Loading...
HomeMy WebLinkAbout20110359 Ver 1_More Info Received_20110913Stimmel ?I Stimmel Associates, PA Landscape Architecture Civil Engineering Land Planning September 9, 2011 Annette Lucas NCDENR -Department of Water Quality 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Reference: Village Point Phase 2 Infrastructure Clemmons, NC Dear Annette: ?\ -0=3?5 ? Please find the following additional information relating to the 401 Water Quality Certification for wetland and stream impacts on the above mentioned project as requested in your email dated 9/6/2011. Enclosed in this submittal is the following: 1. Construction plans, calculations and details of the existing sediment trap we are proposing to treat the runoff from the roadway over the existing dam. 2. Construction plans, calculations and details for the roadway over the dam. Storm drainage calculations are also included. Note: The roadway over the dam and sediment trap has been constructed. The sediment trap has been cleaned out and made fully operational as previously discussed in our correspondence. Please advise if the submittal package is incomplete or if you need additional information. If you should have any questions about the design, please do not hesitate to call for a clarification. Sincerely, 944 Kelway L. Howard III, P.E. Project Manager Stimmel Associates, P.A. cc: Novant Health - Mr. Nick Eller Sue Homewood - NCDENR - DWQ 4 SEp 1 32011 0H 601 N. Trade Street, Suite 200 Winston Salem, NC 27101 P: 336.723.1067 F: 336.723.1069 PROJECT Village Poir,, Phase 1 PROJECT NO 08-036 SHEET 1 DESIGNED BY KLH DATE 09/06/11 CHECKED BY KLH LOCATION SKIMMER. BASIN #1 & 2 TEMPORARY SEDIMENT TRAP/RAISIN DESIGN CONTRIBUTING AR EAS / RUNOFF COEFFICIENTS 'C' DISTURBED AREA DRAINAGE BASIN SURFACE TYPE COEFF AREA AC A°C AREA AC A"C GRASS: (CLAY SOIL) AVG < 7% 0.20 STEEP > 7% 0.35 (SANDY SOIL) AVG < 7% 0.15 STEEP > 7% 0.20 WOODS: SPARCE GROUND LITTER 0.20 DEEP GROUND LITTER 0.10 BARE SOILS: SANDY, SMOOTH, AVG. SLOPE 0.30 CLAY, SMOOTH, AVG SLOPE 0.50 1.26 0.63 1.26 0.63 OTHER 0.63 0.63 TOTALS: 1.26 ACRES 1.26 ACRES COMPOS.'C- -----> 0.50 -----> 0.50 RAINFALL / RUNOFF I SEDIMENT LOAD / SURFACE AREA 10 YR (B D E) SURFACE RUNOFF 10-YEAR SEDIMENT TRAP/BASIN REQUIREMENTS 57.1090 Tc = 10 min. SEDIMENT STORAGE REQUIRED= 1800 CFIAC 10.7000 C = 0.50 SEDIMENT VOLUME REQUIRED = 2268 CF 0.7570 i = 5.76 in/hr SURFACE AREA RATIO (75% EFF.) = 325.00 SF/CFS i = B1(Tc+D)^E A = 1.26 ac . REQ'D. SURFACE AREA= 1180 SF B. D & E CALC. FROM HYDRO-3: Q10 = 3.63 cfs ORIFICE DIMENSIONS AND DRAW DOWN TIMES TRAP/BASIN DIMENSIONS AND VOLUMES DRAW DOWN TIME = 2-3 Days LENGTH TO WIDTH RATIO = 2.00 SKIMMER SIZE = 2 in. (From Faircloth Chart) SIDE SLOPES = 2.00 Orifice Size = 1.25 in SEDIMENT STORAGE DEPTH = 3.00 FT Cd= 0.59 SURFACE AREA PROVIDED = 1250 SF g = 32.20 TOP WIDTH OF SED. STORAGE = 25 FT h = 4.00 in TOP LENGTH OF SED. STORAGE = 50 FT Q = 0.023 cfs SEDIMENT VOLUME PROVIDED = 2508 CF OK DRAW DOWN TIME = 1.13 Days BOTTOM WIDTH = 13.00 FT BOTTOM LENGTH = 38.00 FT OVERALL TOP WIDTH = 31 FT OVERALL TOP LENGTH = 56 FT OVERALL TRAP DEPTH = 3.5 FT WEIR LENGTH = 5.0 FT FLOW DEPTH OVER WEIR = 0.4 FT Q=CdA((2gh)1.5) FREEBOARD = 1.50 FT STIMMEL ASSOCIA TES. P A 601 NORTH TRADE STREET. SUITE 200 NINSTON-SALEM. NC 27101 (336) 723-1067 Y i O M sue`/ v O Q V L W CO) L 3 E m l vcm a`rA:111 a+`1F a !I jr, j n Q a r? N C O C W l 3 d w E _o o 0 m = 0 'IT C 16 E 7 Z E CD co 0 co 0 ai ii a d 1S1 m CL c } R X L Q 00 V v C c (n O W O i ? W W ` I i U U < y C O O O O - J U U U U 1 0 ° rn rn N N > M M M 61 LU G 00 00 0) m G E D m 0 p O rn M LO U) M I= 6) a0 m m 3 cr ` C7 O co mo r- r- r- r- m - Il- M I- N N It? M to m lD (D O j co r- O 6) > N W J CD LO co O r- _ CD r- r- co O Il- O r N N LL? 61 lD Il c co v Lo m CL (0 r- m m 2 LU O L Lo (D O m O 1 L E P 9 N I? d r- l co c 3 Z C C (^D r I - I` o M M O - c O O o O e N - M ? d a co d N C in - LO a) N r- y V O O CO d M V 7 LO x If1 O N co D ° OR Lq ° - U N r a Z _a LO m 02 w v F- R N V M II 0 C L O O O O U II ? .? C V V R V' N C ? O (D O N T '? O O O O m N } I II U C O O O O O d O O O O .- I _ c f a E :° o Cl) 0) m y U . F o - m o x _ ' l7 1 C O Cl) U) M CO O O ` Q 1 C O O O O 0 i O y 0 0 ? O 0 m 1 6 1 6 t a, U (? O O O O O c 1 N A M M rn E • U 0 °' `r 61 v ` ? C V (j LO LO M ) 61 E o Q C fC O O O O O ' O O O O O O O O O C J O O O m Cl) r- C ¦ ¦ F J C W C W co ? (n C v W ? O w C N M 7 a lq J N O m 6. C FFl?? u I cn ° w ° ? o p w W U W U i , C N O M I w O O O O `^ I ? U U U U E rn rn rn > y M M M ? V: a m co m rn CC _$ n n n n o E 0) Lo m C L 2 O M (n M C ? 0) 00 61 Cl) ? p n n n n V to n O co Lo (o M ui (D o a cnp ono A) W co N CN -q O cc O J C7 _ co (o to n co n n co = p ? n n n n O n O n N N !7 O LQ n C m ":r Lo m > _ CD n Ono Ono O a) ? W O Ln O O t (O co 00 Lo r- 'IT r-? CD Z > c p CD r, r- co d a p o o O p (A ° N ? ri d d N C N M C O OD -y ? v v (o v a Lo O N 00 u z ?= w OR U? o V o a Uw ? N a? u N O M 0 0 v ~ w O M n n U u ` U C t C O O O o m .-. t0 (D (D (o O C ' M O <t O 0 1 ? } ;, ? 0 0 0 cn 0 ? ~ 0 0 0 0 m 0 0 0 o a c E c R 0 Lo co a U 0 O O co o b m ` U rn V M ur M co co O < Q C O O O O O a O N m rn m m a 0 U o 0 0 o E r IC M O N co _ (j Lo co rn c O O C C) C _ U U Q O Lo V Cl) m rn E N C (6 O O O O n O co C) O CD O 0 O CD 0 M ? 11 . C O O O 0 m co > w ? ? .. O 10 CN, r- O O C N O .C W W Cl) U W , C 1- J F- 2 O p . y C ? Z N M d' rt o ` y '`y, "w : , , , y , N,,,; 7 '4 ~ z , k z , / ~ r' p b ~I r./ ~ } ~ ~ ti~ a, , > t w f 0 ' ' 752-mm ExIST1NG CONTOURS ~ 2' IP~TER,VA~.S < . _ T, ~ , . ; , , : , , , 750 E~ISITNG CONTOURS ~ 10 .INTEf~'V,BI.S ' i;, ; ; ~ ' , ~ . / n'" r ~ / ~ , PROPOSED CONTOUR ~ 75a £ i ' " ~ k:.. ~ H ' . .y ~ f ' N' "J ° F Y~ j~ I • ~ fi , , ' -*t ~ v RIGHT-OF-WAY ~ , ~ ~ , y , ; ~ e? ~ ~ , ~ ~ ~ DISTURB LIMITS LINO , . • w i ff.3' ~ ~ ~ ~ ~1 dire( s~ciat~s, P~ , • 'ya , . R f ff; r ; .Y ~ ° ' ~ 6 J/ ~ Landscape Architecture. r' ~ ~ E ~ " ; . t f / ,...rte 1 : . ~ i c k. - : ~ , Y ,EY~ST#NG TREEUNE i , t ~ ~ ! " ~ j' Civil Engineering ..,..w. ) W ` , p Y ' ~ > ~ ~ J~ ~"f~ < < I ~ ? f ' .fig ~ Land Planning CLEARING LIMITS ~ . r, "'2 w p' ~ iJj~ ~ f r r 1 s ~ dj ® a ? .dl~ '(r , , ~ , ; ~ ~ ~ 601 N. Trade Street Suite 200 w ' \ ~f. , --o~-o-~--n-~~-r~-- S1LT FEhICE ~ 1 ~ ' ° , ~ F' / Winsta~ Salem, NG 27101-2916 , , • ~ ; ; ~ ; t ~ r' t` ~ s f ^ i` ; ' ~ ~ ~ P: 336.723.1067 F: 336.?23.1069 , , ° ,cXi~fill~G, . ~,;r ' ~j t~ ~ ~ > SEALS: e . TREEL NEs ! s ? ' ' TEMR.ORARY DIVERSION _ _ , f ~ ~ ECEEECEEEE(E(ECECE(E((CECECE (E(ECE(E(EE , . ~ _ , £ m ~ ~d ~ J . J'~ , , ; , i , , . i , i ~ i : f ' ~ 1 ~ s ~ a~`f f ~ " q» `ti ~ r r f` ~ F , J` , , t. 5 ~ In, TEMPORARY SLOpE DRAIN ' s `'a ~ ' ~'~f ~ ,~'t` r d t O "~M 4 s f1 ft f:> ~ NCBEESCERT.N®.:01347 ° \ ~'"s .fi~ ~ I.. 1 ~ ( ; r J °a"'~ , ~y~ ~ 1 r 4tty 61dBtgPtf t. , , £ , ~ , ~ d " 6B , , _ ~ ~ ~ ~,r , , ' TR~L r` , ; f s' ' J j ~ i° ~ ~u '~F ~ ~ 1 i` i o s J, < A. i,,~ ' STONE'CO~STRUCTION ENTRA ~E ` f I~ ( , , _ , ' r / 1 rf Q' ~ I~ l ~ ) w ~ 0278 4 , ~ 3 4 t , , f ? , , I t ~ inCC,f / F' ~ / s' ~ 5 / - ~ r Zf ! d i fi O' w, ~ " / ~ f 11 1 ~ ~ 1 tl e a --w ~ ~ Y , c ' , ~ ~ ~ 0 f ? ~ //flr" ~ ~,J ~ ~ " ~ j f ~~78 ~0 1 aB'~ ~1~ ~ ~ ~ J 3 / ; ~ ~ ft , , ~~dPlillfiX9ti9 f ~ . , ' TEMI~QRARY,.- SIMMER BASIN s ` , , 't i y \ ~ , , ~ a s f % I ~ P ~F j 4 i , o,: ~ x , J" ,r ~ S , i. „ r y ~w„ N ~ ,A f a ? f 9 f ~ i 1~ ~ , 1 , r f i .I ~ e ,so 1 s t 1, ~ ° ` ~r`~ i ~ l s s ' ~l I PRpJECT; , ~ / , i . J ~ ` 3 4 >k ' ' ~ ~ ti~~.~~ o..,,,~~~ ~ } F~ ~ f i ~ f ~ 9 I `s ' f £ JJ ~ 'i s ~ f c i t ; 2y S ~ i . ~ ; , 3 `t i ~ ~ r j „ # S 4~ s I£ y .y .5~~'~ F5~ ' t s t F 't. ~ j ~ } ~'e - i ~ ~I 5 ~p t I~ 3 l k ~ 1 %1i :'v.... ~ ' t 3, ; i , i ~ ~ ' ~ i i s 12 ~1lr~I~I~ f Iu f 1u Ifs lT, 61~ / # r ~ s TRE~,L(NE,~ i f ~ f ~ t. S r,..~ o 1. , f I ; ' 1 i ~ ~ " / t ~ 1 TYPICAL , , ' i 1• ~ ~ ~ ^ 6 ! by i ~ ~ N ~ . ~ £ ' g f i~ ~ i r , ~ ~ . 2$12 ~a ~ t` ~ .e _ ~zz ~ ~ LC~K 423 L~ ~~A ~ ~ ~ ~ ~ ~c ~ 36gg • ~ ~ ~ ~ - t ; r l ~,r , 1~ , ~ ' ~ , . i d f ~ i s 't. t i ~J` r,.,, > ~ 14~ ~ 1 4 i !1~ { e I i "S .7 t . . . s 1 s t F j s , ~ ~ , i C ~ ~ ,.....,.M. ~1//gypV'~~'1~) ~~°'qy } ~ ~ ~ ~ ~ / "y ~°i r- -NSf e' >~K' j' f 'i N { I J j f £ , , t £ ~ \t 1 f i ' s £ f 1 t £ e ~ ; s; fie,,. i ~ ''r ~t~ ~~i ~ A. w y ° i I' ,1 ~ ' ' k ~ ~ ~ f.. ~ . `la 0 t , @@ ~ • ' ~ EXISTING ~ i , ) ! ,i ~ ~ j f ~ E m - s ..q, os~ . q ~ s t` t~ , ~ ~ ~ TREELINE, ° ~ ~ ~ ~t, ~ ~ z ~ f TYPICAL t 3 1 ~ ~ ~ ? f f ~.x>'y a,?"~ ~"°r,,:,;• , ,HYpR~SEED D,O~h1STREAM EMBANKMENT ' .3 ~ l ~ ~ £ ~ ~ s ...~,..,,~,.f`` ~ yam r ~ F 1 S .d ~ We ~ 3 ~ ~/~{~~?r~ , fir` 'v \ .s" ~ ~ \ »'r' , ~ `x~~ _ ,y"'Y~IEN EMBANKMENT AT 9/2,>~OTAL ~ ~ f 1 ~ , f , ~ ^ ~ ,,.....M HEIC3hIT AND COMPLETED r ~ f I ~ 1 ~ ' .,,,w e„ \ f `5 w.~.... ~ ~ l f 1 t ~ r/ ` ' DIVERSIONS ~ ~ n f ~ ,f • v ~ f ,F ~ `l ~ DEWATERING -5. ?f ' ~ ~ ~ ~ ~ • .m ~ ~ ~ ~ ar e~ ~ ~ f f ~ t - ~ ~ . m„_ DISTURB LIMITS,.. , ~ f , s `~rf . f f i~., ~ r'+ ~ } , f ~ ,,x~t k , p I J S f rf~ ~ 9` d A~ f f 3 1 i p i ~ mo ~ia(~'~.4y n "7f"ICAL "2~~ ~ f f s ; PROV#DE APPLIEi)'`POLYMER SYSTEMS, INC.(1~~878-49~-529$~,,,~'APS 700 ~ ~ X23 F f j ' t S ~r~. , 9 TERRA TC7Bk"E~) g ~ j° ! "`f ~ £ 1~ ,f ~ 1 `4 ?iii ^5..,.,. 7~ l~ ~ v r~ -I~ / ~ t ' ~ J AT°~5' INT'ER!lAI ~ ~ ~ `~f SERIES FLOC LOG, IfySTALL AS PER MANUF,4CTURERS SP,E~FICA110NS_», ~ ` , A w. i OR APPROVED EgUAL~ AT ENTRANCE OF ,PPE. ,;r'~ ? ' ~ .fi, ALONG BEeRAM~ f F'~ . y , f' f 3 `t t k~"" '~fi~'. ~ T~.~.~,.eRh~ ...;r P : ~ ~ j \ / g r / ' m s~ "'d ,SEE DAM SECTION PLAi`~ AND EXIS,111NG r `G}ETAILS FOR OUTLET STRUCTURE ,i K'C TRE~LINE, p ~ s ~ f f ; ~ ~ .,.w , y MPO ~ ~ f ~ ~ 3 t r, ~ DIVERSICJP~"..BERG / ~ ~ ea ; ~ AhtO AM SPECIFICATIONS I / TYPICAL ~ ~ j 'y . ,~3kr ~E , : °FY~d.I~AL „N a f t ~ ~ # ; ~ TMICft RIPRAP BEtfM ~ ~ ~ ro,.~,..,,.,..mw~,w o Vhf #57 WASHED ~~ONE " I j w~ w w~>. i y J a < ~r ~ y v _ p~ ~q S~DIMENT FILTER ` -5' a' y!,j ,EXI~11N~ °•r 3f: i'Cr""w,~ ~F f F/ ,N^tl { .,f j ~~.p SjT ~ ~ ty J ~ f' i ? y ~ f` "'`M e yeti. / r ~ y / TAT ~ 4~Lb ~ y f L l ~ • ( ' f Y SJ Y `1 ` S yla , r~ G.. W .m f ~ f r Y I f 'a l f i s~ fie? f*~S r s f; ' P 2 ~ 4 ~b E ~ ~ ~ ~ w,., 9ti ~ z` ~ ~ ,f f~ ~ {:F =k `~w.W ~ ~ CLIENT; ~ f ~ ~ r y ~ ORTH~ AM~RICAtd' GI~EEI~ ~Tf~ ~t .a y f. O ~ ~C 15~~ STA~'LE P,ATT~RN ~ TERRA TUBE i 8 4 ? ~ ~ OR PPR~VED?EQUAL ~ , f ~ t INSTALL AS PER MAN. '"~*~,;,<,.;~,.'"',U ` U //?~Y~`§ ~ Py/~~s~~'~~~ E f fF ; t; VO j~' E~ lS 1. ~`,w,,y` , M. ~ ~ ~ RE,COMENDA S~ ~a ~ f ~s i 1 1 C~.EAN WA -R ~ ~ u ~~s~~ JE~' 1 I i ~ r~bYek NOVANT NEALT~E, INC. ~ r f ~ 5a ~ DIVE~tS10N BEM ,s ~ ~4 , i r w 't x, ~ 4~"~'~~r' ~ ~ 2086 FRONTiS PLA7.~t ~LWD. ~ ~ ~ f WINSTON-SALEi~, NC ~71~3 v ti,. , ~ f f f d j r a ~ ~ DINE '~RAP'ENTRANttE WITH € ~o ,.,w y INLEfi PROTECTION, ~ \ (336) 4{13-3506 w.. M 4 I ~ TYPI,CA ~ ~ j, ~ £ r f Q~ ~ ~ CL~"55 "8" i~IPRAP ~\y~ UMI ~ ~ ~ ~ 'DISTURB TS, ~ CQNTACT: ~ICI(ELLEF~ .,,4 f" f / f ai aJ f ~,K ~ ffPrJ'~C~y ~ ~I ~q y~, - ` - 3 ~ ~ ;TYPICAL 'w, ~ , ~ f a f f ' nfl. ~ a~ 8 ~ / , ~ ~ ~ g , Iy' '"~'~'~ss ~ _ `^w.• w a,,.., I GV rv;~ y~; i ~ ~ TEMPORARY DRAWN: a ~ J TERRA TUBE, t DIVERSION BERM, NSTALL AS PER MAN. r.i,,, TYPICAL HATE: ~-~-OJ *'*y ~ "^w N ~ ~ }f { l / f f ~ f f I ! ~ ' ~r^' ~ ~'j1 y%'~' s l r ~ •CO END ON~, -b.~ t `e, ~~`y ~ ~ t f f i ~ , * „~~f ~ ~ ~ ~ REVISIONS: f` f i ~ .s,, ~ , ~ 1 2.26A9 OWNER REV{SIONS 1 s s '"r ,f" f~ I d ~ y ~ f { S, ° l , -tit fY ~ ? 4 ~ £ ? ' _ 416.09 NCDENRCOMMENTS t ~ { j t t 4.s i j ~ ,gr . r t ~ ~ 3. Y s j 3 . :1'd, .i. r~ ~ t~ r, ~ 9e~ TfRRPg~ TUBE{S~ 6 ~ 3 8.17k9 REVIEW COMMENTS- ~ ~ ~ ` ~ a I,~" r ~ r~ ' AT 25' }1~TERVAL ~ ~ f>,-,. r ~ • ' ,,w .._e, ,r I ; ~ ~ w ~ ~ ~ 1 / ` 4 CI,~SS 'B''' RIPRAP .1'' r P~ ~ ~ t f £ ~ I I -5. ~ CHANNEL LINE ~ ~ ' ~ aALONG ~ERM, -5, w, ~ 4 12.0409 REV, E.G. TO REV. GRADES £ ~ { f r ~f f~-w.. t ~ ~ ~ ~ ~"fYPICAt; ~ ; ~ 5 2.8.2010 REV,E.C,SHOWR.L.E.C. IC~ ~ ' 7 £ ~ , ........,,.M ,Mm ._r ~ ~ ~ 1. ~ ~ ~ j, j f,~" J 1 £ 1 / ; 3 ~PLU E ,~~f`" ~ ~ ; ~.INEr TRA E~ ~C 1 rf ~ j;'' . ~ i 6 5.2320'10 RSV. AS PERVILL, ~ CLEMMONS • f i O' ,f' 4 '4~ r' , 4 r i ~ ~ ~ 4 £ f'1 f w ~ 4 f _ ~ E, 1~ ' ~LA~S t B~~IP~ s 1` ~ ~ o~ r r ~ 5~..~ JOB. N0: L~$~Q3fi f ~ ~ 1 ~ SOW AREA ' ~ ~ ~ S f i ~ ` ~ ~?f~ ~ s' ~ " CLA~S "B° ?~tIPRAP`~ ~ ROW,~O BE _ , f ` SF9EET TITLE. , 1 f f. ~ I I Ott~LET Pf~OTECTI~'N ` JC`~ N~. _.°_i ~ ~ r t `a ; ~ t € ! L~RITS DIS?fiJRBANCE ~ ,r' ~ € ~ ? ~ , w ' - , •t t ~ ~ r ~ ! N 8~~ 234'337~~ s f ` ~ ~ I T i 1 t ~ L~j{~ y, t F'~ £ ~ t t ,i ~ j f ? s'E 95~842~.85~,, } { ~ ` f . f ~ ~ ,,r I ,f i $ ~ f , f 1 ( _,M~ .o~, _ 3 { f CO~TRAC OR T~ HAVE SURVEY{;1R ' t ~ ~ ~ 1 ~ I FIELD NO ,DISTU,~BAt~E ~ i i> r ~ °UNDEt~INE WI~,T'H ~ ~ ~ ~ ~ ° , d ~ °NCpOT TYI~ 2 8 ~ r I ~ ~a ~ m„M ~ ,e . 1 I ~ s' ~ STANCE .Id TH ~ ~ r TEF~RA TUBEES),# I ~ t ~ ~ ~ f' r TO:~~ STREAM R WET1.AND,~ SO~i~TH j f ? IN ALI~~ AS PER MAC; ; f ~ ! i ~ t~ Oh; THIS,'LOCfi~TIOaJ ~~i F` ~ ~f ~ OTEXTIC.E FABI ~t~ e r ~ 1 { , .m. ~ j ~ , f F < 1 ~ R~COMENDATI0~5/'i ~ ~ ,f.., 1 ~ ~tA,~S 'B' ~IP~APf l~ ~ ° / rd r t ~HA~IN~L L~NF~§2 S ~ ' CLEARINCr' LIMiTS,~ ~ . l t s~~w ro_, 1 1 ~ f' Tf~EE PI~OTEG~IO{~ ~ Ski ,7 t ~ ~ ~ t ~ / ~ ~ENCr, TYPICAL ~ ~ . ? ;i. ~O ~IS~UR~A CQ~ --rr ~ TEMPORARY ° TYPICAL y ; ~ ~ ' , j r ~ } i `1 ati ....d , T ~ f„ " ~ 1 ~3 j ~ i „`f oI'~ ~ ~rl{ ! } p f i f / ~ ~ ! f ~ ~ ,~u ~IS[~~ ~1or~A~, ~ , a ~ ol~~roN;;S'~RM ~ ~ f~ ~4NgS ~ 7 ~ , ~ } ~ S ' 3 ~ '0. a 1f ~ ..E r r ~ ) 3 {f f p f £4 1; 1 ~lI IlFAlly P1~ / , E r st,, ~0 '-A 1 { NOVANT I~EAr IJNQ rap eU~ U f' SILT/' cNt; SHEET NO.: ` 1 ~~V /'DR.` 2§ Mori, STOlE F p MM s QU EffSi' A A 1 , ~d N T # REVISIONS c-3fz t SCALE; 1" = 60 n A6-11-2010 ADDENDUM #3, REV. E.C. MEASURES 60 Q 60 STIMMEL ASSOCIATES, P.A. f s' FRp ip©' $UF EXISTING WSE 771.10 NOTES: WSE 771.10 ~ 1. DETAILS ASSOCIATED V~TH ADD ALTERNATE ~1 ARE LOCATED ON ~ RROR FAR PROPOSED WSE 768.00 WSE 768.00 ~ CI #lO2. SHEET C-6.5. f BILLY TESH AND EM~9A TESH Os~ PRECAST ' ~ ~ ~E CONCRETE DB. 726 PG. 1$5 ~c0~ ® ~ , ~ R=1QOO.OO' RISER CLASS "B" RIPRAP WAVE PROTECTION NCDOT STD. 840.01 2. ALL ROADWAY CONSTRUCTION SHALL CONFORM TO NCDOT STANDARDS " " AND THE VILLAGE OF CLEMMONS STANDARDS. BLOCK 4247 LOTS # 105K ~ SEE SHT C-6.O 0 PROTECTION GRATE TYPE E 3. ALL ROADWAY, WATER, SIDEWALK AND STORM DRAINAGE WORK SHOWN aRMAL POOL 1 STA 19+05.70 ON THIS SHEET SHALL BE INCLUDED IN THE CONTRACTORS BID UNDER L=53.30 ~ 2 ABOVE AND BELOW NORMAL P OL ~ Tan=26.66' ~ WITH NCDOT GEOTEX111.E UNDERLINER° UNDERLINER. 1 ADD ALTERNATE ~1. „ ~ l~3 X3'14 EXTEND 10 BEYOND NEW DAM FILL. :W DAM FILL. ~ 4. SEE SHEET C-6.5 FOR TYPICAL SECTION. 4 ChB=S 65°39'26" E 7°~~ ~ ChD=53.29' EXISTING LAKE ~ ~ a REYNOLDS LA{~E ~ ~ eorroM 766.6af BEGIN NCDOT STD. GUARDRAIL, STA. 19+26, GRAD 350 END ~ o ~ o ~ EXISTING NORMAL POOL = 771.101 ~ n, ~ * o PROPOSED NORMAL POOL = 788.00 ~v~ m+® f D U 4J d W o 4F ~ `y,sr +rrw~~ SIDEWALK BY ~'`~--wooam ~ tEitll~'I~I S~1~:9 A ~r ,%,~rpi ` ~ VILLAGE OF is ~ ~ i~., ~ ~ ~ ~ END NCDOT , Q~ N ~ BIKE LANE SYMBOL & TEX ~ ¢ N °-l ~ + STD, GUARDRAIL, h r ~/~.GQ,N~jt~.~ z~;r~',;{~':;ai';h~:~~l_„ i - ,e SYMBOL & TEXT , ;~d~.~- 7p CLEMMONS ® Landscape Architecture ~,yf.,. ,N;,r/%- PAVE~AENT MARKINGS v ~ .JQ C?~ ill °~/fir' /rr l/r/Y.~. •.,.rrr Cl'y;r.''i`;~•'„"z^M .-.ln,<~s.~I'::;%~.~'r:;l~i';~,.< .;.z.,,,,,r....r",os,..>,.;~,..,,,,, LL ~ ~ STA. 13+95 00 ,,.x , , ~ , . " % ° ;f, x ~ >`r;y / r ~ , <r ,f,,,z~ f y. t,. /~~1 _~(~!'.~ii, i./. r'!" l' i f~ y ~;~:v~.r. f' Z ,,rl, / .~,...,a MARKINGS ~'O 0' M ~ Civil Engin ee~ng ~'.~'~"~~~.r,~ Rid ~eFir" ,r~~; ~~/r, ()!9 ~t~ DRIVEWAY TURNOUT, Land Plannin ,•~:SN',.-Y ,r i.i(.r,y.. a: .p,.r.;''.x', r,•ci,,,, ~/rT~ rv.fr y ,_i~;;>yr,...,,.~. J 4 t- x., .,ffft:.3_Z!w., s• .Y .i'~' ~ ri.,,..,i y ~,t,.~'r'.. N,..~j, /;,..i>.''„'~, ,;~j~~`t~,:,j..;"~''.,;:;,;~~'<~~.,~~' ,,,r Y;A w n ¢ GRAD-35Q END ~ ~<s.y'r~..,,.~.:::. ',1. <„,he's{ ' „7 T j!n r ~ ~`'~aMrr .P ,C~ .r~ ( F . ' r,u i' v EX1ST1h(G~ ~ r,F„r .~i , .,,....,..._W_::~:a;:,.:....?2~rus,~1,'xzx,.NJ.;',`,?.v;;i,..h. i:, %~.1 3•r% F~~ OS~p BEGIN STA: 19+31 ...,r..~. ;3~:£?fx..'r~r:L7~>... ANC yr•,;.~r,'/',1 ® Vl~ to a;:%:?.~-.N ,o.~.l,;:x.i;.:/;.s, ut TREEUNE, BEG STA 11+39.68 ~ ~ i ~ TYPICAL „ ,y~r%;r~,~~':% yj~~~~,,~',1 hS~ END STA: 19+61 609 N. Trade Straet Suite 2Q0 N 833590.4086 in ~ ~ W~- NCDOT 84x.02 Winston Salem, NC 27101-2916 E 1588018,2499 ~L W L wL WL ~ vii END CURB & GUTTER P: 336,723,9067 F; 336.723.1069 ~ ~ ~ ~ • AND SIDEWALK m ~ ~ ~ `e STA 19+75 SEALS: ~d ~ ; , NCDOT STANDARD 1 S 64°07' 3+00 4" WHITE STRIPE ~ ~ ~ FOR BIKE LANE i 14+00 ~ 15+ 0 16+00 p ~ 17+DQ ,18+00 ~ ~ ~ S 67°1103 E 473,64 4,15+00 m _ I! 19+ 20+00 ~ 21 +00 NcaEES cE~T. ~0.: c•734~ ~ _ L.. - _ _ ~ ~°n ca m NCDOT STD. 1145.01 TYPE III I ~ alaaama p°°°° BARRICADE WITH ROAD ~ ~ ° , < ° .0. ....1 0. i "t:' },r, . ...t., i. ..y y. . y ° CL05ED SIGN{R11-2) ~ °~s . ° .o END CURB 8c GUTTER : , , , , ' ' o , . , , . ' : v.. , , 1-8 45° BEND ~ 1-8 PLUG AND SIDEWALK STA 13+25.00 W / ° ` EL ~ a ~ ~ ~ ~ 1-6~ 45° BEND • ~ N 833454.6182 , m ~ a ©7912 N ~ ~ f ` / t-8 PLUG m F F E 1586296.2765 ' ~ F PROPOSED fi x R" F ~ ~ DITCH ;s° NCDOT ST[ NCDOT STD. 310.01 R ~ CI X141 a '~~!G!~ ° °'a,`~• . ' ~ A° ~ TOE OF ' ' s , u ` ` STA 18+82.17 6 • - ~ A' SLOPE ~ , .TA 18+82.17-60.98' R~ F NCDOT STD. 840.01 ~ ~°""ti4* p W GRATE TYRE "E" ~ °°'e°p°asasaiaalB't NCDOT STD 838.21 ~<`< F x,: . ~ • • . ' - • y'° ~ CONCRETE HEADWALL ~r 1 £ ®F F W STA 19+05.70 ~ • ELEV. 762.79 x'<;> `'r> 1-8" 45° BEND r ~ W s TOE OF ~ 1-8 45° BEND A. 1 F Y1 / SLOPE ~ END NCDOT " " STD< GUARDRAIL, INLET PROTECTION, f ~ CLASS B RIPRAP STA. 19+00 TYPICAL „ " NOVANT HEALTH INC. w W :r'"":''" ~ , :x f ~ N r-- W INV 752,79 . OUTLET PROTECTION y~~, 6~. / PROJECT: DB. 2812 PG. 466 ~J W ; rf r.Y ~ - ~ L-9' GRAU 350 END EX[STING W=11' - NCDOT STD. GUARDRAIL STD. 826.09 ~ ° BLOCK 42U7 LOTS # 105E p r: '<f,%'°'/. WETLANDS, o g 11 OF 11 WITH WOOD PAST dr; OFFSET ~ WETLANDS, ®6„ NOVANT HEALTH INC. BLOCK FACE OF GUARDRAIL iS TYPICAL ' N P NG P ~ ' `~"%-~,f:*~ .r~`= NO DISTURB TYPICAL UNDERLINE WITH DB. 2812 PG. 466 NO DISTURB NCDOT TYPE 2 BLOCK 4236 LOTS # 16A ¢'w FLUSH WITH FACE OF CURB. PAINT t3~; LU E OOL ~ U R T DISSIPATOR ,<;~~~~~,ytz WOODED G A DRAIL BLACK TO MR CH LIGHTS. I, `;<.~:f.y,r! REFLECTORS PER OT ~ BOTTOM ELEV. 749.39 r„ NCD STDS. GEOTEXTILG FABRIC ~ ~ SEE DETAILS ~ ..,1~ /9(~ ry SHEET C-6.4 TREE PROTECTION iEE PROTECTION $ r ~d 8 DI WATER LINE FENCE, TYPICAL , :I,,._.,., •,._.,-~,_M.~.w____,_.,..,,~, , PVI STA = 13+05,22 TO CITY OF ~NSTON-SALEM LIMITS OF DISTURBANCE :NCE, TYPICAL 3 -6, ~ r° STANDARDS AND SPECIFICATIONS N 833234.3374 PV! ELEV = 792.14 „ ......,,,...,v . e, , _~.,.,-.,i, ,.,..;.m.._.. _.,...".,t,,. E 1588422.8587 FACTORY RESTRAINED JOINTS AS . ......1'~; , ;.,..._._.,..,,,_.~w,, , A° ' s _ °g PER CITY OF WfNSTON-SALEM STANDARDS. STAKE IN THE FIELD ~r ~ ~ K = 30.21 a FROM STA. 13+60 TO STA. 20+05 ~ NO DISTURBANCE TO THE STREAM ~ UNE TO BE INSPECTED a ~ N OR WETLANDS SOUTH OF THIS ~ gTREAM BUFFER m ~ ~ BY THE CITY OF WiNSTON SALEM LOCATION 109 TOP OF BANK UFFER ~ n 160.00' VC 00' STREAM B SCALE: 1" = 40a ~ EXISTING ._~~,Q~~'.._ 1 OM TQP OF BANK ~ w TREh~.INE, ~ U PVI STA = 14+63.23 . LOW POINT ELEV = 778.30 ~q d ~.(j TYPICAL LOW POINT 5TA = 19+05.70 ~ ~ ~ ~ PVI ELEV = 782.57 ~y , , . w...._., .F ~ A.D. = 5.05 9 PVl STA = 19+20.70 ~ € ~ ~ PVI ELEV = 778.00 ~ ` ~ ~ , 1~ i~ . . c~ > : m. , ~ ...,3e Qa ___.r_~.._.,.,~_.. EXISTING CENTERLINE ~1 ~__.____~,m, ......_...w__<.__: ..M. PROF{LE 5CALE \ ' ~ . . _ _ ~ 40' ,,.M_ ..a_. " u~ r. _W _.w__.._ N OR I Z - , _ , , . i i i i i i i i ~ i i i i I p_ : ~ , ~ ~ C r ° ~ v1 ` i i , ' i i ~ ( T~C 77.42 ) ~ ~o : i ,a. t ~ ) GENERAL: ! ! T C 778.42 ~ ~a lir . i1vV" iT~ i t~:58 CITY OF WINSTON SALEM STD NOTES; ~ III~V OUT X6853 ) J;, .__...M..,...~..,,_,...,....._.~ ~ . ~_w._~._..~.,...w 1; QO GENERAL: ~~O L CONTRACTOR IS RESPONSIBLE FOR LOCATING EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION, ~ ~ ~ ~ Dax CEW HTHEMOST , ,,__......w_...,., _..w,",w_:_._.,,,,.,~,,...,_.,..,>.,-,... , _ _ _ Z. ALL EROSION CONTROL DEVICES SHALL eE CONSTRUCTED AND MA{NTAfNED IN ACCORDAN {T ° - w.~.. _ _ CURRENT' STANDARDS OF THE LAND QUALITY SECTION OF THE NGDENR. ._.__~~._r__..~_._..~~_.. x___ s 3. STABILIZATION STONE UNDER PIPINGTO BE PLACED AS REQUIRED BY C4TY INSPECTOR WHEN CONDITIOhiS t ,..,..r."~_".,..,,~ \ END DATER L~dE . ~ ~ ._H..._ G-.,. J : ~ . ~ ..~~TAr 0+05 .,,_.WARRANT. _ _ i i ~ `3 2 LF THE IGHT- F-W D PAVEMENT ANDWIiHlN R 0 AYAND R ' NT ALL GRADED AREAS NOT UN ER (0 , „,~4, AS A MINIMUM REQUIREME EASEMENTS SHALL BE PREPARED, FERTILIZED AND LIMED, SEEDED, AND MULCHED IMMEDIATELY UPON COMPLETION . 'g.yp.! _ ..-;_m. ~ ~ . ~ . ,i '?1 " A• OF CONSTRUCTION AS FOLLOWS (APPLICATION RATE PER 1,000 SQUARE FEET): ~'A0~ t ~ f~ ~ ING WNS OR OTHER FOCAL AREAS ' ~ TYPEiSEED (LA ' ""-900 LBS. OF LIME ! ~ I ~ ~ 20 LBS, OF 10.2040 OR 20 LBS. OF 10.10.101N COMBINATION W14 LBS, OF 036.0 END WATER; LINE S, .41 RT ~ I` STA 18+76>34 ~ sQ "°'5 LBS. OF TALL FESCUE, CONTAINING A BLEND OF 2 OR MORE TALL FESCUES ST`A 1 ~-I-DO ~ ~ ` ~ ` U h1;~r 'b 4 _ 1 / - UCKYBLUEGRASS i LB, OF KENBLUE OR KENT EXIS NG GR DE A 1 LB. OF WINTER ANNUAL RYE (NOVEMBER 1 TU MARCH 1) .1.°°°° ' ` - - - A ~ € LCNGmCI"NfiERLINE ? x O D ~ , , _.-~QE.,.R ...~..,R_. AM. -•-TYPE II SEEDING (GENERAL OR LOW MAINTENANCE AREAS) ! . , ~ P , i i ` 7 ~ 100 LBS. OF LIME i i i I : ~ ~ ~ ~ _ _ ~ 10d•(?9 REV'5DWATERLINET03FTfiAVER 15 LBS. OF 10.20.20 OR 15 LBS. OF 10-10.101N COMBINATION WI 3IBS. OF 0-46-0 ~ - 4 LBS. OF TALL FESCUE, CONTAINING A BLEND OF 2 OR MORE TALL FESCUE CITY OF WINSTON-SALEM 12.04.09 REV. INVERTS ANDPROFJLE FIED SE D AUG 15 TO FEBRUARY 1 s ~ . 5 CART E UST _ ~ _ . ...1 LB. OF SERICEA LESPEDEZA (U E UNS ) ...,.-w; . , ~ _ . ~ I 114 LB, OF GERMAN MILLET (MAY 1 TO AUGUST 1b) ; ,-~_,...a,.,.,_,_t_.,-~ ~ ...w .......,PERMIT NUMBER ~ / I LB, OF RYE GRAIN PRIOR TO MAY 1 ORAFTERAUGUST 15 ` ----f . _ ~ ~ . CLIENT: ~ _.,.~•w._:.. WATER SEEDING MIXTURES OTHER THAN THOSE LISTED ABOVE MUST BE APPROVED BY THE CITY INSPECTOR PR10R TO ` ...,,,.SEEDING. ~ . ,~'Ft' R ,__.u~..~_ ..,.,.w. SEWE ~,_-....~....,..x.,,.. .._.,.,.~~.......~~...__.w~..__..~.:.__w___~..~.......v. NOVANT NERLTH INC. • i _ A, ENGINEER'S ; _ , " - - _ 5. PRIOR TO REQUESTING A FINAL INSPECTION, THE OWNER MUST SUBMIT RECORD DRAWINGS, " ` " ' ~ ' ~ ' ~ ; ...M. ~ _~5~1 I.Fv..... , ~.__.w_ DATE .,.,__~..w.,~._.~~.~.r.~.~._._w ~ : 1e" RCP; ~ EROSION CONTROL 24$5 FR®NTI~ PLAZA BLVD CERTIFICATION PROPOSED FINAL PLAT AND CONSTRUCTION CHECKLIST TO THE ENGINEERING DIVISION'S RECORD i ~ _ CENTER, WINSTON~SALEII>1, NC 27103 ~ PLAN APPROVED {336 X43-3505 I ~ s ~ ,_m.., W . . . u-•6, ALL WORK MUST CARRY AONE-YEAR WARP•ANTY 70 COVER ALL DEFECTS IN MATERIALS AND WORKMANSHIP. - - ..w u...., . _ . . ~ APPR XIMATEiEXI~TING G ADE a: - - PO iJE PY F R N.._ THAVEACO 0 THE w_.,,.._._....ALO ~ED,S~fIA, ~ C®NTACT: NICK ELL~R „,_.J. PRIOR TO BEGINNING ANY WORK WITHIN NCDOT RIGHT OF WAY, THE CONTRACTOR MUS , , , , ,.,......„.._„,1`.~r~ . _ .N w., ~ F THREE-PARTY ENCROACHMENT AGREEMENT ON TliE JOB SITE. DISENFECTION OF PROPOSED WATERLINE TO TAKE PLACE.AT TIME OF CONNECTION TO PUBLIC WATER SERVICE. I ! ~ "0~ ADING PERMIT REQUIRED _ W ~ ~._~.,.,....~,..,....wM ~ IOR TO LAND DISTURBING ~ d..._ ......_.~~,w..,_~.... . __.,x.__.~~_. _~~..~_.rv;._....,;...-,...;,.~~..~._.;~~_.;~_~._......__~.w.~ ..M,.;__„M.,._~ _ DRAWN: TEG APPROVAL OF THESE WATER PLANS DOES NOT ~ 54° DIP: CONSTITUTE APPROVAL FOR CONSTRUCTION. 7~0 DATE: 3-4°09 CITY OF WINSTON SALEM STD NOTES: AP~RO~IM TE EXIS`DNG ~ i i APPROVAL FOR CONSTRUCTION MUST BE r ` ! ! IN FORMAL WRITTEN AGREEMENT. REVISIONS: ~ r „ i'SiVI""~Y'" V'Yf\'{':f~'1tT(.-,...,.........,..,,.. ,_~»,..,.<y;, WATER: € FACTORY ESTRAINED J~fNTS_..5..__w,. ~ ~,"ELEVA~tON 752.50 -_`Yy, acs f ~ ~ ,,..,...H..., . T TA A FAILURE 0 OB IN SUCH GREEMENT 0 6 5.3.2010 REV, AS PER Vlt1.OF CIEMMONS 1. THE MOST CURRENT EDITION OF THE CITY OF WINSTON-SALEM TECHNICAL ~ s ~ , .,,..~_.P.~~,".CII~_ .•..'~l~.ST~L~.SAf..EM...ST~P~DAt31~,S,_. ~ m ~ ~ ,...A: _...~.A..:.,...,_,,, '-""SPECIFICATIONS ANDDETAILDRAWINGSFORWATERLWE CONSTRUCTION \ I ; SAT ~/~Tt LIME LMUS~~I~UJ ,ca ..,...,...~..~.,._~~..._.,_..___..w.~,~.._._ _ PRIOR TO BEGINNING OF CONSTRUCTION FROM STA 13#60TOSTA. 2 +0~ ;i WILL GOVERN ALL WATER CONSTRUCTION. , WILL RELIEVE THE CITY OF ANY 5- - 10ADDENDUM#1 _.M. ; . T 2120 FINANCIAL PARTICIPATION IN THIS PROJEC REV. GUARDRAILIPLUNGEPOOLPROF. 2. FOR RIBBON PAVEMENT STREETS: HYDRANTS, WATER METERS AND SEWER ~ ( / , i i i W ..,~_w I ~ HATSOEVER. SIDE OF THE RIGHT-OF-WAY. . , „ CLEANOUTS SFIALL BE PLACED 5 FEET IN M ? ~ ,w.° - _ _ e( PLACEMENT MUST BEAT LEAST 2 FEET BEHIND ALL Di'CCHES. / . - 8 10.11.2010 ADDED DRIVEWAY APRON, Ap CITY OF WINSTON--SALEM GUARDRAiLANDGRADES ,_,.."FINAL INSPECTION PROCEDURE: ..M . _,_•„..,.m-,~,._.~_.~ ~ _ , BY: 9 10.21-2010 REV T.C. ELEV AND STORM _ _ JOB. NO: 48tl036 1.OWNER SUBMITS RECORD DRAWINGS, ENGINEER'S CERTIFICATION, PROPOSED FINAL PLAT, AND ..k.._~...,.. x-..~~_~......_.___ , CONSTRUCTION CHECKLIST 70 THE ENGINEERING DIVISION'S RECORD CEDlTER. ~ ~ ' SHEET TITLE: N IN PECTIONFORWATERANDIOR ...,.,,__~____,.._....,......,_,_.".y"~__, _ _ 2. UPON APPROVAL BY THE RECORD CENTER, OWNER MAY REQUEST FI AL S ` WATER DESIGN APPROVED SANITARY SEWER. „ . ~ _ . ....www___~.-__.4._--~ WATER 7~O ~ U H, , , u.w...,,,,_, w EL~VA7ION 749.39 Y UTILITIES DIRECTOR DATE I : , ,r-'~rrv-. APPROVAL BY THE UTILITIES DIRECTOR OF T1iE WATER AND SANITARY ~,..,._.v..„...r.m..,.., . : SEWER lNFRASTRUCTU E DEPT ~ R CTED IN THESE PLANS DOES NOT . - _ - CONSITIUTE'APPROVAL FOR ANY OTHER PURPOSE THAN THAT SET 7 # * CJ Q1 ~t SA f9 r e- r 1 LK N CJ 4V 's cq ~r n n c~ € N c4. cv 'q hUKll1 IN Z)ti;IIUN " Ur Ittt WAItK bTbitM t'UUUT ANU StUllUN C'4 ` `A r4 cs'`~ u r r r r F'J {p 07 d i Ph ri N O h Ih~ -4 r r Ui E cri . of ; n . sa d r.I 1. d ci • ci of 36 OF THE SEWER SYSTEM POLICY OF THE CITY/COUNTY UTILITY SCALE; AS NOTED of • of co • j i ( ao .00 ) g7 -w co . ad COMMISSION. TO THE EXTENT OTHER PERMITS, LICENSES, PERMISSIONS O fA M ~4 IPI i Cit Ce1 : 0.Z 06 00 : qp : n t9t. Ql N DO :qp k1 N . 9D ~04 iK om ,...,m i-,....._....~ r~ rl- ___,,t` r r, ~ w n i~ { Y* I*t n n n: n n r• n: Ou F. n, ~~,..r 1_. . OR THE LIKE MUST BE OBTAINED TO COMPLETE THIS PROJECT, SUCH SHEETNO.: n ns :n: Vin. n: J [ J (r J C J "I oe J 6r : CC J ~ J r J Q J J !L' J ~ J ( J ( ARE SPECIFICALLY NOT GRANTED BY THIS APPROVAL AND MUST BE 41 -j x OBTAINED BY THE DEVELOPER AND/OR HIS DESIGNEE. y UUU 0-00 CJUfi3 U U: UVU U U; UUC7 U U; 7Ufa U fu_ U td 4b tJ r F 8 D[ YV IER; UNE r- U U Q v c.) 0 v s c~ ~ W v: } r r r r r ~-l r r;l r( r r wrOR C-140 18+00 19+00 p 20+00 21+00 co 8 10+00 11+00 12+00 13+00 14+00 15+00 9 10+00 00 17+00 184 Q nwn 4~~~~,,.~/J.~J~..J~..J~.Jv?'J.J~,./v'JJ?~./~.l`1~1~1J.1.JJJ~NJ•..~~ J STIMMEL ASSOCIATES, P.A. 100' MIN OR 4x CIRCUMFERENCE OF LARGEST TIRE (Whichever Is Greater) COTE 4" MIN EXISTING CONTINUE FENCE COMPLETELY AROUND 4°' MIN PAVEMENT AREA TO BE PROTECTED. NO 6LDG. ` .STONE SECTION WITH 2:1 MATERIALS, DIRT OR Et~UIPMENT TO BE ~ " ~ , fe O O O O t ^ , t 3> z ~,q 4 STEEL POST B O.C. ~ S SIDE SLOPE, SEE STORED INSIDE FENCE. ~ s ~>,;i a~ ~ i ~zx ~ ~ 3Yd ~ ^ v' 53~ 3,~ ~s t ~ ? ~s x z 1 ~ lr nA'e ' ~ , , : ~ y- ~ ~ TM~` WITH 12 GAUGE WIRE MESH SECTION A-A BELOW ' 6° MA}(. SPACING AND t ) TEMPORARY SIDE ELEVATION FILTER CONSTRUCTION SPECIFICATIONS, FILTER FABRIC EXIS1ING GROUND CLOTH ~ STONE -USE COARSE AGGREGATE 2 - i INCH STONE SILT FENCE BLAZE ORANGE 100' IN- ~ ) " M ~ LENGTH-AS EFFECTIVE, BUT NOT LESS THAN 100 FEET TRENCH 4• X 8 DEEP, TO DRIP lJNE OF CANOPY 15' MIN. SYNTHETIC BARRICADE S~imnt>~~ MESH (OR APPROVED OR 4x CIRCUMFERENCE OF LARGEST 11RE # THICKNE55-NOT LESS THAN S INCHES. EXTEND FILTER FABRIC (Whichever Is Greater) ~ V~DTIi-NOT LESS THAN FULL WIDTH OF A AND WIRE MESFI, BACKFILL EQUAL) TO BE FASTENED ~-antlscape Architecture LL POINTS OF INGRESS OR EGRESS, 25' MIN SILT FENCE, o ~ ~ WASHING-WHEN NECESSARY WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO AND COMPACT TO POSTS Civi! Engineering STEEL,iW00D ~ Land Planning "cn i~ ' OR CONSTRUCTION z ~ ENTRANCE ONTO PUBLIC RIGHT-OF-WAY, WHEN WASHING IS REQUIRED, IT SHALt BE DONE ON I 1 POST TREE FEN - ~ AN AREA 5TA ALlZAE iv CE RETURNS EACH SIDE a ~ ~ B D WJT}i CRUSHED STONE WHICH-DRAINS INTO AN APPROVED SEDIMENT DIRECTION OF FLOW d. ~ o ~ ~ ~ ~ TRAR OR SEDIMENT BASIN, ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY C~ 4'-0" O.C. POST TO PAST 609 N. Trade Slr®ei Suite 2fl0 ~ S10RM DRAIN, DITCH,OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, ~ ~P p~ Winston Salem, NC 27109-2996 ~NCDOT TYPE 2 GEOTEXTILE P: 336.723.1067 F: 336.72.3.9069 ,b~;~, J~Q o0 00 00 00o OoO O OO OR OTHER APPROVED METHODS. 4~ NCDOT ~ ;~.ti;, d Q o o _ FABRIC o~°o © ©o ~a _ - _ FABRIC UNDERLINER ~ ;'t;°?~{;;~;~ d X MAINTENANCE-THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WrIICH WILL PREVENT - = - ~ - 4~~,y ~ E ISTING I~_IIE---II II (I !I II I- p TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC -~Il.-lll =1 - - ! 1-Il~llk PLAN tN SEALS: o ~ ' ' ~'~°`r0 d ~ OQ 0 0 0 AVEMENT -I I-II fl II-N~iII-II II 111-III=f - ' ~ ...t~ - ,z:,,.. ~ o 0 0 (~o Qo 0 o TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND OR ~ - _ _ _ I I-I. 12 THICK LAYCR OF NCDOT ~o po p ~o o a o o •o ~ IL= - iii-I~~f- I_~[-I ~ I~ ,,,,n ~ .,.,y~,, Q Q CLEANDUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED ROPPED, 3 - - - `r m 57 WASHED STONE „ Q - - ' 'II II ~ II 1-i~-i~ III-f~-~~ ~ ~ 4 MiN. 4' MiN. EXISTING o a WAShIED OR' TRACKED ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. - ~1~- - ~ : r . I- ~ _ i 00 -IL-LI-II?-L 1 . II -(I I-1[1=11 GROUND ~ ~ ~=~f-i~ - ; ~r - _ PLAN VfEW II I~I~-1~~-_ I~ l II-II-II g~ NCDOT CLASS B RIP RAP , I-I I_I I I III-III-I I1=1I I-I I I~ I -I I ~.-I I 1=1I1=1 III-I 11=11 I-I I f--I T I~~.I ~I I1=.~J.I I~ NcBa~5 cl:~~r° N®•: C-~3a7 11~ ~I~I II 11111~~-~"l~-I~I= I~~I ~ ~ ~III~I II ~I~I I 1=~IIIII~LI(Ill I~ 11~=1i I~ - ~ 0 ~°'''9iRB7fB B 4®d0 2" TO 3" CLEAN STONE .,'r' ~ 1n II :r_ ~ I ~ II III-II N COMPACTED BACKFILL - - ,1 -~Il~l I(-I I -III-= I I I 2. =1?1=1I I1=1 I1=1I 11=1 I 11= I I^I1 I Ill I I~I f 1-11~~= I I~I 11=1I a=-I I I~ I (IC °~°S°° ° ® , ~ } ~ III 1~L 1111 ~i I~11 ~1~1~~~1I ~I I II ~ I I I~ i I>^ I I~I IllT_~Tll~~li ITT I II~ {IT I _~1T~(~I-1~-1~-- , EXTENSION OF -III~~ 11 I 44 ° °9i ° f 9'-6 MIN C~ CENTER -ITt i ' FILTER FABRIC AND WIRE 11=1 I1-I I ~I I I-I I l=J I I-III-I I f~ I C I -1I I-III ! C=..~=1 I Ill 11=1! I-I - I~~ I I-I I1~=1~ I i~ a ~sEAL ~r; ~ MESH INTO TRENCH I I ~ ~~t~i ~ illi ~ rare E~~•i ~ P~~ ~ i~t s E~~ 119 ~ tL~-~E ~ ~T~II ~I I~~~~~-~,Tli ~ it I I,,I I li o EII ~ o ~s~2 0 NCDOT 1 FABRIC I NCDOT TYPE 2 GEOTEXTILE ~ ~'4 ° SECTION A-A I A-AABRIC UNDERLINER °°,a~ ~~I~r~~0a®° • oo s°r T T TI N.T.S. N.T.S. N.T.S. INLET ZONE 35.E OF SURFACE AREA INLET ZONE 25~ OF SURFACE AREA PROJECT: INLET ZONE 257 OF _IYlaintenance ~,f Fiber F~„~~ion Tubes RF GENERAL NOTES; SU ACE AREA ~.-.,p•-~e~'"'°'~~ Q2 1. DRIVE 5' STEEL POST AT LEAST To assure long ternT performance, Fiber Filtration Tubes {EFTS) installations must be properly ~ OUTLET ZONE 15~ 24" INTO SOLID GROUND, F SURFACE AREA maintained, By definition, these devices are designed to provide filtration and it is intuitive JUTE MESH (3q0 g/`m COIR EROSION BLANKET OR EQUAL TO BE TREATED WITH SII.TSTOP 2. USE STAPLES 1' APART that a properly functioning falter will eventually need to be replaced. This is the case with the B OR 9 INCH water, oil and air filters that we all use on a daily basis, POLYMER PER MANUFACTURER'S RECOMMENOAl1ON, HORIZONTALLY AND VERTICALLY FL06ti D<E;y T. UBE ~,(6"ist£k6~, ~°dt' €9r~'„tt~~.~' f rat ~a~A",F€~~ f a,~f'.,E" 1 LOti4 D Etl;f~T iGN ~'~1"~ `~~'~FA~ £9i~~ The fast maintenance activity For FFTs is to inspect the installation every two weeks andlor RE-APPLY AFTER EACH RAIN EVENT TO ATTACH THE FILTER FABRIC TO THE WIRE FENCE. ~ i.- after each si ificant eci itation event rcal3 > of rainfall as mandated b the US SUPPORT POST, JUTE MESH OR SIMILAR, SUPPORT ROPE 2°I° INTO BOTTOM STAPLED OR TRENCHED STAKE TO ~1PPORT X K 3 IN Pr P {~tYP~ Y_ ) Y - ~ E ~ ~ EPA NPDES regulations. When sediment accumulations reach %z of the FFT height the ROPE OR 1MRE 3. MINIMUM BAFFLE SPACING IS 10', OR WIRE TO OR SIDE INTO BOTTOM ~C SIDES (TYP. BOTH ENDS} PREVENT j sediment should be removed to insure storage capacity far the next event, This may ba ~ . ; d _ _ accomplrshed usuig hand labor or a small bucket loader. Care must be taken to prevent amage SAGGING i FI~.~-~ TFIE FLOOR OF THE ~3ASIhl IN BAC'KF!LL e BACKFILL AND . _..>t== , • 15 T1.7 G ~ .[NCHFS ~ ~ to the FFTs, place all FFTs that display torn netting and/or excessive deformation, ~'I X ThIE OUTLET ZONE AND BERMS CONT'ACT' 4 SHOULD BE SEEDED lu'~ATEI?IP,L CGMi'ACI' LOOSE : . . R I Iw-.~ I E 8 ' 'U ..~i: ,1, i.. , ~ ..i - 1 ~4 w - ; iy . ;.i: r.:. Jiw .3.f.:,. N : + " .,.......y ^ r -,N .-y.:~.: UPSTR A i~.~'. :.,.4 i.i.....!. ..:.:i,.,i 4,,..,...Y• ........C.1.:... ...i..:.:.i........,f:.'.':'i. :.1.:,: if.~.,.,.,.4:. ~.i. 3.i, ..I .3 y BASIN I:, r.:.. ' ~ { f, { 4 f i .,gyp.;.; :.:..,i ~:.~3. .j.yy.;.~'~ ::...,w, . , H ir4 :.1 :.1., r r, r .,,..,;:,,,...J .n f. Y.• i , :.4 % 4:. f.wyy .•J.i.~ .yif.i„:~.i~i:S. ,.h... ,.i l:~ ..3.i~ . .i..3~.r~ ~ ' Unlike man sediment retention devices that Sim. l act as barriers to slow water flow UPSTREAM OF i:.-' f . ~ ° € - Se1V FEES' Y P Y ...f.,.,,...... y H.~....., , ,.3., ~ ; . , : iS CONSTRUCTED : , 7 3, .3. .f. ,i. ;..,v;.::,. r r. ,:.i ; I . , , , Y. r......,,.,d . ! r ' . r 1 ft. 3 } J.. ;.y., f... . E.;. TUBE ' j;~:: i E '-~-•m velocities, FFTs are also designed to capture sediment within. their 3-D matrix. As filtered ~V' 4N"~~ FED material accumulates the matrix will eventuall be m to blind or clo resultin m reduced flow :L;.i: wl• Ci .,:d.: p .4:.Y4q„d:., .f. :i%. ~ R r3 .P f Ji„ 1i4!.'. I'.!. ,iJi' I::,l,:~!' i ,:.;.y.; III 'J""! i.Yi:'. T/ h 3 SCPDM S , „;;.4,.{ .,..3.f..-~,..i.3.. r .f. r.,<. 3.;.;.;.,:. REFER TO NCE r..w.. ....t...,.,,,r: rb, p;,p .,;.;..,.,.;.;.y,,.,.r;.,,.,.....;.:,,.;.:...c.,..{~.r;s.;.;.,,.;.;;.,_;>,,.;.,.;.;.y...,.,p.,:;$.:;:y;;.,.,...a.,,::~~;i~;,'a ;i;t,; - :,f.,, .,,y...... :,rr ~y:.r,,.I..:,.: .,,y....< .I,L,.f;<. s.. .r,,,:.L..;.,.:.r.:..~;.; . ~r~ U SHAPED ..;.,.e.. a I, 6 GR S !NCH ' ~ f ' _ € ~ rates and ingreased turbidity ofwater exiting the FFT. The functional longevity of an FFT is ~ U-SHAPED WIRE -__.I' ~;y'r ~ r :l>, w» ~r.~ix°;~ :......._i ~ _ x,~ rdi;fh~a . ~aU4~ i~G„•',;•.a < £~i ar:~~~aata,£ ty,' 6a,1J~ ependent upon a variety of site specific environmental condikions including duration of .i. :i7:` .:.3.: 3. 3.f.~. :i:<:~`° .65 FOR ADDITIONAL :I. f., i:' : r: a;:. .......:.L4~. ,.~.L,.,::.:.;.;f..,.,.,:.:.....;..:.:.:..:.:..,4 :.r:;:~:,~.....,.,,.:.: ~ 4rt:3 SPECIFIATfOMS. LINE TOOT STAPLES PLACED AT ,fs~.l~" ,t~ s~• ,;a d F s~! v,:'~~a GPs. ~f ik~t'r~~ Ij installation, sediment composition, the presence/type of a flocculent and amount of water that GNE FOOT lI``ITERVw,L S ~ has passed through the device. The functional longevity of an FFT must be determined by _ Dr21VfN TW - - Q DRIVEN THROUGH _ ~ mm I QiJTE~C i GtJTER 1 INCH QF , regularly scheduled f old inspections and on site experience will lead to predictive results in a TUBE. ~I given environment ooo~ Q TUBc. o F..XCAVATE h EXCAVATE A ~S.l"'1' € Fiber Filtration Tubas are designed to photo"biodegrada within two years. Depending upon rte; DiT PLACEMENT _...____..._.................,_.....__.....__.E~ Pi.AC~.lo1cNT TRF..NCH application and long term land use the devices may be left in place or removed. FFTs will CN A~aLIT ! INSPECT BAFFLES AT LEAST ONCE A WEEK AMD AFTER EACH RAINFALL. MAKE ANY RERUEREq REPAIRS IMMEDIATELY. DEEP ABOi.IT Itdt'Hi•.5 f support long term plant growth in areas conducive to establishment of dense vegetation. If an DEEP / GVERIAP ADJACcNT ROM. ENC%S BY A ~iIN(MUM OF GNE FFT is removed there are at least three options for disposal and re-use, X BE SURE TO MAINTAIN ACCESS TO 1HE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE OR ~ -D" MAX, SPACING X-.__._X~ U5E '15 Tt FGGT AND REraUCE STAKING INTERVP,L TO ONE FOGT WIT'r•EIN U5E 15 TG 24-°1NCH STAKE WITH 6--INCH GVERLAP SECTION BECOME INEFFECTIVE, REPLACE IT PROMPTLY, MIN!Mi<M E tTYPICAL) INTERVALS MINiMi<M EMBEDMENT Si'AOED AT ~1W0 F'CD'I' 1. The FFT may be re-used for additional sediment retention or storm water treatment REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADE4UATE STORAGE VOLUME FAR THE NEXT RAIN 7U6E, LEA= INTERVALS DRIVEN THRGUGH OUTER 1 fPdCH OF FOR CHANNEL APPLICA•flG~^dS; 3G'fH iJP5TRfAt~3 AND applications if there isnatexcessivesedimentloading. TUBE, LEA~r'IPG ABOl1T 3 INCHES OF 1'HE STARE DG'A'N5'I'REAM ANCHORING SH(JULD BE A'C rO+'JT fNTERVALS 2.Th.eFFTmaybecutopenandthematrixmayberolledouttobausedasablanketif AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANDUT. 5° STEEL POST PRCTUD!NG SEDIMENT DEPTH ShICULq NEVER EXCEEfl i'IALF THE OE5IGMED STORAGE DEPTH. PROTUD!NG ABOVE THE TUBE Chore is not excessive sedimentloading. ` _w.._......_....-.__ AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFIIE MATERIALS AND ~..OW ^ ~ e, 3. The FFT may be hauled to a landfill if there are potentially undesirable constituents w.~n_E x3re rrtar UNSTABLE SEDIMENT DEPOSITS, BRING TFIE AREA TO GRADE AMD STABILIZE IT. X 8" TRENCFI rv~ ~e3•s.1~ra >1e.M~n "u ~-~:,;;w""~~°"° trapped within the matrix. PLEASE N3Tf YH0.7 THE :NfURW1AIW", FILr PdNAE Yerra °uCes PmtEle Nleve - ~ PaES:h'i'tQ 9tRE1N IS GENFRPI Siapa and Channel Aata'I,dr~r~ - BACKFILL AND COMPACT cown~ 5~Y Irdr3m,~Tran o\LY A is reR ~ Tare lace, carefiill ell out the anchorin sta les and stakes. Take care not to dame e caHCEPnxL 5e eNL APdA aor iNrefoEo co:riw^r NuueE+, snA~•r,Aa-ssst ~ ~ P Y P g P g Te as usaa +ca cardstR«sT•ord. asHtus Fib~€ I"iltrati~r Ttab~~ erosion oontrol devices that have berm installed in con unction with FFTs, The sta lee and FENCE AND FABRIC Yn as usao +cR rs Accuaa~°, m¢ _ - BURIED IN TRENCH ~E~ f~ EVERY LF!'URT tdgc BEE?t MADE TO ENfiURE j ~ ~ P ris Arcuaa~°, rHls traFORM~noN srau±o , ;TERRA-TUBES ~'a sir: ~,~,p,~rE~PY°,,,n~r~,an,a f, , ; stakes may be reusedrf they demonstrate no significant damage aad can be driven back into Mtl? ak us~n f~o3: VFL11i4Uf I,h~DEP:ND _ EXahliM,d'!itiN AMC ~ ~ 'O~/ry~ _ as e!?< ,uorr H n,, osi,Mii. ~ the roe MUY iir, lt,;Ev f'0i2 R SPECiI'1C APPLIi;ATiUN xma;ur LuaFP;rdoFNr PeaFrssECNa ~ . I PROP ILL VIEW - ARAWt; av: MuR anal a/a/3t I s ue rdo .a scvr: g nd. [remove die "spent" FT"C and reshape the existing trench, if applicable. Smooth the _,~a, ExaM«tanaN ,mA w:RlFicaTioN OF «s / ~ r soil surface and install the new FFTs following the published installation guidelines. Be sure to ~ O SU11A91LIlY, APPLiC =11~. i SLOPE C•iAhNE. Cllr..^,MF.n sr: MST_ .............._..tu~ .°Q/4J~7-.I..sh~e7..'..or ~ _..___....._._......_...i sudTneanv, APPL;cti6TUTV Ana AcaiRACY, ~ DETAIL. ~ . _ compact any residual soil against the base of the FFTs to mmumze the chance of undermining , 111= by water. . T T a N.T.S. N TS N TS ~ 3 s , ~ ~ ~ ~i. tit. ~ r ~ ~r r '.z r ` r i £ tt a r r r y ` r z ' ~ TEMPORARY i ~ =t A A , SLOPE DRAIN PLAN VIEW a SKIMMER SEDIMENT CttiSIM ARM ASSEMBLY :9 a tr DESIGN CRITERA n . ~ ~ ` 9 ` ' `Y r 3 FLOW CLIENT: „c~/~ x`a ~ s~~"a~ ~~~f~ a~%~' NOTES: z ~ g~,a, .t~ 6',3tKS a~ ~l,f ,s,: OUTLET PROTECTION TALE: f gRWMAGE ; f ai ,r ~a . ~ i. AREA < 1D AC. rig%';'Y ~`z` ~t' ~i~.y~~f~•~ ' EMBANKMENT 1. REFER TO ' a` OUTLET L W1 W2 MIN. ~ ri °j Maw r ~ PROTECTION (fT) (FT) (FT) THICKNE5S(IN) APRON MATERIAL N01lANT HEALTH, INC° (ACRE'S} ; ~~F T , ~N~;; ; _ "C" ENCLOSURE ; 3 : z , «s ~ s k . NCESCPDM ~ CLASS "B" sTaNE 2085 FRONTIS PLAZA ~LVC1. s,~~~,, ~ ~ E~x~. ~~~~•~,f:~~.,y • FOR ADDrnDNAL MIN. INFLOW i Lit c , ~...~i":~,.~.. t l; t~ A 12A 4.0 14.0 18 FILLING s sT,;a~~,s s ;h&c8~,3,~a~z>it~: DESIGN ~ ;1 fk fa f;ai B 22.0 12.o zs.o 1a3 CLASS "B" sroNE 1NIN~TON-SALEM, NC 27163 FILLING (336) 4D3-3565 a111G STD 2:9 STRUCTURE s%~, ,y y ; rg t SPECIFlCA7IONS k $ t e,s ' ~ fs^~ ' REGARDING q~ . , ~ ~ , _ : >s _ WATER ENTRY KNIT f~gL ~ _ ` ` ~ ~ f, ~ C 12,0 3.0 13.0 18 CLASFILLINGTONE CONTACT: NICKELLER A V SKIMMER ~ ~v ~ z~~u sEDIMENr PERSPECTIVE VI~.W a V `'`r'',_ ~ye.y~y/s~9~~Lt~' 3A~~r:? BASINS. ,y, MAX. £~S `t i ~c~ ~Y s y4 ~ ~R LENGTH Tq 6: t ~ , , s ; ,y nKik s~~&~r~ jai : ~ ~ 2. REFER T~} STD, W#qTH F~tT10 t~ r~r ~~/~si~r~ y~k~~~~~,'~,, s, zr . >sLr.<y4=. ~ ~ : r :r:,, / 3p, i S FOR PVC VENT ;<~i£~s. ;ws I y ; ~ SCHEDULE ~0 ~ ~ ~ £ [r~~. ~ r BAFFLE SPACING PVC ELBOW PIPE s~Y~~G`~fx l ~ " s~~ ~5.£~ ~ PVC END CAP PVC PIPE DRAWN: TEG HIM, 18DD AREAS ' ~ ! yyi ~s~ 3 : v a~ ~ :a ' 3 AUERA~E _ ha r~ ~~~,~a t ~y~~~,~z , F AND INSTALLATION. t Y . js ~ i, ~x / VOLUME (CU, FT, WIDTH ®LEPIGTW ~3r. / ~ { ~r Fai~9 x~>~x .t ~ £ - " PLAN NCDOT RIP RAP DATE' REQUIREq PER Ac. 1 F~~. h~ °lz ~~<~~~x. EMERGENCY rz: : s,~T3 : ~ : x F4~ ~ u~ r' ~ 12 THICK BLANKEI WATER SURFACE ~s " gISTURBEq ~ 4` f£~ SPILLWAY N a < ~ F 1 2 TO 3 4 AGGREG ? AREa of &4SIN WATER ,x4 r~ , ' THICK BLANKET OF REVISIONS. OUTLET PIPE 'O 3/4" AGGREGATE RIP RAP, y:' '?~H ef'~s~. 3' sk s~1~A. ~ ~ ln,'' ,f*r{..... Ris suRFACe Ar TDP DF PR~MAR't' ~,,f; , ~w~~~;y ~ , a.:„, y , NCDOT 57 WASHED ST{ SPILLWAY ti'= : ~ s j k57 WASHED STONE) NCDOT CLASS B. 8" ° p a° ° _ ~ 1Q 8.17-09 REVIEW COMMENTS 325 ,v:~,~~£nt;zr - PVC END CAP = ~ ON F SURFACE ~Sfl. PT. ` ON FACE NCDOT TYPE 2 GEOTEkTILE 2 6.4.2Q10 ADDENDUM #3 REV. BAFFLE DETAIL AREA I ;'Nr PER CFS ~ 3. <~<>~>, ' OuIRED ctD) ~ 3 PVC PIPE SCHEDULE 4O 2 FABRIC UNDERLINER 'ADDED TERRATUBE DETAIL/REM CHECK DAN CROSS-SECTION VIEW BAFFLES 1 . " PVC PIPE t~~~~ I~' MIN. ~ SECTION I ' 1 2 HOLES IN ::x:;<; W-5' HIM, UNDERSIDE ~3,,'i',rv.._ 1' FREEBOARD-° - ~ PVC TEE ~ ;:;:a: 4 rs NATURAL tv t ~ £ Sir ~ ~ GROi1ND - L 6" MAX. DEPTH OF FLOW EMBANKMENT "'`:`I~' PVC TEE ORIFICE INFLOW " ~~s`<. PLATE ~ 4 ~ F a ~ M~ , .~.J if t a~` ' ~ ~ o OVER EMERGENCY SPILLWAY ' ,`f~:>" STRUCTURE BAFF#,ES ~ T-1.5 MIN. I'`'' MIN. 1' ~xGr,r~ i €f l,l f f f ~ ~ ,T ~ ~ ~ PIPE F1pW JOB. NO: 08-036 Z=5' MAX. '"'"y' y f ,£~:y FLEXIBLE s HosE .f„s, : ~ ~ c s~Zkdna DTs .2""%r , ~p,~'~~~~ SfiEET TITLE: DEWATERING y' ~ ~ h'~t:~-1 ,~,y { 0 ZONE ry ~r u9~ ty. , f ~ ~ f , ~NCDOT T'FPE 2 GE4TEX1iLE ~~lb~~~°~' FA®RIC UNDERLINER aGbGb RIP RAP A N ~,Ni~„~>,y; ,f, ~,h~ ~ ~,~!ya,:~, y ry, EMERGENCY ;z SECTION A-A ~ WTLECpIP~~p~u~ D~jd ~ I FILTER FABRIC SPILLWAY r SEDIMENT ~ END VIEW NOTE ANTI-SEEP FRONT VIEW NOTE: SEE ERO~ON CONTROL PLANS fOR SIZE SPEGFiCATIONS• ' a u~ Y~' T STORAGE ZONE COLLAR I PLAN T Chi I r~r ~ T~ T T~T~ ~ .^-,f:AIF• ~.re ea area•a a~a R a e •a®a® a SCALE: NTS SHEET NO.: N.T.S. N.T.S. 6,3 UC STIMME_ ASSOCIATES, P.A. i i MAINTENANCE.. PLAN TEMPORARY 5EEDING EROSION AND SEDIMENTATION CONTROL NO-fES: ON ENTRANCE FOR LATE V~NTERjEARLY SPRING: TEMPORAj~Y GRAVEL CONSTRUCTION ENTRANCE SEEDING MIXTURE MAINTAIN THE GRAVEL. PAD IN A CONDITION TO CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING SECTION{S) DISTURBED AREA: ~ SPECIES: RATE (LB/ACRE): THE CONSTRUC110N SITE. THIS MAY REQUIRE P MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE, DISTURBED AREA - 6.30 ACRES ' ' RYE {GRAIN) 120 AFTER EACH RAINFALL, INSPECT ANY STRUCTUR ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT 1. A SEDIMENTAI`fON AND EROSION CONTROL PERMIT SHALL BE OBTAINED FROM LY REMOVE ALL OBdEC11ONABLE MATERIALS SPILLED, THE CITY OF NSTQN-SALEM EROSION CONTROL INSPECTOR PRIOR TO ANY ° ~ ~ ',~r ~ 3 MIN, 0~ ANNUAL LESPEDEZA 50 OUT A5 NECESSARY. IMMEDIATELY REMOVE ALL `JN (KOBE IN PIEDMONT & WASHED, OR TRACKED ONTO PUBLIC ROADWAYS, 3LIC ROADWAYS. ~ A MAX.2 1 COASTAL PLAIN, KOREAN LAND DISTUR LNG ACTIVITY. 18 MIN. IN MOUNTAINS) TEMPORARY SEEDING HEIGHT 1 RESEED AND MULCI~ AREAS WHERE SEEDLING Eh 2. AN ON-SITE ~RE-CONSTRUCTION CONFERENCE WITH THE CONTRACTOR, THE ~1111111~~1 P RE SEEDLING EMERGENCE iS POOR, OR WHERE EROSION OWNER AND THE EROSION CONTROL INSPECTOR IS REQUIRED PRIOR TO s SEEDING DATES OCCURS, AS SOON AS POSSIBLE. DO NOT MQW DO NOT MOW, PROTECT FROM TRAFFIC AS MUCH AS BEGINNING WO',RK. Landscape Architecture MOUNTAINS--FEB. 1 -MAY 1 POSSIBLE. PIEDMONT--JAN. 1 -MAY 1 COASTAL PLAIN---DEG. 1 -APR. 15 TEMPORARY DIVERSIONS 3, THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE CONSTRUG1lON CIvII Engineering SEQUENCE. I Land Planning OBTAIN BORROW FROM EXISTING GRADE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY SOIL AMENDMENTS REMOVE SEDIMENT FR®M THE FLOW AREA AND L SEDIMENT FOLLOW RECOMMENDATIONS QF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND CHECK OUTLETS AND MAKE TIMELY REPAIRS AS JW AREA AF1D REPAIR THE DIVERSION RIDGE. CAREFULLY 4, THE EROSION AND SEDIMENTATION CONTROL MEASURES AND DEVICES SHOWN ON 601 N. Trade Street Suite 200 LY REPAIRS A5 NEEDED. WHEN THE AREA PROTECTED IS THE DRAWINGS ARE INTENDED A5 A GUIDE. AFTER GRADING BEGINS, ADD Winston Salem, NC 27101-2918 SHAPE BORROW INTO BERM AGRICULTURAL LIMESTONE AND 750 LB/'ACRE 10-10-10 FERTILIZER. PERMANENTLY STABILIZED, BEHAVE THE RIDGE ~ c VE THE RIDGE AND THE CHANNEL TO BLEND WITH THE MEASURES A9 NECESSARY. TO CONTROL EROSION AND SEDIMENTATION. OR AS P; 336,723.1067: F: 336.723.1089 NATURAL GROUND LEVEL AND APPROPRIATELY , EXISTING GRADE MULCH 'PROPRIATELY STABILIZE IT. DIRECTED BY 1HE CITY OF WINSTON-SALEM EROSION CONTROL INSPECTOR. ' SEALS: ~~ditig1a~aateaggggg APPLY 4,000 LB ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR SKIMMER BASINS INSPECT SKIMMER SEDIMENT / AER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH 5. ALL DIVERSIONI, BERMS SHALL BE FERTILIZED, SEEDED AND MULCHED ~e`` `g.® ' ' ' ~ A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS SIGNIFICANT {QNE-HALF INCH OR GREATER) OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. IMMEDIATELY AFTER INSTALLAl10N. PROVIDE MATTING WHERE CALLED FOR ON 4~®` ~°=~~POR,~ j s6~' °°a~ A MULChI ANCHORING TOOL. REMOVE SEDIMENT AND RESTORE THE BASIN T ACCUMULATES TO ONE-HALF THE HEIGHT OF Tl E THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT THE DRAWINGS. a ; ~ F'°"e~ E HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE ! ~ MAINTENANCE SIDE SO THAT THE SEDIMENT UNDERNEATH IT IDERNEATH IT CAN BE EXCAVATED, EXCAVATE THE SEDIMENT 8. ALL EROSION'~AND SEDIMENTAITON CONTROL MEASURES AND DEVICES SHALL BE ~ m REFERTILIZE iF GROWTH IS NOT FULLY ADE UATE. RESEED REFERTILIZE AND MULCH FROM THE ENTIRE BASIN, NOT JUST AROUND 11 Q , UST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE INSTALLED AND MAINTAINED IN ACCORDANCE WITH 1}iE NCDENR -LAND TTOM OF THE BASIN DOES NOT HOLD DOWN 11iE SKIMMER. QUALITY SECTION'S EROSION AND SEDIMENTA110N CONTRtJL PLANNING AND ~ 'c a N T ~ IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE, VEGETATIQN GROWING IN THE BOTTOM OF THE E DESIGN MANUAL. ALL MEA5URE5 AND DEVICES SHALL BE INSPEC1~D AFTER FOR SU M R: REPAIR THE BAFFLES IF THEY ARE DAMAGEI ARE DAMAGED. RE-ANCHOR THE BAFFLES IF WATER IS ANY RAINFALL EVENT, OR ON A WEEKLY BA51S AS A MINIMUM, AND MAKE ANY p°°'°°°~;,sg°°°°°~!'~m°`® SEEDING MIXTURE FLAWING UNDERNEATH QR AROUND THEM, SPECIES. RATE (LB/ACRE): dD THEM, NECESSARY REPAIRS IMMEDIATELY. ®ggg '~'~q~®e gggBBl9949&At ~q\ GERMAN MILLET 40 IF THE SKIMMER IS CLOGGED WITH TRASH AN nTti TRASH AND 1T-IERE IS WATER IN T1iE BASIN, USUALLY 7. ALL SLOPED SURFACES SHALL BE ROUGHENED USING TRACKED EQUIPMENT TO gli47y ~ T JERKING ON THE ROPE WILL MAKE THE SKIMfr W ~ IN THE PIEDMONT AND MOUNTAINS, ASMALL-STEMMED SUDAN GRASS MAY BE SUBSTITUTED AT DEBRIS AND RESTORE FLOW. IF THIS DOES NO AKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE MINIMIZE EROSION DURING VEGETATION ESTABLISHMENT. `0~®6' ~®,®gg THIS DOES NOT WORK, PULL THE SKIMMER OVER THE SIDE B, ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED IN ACCORDANCE Willi ° '';'m"''~, T~ A RATE OF 50 LB/ACRE. OF THE BASIN AND BEHAVE THE DEBRIS. ALSO DEBRIS, ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO THE SEEDING (SCHEDULE WITHIN 15 WORKING DAYS OR 21 CALENDAR DAYS, ~ ~ r , ~ 2 FT MIN , , ~ € SEE IF IT 15 CLOGGED; IF 5Q REMOVE THE DEBF MOVE THE DEBRIS. WHICHEVER i SHORTER AFTER COMPLE110N OF CONSTRUCTION. ALL SLOPES m ~ a i . i . ~ ~ !w~ SEEDING DATES ~ .--I ~ i I~:. ~ MOUNTAINS--MAY 15 -AUG. 15 iF THE SKIMMER ARM OR BARREL PIPE IS CLOG FEi. E~. I~--~,~;- ' SHALL BE SEDED AND~MULCHED W111iIN 15 WORKING DAYS OR 21 CALENDAR AL m L PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE DAYS WHICH VER IS SHORTER AF11Di COMPLETION OF 1HAT PHASE OF GRADING. ° 0279 2 a ~ I ~ ~ E E I i I I ~ ` 2 MAX PIEDMONT--MAY 1 -AUG. 15 OBSTRUCTION CLEARED WITH A PLUMBER S SN. - PLUMBER'S SNAKE OR BY FLUSHING WI1H WATER, BE SURE SEEDING MIXTURE SHALL INCORPORATE SEED TYPES FROM THE PERMANENT AND ~ Q ` ~ ' " ~ ' COASTAL PLAIN---APR. 15 AUG. 15 AND REPLACE THE ORLFIGE BEFORE REPOSII'IQNII RE REPOSITT(INING THE SKIMMER. TEMPORARY SEEDING SCHEDULES APPROPRIATE FOR TTiE TIME OF YEAR THAT a °q~ ~ ° 501E AMENDMENTS CHECK THE FABRIC LINED SPILLWAY FOR DAMI ,WAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH SEED IS BEIN~ APPLIED. `0,,,~~Clid°,.° BOTTOM WIDTH ' FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB ACRE GROUND FABRIC THAT SPANS THE FULL WIDTH OF / LL WIDITi OF THE SPILLWAY, CHECK THE EMBANKMENT, 9. ALL EROS~ON'CONIROL MEASURES AND DEVICES SHALL REMAIN IN PLACE UNTIL gg®Ig~p~O b'''~® ' AGRICULTURAL LJMESTONE AND 750 LB/AGRE 10-10-10 FERTILIZER. SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND SETTLEMENT. MAKE ALL NECESSARY REP tOS1ON DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING ALL DIS1URBED AREAS ARE REVEGETATED AND 1HE ER051ON CONIRpL rba~{'~& 'ECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND INSPECTOR APPROVES 1HE REMOVAL OF THE DEVICES. PROJECT: MULCH OTHER DEBRIS FROM THE SKIMMER AND POOL A ~R AND POOL AREAS. APPLY 4,000 LB/AGRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCIi ANCHORING T001_. A DISK WITH BLADES SET NEARLY STRAIGHT GAN BE USED AS FREEZING WEATHER CAN RESULT IN ICE FORMIN 10. THE CONTRACTOR fS RESPONSIBLE FOR COMPLYING WI11i ALL CONDIT30N5 IN TTiE IN ICE FORMING IN THE BASIN, SOME SPECIAL PREGAU110N5 NPDES GENEf~,AL PERMIT ISSUED AS PART OF THE EROSION CONTROL APPROVAL A MULCH ANCHORING TOOL. SHOULD BE TAKEN IN THE WINTER TO PREVENT I :R TO PREVENT THE SKIMMER FROM PLUGGING W11Ti ICE. THESE ITEMS ;INCLUDE BUT NOT LIMITED TO RAINFALL MEASUREMENTS, MAINTENANCE', & REPAIR RECORDS, ETC. - MAINTENANCE SILT FENCE 1,5 FT CLASS REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED REFERTILIZE AND MULCH INSPECT SEDIMENT FENCES AT LEAST ONCE A W ~tiST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY y 2 FT(MIN) B" RIPRAP IMMEDIATELY FOLLOWING ERASION OR OTHER DAMAGE. REQUIRED REPAIRS IMMEDIATELY. SHOULD THE SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, I,' ~ 1 TEAR, DECOMPOSE OR BECOME INEFFECTIVE, RE " ' } ' _W FOR FALL: EVERY 60 DAYS. REMOVE SEDIMENT DEPOSITS ~i"'=~` ~ ~ ~:~E'' 2 MAX NEFFECTIVE, REPLACE rf PROMPTLY. REPLACE BURLAP TENT DEPOSITS A5 NECESSARY TO PROVIDE ADEQUATE EROSION AND SEDIMENTATION CONTROL NOTES: ' " ~ ~ ~ ~ ';,,1 I . i, SEEDING MIXTURE STORAGE VQLUME FOR THE NEXT RAIN AND TO ' RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE 4 FT NCDOT TYPE 2 SPECIES: RATE (LB/ACRE): CARE TO AVOID UNDERMINING THE FENCE DURi~ - ~ GEOTEXTILE RYE {GRAIN) 120 MATERIALS AND UNSTABLE SCDIMENT DEPOSITS ~ IE FENCE DURING CLEANOUT. REMOVE ALL FENCING 1. NO CLEARING OR GRADING WORK SHALL COMMENCE UN11L ALL EROSION AND STABILIZE LT AFTER THE CONTRIBUTING DRAINAGE ENT DEPOSITS AND BRING THE AREA TO GRADE AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE. UTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. BOTTOM WIDTH UEIDERLINER SEEDING DATES 2. CLEARING LIMIT'S SHALL BE CLEARLY DEFINED PRIOR TO BEGINNING CLEARING MOUNTAINS--AUG, 15 -DEC. 15 PERMANENT GROUND COVER PIEDMONT AND COASTAL PLAIN-•~AUG. 15 -DEC. 30 THE OWNER QR RESPONSIBLE PARTY iS RESPOh OPERATIONS. ''CLEARING DEBRIS SHALL BE PROPERLY DISPOSED OF OFF511E IN A tRTY iS RESPONSIBLE FOR THE LONG-TERM MAINTENANCE OF PERMITTED LANDFILL FACILITY. ONSITE BURNING OF CLEARING DEBRIS kMLL NOT THE GROUND COVER ON THE PROPERTY, GRQL OPERTI', GROUND COWER MUST BE MAINTAINED TO A BE ALLOWED. TREES OUTSIDE OF THE CLEARING IMITS SHALL BE PROTECTED SOIL AMENDMENTS DEGREE TI~fAT PREVENTS SAIL ER0510N AND SE[ ~0510N AND SEDIMENTATION AT ALL TIMES. DURING CONSTRUCTION. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/AGRE 10-10-10 FERTILIZER. 3. PRIOR TO PLACING FILL, ALL FILL AREAS SHALL BE STRIPPED TO REMOVE TOPSOIL, STUP~PS, ROOIa, ORGANICS AND OTHER UNSUITABLE MATERIAL. ~ ~ STRIPINGS SHALL BE STOCKPILED AS DIRECTED BY THE OWNER. 1 MULCH APPLY 4,000 LB/ACRE STRAW. ANCHQR STRAW BY TACKING WITH ASPHALT, NET`f1NG, OR PERMANENT SEEDING N,T.S, A MULC!-I ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS ' 4. ALL SOIL STOCKPILES SHALL BE PLACED WITHIN THE DISTURBED AREA LIMITS ' A MULCH ANCHORING TOOL. ALL UNPAVED DISTURBED AREAS OR LAWN TO ( SHOWN ON TTiE DRAlMNGS. STOCKPILE AREAS SHALL BE LEFT SUCH THAT ' {OR LAWN TO BE REESTABLISHED) OUTSIDE RAINFALL RUNS 4FF AND IS NOT TRAPPED ON OR 1MTH1N THE PILE. ALL RUNOFF MAINTENANCE PLANTING BED TO BE SEEDED WITH AN EVEN M ITH AN EVEN MIXTURE OF REBEL II, FALCON AND SHALL BE DiREC1ED TO APPROVED SEDIMENT TRAPPING DEVICES. ' REPAIR AND R RTI I E DA IMMEDIATELY. TOPDRESS WI 50 LB ACRE OF JAGUAR FINE FESCUES, 4R APPROVED EQUAL, i EFE L Z MAGED AREAS TH / SO AS TO PRODUCE A THICK, FIRM STAND OF I iOVED EQUAL, AT A RATE OF 5-8 LBS./1,000 S.F. RM STAND OF GRASS. FERTILIZE AT A RATE OF ~ NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 10 LBS./1,000 S.F. WITH 10-10-10 SLOW-RELE. 15, OVERSEER WITH 50 LB/AGRE KQBE {PfEDMQNT AND COASTAL PLAIN) OR KOREAN ASPFIALT EMULSION TO COVER SEED UNTIL STAI •10 SLOW-RELEASE FERTILIZER {U5E STRAW AND (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. SOIL TEST, OR APPLY 4,000 LBS./ACRE SLOW- ~ . ~F~ED UNTIL STABLE). APPLY LIME ACCORDING TO I, ~ ,'`~l" i./ACRE SLOW-RELEASE PELLETIZED AGRICULTURAL ~`A LIMESTONE< SEEDBED PREPARATION: TOP OF RIP RAP END OF DARREL 1. RIP AREA TO BE SEEDED TO A MINIMUM DEPTH OF 4--8 INCHES. SEEDING DATES • 6" BELOW BARREL INVERT 2. REMOVE ALL LOOSE ROCKS, ROQTS, ETC. LEAVING SURFACE SMOOTH AND UNIFORM. AUG. 20 -OCT. 25 ~ FEB. 1 -MAY ..1-MAY, - - 3. APPLY SEED, AGRICULTURAL LIME, FERTILIZER AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH THE SOIL. 4. SEED ON A FRESHLY PREPARED SEEDBED AND COVCR THE SECD LIGHTLY ~MTH SEEDING ~ - ~ P NT 0 UL P CK >~1~. . ~ y 13.0' EQUI ME R C Tl A AFTER SEEDING. ~ 1 5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. o , , ; , ~ i ~a BOTTOM PLUNGE POOL 1 F'm T.: ~ ~ ' t,..ri~ ` a,~" w }v Y.i ~ ;:ny z ~q i ~ i V /0 2' 1 SLOPE 2' I NOTE: t: ~ ROCK RIP RAP SHALL MEET THE REQUIREMENTS OF MORTH CAROLINA DEPARTMENT 38 2= OF TRANSPORTATION, STANDARD SPECIFICATIONS, SECTION 1042. THE RIP--RAP SHALL BE PLACED TO TFIE REQUIRED THICKNESS IN ONE OPERATION. THE ROCK SHALL BE DELIVERED AND PLACED IN A MANNER THAT WILL INSURE THE RIP- RAP ~ IN PLACE SHALL BE REASONABLY HOMOGENEOUS WITH THE LARGER ROCKS ~,u~•~ - UNIFORMLY DISTRIBUTED AND FIRMLY IN CONTACT ONE TO ANOTHER WITH THE SMALLER ROCKS FILLING THE VOIDS BETWEEN THE LARGER ROCKS. FILTER CLOTH I 17.4'--~;~ SHALL BE PLACED UNDER ALL RIP RAP AND SHALL MEET THE REQUIREMENTS OF i NORTH CAROLINA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS, PROTECT 5 SKIMMER DETAIL JUlE NETTING {TYPICAL) PROTECT WEIR >MTH FILTER ~ RppEIEVAL (SEE DETAIL 040O0.1B) (SET: SHEET 1) 30.6' ~:,N' SECTION 1056, TYPE 2. FABRIC A FABRIC AND RIP--RAP ;3: ~,4~:... ~:1 WEIR 1g" ~ BOTTOM PLUNGE POOL. ' ~ 2•"'' EXIST GRADE 29 , ~ LNG GRADE EXISTING GITADE TRANSITION ~ 4:1 ~ NCDOT CLASS ~ FILTER FABRIC ~ ~ CLIENT: TD XISTING EAM ~ 11.1' - 2 RIPRAP E STR „ ra GEOMETRY ~ Q Q - - NOVANT HEALTH, INC, ' EXISTING STREAM - I ~ I~- I ~ 205 FRONTIS PLAZA BLVD. ' A = l o a d ' LENGTH iNINSTON-SALEM, NC 27103 5°x3'x1 a° ' END RIPRAP ~ 1 AT END DF 2 MAX ®y~ EXISTING WASHED 17 4 FT NCDOT TYPE 2 NOTES: 6" STONE APRON (336) 403-3505 WEIR DETAIL CONTACT: NICK ELLER TRANSITION STREAM STONE GEOTEXTILE 1. USE FOR DRA I. USE FOR DRAINAGE AREAS NOT EXCEEDING 5 {FIVE) ACRES. ' SEE PLANS FDR LIMITS OF STREAIN BEDDING UNDERLINER 2. EARTH BERM SHALL BE STABILIZED sv/SEEDING ACCORDING DISTURBANCE. DO NOT DISTURB THE BOTTOM WIDTH 2. EARTH BERM STREAM BEYOND THIS POINT. TO TOWN SPI TO TOWN SPECIFTGATTONS. ' LINE WEIR WITH DRAWN: RIP--RAP ]DATE: 2-9-09 DESIGN 0 DESIGN OF~ SPILLWAYS NCDOT DRAINAGE ARE REVISIONS: DRAINAGE AREA WEIR LENGTH( a~; ~ „ TOP OF DAM 1 8-17.09 REVIEW COMMENTS HEADWALL (ACRES) {A ORES) 4 0 ~ , s~ 0 RIPRAP ON PLUNGEPOOL 1 SIDES IS NOT SHOWN 2 FOR CLARITY i 3 2 6 0 r` ~2 12.04•p9 PLUNGE POOLICHANNEL DTLS. INV. 4 BARREL 4 10.0 DITCH AND BURY . ~ 752.79: TDP O~F BANK 5 1 DIMENSIONS S 5 12.0 FILTER FABRIC EDGE 1 DIMENSIONS SHOWN ARE MINIMUM FILIt_R FABRIC WEIR LENGTH (MIN. 12" OF FABRIC) = G CONCRETE ~ 752,OOt' ~~F r,,, "~,,,~u MAINTENANCE JOB. NO: 08-036 CRADLE ~ ~ nY ~ Uc%,"c ~ T Q, EXISTING SLOPE ,,,,i~-~• ~~;~~,~i~•.1,~„ 3 » NCDOT CLASS 2 RIPRAP INSPECT lT~v1PORARY SEDIMENT TRAPS AND EMPTY SKIMMER OF ALL DEBRIS AFTER EACH PERIOD OF 51GNIFICANT RAINFALL. REMOVE SHEET TITLE; e ~irx 749.39 ~ os ~ ; , t ~ , A, SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH ' - ~ , ° ~ r A,y 6 #57 WASHED STONE . ~ - OF THE TRAP. PLACE 'THE SEDIMENT THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF II ~'I~li ~ ~ '!~I THE GRAVEL PAGING. I NCDOT TYPE 2 ~ _ NCDOT TYPE 2 GEOTEXTILE FABRIC GEOTEXTILE FABRIC CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS UNDERLIhIER 13.6 FT 38.2 FT 11.1 FT A MINIMUM OF 1.5 PT BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SP?LLWAY MUST BE REPLACED IMMEDIAII:LY. COMPACTED SUBGRADE STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE 1RAP IMMEDIATELY I I AFTER CONSTRUCTION WI1H SEEDING. 0~ A P~ Aim A P h A°~A A A A\ 1 ~c A"~' ~ A'® A A A R I ~ I ~ I k ~ k A I® I®°f I"°° I I t"~ I"'~ f ~l C°°° I R 1 I`°'1 I I I 1 A ! ~ °e 0 - I I III m r I Lm I 01-\311N r I LLV /-1 T SCALE: 1"=s0" sir Kar r~.uNC~~ ut i aiL .~r " ' ~vTs SCALE SCALD: SHEET NO.: (0,4 0 STIMMEL ASSOCIATES, RA.