Loading...
HomeMy WebLinkAbout20030909 Ver 3_Email_20041215mail~x:///C ~ /Documcnts~%20and~~~lOScttin~s/cynthia... Subject: Re: U-2524 AB/AC - 401 WQC, Condition 14 From: Cynthia Van Der Wiele <cynthia.vanderwiele@ncmail.net> Date: Mon, 15 Dec 2003 09:39:14 -0500 To: Phillip Todd <ptodd@dot.state.nc.us> yes. thanks. Phillip Todd wrote: Hey Cynthia. I am in the process of trying to write a letter to DWQ about Condition 14 which involves the NCDOT through its Division 7 Right of Way office providing "evidence" that its on-site stream mitigation areas are within right of way. Would a letter do with the Project Section, Station Number and Plan Sheet Number noted? I was thinking this b/c you already have a set of design plans and the areas are already noted with "C/A" (control of access) notations. Please let me know what you were thinking with this condition. PT 1 of 1 1/16/20041:23 PM