft). Other non-wetland waters: acres. Identify type(s) of waters: Wetlands: acres. NON-JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY): If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers Wetland Delineation Manual and/or appropriate Regional Supplements. (] Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce. ? Prior to the Jan 2001 Supreme Court decision in "SWANCC," the review area would have been regulated based solely on the "Migratory Bird Rule" (MBR). R Waters do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction. Explain: Q Other: (explain, if not covered above): Provide acreage estimates for non-jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional 'udgment (check all that apply): Non-wetland waters (i.e., rivers, streams): li near feet width (ft). Lakes/ponds: acres. to Other non-wetland waters: acres. List type of aquatic resource: Wetlands: acres. Provide acreage estimates for non jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction (check all that apply): Non-wetland waters (i.e., rivers, streams): li near feet, width (ft). Lakestponds: acres. Other non-wetland waters: acres. List type of aquatic resource: Wetlands: acres. SECTION IV: DATA SOURCES. A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked and requested, appropriately reference sources below): Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Data sheets prepared/submitted by or on behalf of the applicant/consultant. ? Office concurs with data sheets/delineation report. ? Office does not concur with data sheets/delineation report. Data sheets prepared by the Corps: Corps navigable waters' study: U.S. Geological Survey Hydrologic Atlas: ? USGS NHD data ? USGS 8 and 12 digit HUC maps. 2E U.S. Geological Survey map(s). Cite scale & quad name: USDA Natural Resources Conservation Service Soil Survey. Citation: National wetlands inventory map(s). Cite name: State/Local wetland inventory map(s): FEMA/FIRM maps: sy 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) s Photographs: ? Aerial (Name & Date): or ? Other (Name & Date): Previous determination(s). File no. and date of response letter: ® Applicabletsupporting case law: ??' Applicabletsupporting scientific literature: Q Other information (please specify): B. ADDITIONAL COMMENTS TO SUPPORT JD: STORMWATER MANAGEMENT PLAN WBS No. (State Project No.): 34783.1 TIP Project: U-2211B Caldwell County, North Carolina Hydraulics Project Engineer: David P. NCDOT Hydraulics Project Engineer: Project Description: August 21, 2009 Bocker, PE Andrew T. Nottingham, PE This proposed project includes widening the existing two lane shoulder section to four lane divided curb & gutter section on SR 1001 (Connelly Springs Road) from US 321A (Norwood Street) to SRI 712 (Starcross Road) east of US 321A. The project is a proposed upgrade of theiexisting two lane road, an addition of an interchange on US 321, and a replacement of the SR 1001 bridge over US 321. The overall project is 0.9 mile in length. There are 2 existing crossings of UTl to Gunpowder Creek and 1 existing crossing of UT2 to Gunpowder Creek, all of which will be upgraded and extended. Environmental Description This project is located in the Catawba Basin, but since the project is not on the main stem of the Catawba River, riparian buffer rules are not applicable. UT 1 and UT2 to Gunpowder Creek are classified as class C streams and are not on the 303(d) list for impaired streams. There are a total of 5 permitted sites on the project, with permanent impacts totaling 1252 feet of stream and 0.24 acres of wetlands. Roadway Description: The proposed roadway cross section is a 4-lane facility with divided median or concrete island, consisting of 12 foot travel lanes. Several areas along the mainline at intersections also consist of additional turn lanes required for traffic circulation. The project drainage system will consist mainly of storm drainage systems, ditches and cross pipes. Berm drainage outlets will be used in order to pick up off site drainage at the top of the high cut slopes. The berm drainage outlets will discharge into a 2GI along the bottom of the cut slope. The 2GI will connect into a storm system and outlet into a ditch. Shoulder berm gutter will be utilized in areas of high fill and/or excessive runoff. In these instances, the runoff will be collected in a 2GI and discharged into a preformed scour hole, ditch or stream. Page 1 of 2 U-2211B Stormwater Management Plan 8/20/2009 Best Management Practices and Major Structures: The primary goal of Best Management Practices (BMPs) is to prevent degradation of the states surface waters by the location, construction and operation of the highway system. The BMPs are activities, practices, and procedures taken to prevent or reduce stormwater pollution. The BMP measures to be used on this project to reduce stormwater impacts are: • Major Structures Station -Y5- 31+08 Existing 7'x7' reinforced concrete box culvert under US 321 will be retained and extended downstream for approximately 214' and upstream for approximately 646'. Multiple baffles will be utilized within the downstream portion of the culvert extension to provide energy dissipation within the culvert. A 60" floodplain pipe under US 321 will be required to meet FEMA requirements. A benched channel at the inlet and outlet will be utilized to maintain low flow. Station -Y9- 10+94 Existing 72" Corrugated Metal Pipe will be replaced with an 8'x8' reinforced concrete box culvert under Starcross Road. The culvert will be buried one foot to promote fish passage. Extended Dry Detention Pond The interior of Loop C will be utilized as a dry-extended detention pond to provide treatment of stormwater runoff prior to discharging into the proposed box culvert extension. The interior of Loop B was not conducive to provide stormwater detention due to its small area and extreme slopes. • Roadside Ditches The majority of roadside ditches on this project were unable to obtain a 3:1 slope or flatter due to the physical constraints of the mountainous topography. Most ditches on this project were lined with rip rap in order to control erosion. • Rip Rap Pads & Preformed Scour Holes Rip Rap pads and Preformed Scour Holes were used in order to dissipate energy and reduce velocities at pipe outlets. These structures are located throughout the project. • Cross Pipes in order to allow for fish passage, cross pipes will be buried a minimum of 20% of the diameter of the proposed pipe size, up to and including 48" diameter. Pipes greater than 48" will be buried 1 foot. Page 2 of 2 PROPERTY OWNERS NAMES AND ADDRESSES NAMES ADDRESSES 16 THOMAS SHUFORD & 1229 CAMELOT CT SYBIL BUFF LENOIR, NC 28645 22 NELLIE JACKSON BLAIR 3144 STONEY BROOK DR LENOIR, NC 28645 30 LILLIAN WALDROP LIVING TRUST AGREEMENT 4-2-04 BRUNSWICK, OH 44212 31 ELIZABETH C CRAVEN 2785 SMOKEY CREEK RD LENOIR, NC 28645 34 RENEE TRIPLETT 1508 STARCROSS RD LENOIR, NC 28645 35 CAROLE K. SWEAT ET AL 1305 HIBRITEN DR SE LENOIR, NC 28645 36 JOSEPH A GOMEZ A/W 527 N BOUNDARY ST RALEIGH, NC 27604 38 EDWIN DUARD PRICE PRICE JOHN ALLEN & MARK TODD DENVER, NC 28037 60 CALDWELL GARDENS P.O.BOX 1526 HOUSING INC. LENOIR, NC 28645 61 WILLIAM HARTLEY & 1514 WINDSOR ST. STEPHEN ICENHOUR LENOIR, NC 28645 NCDOT DIVISION OF HIGHWAYS CALDWELL COUNTY PROJECT: 34783.1.1 (U-2211B) SR 1001 (CONNELLY SPRINGS RD) FROM US 321A (NORWOOD STS TO SR 1712 Permit Drawing (STARCROSS RDA EAST OF US $21 Sheet 2 p{ I SHEET OF 08/13/2008 N C W ' O 2 N N O d j y N D m N m Z N m n W u U% W m< N d 6 EE d N r C O 'i t E~ 4 u t i 0 a o ? ^ C m Z C C Zj C m C H N Ol O ? O <? N ? y O ? A 1? C < L d u?UE v W ? N K G a <o a ? m o m L 0 0 z z E d m W E d c o 0 0 c 0 H w w C T- ? -- b € - - to c'mcmd m ._ m V ? U Q CL a m F q q « d m ? 5?3 W ~ ? C a o a 5 c m 3 W 3 m a E- 10 m ? lL d 3 C m C ? C < ? N m_ N N €LL N ° 3 a BD X F. 0 m m 0 0 0 0 d 2 = m N N d ? m N d Ti ? m m y m ;; , g K q K 2 d ? : 3 v m co p o fp m K 0 N W U Y Y Y I Y m m m c m m m N m Cd m m F- x "r lC K H H 7 F-1- : Q J J v W ? ' O C N ? J K N (7 O N + 1- W R f ? K 4 N O Q N t0 + + O < h W N W O F N i l g N O N i pa P Permit Drawing + c=v I +m » N < i i Sheet 3 of I =c. i N ? U a J J LL F O ? 2 N f70 a ?n C Z O 0 SSSSS 89/88/99 SSSSUSERNAMESSSS rCO11lTRACT: TIP PROJECT: U-2211B u T ? N ?r ? f O ? O O a u "OD mZ y ?? b m m !(p?j M M Z a - y _ ° O N N N - y N _ N m? {. y >C R u > ? V E H = m Z ;O (? ?i cD D ? l A o O • c d n N n i ntl tl II tl tl tl tl O imno OC C ?m p A p O A P o v„1 ? as X R Z 0 p M 1~?. 17 • u A :k 3: •I i o Ir V t ? ? ' O m O r ? _ _ \ pp C 3 y,, D', r Z 1 Z Gl m Z A y S a ? ? te' J_ - ? ? . M' Z ti w = '? I g? 8 'm am w I. 0 ? lV ,'r a m N y y „ Q7 8 r 3 ~ ( ? y M m O m y t? °y m g g Q `^" yV ? '1y?d !9 c I a C O m tl A m N m L C) tl tl ? ?, . ? x l ? z M m N 8 6 y O 0 P?0 E H ? ? we SP ? b y x " C ? m a b 03 m n N ?'C b N f z m z : • Q / ?y 0 o ? ? M =x ?g u8 m ? ? x z b u m t" Goi 1 70 • g 4 G) 4 ` ? J~ < ,' n --? Vi N O o y o j ? y (A y 2=5v S 9 -? 8 a CA o o 72 m M y / !q G C Y/? < h J a y e. sa3 tv '? b my ! na ? C y N a? 8 to 8 x /_ ? `77, ` y m t ? C N c \ I NAD 8395 C a p @ &'? P ? Cr > @ CI y m aa 3 F F ? B/V/991?i :z[YSTIYFf fff{ .... +00.00 ST A. SHE ° ET 5 M.,TCHUNE SEE \ \ \\\ \\\ \\\\\\ ° ° i P e „IN F? as -og sue,[ ?!? ? '[ ?IIII T3 J` I, / I $ -5Nn ?\ ?o ovt ?- 1 .;a P9 S I IIOiY / ^ ? ? ? ? \ _ o \ \ p? ?; i ens o I - Q h 2 -- v? 2 ue mz of m t m i. r? o r ^ a? _ 15B 1oN .QC ? a IJl / 4S pp - - n N te \ I °° I I. a a n 5 a F-ri x? ms a * ' / 4jy F sot/ i; lad \ v /? R A Zs - / / o OF I ?-E i7 I S 1,1,40 p N? UNF / _a sFF s F / ? s? ? ° ?ra ?zo J ?? s m y m p of i'..4???A0 / 4 ll2?iSSl?1,^F:.::r}cu????ss?>taa?s?? eivisa r? oA 3 / n} ?? $ EVa Ln m i I A I I WV ?o s, ?3 - v n _ z t ass 4 ? I ,t KE I ? I ?€ PN. y/ or ? n u \ C _ _ 'rte,, - - c o m m _ o n y A . 0 s n? WAIT t Y ns ?` 8 I M1 \ f 7 \ 1 C 40 f d B? g'Z ?? ci ? M fl o SFE SH ? ? FE „€ r ? ?? rr ?? ? T _?` / ^ H ? AC O19 a 42?1L.M ? i o zr CD W 3 I U YV vjI 5 S 1 4 O S m W 0 n N O i. j.. ?kVL901d f F '???NE SEE SyEET 6 -L- STq 42`00 np? 10 3 3 e ? O? ? ? m u ??11IIph$`?? ? ? ? "? ? teI Or / =?TJ 9A Ia*: I ? p R ? m ? - - all o ° - 0 45 ?I• N 4? 9 ? n• ? y ? Y S m A I Q o p ca v 0 10 I ; n; -Im O I $I\ ? $ ?o F ,r I o? a 1 , _?\ \?_ ? \ I o „ ? ?, ? s ? o ? ? X02 ?6, \ Az A 1 N m A/\• ?,?? ?? I P p NN c ? ? _? 00 o ' \ y a \ z3€ ` 4 Mr4 m ?y5 ? ?a F." ?r??? s?s? fob '£?Qm? T--j O AO x?) i? : Vlr?m P ?? z ' 1 I I m o m?mm =b ?? • lz ?o n?i?N4 y m np va I I ! I i I I I c? ;NflSSffil SfSSfSJf 8/V/9 t a d 1 3 V MgTCHL/NE SE- E SHEET _ 6 ST _? A 4 \ 2f0 .00 - I r ? r '?i E t't I r - r, f - (-Aj 4S a ? 3 I ?v I? 9 / 11 i p if ? a of if m a s? ez IRA w i?N? m y w {v 1 I f t MAY 7.MO - R/W R£VISA'.W'S - PARCEL PP.COMR/NED PARCEL 55 WITH PALM PP WD CRAK.ED THE OWNER NAYErPAWEL %CHANGED OWNER MWE AWES W 55 99TT [[ RECD EXISTING R/W 5 FEET AND MADE THE EXISTING R/W COMTAMLED ACCESS. tfff i3if t{DGNSHttitf iit{ii{{ B/17/°. I MATCHLINE SEE SHEET 6 -Y5- STA3I+OOAO / sT?2 00 0? FSY„p /f? of 'r ? / A / •' o . It'. ,' ? ? I ? I ? of ? •? S: It o I I I ?: ln? 1 F /. I I:o' / ? ' a / N F a I ?e ?. II ,? Q S5 / ? ff =. I I I I ? ? r = v N y I I ?. e I I If p, .. ee ? ? ? e 1 ? t1 !??o?// ? III o? / a II , II I? it i? as / ' -.b II II s. I I I ° 6-P a r 1 ?? 11 ? ?, /,/?• Q I?' Nrro St, ? II o€ I ??/?? ? m? u ? 13 91 II Gal l I ? Q m o I ? I Gil \ 7 / p oI ° IY - - I N - to 71111 II u r o List ----, II I II 11 ?. / a I - I-' III 1 ., , I I uvarora pl YAM T.AOA) RM REV/S5 -PARCEL DE THE INE I PARCEL 55 WITH PPARCEL PP AND CNMK£D THE OWNER NAYFrPMCFL 54CNM'CED OWNER NAYE?PARCE[S 62 & 63. REp/CEO EXISTING R/W 5 FEET AND YAL1 THE EX/5T/NC RiW CONTROLLED ACCESS. t t MATCHUNE SEE SHEET 6 -Y5- STA3/i00.00 6 4Pj ? x \ I Q 4tm,\ L? N m i 3 3 4 ?r lil 'i?g I I s S ?p A I ' ? 1 11 e 1 4 , I I ? I ?I !1 ? - r n I -' IK I ? 'JI I ua .>/' -T ; l 1 0 i 1 {r I III ?I 0 I yy L \ ?? ?u I ? 1 I I ? ?a 1 I 1 o - i I I ? .p y / I I I IAM1 \ / u 1 ? I C / 11 "? I 'p \ \ S p7 i G ? F C O? r ax gA tsttsf$15 ilMppEif f i $ 11E SEEMAM ttt f fLLNttYSitisistitsst 8/231 I E 1 I I I I O O I I I I _ O ?i I I O O ? I I f I ° ? ° I a I I I o ° I I I i ' I I I ?. f II I I I i ; ? ? ? o o l I , I ? ? I I I I T N ' N I N P I m O m ° r p N V I O 0 I I ' ? I I I I I N N I O ?' ° ' L I I I I I I i. I I I ' I I I ! I I 7 I I ti N _ T I ik m* I I m 1„ ? I N ? I z + o ° c o ° -S m I s I I I I ? I o I ° z I I ? e Z ° O I ? I r co x i o I 1 ? 1 ? I o 'I Sssss{$S{YpS TIMES Sttt S58fIl5E8NAMEf Ef fL L rttsiHesste Hii6 8/23/9° I O ° I O ? I N ? 1 O O _ I ? ' I O O ° I: I I ? ? o I ? I I 'III I 1 87.29 I 1289.6 ' ' I I ° I II ? ° 4 I 8 I it ? ? J I'l i i i W ? / , 1lJ ? I + / N .. P O P O I V O N O N N I II II I / O I ° O I I I 1 11 N TI N I I Ili I ? I .ti I i I I 0 N m I, o = I c ? ° ?I I a Q: II ? I z o ff9 >: I z ° z I I I a o Z o i I I ? I 1 I ? I o 'I ri I I I I I t Ell it FA ?w v 5/23/2811 N m J m 'g Oil H r e 0 OR r ? i ,I t ) , ffigg E ; f ; _ {$ (i I N O O I i __a I N N :q m -A cn C? 2A-MAY-201110:19 1 r:\roadwayy\proII\u2211b-rdy-tsh.dgn 89108/99 $$SEIbERNAME$$ VI 11CONTWACT- TIP PROJECT: U-2211B J O ? O Mn _2 rr N A N ? r N ? N V n_ m "'A.DDD T C _ n n e i 22 O Q O H 4j O u s W M r r I (n 4 z N ?. i i r ° Elm ] T z n I gg R mow 3 § b ~ n < O o 0 ti C Z N O< p n p II OC M x II III II II II A p O A P a C 2 rm 4t 3 I? P V "1 R iR OO A a ya ` QZ x A _ w . R N Q ? ? I m m Z Z r m 2 Q y I z x O „ ti v 9 Q n c N r o 0 0 0 m H J? ?I pG] m N _"1 p x 9n m 1 i n? 2 I M O 0 m y N N P Q O m w e =S W x O y y FE 'G ~ z li7 c C) ki g O k A k4 I r w ti b n b yz b ti N C n ? yy yyy 17 ID v a n O' ?C u n E a m y ?l c f9, ® M > ? cn 0-4 9 I 0 (7 '? i . a s C 5 N a 5 W a 1 .. s f 1 `1I t I II i I ? II G ? II aT l II m ? Z .y ,: o II i _ II ' DTI II II II II I I Y ! -N 5 T Ic N N O MM Q s o N Z ti t Z N 0 O ? J I O m O v o 0 o A A A 0 C, n n o n M m m N j N A W N O m v W N A W N ut A W 1 "m O<a ° y D y a% S? t? Ty SY? 1 my9 r >ya 1a mya ?1? Y? wya >19 Y » Y9 ya < <a Oa p m 1 l V A i V m % i >% O 1 ? n TO ? _» O mV >v Tt? ?'? >% = t > ta t ? = ? i Z yt w ? ? r [ F ? [ fi>< m>) >) A>< ?» 1> >< ?>) >>< r » )1 9 ?< e s<> a 9 '-a C i>t f> » 9 m9 m1 TYa mi mi oma AL iO T? mi m9 YO-°? T YO?T ? OA9 Aa m1 oA y y O- A % O% s O% mi ! TN . % LO% rmn y %% TT % l P 9Z ey -?? >Y " "? > O y m ' i Z y °` ? S9 _ < 90 i9 _ Y t _ 0 > r <qi . > m,•s• <yz + m >S n y x m n <P m m 7-5 Y Z > w z Y> _ s = > ' y s m m m m m m s mTS m s m ° o >1 °>m >V >? 9 a O? .% m e a em 9 Oa T ss O 09 '1 Ti T9 Te >O w< <Z % wGZ <? < pZ> 7 > m'> T a 9 T> y1 z > y y r Y r ? 01 f >? 0 Z » y Z >? OY S Or YOy 01 ° O? m "mn O" °f m Y»" a m? a '? O M> ° 0? 0 . G ` m Po Y p Q O Y O O Y 0 0 ? ° Y p " » ° i n ai ? se az s mz me _? am OOmo °mo mmi mmmo °mo amen is s ?o ?? io ?a g ma m% ? T ma Mme i . ? Z ? ° N ? . A ? P ? v A Om !?T ? T IOT - TN yTA O O pm ? 9, a.. im m i ym y a S (e » y w W w n 0C r 02 T m 0 0? N O mmC 0 oD 0» O T V 0> O? 0 Om. om m 0 P1 P Y 09 °i °0 09 °a C 9 C > O m° ' L <° m as '? ?? <v? ? ?a^ a? a> Aa^ a? a>> a^ a^ <; ? D as °° as ° c as - - °mo p mo °m p m s . % - n ' i % c »• i v i P ° o ivy ws c ..s Z A A'm n m P ?> ee en » w 9 a 9 L ia zc 9 O G i y- Y9w T a ?D 9P 9 Z9? O m9 i C 0 ( 1 y 9 y > y y y s 0 0 O wm 00 » m t [>f? r ?» A r L "» ? Q ( < O a< < < . wpC °C °C p; °» Z - pY Z pY ZY _ m : °m : » o pY P< Y < m< r? T? e » » yam a° e a^ oA m w ? » ? =T ; = » A ? _ ? D o-m - ° ?a pa o ° •° a c? ° O° . ` m ? a ? > > p P O 1 ? z n Z r m 'E < C 1 9 A W N co N y co .. s % % a m ? ? ? O n u a i ' " ? ? ° ° Y p _ . a . a o s m a m w p a o. o a n m .Y r m P o » » a i " O m 0 O > > v 0 > O y C 0 ° n my ai m » y c » > s m ? ° ie » m ° . m a M 0 0 e <_ <_ M . m i O jr, O N f a `F > ? I a• a. d m 00 m a I d ? o <I ? + T S °o n • I i 3 I ? D I g 0 N O 7 m O 0 CL. m d m m A ° A : < m A o mI m TI 0 Y_ i s y y s ? m » w {A S O 7m m S R_ w m d m m v 0 o' N 7 O 7m O 7- O d a m d m { 1 P`Naae.oy 0:20 i I I ? 1 I ?I 1 1 I I ' III I I I I 1 Z• < C ti ' ? N S x ? O c p ? m q m ' m N m N m o q e ? o O o N O ° O n P ° Y ° O ° q ° ? ?+ ° ? p _° ? m .°. Z O ^ .r.. .t ° m H H - 9 m m m > i a > X m G ? > ° v M n m O ! ° r m Cl ! ° Y O y m y O O O ° +O > m O O m [l O > b (1 ' 9 O p m m mN U - ° ' 9 O N m a p U P a o G O 1 9 ^ r m i ^ ° O I 9 M r m m a ? ° O F? N ^ r m m ! 9 O T O s a T ° 1 ? T ° 1 9 O U ° q o P ° ? + N O P ° 9 O P m i e P m Y N m ° q P ?ICII '? -=1 ?O Z ?a c m i 1'. ?w 7 N C o m + J w d7 u e ~ ?r lO m 5 0 y Z N 0 4 + Y N > N C O 1 I f i t I i I G r N N O p f ? O N G 0 0 Z Z i w O ' u u + P I N ? U O I I i i t I W 4 Y mm 9 0 Z Z 9 ca a i? t t ?C V O N O ((? °o f 0 y V 00 ? } C 7 u ? C Y V A + + V N u G SO ss C V O n V O ? u o ?_ g 0 H 1O lO g 5 1 ? Z TT ? u u ? a N q O O 1 I: S tt }? 41 N ? u T T C Y U P u u m m p N ? NI A ZO O Y 00 ? F 00 C7 ll 7 i O m u Z N r. Z Z m Z 0 E ? d a i I I I ?I i I o ? °o o i- O O N ? T F I ? Z u°II N o '{ I + D it l I II it II ? I ¦ G O Y ' fail N + ? c W c N ? m P r W m N m a P v r o W v N v n O v 0 v V v 0 o U v ? v W v N v + ; S m v ? L m w ? L O x.T 0 Y y > S m m s z Y > a Y 2 i sm a > r a m P ; ( m Y Tm 0 a S O N ? O P v + - ? O 0 o y 0 a O a Y Y m m O O + o > m O > m O 0 > 0 O > a N W O v m 0 N P O O S > a N P O m W a 0 p W O m p 0 N P O 0 > a w O - O v a w r O O O > a - w_ 0 O m > a w m O m N S a w_ O O m G > a m T O - U > P a T O P > aY m T O P > > a m O YI O P o -- P O rY 0 O 0 O > a m O W m d 0 O P m 0 O P 0 icm m ay ?0 O_ E a m fig 1_ nm I1 t t $5 z T r u P + + m W ? O u rF 5s r r m + + O O O ? O S O 00 z 1 S O K T o b U, o m O?1 G IZ +" P a y HO-a" 4 N z z 0 A r? t 7 z is m I V V „ L? N P U P n > a F r r z T t p w w t N O W o o $ W Z cCV m G S II t, Piss , ¦ P ? _ ~ r 4 N + ? c q ? N ? m P m ? m P m N _ m P o ? o m P N o o m m m D Y ? P ? q ? ? ? q ? N D ? ?m m o -j D w ? Z D x m y ; m 7 y S y a x 'z m a ti ° s D o m D w m D a ° o o r y? --) w q n n .. > q n m > m ,9 m > P D - p q cOi m m N q S - N w m a m N Q m m N P m ? m S ? m n H N m ? w m M ? o m m m > a r O s T o > P u n a o P '? O a n O w m o P q m u w ? y ym Fi ?C m x? L? 0 z r o m O F Z = Z ? O a0 i i 1 i ?o o m ?? N _ O w ^q --1 i O z t 0 + N G ? O s r m Q O Z Z O co s N Z O t V s C m Z O P t • • s ft"? tf tY?3? ? ? rr?? m Nttt??t m t ? m t + ++ + + + + T T + o o N G N O (y? V P S C N j 2 ++ O >' S O F S S O O yq'j O O ? S S G 00oo°u m 0 00 °o g 0 -, iiOO O '?' i t ?0,?, 0 0 0 Z rp S Zro ffl I Z fffY 1 II z `a p o S' q' o s tT?2?2 ° t? t>> P r N ?YN11 yN11 m N J I I N T r ????yy ++ y --1 +?+ O H+ N V 4 V O T T N G m N t t G ?+ G _ P O _ V _ G ppp S O N J S+ Y + N P O GO ? S O lu O J 9 O O 0 0 3#; H ! I 0 O T N n H Z Z O ? A I It 3 3 1 1 T t A p T u m 53 i i ? T T N ? A u } u u O 0 O O nbT F N A O Z Z O ca ¦ i C ti ' V H a if O c N ? .? m P r m P m N _m o P 0 1 0 tl 0 N _o n O m m n V m m ? P m ? m m n N n ; o° -t m .rr. Z O % m y ; m > y S a m ? ` m P c Cl N ° m P m + ° n P m V m o a r H H m m O fi +O > m O m > P O O > O n > a m U n m m N P < (s - m P m a m N P 0 i m N P m > a w O n i .. + O > a w_ O m a .? r O m N .Y i ?"? O m ; a m T O i P m T O > I? m O > ? m O P o tl o - P A 15 m O P a < a m O P m i o - P m S m O P m fT m ? -si m A'S ?mo c y r m m K F N n w 1 O Z Z O N ny?_ F m wy 1 R Z O (DM r n IN w ? p IZ Z O 0 P A 1 I I 1 Q a P r m T m NN r m mm N O y 9 V O + P y y ^9 F M OO -1 O m ? ? m a ? O m a y V T 3 T O Z z o Y ?n ,? T O z z N ' 3 p T O z z O ,'?? T N O z z O O N O + V O O ? N V ? O O ?J O N 8 g? 9 8 w I ? ! < c y a A a O a N _a % c O L N L mw Pm m d Mm m o u m A o d O N o_ m 0 O O n Y fa 0 l'a u m A o d n N o + ; G T T x w N + m i + m m m w ; G ; G A N < d < d ' T m .. % > a - a o > a > a D S D a a a s a i m y $ ° ' ' m .. s ?+ ' m a - m a - u a o y i w z ll ° ° o a r y y D > m > O • m N • N m N + + T 0 0 ^ 2 y 2 2 0 m m m Cl [f O m 0 w w N 0 1+ 0 M m 0 O 0 0 0 ° m 0 m n O [a CI N N + + + T T O w O 0 w 0 S 0 > i P u n m m m ° n ° m ° An y < u < . m o n m A m ° j > m m m m IM u m O r T y y n o y ?1 D S I D F ? r to ? m S _ w -1 i II I ! $ ? § Z f z O O 1 ny? F N 0 Z Z O P N I O c I Z b OZ = ?f b Jbp' b y?1? p3 1 ? 3 3 ? . 1 1 a 1 1 N TT> 1 ? T Yi > ao ? N h ? ? N m 0 0 0 m o?o m w m u v + 0 00 £ pov N N N £ ? ou O l? p O O t 11 O $ ? T 000 p O 10 a 0 1 Iq Z 0 m m ptt z 0 y Z 0 y i t z t j m ?i? V N P N ? w + + + +++ 0 P m + + + A m '.?? u mao a o 0 'o1 u o, a? ?C y 3 r a x ii d.wA..d,n 4 ? 6 ?a r r yz ? a as n S r - p SY Y ? -4 a? i F a T ? ????pppp++++ S Ir s t a a 0 L? S 9 I:? , I i n S F s ?e n 3' Cab LLGx b0 ° / g I ? I I ? ? i a ra oy p R 44Xnnnnnn ggg E Y irrr EWU 5!39 »»rTT xy -°ci 4F 1 :Y 7 ad aV xg ?f ii ss as a p °L. 8x8 aaa C75 Ott % 4 i 3R Y a°° t ? i F ?a »sb 6 ^ 4 ?p4 »st If tit + ° tit e pyJ!`` ++ $ 44La +iig x88°8 are pr. p a a =sx ¢ [g ? } 4 , III I In pvvl ?0 a4?S x x? a ? r 4 y z s4 ? »6 rq ga s p ?m Q s i If :, ++ as pf aF° SF< P7 of ss xa ,4 I 4 t=T q i f e ? I88 $aa c f S a '_ ° a r' [ o .. l K s 4 _ :xa »ss 4m ; s 8 a s?4 + »s f fE g l s° 3 3R s+ a x s ? a ++ ° I ss a ., xx . e :»ss TTtl 0. .ss g a a8a Q c . 66 v M D N 1 i I. ?-2011\_ 20 I I I1 I 1 Mlb-.d, a BL 9 x ?-a a I xQ 41, 1 xl I I., J a Q ° w I I a ?: a 0 Ft a r-x ? a ? o I ?I ? I i? Q ' x? a tll I?It l n? i o - a s ?? u ? I or31BE I oaZa s I? h i ??? I ° 1 . I I dlx_ Im I?1 vo f• f_ hj' 1 Q ?Qa °-x- I I I a z' 1,15 I I I I ; II ? - --- a I I I I; '-,I ? a - ,a I II 1 ? 1; I?? M __ P c 1, elll- I ? II l i; I'? 'l a MATCHLINE SEE SHEET 5 -L- STA/6+00,00 III ?s H mrn VV iN i ?I I. A I ,I IY Q?? I ? MAY I? 2W - R/W REVISION - PARCEL SADDEO A.76•Q4NEWAY 1 MAT-CHLINE?SEE? I I ' x?.x'TPwF? ' IaY ' IaO If x f 60 BLR LLl f, FR ?j 41Ap c . b \ Z \ \ z I 11 dw I? ga 3 g u ° S a Ae SYa 16+44/5 1 I I \ I I I I I I r \ ?? 1 I B 1 1 caw \ I I 7 ? 1 I i I I ? 4 I I ? / f ?5 O? ? % as tcs' (Alt T 4 -L- STA16+00.00 I 1? 1 ? a !?- ,-- Ilo II ° ? a 41 ? M, 1 ?? 41 0 Re•c Ir 1 I I I 4 I I I I h I $_P nl m I I x l I I n , A Q? 1 ? I ? ° ° lil I t 7 +a • J , J ik _ Ii'...._ R P 5n\,? V-k X 4 C I I l Q p c? a {E ?V? II V O ?? \ ?a n 4L ? x x rr Ae o 1 _ 141 ? I ?L ? «a \I ?I II II I • I o I I II 1 ? ?_? 7 I i I 1 .Y %% ?L'S1 ?I 1 S ?I 2 f? ' I 1 1 1 1 1 8 - L5 o ? 1 \ c ? / k?' ? P 1 1 i N o\ ?\\ 1\ \\ n a ,.p o c ' I ?Y "Y it _mua ?%•?G3 __? ?JIf ?\.?" 1 a mmmmm e \\ \\>? 8 : w A p5 \ .. _Q\\ \\ I` m l I i G MATCHLINE SEE SHEET 6 -L- STA28+00.00 ryl r: F; ?mmm o e; 1aaN m a c i V OI m ` ; NNE &8(ND - RIW REVISM - ADDED AN EMERGENCY ACCESS DONE TO PARCEL B yy Y- oo11 1 -1 Md.ell\P?o \d211b_rdy_peh 6.dgn 0 100 X 5 -L- ? \ \\ as 9` /oQj 'jam SEE SNEET s \ \\N \\\ ?_ / ./. AATcH pO ice- ° b ?? i\\^i3ry t l J)I mss _.-- ns` \ z O S ,p \ $ C O . \ p & ry 0 00 rra?I xis ?? $ e •I h- c'.---- a I I {{ un, 12 g 69 12 93 4r 1#41 s 09-T F -L m mm= ?o , ?a p rr _ - - - -- - - ---- rn T Y?law '?.2 ` 1 r .i 1 a Ln o p cn m - O?" r o I. ?? N g ? .R 1 aE IQ _ Mrs N rt\ oti p ? : 11 ? ? ? ? \ 1 s *? a S 1 L?> I 7 w 8 z o it E . I I 1 F ? , o o ' STA ,/ 8 ? o l MAY 7,200 - RAY REVISIONS - PARCEL MCNAMGED OWNER NAME,PARCEL 27.CNANGED OWNER NAME AND DEED BOOK IMFORMATKMSAND EXTENDED PAVED ORAEWAY TO PROPOSED R/W,PARCEL 31 CNAWED OWNER NAME, PARCEL 33 CHANGED OWNER NAVE AND DEED BDOC INFORMATION, PARCEL 3&Shg4TENED GVARORAL ON RIBR?EN TO KEEP ENTIRE EXISTING DIWEWAT ENTRANCE. N a O $? I ?? I RJR a 7 ?y a a' I I pJS,,J' ? I I -8001 b ?i a a i 1 0 S CF • II• A 8r ? , s \pY? I '?, Ial I F ? sw , _ 8?o III ' ? a ? a X?.Y'? ? ? < A at V S a snyy ?I I? ?e W °•/ a Rws al}?a F ICI', '? , f? ?aa * ? ©I? II? g L? \ I? m o a GQ - o? c>• e O A q? a o? G L T 5 • i ? r II aye !:?i - ,J• In 45 _ A E ?a m • a? n• ? 3 y 1 50 1 ? ? I .w .l P? ZZZZZZ I I I • J \1 ° \ ? (y 1 ? 1 a ? `R R4i g ap N .. yp i w A ' , I d m dU w Ola A N IU w O 0 w A I ,<' 4\ Mii NimN4 A i I DECEIIDER I,EOKI - RAY REVISiow - REVISI£D EXIS MG RAY DY PARCELS J9 & q. REVISED PROPOSED RAY OR PARCEL JA REVISED PAOP£RIX DYWER M WE.PROPOSED RAY & PROPOSED ME OR PARCEL In r MATCHL/NE SEE SHEET 7 -L- n ?N \ a ij \ ? Iry I I 4 ^@@'Q N 3 0 ? \\ '? ? s ? I I Z1 rQ Fla .I ??}}55-- ?. tQ? f}xT.pa? ? \ r+1 ????? \x\ Q III I ' c6 \ p1 1 ?. II © / l ?C) I li 7 5603/M Y I C t T/ Q f? G} it y O .o E3 ? it a o Q b O Q?? w 9 .o d ET o? x'? x x'?pq h Q I [T ?? l i?-=?20 b 1 1 1 I I I II I? II II I N I I f ii r' c m Mi ?EAA a m?mm N 'L N a z 0 ? I GIECEMBER LEWO - RM REVISM - REAMED P"ER" LINES QV PARCELS 4.47 b M 201110,21 , A ,o 0 N {°a ? 0 22 zn O?i {tlZ Oa"L' $? 1 uu u 00 Y / a bmT ?? V I ?? 7/ / o ml (? e? & / i O If VII Zdrsra 10#0awy d n aP?l I I ?- _x?x xts• wx??l I ?/ ? /? \\z? _--'----III I /r}i I I ?'1. 1 m Q It. ie• cw I^ I h / fi. BAiUpO z II ? ?lx ? III/ atle?fi \ 'j rC L? CM01 II , , _. V ? ? i I Q ® •, 1 1 co I b Z-O _ __ I e? 1 \\ 1Q © I ? ?? ? ? I r 1 lit e 1• A ?? "y 1 Q 1, \ ? ?\\ o?e11 I 1 - ? en ?? I, 11 0 0 f/? J L stars I , • Ir ? • I ? It \ •+s I I 5 ° t I MATT I I? Sy ® 3 I I I ila ?? ? ? ? p v e - ' I r? . ao"c 1? ? ? II* .em?: e o 8 ? I ? ?'' gas I ?I o I I a I i \? c. ester ? I ? ?`?.JJ I g p fi 1 \ : d 0 s I ! ?3 we`e' SN* M ?15kp0A0 m w N N?i'? x? III ?0 11;.II???y H Ml i!x REVIMOM MAY 7,2010 - RiW REVISIONS - PARCEL 20.CNANGED OWNER NANErPARCEL SKSUBON/LIED INTO PARCELS 54.54AAND 5IB.AND CHANGED OWNER NAVE AND DEED BOOK INPO4VATKMLPARCEL 54ACHANGED OWNER NAME AND DEED BOOK INFOWATION ja I ; ; gs l i I,lll /` ?M °°' l ti % 11 // / l0 f C 11 0 ¢M ?_ as. l lI l P _ _ aP C y ? \ 1 i Q s aE(yp Q-4Y i I I/ , ? ¢I I s// ( I ' III ? ? I / , l Il l II It u la°?? I 1 / Il , :. a R?_ p111 1 / l1 Ill ` /?/ '. ? O 19? f Ln I lI 1 /l'.? It O \ / l I • 1 / rk 5 .. ` I I I I - ? iLZ l IIIT ,II ? , , ?? 1, II It I /IS I o//0 1 / 11 ?' aE° I I s°a' / ? ' 1 f Q ? I I! F a N 7. FI - v II // ?, ^, ?'?Isl I/I g I x II ? ? ?? I ,? I l ' U sl , c Y4' g I I ?c \ ? j 96'&ItN ; I I I I Ln I .. If I I .. .. II -` I 20 1 `_ F ' II Q 1. It Qoo AAA yy N I I I I I I / I ?p9 gm $? S g r • r I R III r°_y x ''.. ...4 R o m?= 6x 'I '?21n I/ ? ? ? I? Z EE SHEET 6 -Y5- STA22t00.00 ?io, Q i z II I O ? I NN 7.200 - RAY REVISIONS - PARCEL MC M&N£D PARCEL 55 WITH PARCEL £P AND CHANGED THE OWNER NAVEIPARC£L SGCNMGED OWNER NAVE?PARCELS 62 & 63. RELT.CED EXISTING RAY 5 FEET AND MAX THE EXISTING RAY CONTROLLED ACCESS MATCHUNE SEE SHEET 5 -Y5- STA3/+00.00 cl\ 06 I a? ? , Q 9 ° m I w . a A/ II 0? ° I I may I? I ? oa?$j \I Ilp ,III Q A. COW 1 I lj d? ICI III A ?? 1 I O N / '2 I 6 Q ?o I I I O 1 I a G3dEl I $ I ' 1 I ? t 4 ° Y I -- I 11 >^ L L -111, C6 / o --- i 1 / ly \n / I N I Q ?' O 35 I ? I I' I I ' I' I I: I. C I' 1 I' IJ1^ (GIN V / P z $, 40 11. - I p z!w,od I 7 I I I I ?? I I ? I I g ? I I I I I mr I I I g I 1 1 ? I ? ,I Y f I O e ? 1?ppIy1Y1??QQGG O I 0 zl I° ?1aSu??l ? 4I I I? a i? S i `f 0 J N A N P B ?g3 7 i N N O m O O m i k ?Igihl ; A A N i i i 8 9 6 F it l ? 1. .Y 5 .. I ?. d4 P N V N m n 2 i i ? O 8 L O N A N P V O O N O O N O A N P V m `O N O N N N 3g? pyi 9 Z$ 9 4 I 1 I ? Ill. I r i 0 N W A W P V CD ?O N O t? 2 2 i i ? O 8 egg 7 d 0 N W A N P V P 1O e i a s m m T M N W - - - --------------- -------- A N P V P 10 N O Q TT V p I n 2 N -- - - n 2 ------- - - -------------- - ----- -- --- - N N i J N N N W N A N N N 0. N V N m N 'O W O W Q ? O i 0 K I N m u ca A ca N P W V W co m `O A O a N A N A A m M ?S€s34"'E?TR? m o??o?aoio n Q ? T O 6 5 i a t n O N to Ih A FT N 9 ? y g p y y A ? R y A n? n 1 1 1 1 1 1 1 1 1 $?N $? ?g ? 0 L S n ti n 0 N O ? i ?: 18 I?? 11,11 - O FRiff ? r Fi?Fi-FF+ 10 I? IN N N N W N A N N N P N v N m N `O W O O N W I ' o I I I ro I? Ip p?_ ? o - a ' ro 2 w A? ?: 5