Michael F. Easley, Governor
William G. Ross 1r., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
April 24, 2007
DWQ# 07-0567
Iredell County
Mr. Parker Nealy, Jr.
Hwy 150 Land Company, LLC
16930 W. Catawba Ave., Ste. 205
Cornelius, NC 28031
Subject: Hwy. 150 Commercial Site, Mooresville
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Nealy:
You have our approval, in accordance with the attached conditions and those listed below, to fill 0.49
acre of open water to develop the site in Iredell County, as described in your application received by the
Division of Water Quality (DWQ) on March 30, 2007. After reviewing your application, we have determined
that this project is covered by Water Quality General Certification Number 3631, which can be viewed on our
web site at http://h2o.enr.state.nc.uslncwetlands. The General Certification allows you to use Nationwide
Permit Number 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should
get any other federal, state or local permits before proceeding with your project, including those required by
(but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations.
The above noted Certification will expire when the associated 404 permit expires unless otherwise
specified in the General Certification. This approval is only valid for the purpose and design that you described
in your application. If you change your project, you must notify us in writing, and you may be required to send
us a new application for a new certification. If the property is sold, the new owner must be given a copy of the
Certification and approval letter; and is thereby responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the following conditions:
The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas
has commenced.
2. The work shall be conducted "in the dry".
3. Storm water discharge structures at this site shall be constructed in a manner such that the potential
receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion
of the stream banks.
4
A final, written storm water management plan (including a signed and notarized Operation and
Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321
Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of the 401 Water Quality
Certification. The storm water management plans shall be approved in writing by the central office before
the impacts specified in this Certification occur. You have the option of using the Express Review Program
for expedited approval of these plans. If you propose to use the Express Review Program, remember to
include the appropriate fee with the plan. The storm water management plan must include construction
plans, specifications, storm water BMP worksheets, and supporting calculations. Noehcarolina
~atirrally
North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service
Internet: ncwaterqulaity.org FAX (704) 663-6040 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper
The storm water best management practices are required to be appropriate for the surface water
classification and designed to remove at least 85% TSS according to the most recent version of the NC
DENR Storm water Best Management Practices Manual. These facilities must be designed to treat the
runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also,
before any permanent building is occupied at the subject site, the facilities (as approved by this Office)
shall be constructed and operational, and the storm water management plan (as approved by this Office)
shall be implemented. The structural storm water practices as approved by this Office as well as drainage
patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be
made without written authorization from the Division of Water Quality.
5. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality.
6. Continuing Compliance. The applicant (Parker Nealy, Jr.) shall conduct all activities in a manner so as not to
contravene any state water quality standard (including any requirements for compliance with section 303(d)
of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines
that such standards or laws are not being met (including the failure to sustain a designated or achieved use)
or that state or federal law is being violated, or that further conditions are necessary to assure compliance,
DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with
such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the
certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in
accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A
NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided
to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of
the Clean Water Act, and shall also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that
conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless
you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act.
If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-
1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721.
Sincerely,
for Alan W. Klimek, P.E.