HomeMy WebLinkAbout20090451 Ver 1_Site Inspection_20110628
e~~
w=
NCDENR
North Carolina Department of Environment and Natural
Beverly Eaves Perdue
Governor
Division of Water Quality
Coleen H. Sullins
Director
Mazch 24, 201 I
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
~~r~.. ~~
2B
R~S~q~.R ~~>> ..,, , .:
""~q~~r,Dee Freeman
R~,. Secretary
Subject: Inspection-NC Highway 28
DWQ Project 09-0451
TIP No. R-2408B
Macon County
Dear Mr. Setzer:
On March 17, 2011, I inspected the construction work on NC Highway 28 in Macon County. Construction
continues along most of the project with grading and pipe installation underway.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: W. Trent Anderson
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Setzer) NC Highway 28 Inspection Letter March 201 I
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-6211
Phone: 828-296-05001 FAX :628-299-7043 One
Customer Service: tA77E23-6748 NorthCarolina
Internet: www.ncwateraualiN.oro JVatura!l1,~
An Equal Opportunity \ Affirmative Action Employer
'-~ !,
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: Mazch 17, 201 I
County: Macou Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ^ Complaint
^DWQ Follow Up Evaluation ^ Other
DWQ 401 #: 09-0451 NW Permit # IP #:
Project Name:
Location of Project:
N C Hiehwav 28 Widenine TIP No. R-2408B
NC Highway 28 from north of NCSR 1323 (Riverview Street) to south of NCSR 1378
(Bennett Road) in Macon County
Project Complete: ^Yes X No
~] Bridge
X^ Culvert
^ Bottomless Culvert
^ Bottomless Arch
X^ Riprap Inlet/Outlet Stabilization
^ Spoil Pile
^ Borrow Pit
^ Wetland Mitigation
^ Stream Restoration
X^ On-site Stream Relocation
^ Buffer Restoration
X^ Bank Stabilization
^ Other
If no, estimated date of completion:
Steam Standards Violation
] Turbidity
Evidence of spills
Oil/Petroleum
Solid Waste
Failed E & S control measures
] Sedimentation Impacts
Stormwater Permit Violation
] Fill
Buffer Impacts (see below)
Other
Additional Wetland Impacts: ^ yes X^ no Estimated Acres
^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres
Additional Stream Impacts: ^ yes X^ no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ^Neuse ^Taz-Pam ^Randleman ^Catawba
Zone 1: ^Yes ^No Est linear fU acreage of buffer impact ~ ac
Zone 2: ^Yes ^No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited
~ ~4
\`
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
UT to Little Tennessee River, Rocky Branch and UT to Rocky Branch
Basin/ Subbasin: Little Tennessee 040401
Wetland Type: ^Isolated x^Non-Isolated (Waters of US)
Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB
X^ClassC ^ORW ^Trout ^WS-III ^NSW
^HQW ^WS-I ^WS-N ^SA ^CA
Type of Authorized Impact: X^Culvert ^Bottomless Culvert
^Bridge X^Bottomless Arch
X^Riprap InIeUOutlet Stabilization X^Fill
Authorized Wetland Impacts:
Authorized Stream Impacts:
Additional comments:
X^0 - 1/10`" acre
^1/3`d to 1.0 acre
^< 150 linear feet
^1/11'" to 1/3`d acre
^> 1.0 acre
X^> 150 linear feet
Work underway on the project includes grading and pipe work.
Sediment and erosion control structures appear to be working properly.
All areas that have been graded and no construction has taken place in the last 14 day should be seeded and
mulched.
All erosion control devices should be checked for proper operation.
Continue to maintain erosion control devices and continue with seeding, matting and mulching as requved to
protect State surface waters.
NC HipJiway 28 Inspection March 201 I