Loading...
HomeMy WebLinkAbout20110728 Ver 1_More Info Received_92010829Strickland, Bev From: Witherspoon, Lauren Sent: Monday, August 29, 2011 9:21 AM To: Strickland, Bev Subject: FW: Bragg Street additional information_Project #2011-0728 Attachments: Riprap outlet protection.pdf For the file Thanks, Lauren From: Becky Ward [mailto:bwardC&wce-corp.com] Sent: Wednesday, August 24, 2011 12:05 PM To: Witherspoon, Lauren Cc: 'Thomas-Ambat, Sheila' Subject: Bragg Street additional information Lauren: I have attached the riprap outlet protection calculation for the Bragg project as requested. I believe I satisfactorily clarified the statement on page 7 of the text when we talked this morning. Please let me know if you require any additional information to complete your review. Sincerely, Becky L. Ward, P.E. Ward Consulting Engineers, P. C. 8368 Six Forks Road, Suite 104 Raleigh, NC 27615-5083 Ph: 919-870-0526 email: bward@wce-corp.com DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project Bragg Street Date 30-Nov-10 Project No. Designer J. Eakins Outlet 1D FES Al Outlet flowrate 23.2 cfs Pipe diameter 24 inches Number of pipes 1 Pipe separation 0 feet Outlet pipe slope I percent Pipe diameter (ft) Zone from graph above = 2 Outlet pipe diameter 24 in. Length = 12.0 ft. Outlet flowrate 23.2 cfs Width = 6.0 ft. Outlet velocity 7.4 ft/sec Stone diameter = 6 in. Material = Class B Thickness = 22 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 f x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D_(o) 6 Class H 23 27 10 z D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity 2010-11-30 - Design of g;prap Outlet ProtectioN.As 11/30/2010