NC®ENR
North Carolina Department of Environment and Natural Resources
Dw~s~on u` WatEr Quality
Beverly Eaves Perdue Coleen H Sullins
Governor Director
August 24, 201 l
Brunswick County
DWQ No. 20070047
Gregory J. Thorpe, Ph.D., Pv;anager
North Carolina Department of Transportation
Project Development & Environmental Analysis Branch
1548 Mail Service Center
Raleigh, North Carolina 27699-198
Subject: Second Bridge to Oak Island Temporary Impacts Mitigation Site, Brunswick County,
TIP No. R-2245
Dear Dr. Thorpe:
This correspondence is in reference to your letter dated August 17, 201 I, regarding the Second Bridge
to Oak Island Temporary Mitigation Site located in Brunswick County, North Carolina. This site is
being utilized by the North Carolina Department of Transportation as compensatory mitigation for
wetland impacts associated with project R-2245.
By copy of this letter, we are notifying you that no further monitoring of the site will be required
since the construction and success criteria fbr the mitigation site has been mei.
Thank you for your time and cooperation. if ,you have any questions, please contact David
Wainwright at (919)807-6405.
Sin erely,
o
oleen ~ll111115,
Director
ec: Brad Shaver, US Army Corps of Engineers, Wilmington Field Office
Stoney Mathis, Division 3 Environmental Officer
Chris Militscher, Environmental Protection Agency (electronic copy only
Steve Sollod, Division of Coastal Management
Mason Herndon, Fayetteville Regional Office
File Copy
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location 512 N Salisbury Street, Raleigh, North Carolina 27604
Phone 919-807.6300 '+ FAX 919-807.6494
tniernef htipa!portal ncdenr.orglweblwq
Dee Freernar
Secretary
NorthCarolina
~aturallt~
An Equal Opportunity 1 Affirmative Action Employer
STATE OF' NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
BEVERLY EAVES PERDUE
GOVERNOR
August 17, 2011
Mr. Doug Hugged
NC Division of Coastal Management
Parker Lincoln Building
2728 Capital Boulevard
Raleigh, NC 27604
EUGENE A. CONTI, JR.
SECRETARY
Re: Second Bridge to Oak Island Temporary Impacts Site, Brunswick County, WBS #
34407.1.], TIP No. R-2245, Action ID No. 199506041, DWQ Project No. 20070047,
DCM Permit No. 20-07
Mr. Huggett:
As you are aware, the Department has monitored the Second Bridge to Oak Island Temporary
Impact Site since its construction in September of 2010. Located in Brunswick County, adjacent
to the bridge over Davis Canal on Middleton Avenue on Oak Island, this 0.046-acre site was
monitored for temporary wetland impacts associated with the k-2245 project. I'he temporarily
impacted area where the erosion control devices were located was left to revegetate naturally and
must re-attain jurisdictional status at the end of three years; hydrologic monitoring was not
required for this project. According to pern~it conditions, NCDOT was required to monitor the
Second Bridge to Oak Island Temporary Impact Site for three years or until success criteria were
met, with vegetation monitoring conducted each year. After each growing season, annual
monitoring reports were submitted to the appropriate regulatory agencies via the Natural
Environment Unit's (NEU) website:
http'//h>v~.'tit~. ncdol. orb/doh/preconstrtrc't;pc'inetr;'Munilojā¢ins;iMunitnrirr.~~Repurts. hlm/
After one year of vegetation monitoring, the Second Qridge to Oak Island Temporary Impact Site
indicates that natural re-vegetation has occurred and the temporarily impacted areas have re-
attained jurisdictional status. Individual annual monitoring data is provided within the
monitoring reports a~~ailable on NEU's website in 2010.
MAILING ADDRESS: TELEPHONE' 919-431-2000 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX 919-431-2001 ENVIRONMENTAL RESOURCE CENTER
PROJECT DEVELOPMENT ANO ENVIRONMENTAL ANALYSIS 4761 ATLANTIC AVENUE
1598 MAIL SERVICE CENTER WEeslre: WWW tVCDOT.ORG SUITE 116
RALEIGH NC 27699-1598 RALEGH NC 27604
A site visit was conducted on June ?3"', ?011 with the regulatory agencies and NCDOT
personnel present. It was determined at that meeting that the site success criteria had been met
and that no further monitoring would be required. NCDOT requests that the appropriate resource
agencies provide written documentation stating that no further monitoring is required and that the
site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at
(919) 431-6529.
Sincerely,
~~`
i ~
Philip S. Harris, III, P.E., Unit Head
PDEA- Natural Environment Unit
cc: Mr. Brad Shaver, ACOE
Mr. David Wainwright, DWQ
Mr. Travis Wilson, WRC
Mr. Chris Militscher, EPA
Mr. Gary Jordan, iJSFWS
Mr. Scott McLendon, ACOE
Mr. Brian Wrenn, DWQ
Mr. David Harris, P.E., NCDOT-REU
Mr. Stony lVlathis, P.E., NCDOT-DE03
Mr. Randy Griffin, NCDOT-NEU