August 22, 2011
Mr. J. J. Swain, Jr., P.E.
Division 13 Engineer
N.C. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
0 ~~
~uV n
Natural Re~,r 2~ w'~.7
sl~q~ e Freeman
~~9~ ecretary
H
Subject: Inspection
DWQ Project 09-0838
T1P No. 4034
NC Highway 151
Buncombe County
Dear Mr. Swain:
On August 11, 20l 1, 1 inspected the construction work on TIP Project No. B-4034 on NC Highway I51 in
Buncombe County. The culverts have been installed and bridge beams have been set.
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection report for
any specific items noted during the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Cole Hood, PE
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
B-4034 NCSR Highway 151 August 2011 Inspection Letter
SURFACE WATER PROTECTION SECTION -Asheville Regional Otiice
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX: 828-299.7043
Customer Service: 1-877-623-6748
Intemek www.ncwatemualiN.om
An Equal Opponuniry 1Affrmalive AC6on Employer
NonrthCarolina
~Vaturallr~
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: August 1 I, 2011
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ^ Complaint
^DWQ Follow Up Evaluation ^ Other
DWQ 401 #: 20090838 NW Permit # IP #:
Project Name: TIP No. B4034
Location of Project: The project is located on NC Highway 15, approximately I mile past the Upper Hominy
Vol. Fire Deparnnent.
Project Complete: ^Yes X No If no, estimated date of completion
XU Bridge
X^ Culvert
^ Bottomless Culvert
^ Bottomless Arch
X^ Riprap Inlet/Outlet Stabilization
^ Spoil Pile
^ Borrow Pit
^ Wetland Mitigation
^ Stream Restoration
^ On-site Stream Relocation
^ Buffer Restoration
X^ Bank Stabilization
X^ O[her Fill
Water Quality Concerns (DW
^ Steam Standards Violation
X^ Turbidity
^ Evidence of spills
^ Oil/Petroleum
^ Solid Waste
^ Failed E & S control measures
X^ Sedimentation Impacts
^ Stormwater Permit Violation
^ Fill
^ Buffer Impacts (see below)
^ Other
Additional Wetland Impacts: ^ yes ^ no Estimated Acres
^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres
Additional Stream Impacts: ^ yes X^ no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba
Zone I : ^Yes ^No Est lineaz fU acreage of buffer impact ~ ac
Zone 2: ^Yes ^No Est lineaz ft/ acreage of buffer impact fU ac
Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited
,1 a . .
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Stoney Fork Creek and an unnamed tributary [o Stoney Fork Creek
Basin/ Subbasin: FBR 040302
Wetland Type: ^Isolated ^Non-Isolated (Waters of US)
Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB
G^Class C ^ORW X^Trout ^WS-lII ^NSW
^HQW ^WS-I ^WS-N ^SA ^CA
Type of Authorized Impact: X^Culvert ^Bottomlcss Culvert
X^Bridge ^Bottomless Arch
X^Riprap Inlet/Outlet Stabi lization ^Fill
Authorized Wetland Impacts:
Authorized Stream Impacts:
^0 - 1/10'" acre
^ 1/3`d to 1.0 acre
X^< 150 linear feet
^1/I 1'" to 1/3rd acre
^> 1.0 acre
X^> 150 linear feet
The culverts have been installed and [he bridge beams and approach slabs have been completed.
Sediment and erosion control swctures appear to be in good shape.
Continue to maintain erosion control devices and seed and mulch areas as required.