Loading...
HomeMy WebLinkAbout20030909 Ver 3_Email_20040604U-2524 AB/AC Subject: U-2524 AB/AC From: Beth Barnes <beth.barnesC ncmail.net> Date: Fri, 04 Jun 2004 15:17:16 -0400 To: Sue Homewood <Sue.HomewoodC~ncmail.net> Ok, I am wrong. DWQ will still issue a modification to the IP.....the USAGE may not, but DWQ will. This will be a modification to the IP, not a NW 33 as Jerry ask for in the request. I will get right on this. Hi Sue. It is raining here for the first time in far too long. I do realize that you are participating in training and you will not get this message until sometime next week, but ..............I am going to try to clarify the modification requests. On June 1 I discovered a second mod request for this project (dated May 17). I have already written (and FAXED to you) the modification to the IP that was dated April 30. The April 30 mod request came through PD&EA (the pre construction side of DOT). The May 17 mod request came through the division DEO, Jerry Parker. Now that you know this little tidbit, perhaps the draft mod I sent you makes more sense. I spoke with John Thomas, USAGE who handles DOT div. 7. John had also already discussed the May 17 mod request with his DOT USAGE colleague Eric Alysmeyer. Both are of the opinion that this channel diversion request is "within the scope of the condition of the new channel" (from the conditions in the original permit). Therefore ..............according to the USAGE, no need for the mod. I did tell John that you felt the requested changes were resonable. John Thomas is to send Jerry Parker a letter explaining all of this, and I requested he cc DWQ. I need something to put into the project file. We are now back to the "no 404, no 401" scenario. All that said, I hope you have a good weekend. of 1 6/4/2004 3:28 PM