Loading...
HomeMy WebLinkAbout20090838 Ver 1_Site Inspection_20110824,, ®~~ ~~ r NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director August 22, 2011 Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 0 ~~ ~uV n Natural Re~,r 2~ w'~.7 sl~q~ e Freeman ~~9~ ecretary H Subject: Inspection DWQ Project 09-0838 T1P No. 4034 NC Highway 151 Buncombe County Dear Mr. Swain: On August 11, 20l 1, 1 inspected the construction work on TIP Project No. B-4034 on NC Highway I51 in Buncombe County. The culverts have been installed and bridge beams have been set. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Cole Hood, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office B-4034 NCSR Highway 151 August 2011 Inspection Letter SURFACE WATER PROTECTION SECTION -Asheville Regional Otiice 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299.7043 Customer Service: 1-877-623-6748 Intemek www.ncwatemualiN.om An Equal Opponuniry 1Affrmalive AC6on Employer NonrthCarolina ~Vaturallr~ DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: August 1 I, 2011 County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ^ Complaint ^DWQ Follow Up Evaluation ^ Other DWQ 401 #: 20090838 NW Permit # IP #: Project Name: TIP No. B4034 Location of Project: The project is located on NC Highway 15, approximately I mile past the Upper Hominy Vol. Fire Deparnnent. Project Complete: ^Yes X No If no, estimated date of completion XU Bridge X^ Culvert ^ Bottomless Culvert ^ Bottomless Arch X^ Riprap Inlet/Outlet Stabilization ^ Spoil Pile ^ Borrow Pit ^ Wetland Mitigation ^ Stream Restoration ^ On-site Stream Relocation ^ Buffer Restoration X^ Bank Stabilization X^ O[her Fill Water Quality Concerns (DW ^ Steam Standards Violation X^ Turbidity ^ Evidence of spills ^ Oil/Petroleum ^ Solid Waste ^ Failed E & S control measures X^ Sedimentation Impacts ^ Stormwater Permit Violation ^ Fill ^ Buffer Impacts (see below) ^ Other Additional Wetland Impacts: ^ yes ^ no Estimated Acres ^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres Additional Stream Impacts: ^ yes X^ no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba Zone I : ^Yes ^No Est lineaz fU acreage of buffer impact ~ ac Zone 2: ^Yes ^No Est lineaz ft/ acreage of buffer impact fU ac Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited ,1 a . . Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Stoney Fork Creek and an unnamed tributary [o Stoney Fork Creek Basin/ Subbasin: FBR 040302 Wetland Type: ^Isolated ^Non-Isolated (Waters of US) Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB G^Class C ^ORW X^Trout ^WS-lII ^NSW ^HQW ^WS-I ^WS-N ^SA ^CA Type of Authorized Impact: X^Culvert ^Bottomlcss Culvert X^Bridge ^Bottomless Arch X^Riprap Inlet/Outlet Stabi lization ^Fill Authorized Wetland Impacts: Authorized Stream Impacts: ^0 - 1/10'" acre ^ 1/3`d to 1.0 acre X^< 150 linear feet ^1/I 1'" to 1/3rd acre ^> 1.0 acre X^> 150 linear feet The culverts have been installed and [he bridge beams and approach slabs have been completed. Sediment and erosion control swctures appear to be in good shape. Continue to maintain erosion control devices and seed and mulch areas as required. B-0034 NC Highway 151 Inspection Report August 201 I