Loading...
HomeMy WebLinkAbout20110461 Ver 1_Site Inspection_20110526 Beverly Eaves Perdue Governor Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Division of Water Quality Coleen H. Sullins Director August 26, 2011 Dee Freeman Secretary Subject: Inspection-NCSR 11 I 1 (Zeb Alley Road) DWQ Project No. 20110461 Jackson County Dear Mr. Selzer. On August 16, 2011, I inspected the construction work for the widening project of NCSR 11 I 1 (Zeb Alley Road) in Jackson County. The heavy grading work appears to be completed and the contractor was placing gravel on the lower section of the road. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental (electronic copy) Transportation Permitting Unit Mike Parker, Asheville Regional Office (Selzer) NCSR I I I I (Zeb Alley Road) Inspection Letter August 2011 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296A5001 FAX : 828-299.7043 One Customer Service: 1-877-623-6748 North Caroh na Internet: w nv ncvvatemuahty om NaturallY An Equal opportunity (Affirmative Action Employer {6 l NCDENR North Carolina Department of Environment and Natural Resources DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: Auaust 16, 2011 County: Jackson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 09-0451 NW Permit #: IP Project Name: Location of Project: NCSR 111 I Zeb Alley Road From the intersection of US 64 and NC 107 in Cashiers travel south on NC 107 approximately 1 mile. Zeb Alley Road is on the right. Project Complete: ?Yes X No Bridge Culvert Bottomless Culvert "Bottomless Arch ? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Unnamed tributary to Chattooga River Basin/ Subbasin: Savannah 01 Wetland Type: ?Isolated x?Non-Isolated (Waters of US) Stream Class: X?Class B ?303d Listed ?WS-II ?WS-V ?SB ?Class C X?ORW X?Trout ?WS-lll ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch ?Riprap Inlet/Outlet Stabilization ?Fill Authorized Wetland Impacts: ?0 - 1/10`s acre ?1/1I'" to 1/3`d acre ?1/3`d to LO acre ?> 1.0 acre Authorized Stream Impacts: X?< 150 linear feet ?> 150 linear feet Additional comments: Work is underway on the project and includes heavy grading. Gravel was being placed on the lower section of the road at the time of inspection. Sediment and erosion control structures appear to be working properly. It was suggested to DOT inspector that two areas with steep banks, near the stream, be matted and that the silt fence be relocated in one spot where the fence was in the stream channel. Continue to maintain erosion control devices and continue with seeding, matting and mulching as required to protect State surface waters. NCSR 1111 Zeb Alley Road Inspection Report