August 29, 2011
Ms. Lori Beckwith
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
??6®1 `085#J• Z
Subject: Nationwide Permit 414
SR 2112, Ben Field Road
State Project No. 13C.011025 (DWQ Minor Permit Fee $240)
Buncombe County, NC
Dear Ms. Beckwith:
I have enclosed a straight-line diagram with erosion control plan, a PCN application for
NWP #14, and a vicinity map relative to the proposed secondary road project on SR 2112
Ben Field Road, Buncombe County, NC. The project was previously authorized by
Corps Action ID 200530182, 0184 and NC DWQ Project No. 041685 during 2004.
These permits expired prior to project construction.
We propose to replace/extend one (1) pipe culvert on an unnamed tributary (UT) to
Jimmy Branch. Total culvert extension will be 10 linear feet with a temporary
impervious dike for dewatering during installation. The UT to Jimmy Branch is an
approximately 3 foot wide stream with a predominately cobble, gravel, and sand
substrate.
Existing channel morphology will be maintained upstream and downstream of the
culvert. The culvert will be placed below existing streambed elevation whenever
possible. Riparian vegetation will be reestablished along disturbed areas associated with
the culvert extensions. Stormwater will be diverted through grass-lined ditches or
vegetated buffers prior to entering streams.
No effect on federally listed species (threatened or endangered) or their habitats is
anticipated.
As a part of the 401 Certification process, a copy of the application will be forwarded to
the NC State Historic Preservation Office as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a).
Division Thirteen Office Post Office Box 3279 Asheville, NC 28802
Phone: 8281251-6171 Office of the Division Engineer Fax: 828/251-6709
w .ncdot.gov/doh/operations/divisionl3
Ms. Lori Beckwith
Page -2 SR 2112, Buncombe County
August 29, 2011
By copy of this letter, we request David McHenry, North Carolina Wildlife Resources
Commission Coordinator, to comment directly to the Corps concerning the permit
request.
By copy of this letter, we are asking Ed Ingle, Area Roadside Field Operations Engineer,
to comment on the above project. The UT to Jimmy Branch is classified as Class C,
Trout. A buffer variance will be required for the project for Stations 14+00 to 15+50 and
26+00 to 29+00.
By copy of this letter, I am forwarding four (4) copies of the application package to Brian
Wrenn, NC Division of Water Quality, 401/Wetland Unit and an additional copy to Mike
Parker, NC DWQ Asheville Regional Office for review and comment. Please charge the
application fee of $240.00 to WBS element # 13C.011025. Please forward comments
directly to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
Roger D. Bryan
Division 13 Environmental Officer
Enclosures
cc: J.J. Swain, Jr., P.E.
Britt McCurry
Ed Ingle, CPESC
David McHenry
Mike Parker
Brian Wrenn
o` ?F %N A JFgOG
LM O T
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
la. Type(s) of approval sought
Corps: fm
X ection 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? X Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
X 401 Water Quality Certification - Regular - ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes X No For the record only for Corps Permit:
? Yes X No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes X No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes X No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes X No
2. Project Information
2a. Name of project: SR 2112 Ben Field Road
2b. County: Buncombe
2c. Nearest municipality / town: Weaverville
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state
project no: 130.011025
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if
applicable): N/A
3d. Street address: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 10
PCN Form - Version 1.3 December 10, 2008 Version
I-
4. Applicant Information (if different from owner)
4a. Applicant is: North Carolina Department of Transportation.
4b. Name: J.J. Swain, Jr., P.E., Division Engineer
4c. Business name
(if applicable):
N.C. Department of Transportation
4d. Street address: 55 Orange Street, P.O. Box 3279
4e. City, state, zip: Asheville, NC 28802
4f. Telephone no.: 828-251-6171
4g. Fax no.: 828-251-6394
4h. Email address: vallen(a ncdot.aov
5. Agent/Consultant Information (if applicable)
5a. Name: N/A
5b. Business name
(if applicable): N/A
5c. Street address: N/A
5d. City, state, zip: N/A
5e. Telephone no.: N/A
5f. Fax no.: N/A
5g. Email address: N/A
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1b. Site coordinates (in decimal degrees): Latitude: 35.68901° N Longitude: 82.47276°W
1c. Property size: 2.1 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: UT to Jimmy Branch
2b. Water Quality Classification of nearest receiving water: Class C, Trout
2c. River basin: French Broad
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing gravel secondary road
3b. List the total estimated acreage of all existing wetlands on the property:
0.0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
400
3d. Explain the purpose of the proposed project:
Increase the typical section and pave the secondary road
3e. Describe the overall project in detail, including the type of equipment to be used:
Grade, drain, base and pave the roadway. Extend one pipe on jurisdictional stream. Equipment used will include
excavators, trucks and graders,
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
X Yes ? No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary X Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): N/A Agency/Consultant Company:
Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Corps Action ID 200530182, 0184 issued on 12/2/2004.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? X Yes ? No El Unknown
5b. If yes, explain in detail according to "help file" instructions. Previously permitted in 2004 but never constructed. The
stream impacts of 10 linear feet are the same as previously authorized.
6. Future Project Plans
6a. Is this a phased project? ? Yes X No
6b. If yes, explain.
Page 3 of 10
PCN Form -Version 1.3 December 10. 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
I a. Which sections were completed below for your project (check all that apply):
? Wetlands X Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Tem ora
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 X P ? T Pipe Culvert UT to Jimmy
Branch X PER
? INT X Corps
X DWQ 3 10
S1 ? P X T Dewatering UT to Jimmy X PER X Corps 3 10
Branch ? INT X DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary Impacts 20
3i. Comments: 10 feet of permanent and 10 feet of temporary impacts.
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individual) list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water Impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond ID Wetland Impacts (acres) Stream Impacts (feet) Upland
b Proposed use or purpose (acres)
num
er of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
6f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
61 ?P?T ?Yes
? No
B2 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Minimum pipe length used to obtain needed typical section and shoulder width for safety.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
N/A
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? X Yes ? No
Mitigation provided for Action ID 200530182 for 20 linear
feet.
2b. If yes, mitigation is required by (check all that apply): ? DWQ X Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
El payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete If Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form -Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes X No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5 -
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? X Yes ? No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: NC DOT Project
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No.
000250 Post Construction Stormwater Program.
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? N/A
? Phase II
3b. Which of the following locally-implemented stormwater management programs F-1 NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other: N/A
3c. Has the approved Stormwater Management Plan with proof of approval been J E1 Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply):
? Session Law 2006-246
? Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal/state/local) funds of the ® Yes ? No
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes ? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H.1 300), DWQ Surface Water or Wetland Standards, ? Yes ®No
or Riparian Buffer Rules It 5A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ®No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form -Version 1.3 December 10, 2008 Version
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ®No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. ?
Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NC Natural Heritage distribution/habitat mapping, field survey
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ®No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ®No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Current Maps/Database
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? Current FEMA Maps
Roger Bryan n 8/29/2011
Applicant/Agent's Printed Name ApplicanUA nt's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.
Page 10 of 10
?jbV
/ €€ ff
% ' ?; / \) F..? ` ??.•-=.J ?.f ?w.I 1, 11. ??1. Jf•!^-;... ?? •'\_„??.`,? 1t (t `a/ t ?J + 01
Z
?.. ? t 4 i ? (''ter.-,? ? _.,._.s %/??'` '1 ? _.p f j •'?. 1.1\ \ ? , , a ; r I t
r ? v {
a, ce?K
i 'tom -. ? ".:r ''• i` - ?'\ ??\ "'±?\ \1 ,?,.` \\\ i (? _ ? 1 I
i ` ?? '`t-< ` -. ?^- '•?r..+? ? •" ?'{/ •? •??".+?' ??` ,.j t'4 `? ? ( lt`? ,.?fj?~???1, ?• `\ 32pp_•`J? ? ;
? •,.,. +•. ,? Jy' .- J{ y d' ? \ .?..-° ? , 444...r t t'1?•t `°`,... J^•, \l?\`\.._-.^-_..~`y>t
t, / .. 4, ".'-»? d. r ? i ? M r J f -" l.?"t,• 1 ? 1?e. - J ,+" x.s t. ._E t Y
t 9 `t..^/ . ?? ^ 1, E may, r""r•'`r? `r ?`^
? -'. 4 h ' ,?'?""^-.« r - ! ? `1*?y R tti 'i ?,?, -,:\ + p r ? • ? ? j h '
F
",8A L- C'ARU, \y - v ? a t A?? t
+Ti i'°"•.?a 1 'q a..5:? ?.1„A%?'' • ( .vim .* ?°, .? y`^_. ? ? '+ A'• ? r r?i •r
8 ji ` / 01 1r '= 1 Siiei
.z,t.: l i r 1 i
\1?1.? (???' • ..,.
B`•' r/y?{•.J• .-' Jam' ?, //????J" a ?• ?r ,/ {^ -V'?` \?` ?1 `,
1LL ! '\.- t LM ?,' . Q ? r."'r Y `, ? ? `?\'i?F!- f°'a .?.I • / / ? '? ..?,'','t?'j 1
4t? t j ..f S 3 „ 4` 0t\
,R X11 a'? { ...--'^`-`} ? a'? ?.,, ` ° "?'? ,} r: /?'"_ !.3 ? 1.•,.r ? f ??`'??'y N? ?^"?,:. /,( ',f"" ?1 /•J?: ?,..??+' _
'4 5 t t; ' v t ti ? ) tt 1 • - } ? ?; J,. -,r C a{ {i ?,., 1 S Y.+: ? l i?-"1 1 f i
? "rys, s 4 1p ?, t+? 1 t,...„? 4 ?` '•?? ?' t ? 1 !,'? ...m?+ ? i f"`h"i°"'; ? 1 ???`'r?? f ?''::-er r.
/ ; '\t t t?? r tFf ?i
IN
\vF'{'..L ?''iyt /rtl Lt`!?p7E(\i\ \ {?j???0?`ft /r
i r` r i r:5 \ i ti , v V ? ? ? ,, •\?„?'ti 1 4t ?,l ,?\, •f i'-' ?' f 3 1' r
`U / t P ?4t ? ?'.. 3 ? ? !`_' ???r XJj { ?? °`••,,., +.:.r^ ?° ..,,,mow ? # L 14 4 ? ?? t a. /f i ? ? I
' 1}• ? 1 jIF/? ft i \? ?i t k ?? I • it \ 1, f 1 f i ?(? ?`^J'? g8pQ+. [x s ??` \ 5 :?`;\ `?,
'sty 7/ t i( ( 1\" i fd l E?? a ',.ITT Ij ''? "'tx.....%'.+ F Y \1 i•- \'?`
1 ! s y k of r -y r y "..
11 ?v ^t
? t .. "i, VIP-
,•? }.? ?J?'?'y ?r i?i ?s i '(? ?a •`_ .'i _. 'i??.?-•,?.,'?r'?? • `?':y \?`•.? k`y.?.?? ?fY.?4 _,° ...?
1, Nj .'
r'! SK, P 12-9 `' J/?frr, M ?
f)'N/ • ?t}, i !i t??t ? P?r??? FJ? f. • ?? t?' ?. ?'??1 `. ,° ? v..
Name: CRAGGY PINNACLE Location: 035.6866841° N 082.4772176° W
Date: 8/29/2011 Caption: SR 2112, Ben Field Road
Scale: 1 inch equals 1000 feet Buncombe County, Nc
CopyngM (C) 1998, Maptech, Inc
Figure 1. SR 2112, Station 14+86, UT to Jimmy Branch, Buncombe County, NC.
N.C. DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD SURVEY
SUBJECT: SR 2112, Ben Field Rd.
LOCATION: From SR 2111 to E.O.M.
WORK TYPE: Grade, Drain, Base, & Pave
WORK ORDER: 13C.011025 PRIORITY: 61
COUNTY: Buncombe TOWNSFHP: Reems Creek
DATE 8/22/11 SCALE: 1" = 50'
NOTES: 45' R/W
Length: 2025',.38mi
PREPARED BY: JSA/CAP
ASPHALT PAVEMENT
;'--?- -- 91 --- -91
Site !
PIPE DATA
County:
Buncombe
STATION
10+38
10+48
11+34
17+07
19+12
20+50
23+47
26+85
28+32
28+65
29+65
30+08
SR 2112, Ben Field Rd.
WORK ORDER : 13C.011025
PRESENT PROPOSED
SIZE SIZE
30'x18"CAP 50'x24"CNP
30'x18"CNP 40'x18"CNP
20'x18"CMP 20'x18"CNP
40'x36"CNP 50'x36"CNP
15'x18"CNp 20'x18"CMP
50'x18"CMP
40'x18"CNP 40'x18"CNP
50'x'24"CNP 50'x24"CNP
20'x15"CNP
40'x15"HDPE
45'x15"CNP
30'x15"CNP
NOTES
Replace Cross PiPe• Crosses SR 2111
Cross Pipe. Extend 10'
Replace Drive Pipe. Right
Cross Pipe, Wet
Cross Pipe
Replace Drive Pipe, Left
Cross Pipe
Replace Cross & Drive Pipe
Replace Cross Pipe
Drive Pipe Left
Drive Pipe Left
Drive Pipe Left
Cross Pipe, Clean Out, Wet
a_„
?li'iCOG''`o
CF,+?Oi_?N GvrTO."J
is;c??k3?
' install low & or endpoint measures in TSF.
` Construct using the 30 day option.
'All wattles require PAM.
`AII basins located at a 5% or greater grade
must be tiered.
'All basins require Coir Fiber Baffles
l C x 3'x z'
i f fi b ?a5'?,
?Ypv er
63G
Ifi i
I raur
i
I
Iv
1 7
4
Li
{f
a
' i
1-7
V) i
I
1+1,
3? 3I
qI? r
,t
jyr-6, 7
I
ks Ypd f1 Lhd.!?
II
Ir
T yez A 661 c )c
I
II
JFI
WCCCIs
FrT
?f
4.
i
ts, I
CRROJ-vM P"T one
I5h 3z
Ivvrr,f
la
13X32'
;i
3'S
PL
n
ftil -10. ic•
4
? avcor,
I
i73? ? 66'
* Install low & or endpoint measures in TSF
.
* Construct using the 30 day option.
t *All wattles require PAM.
*All basins located at a 5% or greater grade
must be tiered.
*All basins require Coir Fiber Baffles
f- SBi:
i --
Tyre
Tfpr, Aottk
9'x3`.2' frl,,. ry Oas.,n
Y P
II
L
??_LLCyy
a_
Nc4%?
9r3r2 Tfrc Q Cu6:n
Ty ft A 6, 14
R
Jc ;
' Lc j:..W
214'x' Sam
MOODS
R tYV6 6 6a5,n
TYP` A?'c u
?IL; ? I? CIYII
kJ''
`J y
? j j j 1fl
9y3xZ
7'yFd 6 pair n
i??a P. C;.4LIt,tl
1 R-
Yai'f?l7L'
II'x 3'X Z
i/ftYB?Cis +?Li?
3
1
I I
/
i
I
C
i
i 10
II
JI
i
n I ?}?
II
is
77
i
I iI
I h IO I ; 'r
i I }
YARD
RNcS l" t C/i ROUj-^J '-o.Icl
i!
* Install low & or endpoint measures in TSF.
* Construct using the 30 day option.
*All wattles require PAM.
*All basins located at a 5% or greater grade
must be tiered.
*All basins require Coir Fiber Baffles
x.922 /I? J? \\ \
i
R
i
t,v,..1{._ c,
x/01 IS°I,{pPaDR.
Ile
a.-
G =R Pi? . STF:. 1 C
INx3`xZ'
?ppe A t?eait
:l
9F3X2
iyPE g ?--T
i!Ojos aw5+n v z
i ffe A iy
V
S
LW 3 + / 7 31
N
L?
r'a:7 EU?rtk;
-jd
E
U
2
(i * Install low & or endpoint measures in TSF.
* Construct using the 30 day option.
*All wattles require PAM.
*All basins located at a 5% or greater grade
must be tiered.
*All basins require Coir Fiber Baffles
1.
?F
3+
is
! n,
ti ? I ? r
/C f1`
Y .
i1P+lt'n 0E. rc
p
cwe ce.e ?
a? R °i 3S
R ay \
3? 1
0
_ I e\ pSVC
? 0
L
BL.CeSTOC[
uiN.
OAS a1N
N
\
BN\\E? 1
\
e p \
NORTH KNOB 1
1
\Yb
V
>' Unioni /
CMO. _, /
R \\
LZ \
RIF \
s
aLu
am 2
b
\ naeaan? j am /
I Goq /
J7 /
yf llE
Ay(
0
CHESTNUT
KNOB n
l
0 1? / r
a /
J... ?
1
1
1 /.
IV
r I\,
1
9 "
1 /
\ i
AU§
1
'Cull`' _.,r? L
IYrHV. '\
erg x?
C..
H\
I
o. ,
c
1
n