Loading...
HomeMy WebLinkAboutSR 1660 and SR 1662 (16)i` Y X_ WA NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director August 23, 2011 Mr. J. B. Setzer. P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road. Sylva, North Carolina 28779 Natural Resources Dee Freeman Secretary Subject: Inspection-NCSR 1660 (Siler Road) TIP No. R-4748 Macon County Dear Mr. Setzer: On August 16, 2011, I inspected the construction work for the new route of NCSR 1660 (Siler Road) in Macon County. Construction includes heavy grading and bridge site preparation. Sediment and erosion control structures appear to be working properly. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, /7 Xz? Michael R. Parker Environmental Senior Specialist Attachment cc: Mitchell Bishop, PE Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Setzer) NCSR 1660 (Siler Road) Inspection Letter August 2011 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanca, NC 28778-8211 Phone: 828-296A5001 FAX: 828-299-7043 One Customer Service: "77-623-6748 NorthClrollna Internet www.navatemualiri.om ?ntura??? An Equal Opportunity 1 Affirmafive Action Employer f4 DWO Site Visits for DOT Proiects Field Sheet DWQ representative: Michael R. Parker Date: Aueust 16, 2011 County: Macon Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 09-0451 NW Permit d IP Project Name: Location of Project: FR-4748 NCSR 1660 New Route From NCSR 1660 Siler Road to NCSR 1662 Wiley Brown Road in Macon County Project Complete: ?Yes X No J Bridge Culvert Bottomless Culvert U Bottomless Arch ? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited l? Name of Waterway(s) DWO Site Visits for DOT Projects Background Info Little Tennessee River Basin/ Subbasin: Little Tennessee 040401 Wetland Type: ?Isolated x?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB X?ClassC ?ORW ?Trout ?WS-III ?NSW ?HQW ?WS-1 ?WS-IV ?SA ?CA Type of Authorized Impact: ?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch ?Riprap Inlet/Outlet Stabilization ?Fill Authorized Wetland Impacts: ?0- 1/I0d' acre ?1/1Ith to 1/3`d acre ?1/3`dto 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet ?> 150 linear feet Additional comments: Work is underway on the project and includes heavy grading and pouring the drilled shafts in preparation for bridge construction. Sediment and erosion control structures appear to be working properly. Continue to maintain erosion control devices and continue with seeding, matting and mulching as required to protect State surface waters. NCSR 1660 (Siler Road) Inspection August 2011