HomeMy WebLinkAbout20110799 Ver 1_Approval Letter_20110909AW
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Division of Water Quality
Coleen H. Sullins
Director
Dee Freeman
Secretary
Steven Thompson
733 Stratfordshire Drive
Matthews, NC 28105
September 9, 2011
Subject: Approval of 401 Water Quality Certification with Additional Conditions
Lot 2 Sugar Loaf Shores, Mt. Gilead
Lake Tillery (030708, 13-(1), WS IV, B, CA)
DWQ Project No. 20110799
Montgomery County
Dear Mr. Thompson:
You have our approval, in accordance with the attached conditions and those listed below, to place fill within or
otherwise impact approximately .01 acres (495 sq. feet) of open water (Lake Tillery) below the normal pool
lake level for the purpose of construction of a wooden sea wall as described in your application and additional
information received by the Division of Water Quality on August 29, 2011. We have determined that that these
impacts are covered by General Water Quality Certification No. 3693 (GC3693). This Certification allows you
to use General Permit Number 198200030 when issued by the US Army Corps of Engineers (USACE). In
addition, you should obtain or otherwise comply with any other required federal, state or local permits before
you proceed with your project including (but not limited to) Erosion and Sediment Control and Non-discharge
regulations. Also, this approval to proceed with your proposed project or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 Permit.
This approval is for the purpose and design that you described in your application. If you change your project,
you must notify us and you may be required to send us a new application. If the property is sold, the new owner
must be given a copy of this Certification and approval letter and is thereby responsible for complying with
all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of
stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506(h). This approval
requires you to follow the conditions listed in the attached certification and any additional conditions listed
below.
225 Green St., Ste. 714
Fayetteville. North Carolina 28301
Phone: 910-433-33001 FAX : 910-086-07071 Customer Service: 1-877-623-6748
Internet: www.h20.enr.state.nc.us
An Equal Opportunity' Affirmative Action Employer
One
NoahCarolina
Thompson
September 9, 2011
Page 2
Additional Conditions
The following impacts are hereby approved, as indicated in your application and supporting information,
as long as all of the other specific and general conditions of this certification are met. No other impacts
are approved, including incidental impacts.
Placement of rip-rap below OHW, 0.01 acres, in accordance with the application, drawings, and
supplemental information.
2. No waste, Spoil, Solids, or Fill or any kind
No wastes, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Pre-Construction Notification. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order
to protect surface water standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Sediment and
Erosion Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most recent
version of the North Carolina Sediment and Erosion Control Manual. The devices shall be
maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within six months of the date that the Division of
Land Resources has released the project.
5. Protective Fencing - The outside buffer, wetland, or water boundary, and along the construction corridor
within the boundaries approved by this authorization shall be clearly marked with orange warning
fencing (or similar high visibility material) for the areas that have been approved to infringe
Thompson
September 9, 2011
Page 3
within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A
NCAC 2B. 0233 and GC 3404.
6. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality
Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached Certificate of Completion to the DWQ WEBSCAPE Unit at: 1650 Mail Service
Center, Raleigh, North Carolina 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts
to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of
the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream
impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this
letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
This Certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please contact Chad Turlington of the Fayetteville Regional Office at (910) 433-3320.
Sincerely,
*466D 4
Coleen H. Sullins
Enclosures: GC 3693
Certificate of Completion
cc: Karen Higgins - Wetlands, Buffers and Stormwater Compliance and Permitting Unit
Butch Brown - Brown's Construction
DWQ, FRO