Loading...
HomeMy WebLinkAbout20110777 Ver 1_401 Application_20110811d Herring-Sutton 2 lCL ASSOCIATES • P.A. ENGINEERS •SURVEYORS •PLANNERS July 11, 2011 Ms. Karen Higgins Wetlands, Buffers, Stormwater, Compliance and Permitting Unit North Carolina Department of Environment and Natural ResourceE Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 D Subject: Buffer Permit Application Batts Farm II Dear Karen: PRINCIPALS RICHARD HERRING, PLS RON SUTTON, PE TIM KENNEDY, PLS DONALD PERRY, PE Ift[Roe9D 4UG 1 8 2011 DEW. WATER OUALITt, WETLANDS AND STORMWATER BRAN& On August 8, 2011 you return the attached application package due to Secretary of State Office indicating that the applicant corporation had been administratively dissolved. This issue appeared to be problem on communication between the North Carolina Department of Revenue and the Secretary of State Office. This matter has now been resolved and the Secretary of State's Web site indicates that WGB Properties, Inc. in now in good standing. Attached for review and approval by the North Carolina Department of Environmental and Natural Resources is a request to construct two level spreaders and by pass channels/pipes for single family residential subdivision located in Wilson, North Carolina named Batts Farm II. One level spreader will be to diffuse off-site stormwater flow into the buffer from a proposed 15" diameter storm sewer and the second is to diffuse proposed development stormwater flow from a proposed water quality pond BMP that has been designed to remove 90 TSS. The propose water quality pond is also being utilized to comply with Neuse River Basin water quality and quantity rules. Downstream of both level spreaders we are proposing grass filter strips but we are not claiming credit for nitrogen reduction with the level spreaders and filter strips. The following documents are submitted in two copies each for your review and approval: • PCN Form with attachments • Wet Detention Basin Supplement Sheet for Water Quality Pond • Miscellaneous stormwater calculations for level spreaders and splitter box 10TTT 2201 Nash Street NW - Wilson, North Carolina 27896 - (252) 291-8887 - Fax (252) 291-5900 Water Quality Pond Design Calculations and Routings Digital File Page 2 of 2 Karen Higgins Letter August 17, 2011 If you should have any questions concerning the above, please feel free to call me at 252-291-8887 or e-mail me at rsuttonrherring-sutton.com. Respectfully, Herring-Sutton and Associates, P.A. Ronnie L. Sutton, P.E. North Carolina Secretary of State Page 1 of 2 North Carolina r Elaine F. Marshall DP7 P RT M E N T Secretary ECZ F ET?,F Y of TAT Date. 811 7i'2u 1 i Click here to: View Document Filings I Sign Up for E-Notifications 1 9 Print apre-populated Annual Report Form I File an Annual Report 1 C.7orporation Names Name Name Type Y'SC WGB PROPERTIES, INC. LEGAL Business Corporation Information SOSID: 011s3R3.. Status: r Effective Date: 10/16/1980 Dissolution Date: Annual Report Due Date: Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Annual Report CURRENT Status: Registered Agent Agent Name: BLOUNT, WILLIAM G Office Address: 2045D EASTGATE DRIVE GREENVILLE NC 27858 Mailing Address: PO BOX 7226 GREENVILLE NC 27835 Principal Office Office Address: 2045D EASTGATE DRIVE GREENVILLE NC 27858 Mailing Address: 2045D EASTGATE DRIVE GREENVILLE NC 27858 Officers Title: ASSISTANT SECRETARY Name: BARBARA K BLOUNT Business Address: PO BOX 7226 GREENVILLE NC 27835 Title: PRESIDENT Name: WILLIAM G BLOUNT Business Address: PO BOX 7226 GREENVILLE NC 27835 Title: SECRETARY http://www. secretary. state.nc.us/corporations/Corp. aspx?Pitemld=4699694 8/17/2011 North Carolina Secretary of State Name: Business Address: Title: Name: Business Address: EDWARD H BLOUNT PO BOX 7226 GREENVILLE NC 27835 VICE PRESIDENT WILLIAM G BLOUNT JR PO BOX 7226 GREENVILLE NC 27835 Stock Page 2 of 2 Class Shares No Par Value Par Value COMMON 100000 1 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 668 http://www.secretary.state,nc.us/corporations/Corp.aspx?Pitemld=4699694 8/17/2011 d Herring-Sutton St ASSOCIATES • P. A. ENGINEERS •SURVEYORS •PLANNERS July 11, 2011 Ms. Amy Chapman 401 Certification and Oversight North Carolina Department of Environment and Natural Resources Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Subject: Buffer Permit Application Batts Farm II Dear Amy: PRINCIPALS RICHARD HERRING, PLS RON SUTTON, PE TIM KENNEDY, PLS DONALD PERRY, PE Attached for review and approval by the North Carolina Department of Environmental and Natural Resources is a request to construct two level spreaders and by pass channels/pipes for single family residential subdivision located in Wilson, North Carolina named Batts Farm II. One level spreader will be to diffuse off-site stormwater flow into the buffer from a proposed 15" diameter storm sewer and the second is to diffuse proposed development stormwater flow from a proposed water quality pond BMP that has been designed to remove 90 TSS. The propose water quality pond is also being utilized to comply with Neuse River Basin water quality and quantity rules. Downstream of both level spreaders we are proposing grass filter strips but we are not claiming credit for nitrogen reduction with the level spreaders and filter strips. The following documents are submitted in two copies each for your review and approval: • PCN Form with attachments • Wet Detention Basin Supplement Sheet for Water Quality Pond • Miscellaneous stormwater calculations for level spreaders and splitter box • Water Quality Pond Design Calculations and Routings • Digital File 2201 Nash Street NW • Wilson, North Carolina 27896 • (252) 291-8887 • Fax (252) 291-5900 Page 2 of 2 Amy Chapman Letter July 11, 2011 If you should have any questions concerning the above, please feel free to call me at 252-291-8887 or e-mail me at rsutton .herring-sutton.com. Respectfully, Herring-Sutton and Associates, P.A. 2 C 1 i 0 7 7 7 o/??F W AT?q pG 1 V. olqiii'?'111411W 1c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: TO Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: BATTS FARM If 2b. County: WILSON 2c. Nearest municipality / town: WILSON X7 L?g (9 2d. Subdivision name: BATTS FARM II Ltz) 2e. NCDOT only, T.I.P. or state project no: N/A J? 2011 3. Owner Information yr i . yrA R 3a. Name(s) on Recorded Deed: WGB PROPERTIES, INC. a &i 3b. Deed Book and Page No. DB 2399 P 404 3c. Responsible Party (for LLC if applicable): LC- 0 3d. Street address: P.O. BOX 7226 A U G 1 8 2011 3e. City, state, zip: GREENVILLE, NC 27835 3f. Telephone no.: 252-758-1081 I NEWDS STORMWATER BRANCH 3g. Fax no.: 252-758-0761 3h. Email address: william blount [wgblount@gmail.com] Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgentlConsultant Information (if applicable) 5a. Name: RON SUTTON. P.E. 5b. Business name (if applicable): HERRING-SUTTON AND ASSOCIATES, P.A. 5c. Street address: 2201 NASH STREET NW 5d. City, state, zip: 27896 ,tom ' 5e. Telephone no.: 252-291-8887 5f. Fax no.: 252-291-5900 5g. Email address: rsutton@herrring-sutton.com Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 3713-33-9848 1b. Site coordinates (in decimal degrees): Latitude: 77.9411 Longitude: - 35.7613 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 5.31 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: LITTLE HOMINY SWAMP 2b. Water Quality Classification of nearest receiving water: SW 2c. River basin: NEUSE 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: UNDEVELOPED WOODLAND THAT HAS BE CLEARED FOR CONSTRUCTION OF STREETS AND WATER QUALITY POND 3b. List the total estimated acreage of all existing wetlands on the property: .20 ACRE ( Linear) 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 378 LF 3d. Explain the purpose of the proposed project: SINGLE FAMILY RESIDENTIAL 3e. Describe the overall project in detail, including the type of equipment to be used: SEE ATTACHMENT "A" 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ® No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ? No 6b. If yes, explain. PHASE I CONSIST OF 5 LOTS ON BARKLEY DRIVE AND PHASE 11 CONSIST OF 10 LOTS ON BUCKINGHAM DRIVE Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? PEI T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? PEI T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3k Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary (7) impact required B1 ® P ? T BSYPAA E LITTLE HOMINY SWAMP ® Ye 457 1095 B2 ®P ? T B PIPE LITTLE HOMINY SWAMP ® Ye 659 451 B3 ?P?T ?Yes ? No 6h. Total buffer impacts 1116 SF 1546 SF 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization I a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. THE CONSTRUCTION OF A WATER QUALITY POND TO DWQ STANDARDS WITH A SPLITTER BOX AND LEVEL SPREADER PROVIDING DIFFUSED FLOW INTO THE EXISTING NEUSE BUFFER FOR FIRST 1" OF RUN-OFF FROM SITE. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. CLEAR ONLY THE MINIMUM AMOUNT OF LAND REQUIRED WITHIN THE BUFFER FOR THE BY-PASS SWALE; UTILIZE STONE CHECK DAM TO CONTROL EROSION IN SWALE AND LINE SWALE SIDE-SLOPES WITH STRAW AND NET MATTING TO MINIMIZE EROSION AND ASSIST IN ESTABLISHING A PERMANENT NON-ERODIBLE GRASS STAND. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in4ieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No ® ? Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 35% 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: SEE ATTACHMENT "B" ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governments jurisdiction is this project? WILSON ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ® Other: NEUSE 3c. Has the approved Stormwater Management Plan with proof of approval been ® Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federaUstate/local) funds or the ? Yes ® No use of public (federallstate) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ® Yes ? No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after-the-fact permit application? ® Yes ? No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): SEE ATTACHMENT "C" 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. WASTEWATER GENERATED FROM THE PROJECT WILL BE DISCHARGED INTO THE CITY OF WILSON WASTEWATER TREATMENT SYSTEM AND TREATED AT THE CITY OF WILSON WWTP. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? TO Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the flo lain dete inatio ? RON SUTTON 6/27/11 Applicant/Agent's Printed Name Applic ture Date (Agent's sign re is valid only if an atrthorization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version ATTACHMENT "A" BATTS FARM 11- PCN FORM ITEM 3e Batts Farm II is a 5.3 acre duster single family residential subdivision located off of both Buckingham Drive and Barkley Drive within the City of Wilson. The development consist of 16 single family lots and 2 open space lots. This project is located within the Neuse River Basin and is subject to Neuse River Basin Rules but it is not located in a designated water supply watershed. Riparian Buffers of 50 feet in width are provided on the east side of the project protecting an intermittent stream that is a tributary of Little Hominy Swamp. Approximately 2/3 of the project drains toward the aforementioned intermittent stream and a proposed water quality pond with a level spreader diffusing the first inch of run-off is proposed. The remainder of the treat stormwater is proposed to be discharged through a non-erodible swale constructed in the buffer. Also some off- site existing storm water is being concentrate and discharge into the buffer through a second level spreader that will diffuse the flow prior to discharge into the riparian buffer. Immediate downstream of the level spreaders we are constructing vegetative filter strips utilizing a sod ground cover, however we are not claiming in nitrogen reductions credits for engineered filter strips. The types of equipment that will be utilized to construct this project are as follows; track bull dozers; track hoes and rubber tired backhoes; motor graders, and dump trucks both dual and tri-axle. ATTACHMENT "B" BATTS FARM II - PCN FORM ITEM 2d Batts Farm II is a 5.3 acre cluster single family residential subdivision located off of both Buckingham Drive and Barkley Drive within the City of Wilson. The development consist of 16 single family lots and 2 open space lots. This project is located within the Neuse River Basin and is subject to Neuse River Basin Regulations. On the east side of the project is an existing intermittent stream that is will be buffered. Also on the east side of the project a portion of the property is located in a flood hazard area. No fill or structures are proposed in floodway portions of the flood hazard area. On Lot 18 of the development a wet pond designed and constructed to DWQ standards is proposed. During Phase II of the project, Neuse Nitrogen Credits will be purchased from an approved mitigation bank The proposed water quality pond has a required surface area of 2942 square feet and 4022 square feet of surface area is being provided. The Stormwater Management Plan for Batts Farm II has been approved by the City of Wilson who has delegate authority of approve the plan and monitor its implementation. ATTACHMENT "C" BATTS FARM II-PCN FORM ITEM 2c On May 9, 2011 a Notice of Violation was issued pertaining to a violation of the Neuse River Riparian Buffer Rules. According to the NOV approximately 1000 square feet of riparian buffer had been disturbed without approval by DWQ. The riparian buffer areas were accidentally cleared by the site grading contractor and this act was not intentionally on his part. The overall plan for the project calls for the installation of a water quality pond designed for 90 % TTS removal and for the first inch of run-off to be discharged through a level spreader with diffused flow through the buffer. The remaining flow will be directed through a by-pass channel to be constructed through the buffer. This buffer variance request pertains to the aforementioned diffuse flow and by-pass channel. With the installation of the water quality pond and level spreader no riparian buffer restoration should be needed or required. --oF w,ls CITY OF WILSON worth Carofina ?i ?L?.- 4 I Ill l)H P(1R •'11PI1 IKS'+ Its ti? D ?f ') I S94 0010 Public Service Ron Sutton, P. E. Herring-Sutton & Associates 2201 Nash Street NW Wilson, NC 27896 May 17, 2010 Subject: Stormwater Management Plan for Batts Farm 11 Dear Ron, The Stormwater Management Plan for Batts Farm II is hereby approved. The plans are dated March 2010 and sealed by Ronnie L. Sutton on 5-13-10. Only plans stamped by the City of Wilson engineering division are to be utilized for construction. Do not hesitate to call if you need further assistance or have questions. I can be reached at my office (252) 399- 2434 or by cell (252) 205-4589. i Sincerely, /? ``? rf1 r Br an C. Spell, 1, CPESC, CPSWO Stormwater Program Manager Attachment Cc: Daryl Norris, El, CPSWQ, LEED Michael Horan, CPESC P. iL ROX IO * WILSON, NOR Ili ( AROLINA 27894-0010 * I F;LEP)I0NE (252) 399-2466 OPERATIONS('FNTER * 18011 HERRING AVENUE. * FAX(252)399-2453 EQI'.11. OPPORTI;NlTlY.4F'FIR.4i477L'F ACTION b','NPLOYF,'R CITY OF WILSON North CaroCiria I'( (14P()R Nil 1) 144u 1 ,7,59.1-t)(? 1 ?.) 11tiblic Servic" Ron Sutton, P. E. Herring-Sutton & Associates 2201 Nash Street NW Wilson, NC 27896 May 17, 2010 Subject: Stormwater Management Plan for Batts Farm II Dear Ron, The Stormwater Management Plan for Batts Farm II is hereby approved. The plans are dated March 2010 and sealed by Ronnie L. Sutton on 5-13-10. Only plans stamped by the City of Wilson engineering division are to be utilized for construction Do not hesitate to call if you need further assistance or have questions. I can be reached at my office (252) 399- 2434 or by cell (252) 205-4589. i Sincerely, l Br n C. Spell, CPESC, CPSWQ Stormwater Program Manager Attachment Cc: Daryl Norris, El, CPSWQ, LEED Michael Horan, CPESC P. O. ROY 10 * WILSON. NOR I'll ( AROLINA 27894-0010 * I ELEPIIONE (252) 399-2461 OPER 1T'IONS ('ENTER * 1800 11FRKING AVENUE * FAX(252)399-2453 F,QV il. OPPORTf rNITY.!4FFIRM.4TII"F. A('TION EMPLOYER O ti ?o Q z CID Cl) 00 O ? o M I ? >z CY 00 ° oU U Q m z z 00 ? C i ?.J ? °?s o o ?r o \ u a ?a u z n? (p r ? II ( ? • ? ? ag ^ q Cn U a d U? Un Ln a Ln O N Z N \ --?- -+- I \ O U N I M \ a O y Q Q W LiJ X J \ 1 C) ? 1 4. ) Q oo CD 4-- U U ?? I I \ ? 1 I I I W I O / Z / I W z l ? L'i (n Z I I j O w O n co 3 Go O m / N / m I Q LL I W O I O C. 0 ?11 Ch a N N N + / N U O Z Q 0 O 'o LLJ w w m m w w < W w I I I mac, III z D I I? I o a I z z I I / -- - / ?I I VIII _ (,n u? O O I I I a? ?I II w W / m I I n w m W III Cf) O J Q \ W W ?n \? • /I h?'? / 4J O 1 M t 1? ? 'o LLJ O I III/ It Z 0 Z CO _ J I it 'I Il _ / U I?I? ? ?I111 / ??I ? I I III 1 11 _ I I ? I I? I I? 1 III I ? / z .3 z m Q- CID N / 12 CC) OZ) ? - // Y) Ln °c 5 O p C, a / r U7 0 + o -Ln W z + w + m O ro ?, U N N / / w O Q ' Q z (N 11 Y O ?O / 2 I cn J / a I OW ) / O Z w w / I O O ~ U / / I / 9F? V / \\\`??`AltlllV IiIU /Z ? G 2 m ? n W v: Z • cn r . - ? p BATT' S FARM II WILSON, NORTH CAROLINA MISCELLANEOUS STORMWATER DESIGN CALCUATIONS ta. •• ?SSlp?y9l9 ' SEA 101 ? - IN q?? ? U t ?- A Z0// l 8 2011 DENR - WATER QUALITY WETUNS MO STORMM TER VAKH l July 11, 2011 PREPARED BY: HERRING-SUTTON & ASSOCIATES, PA 2201 NASH STREET NORTHWEST WILSON, NORTH CAROLINA Permit No. (to be provided by DWQ) • w,t OF W ATF9 O r WNW > STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out. printed and submitted. The Required Items Checklist (Part III) must be printed. filled out and submitted along with all of the required information. I. PROJECT MFOWTKM Project name BATTS FARM II Contact person RONNIE L. SUTTON, P.E Phone number 252-291-W7 Date 25-Apr-10 Drainage area number 1 II. DEWN INFORMATION Site Characteristics Drainage area 133,729 ft2 Impervious area, post-development 53,492 ft2 % impervious 40.00% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 4,570 ft3 OK 4,684 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.9 in 0.40 (unitless) 0.60 (unitless) 4.00 in/hr OK 4.90 ft3/sec 7.37 ft3/sec 2.47 ft3/sec 134.90 fmsl 134.00 fmsl 134.00 fmsl 134.50 fmsl 133.50 fmsl 130.00 fmsl 129.00 fmsl 1.00 ft Y (Y or N) 134.9 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & H. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) N. DESIGN INFORMATION Surface Areas Area, temporary pool 5,900 ft2 Area REQUIRED, permanent pool 3,343 ft2 SAIDA ratio 2.50 (unitless) Area PROVIDED, permanent pool, Ap?,,, pw 3,776 ft` OK _ Area, bottom of 10ft vegetated shelf, Abk_,b,r 2,314 Area, sediment cleanout, top elevation (bottom of pond), Ab*p m 1,117 fV Volumes Volume, temporary pool 4,684 ft3 OK Volume, permanent pool, V,,,,_,w 7,431 ft3 Volume, forebay (sum of forebays if more than one forebay) 1,477 ft3 Forebay % of permanent pool volume 19.90/0 % OK SAIDA Table Data Design TSS removal 90% Coastal SAIDA Table Used? (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 2.50 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, V,.m_pw 7,431 ft' Area provided, permanent pool, Ap,, d 3,776 ft' Average depth calculated It Need 3 ft min. Average depth used in SAIDA, d., (Round to nearest 0.5ft) It Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, Apa,,,_pw 3,776 ftt Area, bottom of 1Oft vegetated shelf, Aba ,w 2,314 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abate 1,117 ft2 "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 3.50 it Average depth calculated 3.00 ft OK Average depth used in SAIDA, d,,,, (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 1.25 in Area of orifice (if-non-circular) in' Coefficient of discharge (Co) 0.65 (unitless) Driving head (H,) 0.80 ft Drawdown through weir? n (Y or N) Weir type (unitless) Coefficient of discharge (C„) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 4.90 ft3/sec Post-development 1-yr, 24-hr peak flow 7.37 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.02 ft3/sec Storage volume drawdown time 206 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.8-9117/09 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.6 :1 OK y (Y or N) OK 1.0 ft OK n (Y or N) OK y (Y or N) OK y (Y or N) OK PUMP OUT POND WITH PUMP DUE TO GRADE Parts I. & II. Design Summary, Page 2 of 2 WET DETENTION POND MISCELLANEOUS DESIGN CALCULATIONS DATE: April 25, 2010 POND NAME: Batts Farm II DRAINAGE AREA: A. WQP SA/DA COMPUTATION Percent Impervious: Permanent Pool Depth TSS REMOVAL : SA/DA FROM TABLE: DRAINAGE AREA: SURFACE AREA REQUIRED: SURFACE AREA PROVIDED: 1 40% 3.0 FT 900/6 2.5 3.07 ACRES 3343 SF 3776 SF B. WQP CONTOUR AREAS AND VOLUMES PERMANENT STORAGE ELEVATION MSL FORBAY AREA SF POND AREA SF TOTAL AREA SF 130 114 1003 1117 131 214 1209 1423 132 329 1429 1758 133 457 1664 2121 133.5 527 1787 2314 134 1082 2694 3776 FORBAY STORAGE ELEVATION FORBAY AREA INCR. VOLUME TOTAL VOLUME MSL SF CF CF 130 114 0 0 131 214 164 164 132 329 272 436 133 457 393 829 133.5 527 246 1075 134 1082 402 1477 SURFACE AREA PROVIDED MUST BE > OR = SURFACE AREA REQUIRED INCR. VOLUME CF 0 1270 1591 1940 1109 1523 TOTAL VOLUME CF 0 1270 2861 4800 5909 7431 TEMPORARY FLOOD STORAGE ELEVATION MSL FORBAY AREA SF POND AREA SF TOTAL AREA SF INCR. VOLUME CF TOTAL VOLUME CF 134 1082 2694 3776 0 0 134.5 0 5543 5543 2330 2330 134.91 0 5942 5942 2354 4684 135 0 6030 6030 2893 5223 136 0 7047 7047 6539 11762 137 0 8120 8120 7584 19345 138 0 9250 9250 8685 28030 C. COMPUTATION OF PERCENT OF FORBAY STORAGE TOTAL PERMANENT POOL STORAGE VOLUME: FORBAY STORAGE VOLUME: PERCENT FORBAY STORAGE= D. WQP 1" RUNOFF VOLUME CALCULATION PERCENT IMPERVIOUS = la la= 40% Rv= 0.41 Rd= 1 Area= 3.07 acres Volume= 4569 cubic feet E. WQP TEMPORARY POOL VOLUME 7431 CF 1477 CF 19.88% MUST BE BETWEEN 18% AND 22% ELEVATION FORBAY AREA POND AREA TOTAL AREA INCR. VOLUME TOTAL VOLUME MSL SF SF SF CF CF 134 1082 2694 3776 0 0 134.5 0 5543 5543 2330 2330 134.91 0 5942 5942 2354 4684 ELEV. VOL. FIRST INCH RUNOFF: 134.911 feet TEMPORARY POOL VOLUME: 4684 cubic feet VOLUME FIRST INCH RUNOFF: 4569 cubic feet IF TEMPORARY POOL VOLUME > OR = VOLUME FIRST INCH RUNOFF THEN TEMPORARY STORAGE IS OKAY F. WQP PERMANENT POOL AVERAGE DEPTH CALCULATION AREA BOTTOM OF SHELF: 2314 square feet AREA PERMANENT POOL: 3776 square feet AREA BOTTOM OF POND: 1117 square feet DEPTH FROM BOTTOM SHELF TO BOTTOM OF POND: 3.51 feet AVERAGE POND DEPTH: SA/DA DEPTH: 3.00 feet 3 feet IF AVERAGE POND DEPTH IS > OR = SA/DA DEPTH THEN PERMANENT POOL DEPTH OKAY G. WQP FIRST INCH OF RUNOFF DRAWDOWN CALCULATION Cd: Orifice Diameter (inches): Gravity Average Driving Head (feet): Elev. drawdown pipe invert: Orifice Flow: Drawdown Time: 0.6 1.25 inches 32.2 ft/sec 0.96 feet 134 0.023 cfs 2.281 days MUST BE BETWEEN 2 AND 5 DAYS DD Ow -rp p8-mm 0 OOmzzz ?m?N=n y O 9mOOO O fn1?T0 O O0m - T m n 3>m j Zm? 00> ZMM D m I- 0 0 O 0 0 A r * u O O a) # N W N i 0 m m o m O no o ii t aa) z ? D2 ? rn w N m_OM n0? M Z m zm c rn a w N -+ z2 m j o w o f ?ni m D w cn in o b? 0 is o D O 0 °CD W ° W N (n N CA N ; ;a y i u o 0 0 0 a Z ?1Z DD 8 ° 8 ° . 8 ° ?m1 o o o o D N ?1 0 0 0 o ?v Z v ni rn mm O 0 0 0 0 0 X 1 Z °o 00, m °o ? 1 _ m v z v? w m m o m 3 - ? b -4 b (0 b N o OD o V) M :. _ O Z 0 0 0 0 p 0 p D A N W CD fJ co c D l w / ADO m . m b a a ?. m, n O;n0 v ? o ~ y • O n i a r O D m v V1 v v v v v m M-5 , z Z m 0 0 0 6 0 b 0 o o b z m Op v Qp N N N N N W D. ° 00 a 0 ° b ° b ° b a 0 0 ? y O N 0 0 01 co ? ; -- P ym w N w w o Z m n m oo m v m, m a ' o v n O A oo N U cn n Z fV o 0 0 0 0 0 0 0 0 0 :. m .il 1 w P a a o n r- m -> mm 0 r CI V V i , . .r. 'a m -n W W N N Q I '0 r :5 D ? m m D o w b w N b A OD i i b W -A z > 0 CO) 0 0 D v o o o = - N ' O 0 0 0 0 0 mm mP o ?, N i -+ a W w N o O) 0- 0 OD . -4 Z y t O OD N o ° i+. w W N N N A A W W W V w OD G m V W ) m Z ZI W al i , ZC A A aa)i 4 -4 mm O i b :A 6 ? m O W O N W ID m 3 D A 0 0 0 0 0 N x ? ? ? ? ENERGY DISSIPATOR #1 PROJ ECT: BATTS FARM II RATIONAL FORMULA: Q=CIA C= 0.38 SEE TABLE 8 1 (IN./HR.) (10YR.)= 6.0 SEE FIGURE 8.03 A (ACRES)- 2.5 Q (10)(CFS) = 5.719 GIVEN DATA: Q (10)(CFS)= 5.719 S(%)= 1 RCP(DIA.)(IN.) = 15 n (p,pE)= 0.012 SEE TABLE 10.1 COMPUTATIONS: Q (FULL) (CFS)= 7.017 SEE FIGURE 5 V (FULL) (FPS)= 5.718 Q (10) /Q (FULL)= 0.82 C= 1.120 SEE FIGURE 20 V 0 (FPS) = 6.404 C*V(FULL) ZONE = 1 SEE FIGURE 1 APRON LENGTH = 5 FT. SEE FIGURE 2 APRON WIDTH = 3.75 FT. STONE TYPE = CLASS A SEE FIGURE 2 STONE DEPTH = 9 IN. SEE FIGURE 3 ENERGY DISSIPATOR #2 PROJ ECT: BATTS FARM II RATIONAL FORMULA: Q=CIA C= 0.42 SEE TABLE 8 I (IN./HR.) (10YR.)= 6.1 SEE FIGURE 8.03 A (ACRES)= 3.5 Q (10)(CFS) = 8.9229 GIVEN DATA: Q (10)(CFS)= 8.9229 . S (%) = 0.16 RCPPIA)(IN.) = 24 n (PIPE)= 0.012 SEE TABLE 10.1 COMPUTATIONS: Q (FULL) (CFS)= 9.829 SEE FIGURE 5 V (FULL) (FPS):" 3.129 Q (10) /Q (FULL):-- 0.91 C= 1.140 SEE FIGURE 20 V 0 (FPS) = 3.567 C*V«,Lu ZONE = 1 SEE FIGURE 1 APRON LENGTH = 8 FT. SEE FIGURE 2 APRON WIDTH = 6 FT. STONE TYPE = CLASS A SEE FIGURE 2 STONE DEPTH = 9 IN. SEE FIGURE 3 ENERGY DISSIPATOR #3 PROJ ECT: BATTS FARM 11 RATIONAL FORMULA: Q=CIA C= na SEE TABLE 8 I (IN./HR.) (10YR_)= na SEE FIGURE 8.03 A (ACRES)= na Q (10)(cFS) = na GIVEN DATA: Q (10)(CFS)= 7.9 See Routing S m = 0.6 RCPP,A.x,N.) = 18 n (P,PE)= 0.013 SEE TABLE 10.1 COMPUTATIONS: Q (FULL) (CFS)= 8.159 SEE FIGURE 5 V (FULL) (FPS)= 4.617 Q (10) /Q (FULL)= 0.97 C= 1.150 SEE FIGURE 20 V O (FPS) = 5.309 C*V(FULL) ZONE = 1 SEE FIGURE 1 APRON LENGTH = 6 FT. SEE FIGURE 2 APRI ON WIDTH = 4.5 FT. STOKE TYPE = CLASS A SEE FIGURE 2 STONE DEPTH = 9 IN. SEE FIGURE 3 4 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 4.486 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 81,514 cuft Inflow hyd. No. = 2 - Post Development Q Reservoir name = POOL VOLUME POND Max. Elevation = 135.10 ft Max. Storage = 5,892 cuft Storage Indication method used. Hydro graph D ischarge Table Printed values'=1.00'%' of Qp. Print interval = 15) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs ds cfs cfs ds cfs 720 6.827 135.07 4.114 0.037 ----- ----- 3.507 ----- ----- ----- ----- 3.544 735 1.028 134.99 3.350 0.040 ---- ----- 1.301 ----- ----- ----- ----- 1.341 750 0.679 134.97 3.350 0.039 ----- ----- 0.761 ----- ----- ----- ----- 0.800 765 0.516 134.95 3.350 0.039 ----- ----- 0.513 ----- ----- ----- ----- 0.552 780 0.434 134.95 3.350 0.039 ----- ----- 0.424 ---- ----- ----- ----- 0.463 795 0.378 134.94 3.350 0.039 ----- ----- 0.376 ---- ----- ----- ----- 0.415 810 0.334 134.94 3.350 0.039 ----- ----- 0.329 ----- ----- ----- ----- 0.368 825 0.297 134.93 3.350 0.039 ----- ----- 0.287 ----- ----- ----- ----- 0.326 840 0.265 134.93 3.350 0.038 ---- ---- 0.252 ----- ----- ----- ----- 0.290 855 0.247 134.93 3.350 0.038 ----- ----- 0.224 ----- ----- ----- ----- 0.262 870 0.236 134.92 3.350 0.038 ----- ----- 0.208 ----- ----- ----- ----- 0.246 885 0.225 134.92 3.350 0.038 ----- ----- 0.195 ----- ----- ----- ----- 0.234 900 0.213 134.92 3.350 0.038 ----- ----- 0.184 ----- ----- ----- ----- 0.222 915 0.202 134.92 3.350 0.038 ----- ----- 0.172 ----- ----- ----- ----- 0.210 930 0.190 134.92 3.350 0.038 ----- ----- 0.161 ----- ----- ---- ----- 0.199 945 0.178 134.92 3.350 0.038 ----- ----- 0.149 ----- ----- ----- ----- 0.187 960 0.166 134.92 3.350 0.038 ----- ----- 0.137 0.175 975 0.160 134.91 3.350 0.038 ----- ----- 0.127 --- ----- ----- ----- 0.165 990 0.156 134.91 3.350 0.038 ----- ---- 0.122 ----- ----- ----- ----- 0.160 1005 0.152 134.91 3.350 0.038 ----- ----- 0.117 ----- ----- ----- ----- 0.155 1020 0.148 134.91 3.350 0.038 ----- ----- 0.113 ----- ----- ----- ----- 0.151 1035 0.144 134.91 3.350 0.038 ----- ---- 0.109 ----- ----- ----- ----- 0.147 1050 0.139 134.91 3.350 0.038 ----- ---- 0.104 ----- ---- ----- ----- 0.143 1065 0.135 134.91 3.350 0.038 --- -- 0.100 ----- ----- ----- ----- 0.138 1080 0.131 134.91 3.350 0.038 ----- ----- 0.096 ---- ----- ----- ----- 0.134 1095 0.127 134.91 3.350 0.038 ----- ----- 0.092 ----- ----- ----- ----- 0.130 1110 0.122 134.91 3.350 0.038 ----- ----- 0.088 ----- ----- ----- ----- 0.126 1125 0.118 134.91 3.350 0.038 ----- ----- 0.083 ----- ----- ----- ----- 0.121 1140 0.114 134.91 3.350 0.038 ----- ---- 0.079 ----- ---- ----- ----- 0.117 1155 0.109 134.91 3.350 0.038 ----- ----- 0.075 ----- ---- ----- ----- 0.113 1170 0.105 134.91 3.350 0.038 ----- ----- 0.070 ----- ----- ----- ----- 0.108 1185 0.100 134.91 3.350 0.038 ----- ----- 0.066 ----- ----- ----- ----- 0.104 1200 0.096 134.91 3.350 0.038 ----- ----- 0.061 ----- ----- ----- ----- 0.099 1215 0.094 134.91 3.350 0.038 ----- ----- 0.058 ----- ----- ----- ----- 0.096 1230 0.093 134.91 3.350 0.038 ----- ----- 0.056 ----- ----- ----- ----- 0.094 1245 0.093 134.91 3.350 0.038 ----- ----- 0.055 ----- ----- ----- ----- 0.093 1260 0.092 134.91 3.350 0.038 ----- ----- 0.054 ----- ----- ----- ----- 0.092 1275 0.091 134.91 3.350 0.038 ----- ----- 0.054 ----- ----- ----- ----- 0.092 1290 0.090 134.91 3.350 0.038 ----- ----- 0.053 ----- ----- ----- ----- 0.091 Continues on next page... 1 Hydrograph Report Hydraflow Hydrographs by IntelisoNe Al Thursday, Sep 23, 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 6.386 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 12,106 cult Inflow hyd. No. = 2 - Post Development Q Reservoir name = POOL VOLUME POND Max. Elevation = 135.30 ft Max. Storage = 7,191 cult Storage Indication method used. Hydrograph Discharge Table (NnWvalues '=1.00%ofOp. Nntirftml=15) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D EAl Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 720 9.174 135.27 6.297 0.012 ---- --- 6.294 ----- --- -- ----- 6.306 735 1.355 135.02 3.593 0.011 ----- --- 2.119 ----- ---- ----- ---- 2.130 750 0.891 134.98 3.350 0.011 ----- - 1.045 -- --- ---- ----- 1.056 765 0.675 134.96 3.350 0.010 --- --- 0.713 --- ----- ---- ----- 0.723 780 0.567 134.96 3.350 0.010 - ----- 0.591 ----- ----- ----- ---- 0.602 795 0.493 134.95 3.350 0.010 ----- --- 0.503 - ----- ----- ---- 0.514 810 0.434 134.95 3.350 0.010 -- - 0.443 ----- ----- ---- ----- 0.453 825 0.387 134.95 3.350 0.010 ----- ----- 0.404 ----- ----- ----- ----- 0.414 840 0.344 134.94 3.350 0.010 - -- 0.364 ----- --- - - 0.375 855 0.320 134.94 3.350 0.010 ----- --- 0.329 ---- ----- ----- ----- 0.340 870 0.306 134.94 3.350 0.010 ---- - 0.309 - ----- ----- ----- 0.319 885 0.291 134.93 3.350 0.010 --- - 0.292 ----- ---- ---- --- 0.303 900 0.276 134.93 3.350 0.010 -- ----- 0.277 - --- ----- ---- 0.287 915 0.261 134.93 3.350 0.010 ----- ---- 0.262 0.272 930 0.246 134.93 3.350 0.010 - ----- 0.247 ----- -- ---- - 0.257 945 0.230 134.93 3.350 0.010 ----- ----- 0.232 --- ---- ----- --- 0.242 960 0.215 134.93 3.350 0.010 -- ----- 0.216 ----- ---- ----- ---- 0.226 975 0.206 134.92 3.350 0.010 ---- - 0.203 -- --- --- --- 0.213 990 0.201 134.92 3.350 0.010 --- - 0.196 --- ---- ----- ---- 0.206 1005 0.196 134.92 3.350 0.010 -- ----- 0.190 ----- --- --- ----- 0.200 1020 0.190 134.92 3.350 0.010 ---- --- 0.184 ----- ---- ----- -- 0.194 1035 0.185 134.92 3.350 0.010 -- ---- 0.179 -- ---- ---- ----- 0.189 1050 0.179 134.92 3.350 0.010 ---- ----- 0.173 --- --- --- ----- 0.183 1065 0.174 134.92 3.350 0.010 - - 0.168 ----- - --- - 0.178 1080 0.168 134.92 3.350 0.010 -- --- 0.162 --- -- ----- ----- 0.172 1095 0.163 134.92 3.350 0.010 -- ---- 0.157 ---- --- ----- ----- 0.167 1110 0.157 134.92 3.350 0.010 - -- 0.151 ----- - ----- - 0.161 1125 0.152 134.92 3.350 0.010 -- ---- 0.146 --- ----- ----- --- 0.156 1140 0.146 134.92 3.350 0.010 ----- ----- 0.140 --- --- ----- ----- 0.150 1155 0.140 134.92 3.350 0.010 -- - 0.134 --- ----- ----- --- 0.145 1170 0.135 134.92 3.350 0.010 ----- ----- 0.129 ---- ----- ----- ---- 0.139 1185 0.129 134.91 3.350 0.010 --- ---- 0.123 ---- ----- ----- ---- 0.133 1200 0.123 134.91 3.350 0.010 -- ----- 0.117 ----- -- -- ----- 0.127 1215 0.121 134.91 3.350 0.010 ---- -- 0.113 ---- ----- --- ----- 0.123 1230 0.120 134.91 3.350 0.010 ----- --- 0.111 ---- -- ---- --- 0.121 1245 0.119 134.91 3.350 0.010 --- -- 0.109 ---- ----- ---- ---- 0.120 1260 0.118 134.91 3.350 0.010 ----- ---- 0.108 0.118 1275 0.116 134.91 3.350 0.010 ---- ---- 0.107 --- ----- ----- ----- 0.117 1290 0.115 134.91 3.350 0.010 ----- -- 0.106 - ---- - -- 0.116 Continues on next page... 2 POST DEVELOPMENT RTE Hydrograph Discharge Table Time Inflow Elevation (min) cfs ft 1305 0.114 134.91 1320 0.113 134.91 1335 0.112 134.91 1350 0.111 134.91 1365 0.110 134.91 1380 0.109 134.91 1395 0.108 134.91 1410 0.107 134.91 1425 0.106 134.91 1440 0.104 134.91 Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfi1 Outflow cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.350 0.010 ----- ---- 0.105 ----- --- -- ----- 0.115 3.350 0.010 ---- ---- 0.104 0.114 3.350 0.010 ----- ----- 0.103 0.113 3.350 0.010 ---- --- 0.102 ---- ----- ---- ----- 0.112 3.350 0.010 ----- ---- 0.101 --- ---- ---- ----- 0.111 3.350 0.010 --- --- 0.099 0.110 3.350 0.010 --- ----- 0.098 ----- -- ---- ----- 0.109 3.350 0.010 ---- ----- 0.097 ---- ---- --- ----- 0.107 3.350 0.010 ---- ----- 0.096 ----- ---- ----- --- 0.106 3.350 0.010 ----- -- 0.095 ---- ----- ----- ---- 0.105 ...End Hydrograph Report 3 Hydratlow Hydrographs by Intelisolve Al Thursday, Sep 23, 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 7.868 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 12,106 cuft Inflow hyd. No. = 2 - Post Development Q Reservoir name = POOL VOLUME POND Max. Elevation = 136.20 ft Max. Storage = 13,228 cult Storage Indication method used. Hydrograph D ischarge Table tNnted values'=1.00%ofOp. Nr`"fte"al-15' Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exf l Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 705 6.124 135.09 4.329 0.011 ----- -- 4.178 ----- ---- ---- ---- 4.189 720 16.77 136.06 7.708 0.016 ----- ---- 7.628 ----- ----- ---- ----- 7.644 735 2.397 135.80 7.284 0.014 - - 7.245 --- ----- ---- ----- 7.260 750 1.566 135.15 5.278 0.011 - ----- 5.278 ----- ---- ----- ----- 5.289 765 1.179 134.99 3.350 0.011 - ----- 1.321 ----- ----- ----- ----- 1.331 780 0.987 134.98 3.350 0.011 ---- ----- 1.042 - ----- - ----- 1.052 795 0.857 134.97 3.350 0.011 ----- ----- 0.883 ----- ----- ----- ----- 0.893 810 0.752 134.97 3.350 0.011 ---- -- 0.775 ----- --- ----- ----- 0.786 825 0.668 134.96 3.350 0.010 ----- ----- 0.683 - - - ---- 0.693 840 0.593 134.96 3.350 0.010 ----- ---- 0.606 ----- ---- --- ---- 0.617 855 0.552 134.96 3.350 0.010 ---- --- 0.552 ----- ----- ----- ---- 0.562 870 0.526 134.95 3.350 0.010 ---- - 0.524 ----- ----- ----- ----- 0.534 885 0.500 134.95 3.350 0.010 ----- --- 0.498 ----- ----- ----- ----- 0.508 900 0.474 134.95 3.350 0.010 ----- --- 0.472 ----- ----- ---- ----- 0.482 915 0.447 134.95 3.350 0.010 ---- ----- 0.445 ----- ----- ----- ----- 0.455 930 0.420 134.95 3.350 0.010 ----- ----- 0.423 ---- ----- ---- --- 0.433 945 0.394 134.95 3.350 0.010 -- ----- 0.402 0.412 960 0.367 134.94 3.350 0.010 -- - 0.376 - -- ---- ---- 0.387 975 0.352 134.94 3.350 0.010 ---- ----- 0.354 ----- ----- ---- ----- 0.365 990 0.343 134.94 3.350 0.010 -- ---- 0.341 ---- ----- ----- --- 0.351 1005 0.333 134.94 3.350 0.010 - ----- 0.331 ---_ - - ---- 0.341 1020 0.324 134.94 3.350 0.010 ----- - 0.321 - - -- ---- 0.331 1035 0.314 134.94 3.350 0.010 ----- -- 0.311 - 0.322 1050 0.305 134.94 3.350 0.010 -- ----- 0.302 - - 0.312 1065 0.295 134.93 3.350 0.010 ----- --- 0.292 ----- ----- -- ---- 0.303 1080 0.286 134.93 3.350 0.010 ---- ---- 0.283 ----- - --- ----- 0.293 1095 0.276 134.93 3.350 0.010 - ----- 0.273 ---- ----- - ----- 0.283 1110 0.267 134.93 3.350 0.010 ----- -- 0.264 ----- - --- -- 0.274 1125 0.257 134.93 3.350 0.010 ----- ----- 0.254 ----- --- ---- -- 0.264 1140 0.247 134.93 3.350 0.010 ---- -- 0.244 - -- -- ----- 0.255 1155 0.238 134.93 3.350 0.010 -- ---- 0.235 ----- ----- ----- ----- 0.245 1170 0.228 134.93 3.350 0.010 ----- -- 0.225 - ----- ---- ----- 0.235 1185 0.218 134.93 3.350 0.010 ---- ---- 0.215 -- ----- ---- -- 0.225 1200 0.208 134.92 3.350 0.010 ----- ----- 0.205 ---- ----- --- ---- 0.216 1215 0.204 134.92 3.350 0.010 ----- ----- 0.198 ---- ----- ----- ----- 0.208 1230 0.202 134.92 3.350 0.010 ----- ---- 0.194 ---- ---__ ?_ --_ 0.204 1245 0.200 134.92 3.350 0.010 --- ---- 0.192 --- ----- --- ----- 0.202 1260 0.198 134.92 3.350 0.010 -- - 0.190 - --- ----- ----- 0.200 9275 0.197 134.92 3.350 0.010 - ----- 0.188 -- --- --- --- 0.198 Continues on next page... 4 POST DEVELOPMENT RTE Hydrograph Discharge Table Time Inflow Elevation (min) cfs ft 1290 0.195 134.92 1305 0.193 134.92 1320 0.191 134.92 1335 0.189 134.92 1350 0.187 134.92 1365 0.185 134.92 1380 0.183 134.92 1395 0.181 134.92 1410 0.179 134.92 1 0.178 134.92 1440 1.176 134.92 Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfi1 Outflow cfs efs cfs cfs cfs cfs cfs cfs cfs cfs 3.350 0.010 ---- ----- 0.186 -- -- ----- ---- 0.196 3.350 0.010 ----- ---- 0.184 ---- ----- --- ----- 0.194 3.350 0.010 ---- --- 0.182 ----- ----- --- ----- 0.192 3.350 0.010 ----- ----- 0.180 ----- 0.190 3.350 0.010 ---- -- 0.178 ----- -- ----- ----- 0.189 3.350 0.010 ----- ----- 0.176 ---- --_ 0.187 3.350 0.010 ---- ----- 0.175 ----- - -- ----- 0.185 3.350 0.010 ---- ---- 0.173 ----- 0.183 3.350 0.010 ----- -- 0.171 ---- ---- ----- --- 0.181 3.350 0.010 - - 0.169 ----- ---- ---- ----- 0.179 3.350 0.010 ----- --- 0.167 ----- ----- -- ----- 0.177 ... End HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB Pk1? j , ? r SHEET NO. ?I OF CALCULATED BY , '^ ?_ 1 DATE CHECKED BY DATE SCALE 1 2 6 5 2 3 -- ------------ r. ?A& 1 G ... szry rte- ? ? ? D PRODUCT 207 HERRING-SUTTON & ASSOCIATES, P.A. JOB 2201 NASH ST. NW SHEET NO. OF WILSON, NORTH CAROLINA 27896 Q (252) 2918887 CALCULATED BY DATE CHECKED BY DATE SCALE s - _ a - c s _ - - s _ e - .. _ - - - = - - . D PRODUCT 207 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB C . (^ t)l f' fy+?° SHEET NO. S OF CALCULATEDBY C" DATE %p £ CHECKED BY DATE SCALE ©. c? Cam. UK s i D PRODUCT 207 HERRING-SUTTON & ASSOCIATES, P.A. JOB ?"NroS 2201 NASH ST. NW SHEET NO. r of WILSON, NORTH CAROLINA 27896 (252) 291-8887 CALCULATED BY DATE CHECKED BY DATE SCALE PrA_ "C,-- - 2 ? ts" 4 r C T? 'c'\ Q . QD.-59 2-- '`--? c s D PRODUCT 207 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE kA- D PRODUCT 207 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB " JPi? ?' a ? ?. Cf? // SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE IK? ?- Q7i s ?..?c? Z all" IL C, C'?k (731. D PRODUCT 207 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB +8S? " SHEET NO. Q4 OF CALCULATED BY DATE CHECKED BY DATE SCALE VJ -- - per, sa sr -. D PRODUCT 207 ANTI-FLOATION DESIGN CALCULATION FOR WQP OUTLET STRUCTURE DATE: APRIL 27, 2010 PROJECT: BATTS FARM II W P:#1 ASSUMPTIONS Assume walls will be concrete block 4"x8"x16" with a weight of 29 Ibs per block or : Assume concrete weighs : 150 Ibs Assume outlet structure is dry on inside Assume block walls are 8" thick: 0.67 ft Assume weight of water: 62.4 Ibs/cf W, =Weight of Structure Wb=Weight of Water Displaced by Structure Wall Thickness: 0.67 ft Outside wall dimensions: 4.33 ft Concrete Footing Dimensions: 6.5 ft Concrete Footing Thickness: 1 ft Invert of Outlet Structure: 132.5 msl Top of Outlet Structure: 135.6 msl Wb= 6263lbs Ws= 9863 Ibs 98 Ibs/cf Buoyance=WjWb: i.'6 STRUCTURE WILL NOT FLOAT t BATTS FARM II WATER QUALITY POND DESIGN COMPUTATIONS ???ttutnuiiuurrrii? 29@ t' IJ 1'/ R, D AUG 1 8 2011 DE - WATER QUALITY n%ANaSNR -1 STORMWATER BRWKH PREPARED BY: HERRING-SUTTON & ASSOCIATES, PA 2201 NASH STREET NORTHWEST WILSON, NORTH CAROLINA i BATTS FARM II WATER QUALITY POND DESIGN COMPUTATIONS I. DRAINAGE BASIN DATA • AREA: 3.07 ACRES • SOILS: COXVILLE AND GOLDSBORO • USE: COMMERCIAL (40% MAX IMPERVIOUS) Ii. POND DESIGN CRITERIA • SCS METHOD • HYDRAULIC SOIL TYPE: C • PREDEVELOPMENT RUNOFF CURVE NUMBER (CN): 72 • 3.0 FEET PERMANENT POOL DESIGN DEPTH • 1.0 FEET ADDITIONAL SEDIMENT STORAGE • 90% POLLUNTANT REMOVAL EFFICIENCY • EMERGENCY SPILLWAY WILL PASS 100-YR STORM • SITE IMPERVIOUS PERCENT: 40% • SURFACE AREA REQ'D : 3343 SF • SURFACE AREA AVAILABLE AT PERMANENT POOL 3776 SF • THEREFORE MINIMUM SURFACE AREA REQ'D MET • POST DEVELOPMENT CN: 83 • VOLUME FIRST INCH OF RAINFALL: 4596 CF • TEMPORARY POOL STORAGE VOLUME PROVIDED: 4676 CF • THEREFORE MINIMUM STORAGE VOLUME REQ'D MET 111. POND DATA • POND INVERT 129.00 • RISER INVERT 132.50 • RISER TOP 134.91 • PERMANENT POOL 134.00 • EMERGENCY SPILLWAY 136.40 • TOP OF POND 138.00 IV. RISER BARREL STRUCTURE • 3.0 FT x 3.0 FT ID CONC. BLOCK RISER • 15" DIAMETER DI BARREL • 4" DIAMETER DRAW DOWN PIPE AT ELEVATION TO MAINTAIN PERMANENT POOL ELEVATION AND PROVIDE A 2-5 DAY DRAW DOWN PERIOD ( 1.25 " orifice) V. DESIGN DATA FOR INFLOW HYDROGRAPHS • ASSUME TYPE II STORM • 2-YR 1 DAY PERCIPITATION: 3.8 INCHES • 10-YR 1 DAY PERCIPITATION: 5.8 INCHES • 25-YR 1 DAY PERCIPITATION: 6.8 INCHES 100-YR 1 DAY PERCIPITATION: 8.5 INCHES • CN: 83 (POST DEVELOPMENT) • BASIN SLOPE: 5 % • HYDRAULIC LENGTH: 400 FT • SHAPE FACTOR: 484 • Tc FACTOR: LAG VI. PREDEVELOPMENT INFLOW HYDROGRAPH Qp SUMMARY ¦ 1-YR: 6.1 CFS ¦ 10-YR: 21.7 CFS ¦ 25-YR: 35.1 CFS ¦ 100-YR: 49.4 CFS VII. POST-DEVELOPMENT OUTFLOW HYDROGRAPH Qp SUMMARY ¦ 1-YR: 7.8 CFS ¦ 10-YR: 19.7 CFS ¦ 25-YR: 26.3 CFS ¦ 100-YR 38.5 CFS VIII. ROUTING PEAK FLOWS ¦ 1-YR: 4.5 CFS ¦ 10-YR: 7.9 CFS ¦ 25-YR: 15.2 CFS ¦ 100-YR 33.2 CFS f WET DETENTION POND MISCELLANEOUS DESIGN CALCULATIONS DATE: April 25, 2010 POND NAME: Batts Farm If DRAINAGE AREA: 1 A. WQP SA/DA COMPUTATION Percent Impervious: Permanent Pool Depth TSS REMOVAL : SA/DA FROM TABLE: DRAINAGE AREA: SURFACE AREA REQUIRED: SURFACE AREA PROVIDED: 40% 3.0 FT 90% 2.5 3.07 ACRES 3343 SF 3776 SF B. WQP CONTOUR AREAS AND VOLUMES PERMANENT STORAGE SURFACE AREA PROVIDED MUST BE > OR = SURFACE AREA REQUIRED ELEVATION MSL FORRAY AREA SF POND AREA SF TOTAL AREA SF INCR. VOLUME CF TOTAL VOLUME CF 130 114 1003 1117 0 0 131 214 1209 1423 1270 1270 132 329 1429 1758 1591 2861 133 457 1664 2121 1940 4800 133.5 527 1787 2314 1109 5909 134 1082 2694 3776 1523 7431 FORBAY STORAGE ELEVATION FORBAYAREA INCR. VOLUME TOTAL VOLUME MSL SF CF CF 130 114 0 0 131 214 164 164 132 329 272 436 133 457 393 829 133.5 527 246 1075 134 1082 402 1477 TEMPORARY FLOOD STORAGE ELEVATION FORBAYAREA POND AREA MSL SF SF 134 1082 2694 134.5 0 5543 135 0 6030 136 0 7047 137 0 8120 138 0 9250 (NCR. VOLUME TOTAL VOLUME TOTAL AREA SF 3776 5543 6030 7047 8120 9250 CF 0 2330 2893 6539 7584 8685 CF 0 2330 5223 11762 19345 28030 C. COMPUTATION OF PERCENT OF FORBAY STORAGE TOTAL PERMANENT POOL STORAGE VOLUME: FORBAY STORAGE VOLUME: PERCENT FORBAY STORAGE= 7431 CF 1477 CF MUST BE BETWEEN 18% AND 22% D. WQP 1" RUNOFF VOLUME CALCULATION PERCENT IMPERVIOUS = la la= 40% Rv= 0.41 Rd= 1 Area= 3.07 acres Volume= 4569 cubic feet E. WQP TEMPORARY POOL VOLUME ELEVATION FORBAY AREA POND AREA TOTAL AREA INCR. VOLUME TOTAL VOLUME MSL SF SF SF CF CF 134 1082 2694 3776 0 0 134.5 0 5543 5543 2330 2330 134.91 0 5900 5900 2346 4676 TEMPORARY POOL VOLUME: 4676 cubic feet VOLUME FIRST INCH RUNOFF: 4569 cubic feet IF TEMPORARY POOL VOLUME > OR = VOLUME FIRST INCH RUNOFF THEN TEMPORARY STORAGE IS OKAY F. WQP PERMANENT POOL AVERAGE DEPTH CALCULATION AREA BOTTOM OF SHELF: 2314 square feet AREA PERMANENT POOL: 3776 square feet AREA BOTTOM OF POND: 1117 square feet DEPTH FROM BOTTOM SHELF TO BOTTOM OF POND: 3.5 feet AVERAGE POND DEPTH: 3.00 feet SA/DA DEPTH: 3 feet IF AVERAGE POND DEPTH IS > OR = SA/DA DEPTH THEN PERMANENT POOL DEPTH OKAY G. WQP FIRST INCH OF RUNOFF DRAWDOWN CALCULATION Cd: Orifice Diameter (inches): Gravity Average Driving Head (feet): Orifice Flow: 0.6 1.25 inches 32.2 ft/sec 0.78 feet 0.021 cfs Drawdown Time: 2.53 days MUST BE BETWEEN 2 AND 5 DAYS Hyd rog ra ph Return Period Recap Hydraflow Hydrographs by Intelisolve v9.1 Hyd. N Hydrograph Inflow Peak Outflow (cfs) Hydrograph o. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff - 6.127 9.502 - 15.81 21.65 31.11 39.63 49.43 Predevelopment Q 2 SCS Runoff - 7.843 10.62 -- 15.44 19.72 26.27 32.00 38.48 Post Development Q 3 Reservoir 2 4.486 6.365 - 7.215 7.851 15.20 24.32 33.15 POST DEVELOPMENT RTE 4 SCS Runoff 1.649 2.422 3.830 5.107 7.113 8.919 10.98 POST DEV. WESTSIDE 5 SCS Runoff 2702 3.780 - 5.689 7.409 10.08 12.44 15.11 POST DEV. SOUTHSIDE 6 Combine 3, 4, 5 5.990 11.20 --- 16.04 19.49 24.74 35.75 51.10 TOTAL POST DEV. Q Proj. file: 8300-F BAITS FARM-II WQP-REV 11 2-3-10.gpw -T -Sunday, Apr 25, 2010 2 'Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 1 Predevelopment Q Hydrograph type = SCS Runoff Peak discharge = 6.127 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 113,492 cuft Drainage area = 5.310 ac Curve number = 72 Basin Slope = 5.0% Hydraulic length = 400 ft Tc method = LAG Time of conc. (Tc) = 8.6 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 696 0.063 1221 0.113 711 1.905 1236 0.112 726 3.487 1251 0.112 741 0.989 1266 0.111 756 0.652 1281 0.110 771 0.539 1296 0.109 786 0.457 1311 0.108 801 0.407 1326 0.107 816 0.361 1341 0.106 831 0.325 1356 0.105 846 0.292 1371 0.105 861 0.278 1386 0.104 876 0.266 1401 0.103 891 0.254 1416 0.102 906 0.242 1431 0.101 921 0.230 936 0.217 ...End 951 0.204 966 0.191 981 0.186 996 0.182 1011 0.177 1026 0.173 1041 0.168 1056 0.164 1071 0.159 1086 0.154 1101 0.149 1116 0.145 1131 0.140 1146 0.135 1161 0.130 1176 0.125 1191 0.119 1206 0.115 (Printed values >=1.00% of Qp. Print interval = 15) `Hydrograph Report 3 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 2 Post Development Q Hydrograph type = SCS Runoff Peak discharge = 7.843 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 83,484 cuft Drainage area = 3.070 ac Curve number = 83 Basin Slope = 5.0% Hydraulic length = 400 ft Tc method = LAG Time of conc. (Tc) = 6.2 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 636 0.079 1161 0.108 651 0.112 1176 0.103 666 0.157 1191 0.099 681 0.243 1206 0.095 696 0.577 1221 0.094 711 4.061 1236 0.093 726 1.811 1251 0.092 741 0.892 1266 0.091 756 0.570 1281 0.091 771 0.483 1296 0.090 786 0.406 1311 0.089 801 0.361 1326 0.088 816 0.317 1341 0.087 831 0.284 1356 0.086 846 0.254 1371 0.086 861 0.243 1386 0.085 876 0.231 1401 0.084 891 0.220 1416 0.083 906 0.209 1431 0.082 921 0.197 936 0.185 ...End 951 0.174 966 0.163 981 0.158 996 0.154 1011 0.150 1026 0.146 1041 0.142 1056 0.138 1071 0.133 1086 0.129 1101 0.125 1116 0.121 1131 0.116 1146 0.112 (Printed values -1.00% of Qp. Print interval =15) 4 Hydrograph Repo rt Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOP MENT RTE Hydrograph type = Rese rvoir Peak discharge = 4.486 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 81,514 cult Inflow hyd. No. = 2 - Post Development Q Reservoir name = POOL VOLUME POND Max. Elevation = 135.1 0 ft Max. Storage = 5,892 cuft Storage Indication method used. Hydrograph Discharge Table (PdnW values >=1.00%ofQp. Print interval=15) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D ExfiI Outflow (min) cfs ft cfs cfs cfs cfs cfs as cfs as cfs cfs 720 6.827 135.07 4.114 0.037 ---- ----- 3.507 ---- ---- ----- ----- 3.544 735 1.028 134.99 3.350 0.040 ----- ----- 1.301 1.341 750 0.679 134.97 3.350 0.039 ----- ---- 0.761 ----- ---- ---- ----- 0.800 765 0.516 134.95 3.350 0.039 -- ----- 0.513 ---- -- ---- ----- 0.552 780 0.434 134.95 3.350 0.039 ----- ---- 0.424 ----- -- -- ----- 0.463 795 0.378 134.94 3.350 0.039 ---- ---- 0.376 ----- ---- ----- ----- 0.415 810 0.334 134.94 3.350 0.039 ----- ----- 0.329 ----- ----- ----- ---- 0.368 825 0.297 134.93 3.350 0.039 ----- ----- 0.287 ----- ----- --- ----- 0.326 840 0.265 134.93 3.350 0.038 ----- ----- 0.252 -- --- - ----- 0.290 855 0.247 134.93 3.350 0.038 ---- ----- 0.224 -- ----- --- ---- 0.262 870 0.236 134.92 3.350 0.038 ----- -- 0.208 ----- ----- ---- ----- 0.246 885 0.225 134.92 3.350 0.038 ----- ----- 0.195 ----- ----- -- ----- 0.234 900 0.213 134.92 3.350 0.038 ----- ----- 0.184 ----- ---- ----- ----- 0.222 915 0.202 134.92 3.350 0.038 ----- ---- 0.172 -- ----- ----- ----- 0.210 930 0.190 134.92 3.350 0.038 ----- ---- 0.161 ---- ----- ---- ----- 0.199 945 0.178 134.92 3.350 0.038 ----- ---- 0.149 ----- ---- ----- --- 0.187 960 0.166 134.92 3.350 0.038 ----- ---- 0.137 ----- ----- --- --- 0.175 975 0.160 134.91 3.350 0.038 -- -- 0.127 - ----- ---- ---- 0.165 990 0.156 134.91 3.350 0.038 ----- --- 0.122 ----- ----- ----- -- 0.160 1005 0.152 134.91 3.350 0.038 ----- ----- 0.117 ----- ----- -- --- 0.155 1020 0.148 134.91 3.350 0.038 ----- ----- 0.113 ---- ----- ----- --- 0.151 1035 0.144 134.91 3.350 0.038 ----- ----- 0.109 --- -- w__ ___ 0.147 1050 0.139 134.91 3.350 0.038 ----- -- 0.104 ----- ----- ---- -- 0.143 1065 0.135 134.91 3.350 0.038 ---- ----- 0.100 - ----- ----- ----- 0.138 1080 0.131 134.91 3.350 0.038 -- ---- 0.096 ----- ----- --- ----- 0.134 1095 0.127 134.91 3.350 0.038 ----- --- 0.092 ---- ---- ---- ----- 0.130 1110 0.122 134.91 3.350 0.038 ----- -- 0.088 - ----- --- ----- 0.126 1125 0.118 134.91 3.350 0.038 ----- ---- 0.083 ---- ----- --- ----- 0.121 1140 0.114 134.91 3.350 0.038 ----- ----- 0.079 --- ----- ---- ---- 0.117 1155 0.109 134.91 3.350 0.038 -- --- 0.075 ----- -- ----- ----- 0.113 1170 0.105 134.91 3.350 0.038 ----- ----- 0.070 ----- ----- ---- ----- 0.108 1185 0.100 134.91 3.350 0.038 ----- ----- 0.066 ---- ----- ----- ----- 0.104 1200 0.096 134.91 3.350 0.038 --- ----- 0.061 -M _____ 0.099 1215 0.094 134.91 3.350 0.038 ----- ----- 0.058 0.096 1230 0.093 134.91 3.350 0.038 ----- ----- 0.056 0.094 1245 0.093 134.91 3.350 0.038 -- ----- 0.055 -- ----- ----- ----- 0.093 1260 0.092 134.91 3.350 0.038 ----- ---- 0.054 ---- ----- ---- ----- 0.092 1275 0.091 134.91 3.350 0.038 ----- ----- 0.054 ---- ----- ---- ----- 0.092 1290 0.090 134.91 3.350 0.038 ---- ---- 0.053 ----- ---- ----- ----- 0.091 Continues on next page... POST DEVELOPMENT RTE Hydrograph Discharge Table 5 Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D ELI Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1305 0.089 134.91 3.350 0.038 ----- ----- 0.052 ---- ----- ----- ----- 0.090 1320 0.088 134.91 3.350 0.038 ----- ----- 0.051 ----- ----- ----- ----- 0.089 1335 0.088 134.91 3.350 0.038 ----- ----- 0.050 ----- ----- ----- ----- 0.088 1350 0.087 134.91 3.350 0.038 ----- ----- 0.050 ----- ---- ----- ----- 0.087 1365 0.086 134.91 3.350 0.038 --- ----- 0.049 ----- ----- ----- ----- 0.087 1380 0.085 134.91 3.350 0.038 ----- 0.048 ----- ----- ----- ---? 0.086 1395 0.084 134.91 3.350 0.038 ----- ---? 0.047 ----- ----- ----- ---? 0.085 1410 0.083 134.91 3.350 0.038 ---- ----- 0.046 ----- ----- ----- ----- 0.084 1425 0.083 134.91 3.350 0.038 ----- ----- 0.045 ----- ----- ----- ---? 0.083 1440 0.082 134.91 3.350 0.038 ---- ----- 0.044 ----- ----- ----- ----- 0.082 ...End Pond Report s Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Pond No. 1 - POOL VOLUME POND A Pond Data Contours - User-defined contour areas. Average end area method used for volume calculation. Begining Elevation =134.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 134.00 0.50 134.50 1.00 135.00 2.00 136.00 3.00 137.00 4.00 138.00 Contour area (sgft) 3,776 5,543 6,030 7,047 8,120 9,250 Incr. Storage (cult) 0 2,330 2,893 6,539 7,584 8,685 Total storage (cult) 0 2,330 5,223 11,762 19,345 28,030 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.25 0.00 0.00 Crest Len (ft) = 16.00 20.00 0.00 0.00 Span (in) = 15.00 1.25 0.00 0.00 Crest El. (ft) = 134.91 136.40 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 132.50 134.00 0.00 0.00 Weir Type = Riser Broad - - Length (ft) = 115.00 1.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 0.20 0.10 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Contour) Mufti-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culverl/Orifice outflows are analyzed under inlet (tc) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It cult it cfs cis cfs cfs cis cis cis cfs cfs cis cis 0.00 0 134.00 0.00 0.00 - - 0.00 0.00 - - - - 0.00 0.50 2,330 134.50 3.35 oc 0.03 is - - 0.00 0.00 - - - - 0.03 1.00 5,223 135.00 3.35 oc 0.04 is - - 1.44 0.00 - - - - 1.48 2.00 11,762 136.00 7.61 oc 0.00 is - - 7.54s 0.00 - - - - 7.54 3.00 19,345 137.00 9.02 oc 0.00 is - - 8.90s 24.17 - - - - 33.07 4.00 28,030 138.00 10.23 oc 0.00 is - - 9.56s 105.24 - - - - 114.81 7 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 4 POST DEV. WESTSIDE Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 0.950 ac = 5.0% = LAG = 2.91 in = 24 hrs Peak discharge = 1.649 cfs Time to peak = 717 min Hyd. volume = 21,606 cuft Curve number = 75 Hydraulic length = 200 ft Time of conc. (Tc) = 4.6 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 683 0.017 1208 0.023 698 0.102 1223 0.022 713 1.105 1238 0.022 728 0.246 1253 0.022 743 0.178 1268 0.022 758 0.121 1283 0.022 773 0.104 1298 0,022 788 0.089 1313 0.021 803 0.079 1328 0.021 818 0.070 1343 0.021 833 0.063 1358 0.021 848 0.058 1373 0.021 863 0.055 1388 0.020 878 0.053 1403 0.020 893 0.050 1418 0.020 908 0.048 1433 0.020 923 0.045 938 0.043 ...End 953 0.040 968 0.038 983 0.037 998 0.036 1013 0.035 1028 0.034 1043 0.033 1058 0.032 1073 0.031 1088 0.030 1103 0.029 1118 0.028 1133 0.027 1148 0.026 1163 0.025 1178 0.024 1193 0.023 ( Printed values >=1.00% of Qp. Print interval =15) 8 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 5 POST DEV. SOUTHSIDE Hydrograph type = SCS Runoff Peak discharge = 2.702 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 1 min Hyd. volume = 28,323 cuft Drainage area = 1.230 ac Curve number = 79 Basin Slope = 5.0% Hydraulic length = 100 ft Tc method = LAG Time of conc. (Tc) = 2.3 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 663 0.027 1188 0.032 678 0.048 1203 0.031 693 0.111 1218 0.031 708 1.005 1233 0.031 723 0.416 1248 0.030 738 0.282 1263 0.030 753 0.179 1278 0.030 768 0.154 1293 0.029 783 0.129 1308 0.029 798 0.115 1323 0.029 813 0.102 1338 0.029 828 0.091 1353 0.028 843 0.082 1368 0.028 858 0.078 1383 0.028 873 0.075 1398 0.028 888 0.071 1413 0.027 903 0.067 1428 0.027 918 0.064 933 0.060 ... End 948 0.056 963 0.053 978 0.051 993 0.050 1008 0.049 1023 0.048 1038 0.046 1053 0.045 1068 0.044 1083 0.042 1098 0.041 1113 0.039 1128 0.038 1143 0.037 1158 0.035 1173 0.034 (Printed values >=1.00% of Qp. Print interval =15) 9 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 3, 4, 5 Peak discharge = 5.990 cfs Time to peak = 721 min Hyd. volume = 131,443 cuft Contrib. drain. area= 2.180 ac Hydrograph Discharge Table ( Printed values >= 1.00% of pp. Print interval =15) Time Hyd. 3 + Hyd. 4 + Hyd. 5 = Outflow (min) (cfs) (cfs) (cfs) (cfs) 675 0.009 0.009 0.043 0.062 690 0.013 0.025 0.072 0.110 705 0.021 0.308 0.666 0.995 720 3.544 1.195 1.244 5.983 735 1.341 0.216 0.303 1.860 750 0.800 0.142 0.194 1.137 765 0.552 0.113 0.159 0.824 780 0.463 0.096 0.133 0.692 795 0.415 0.084 0.118 0.617 810 0.368 0.075 0.104 0.547 825 0.326 0.067 0.093 0.486 840 0.290 0.060 0.083 0.433 855 0.262 0.056 0.079 0.397 870 0.246 0.054 0.075 0.376 885 0.234 0.052 0.072 0.357 900 0.222 0.049 0.068 0.339 915 0.210 0.047 0.065 0.322 930 0.199 0.044 0.061 0.304 945 0.187 0.041 0.057 0.286 960 0.175 0.039 0.053 0.267 975 0.165 0.037 0.052 0.254 990 0.160 0.036 0.050 0.247 1005 0.155 0.036 0.049 0.240 1020 0.151 0.035 0.048 0.233 1035 0.147 0.034 0.046 0.227 1050 0.143 0.033 0.045 0.220 1065 0.138 0.032 0.044 0.214 1080 0.134 0.031 0.042 0.207 1095 0.130 0.030 0.041 0.201 1110 0.126 0.029 0.040 0.194 1125 0.121 0.028 0.038 0.187 1140 0.117 0.027 0.037 0.181 1155 0.113 0.026 0.035 0.174 1170 0.108 0.025 0.034 0.167 1185 0.104 0.024 0.033 0.160 1200 0.099 0.023 0.031 0.153 1215 0.096 0.022 0.031 0.149 1230 0.094 0.022 0.031 0.147 1245 0.093 0.022 0.030 0.146 1260 0.092 0.022 0.030 0.144 1275 0.092 0.022 0.030 0.143 Continues on next page... 10 TOTAL POST DEV. Q Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 + Hyd. 5 = Outflow (min) (cfs) (efs) (cfs) (cfs) 1290 0.091 0.022 0.030 0.142 1305 0.090 0.021 0.029 0.141 1320 0.089 0.021 0.029 0.139 1335 0.088 0.021 0.029 0.138 1350 0.087 0.021 0.028 0.137 1365 0.087 0.021 0.028 0.135 1380 0.086 0.021 0.028 0.134 1395 0.085 0.020 0.028 0.133 1410 0.084 0.020 0.027 0.132 1425 0.083 0.020 0.027 0.130 1440 0.082 0.020 0.027 0.129 ..End 11 'Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 1 Predevelopment Q Hydrograph type = SCS Runoff Peak discharge = 21.65 cfs Storm frequency = 10 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 113,492 cuft Drainage area = 5.310 ac Curve number = 72 Basin Slope = 5.0% Hydraulic length = 400 ft Tc method = LAG Time of conc. (Tc) = 8.6 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 634 0.217 1159 0.339 649 0.308 1174 0.325 664 0.428 1189 0.312 679 0.658 1204 0.298 694 1.091 1219 0.293 709 7.611 1234 0.291 724 15.52 1249 0.288 739 3.079 1264 0.286 754 2.007 1279 0.283 769 1.577 1294 0.281 784 1.325 1309 0.278 799 1.163 1324 0.276 814 1.024 1339 0.273 829 0.915 1354 0.270 844 0.814 1369 0.268 859 0.766 1384 0.265 874 0.731 1399 0.263 889 0.696 1414 0.260 904 0.661 1429 0.257 919 0.625 934 0.588 ... End 949 0.552 964 0.515 979 0.497 994 0.485 1009 0.472 1024 0.459 1039 0.446 1054 0.433 1069 0.420 1084 0.407 1099 0.393 1114 0.380 1129 0.366 1144 0.353 (Printed values >=1.00% of Qp. Print interval =1S) Hydrograph Report 12 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 2 Post Development Q Hydrograph type = SCS Runoff Peak discharge = 19.72 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 83,484 cuft Drainage area = 3.070 ac Curve number = 83 Basin Slope = 5.0% Hydraulic length = 400 ft Tic method = LAG Time of conc. (Tc) = 6.2 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 578 0.199 1103 0.271 593 0.238 1118 0.261 608 0.285 1133 0.252 623 0.348 1148 0.242 638 0.426 1163 0.232 653 0.539 1178 0.223 668 0.695 1193 0.213 683 0.976 1208 0.205 698 2.742 1223 0.203 713 14.31 1238 0.201 728 3.016 1253 0.199 743 1.957 1268 0.197 758 1.270 773 1.077 ... End 788 0.905 803 0.801 818 0.703 833 0.628 848 0.564 863 0.538 878 0.512 893 0.486 908 0.459 923 0.433 938 0.406 953 0.379 968 0.357 983 0.347 998 0.338 1013 0.328 1028 0.319 1043 0.309 1058 0.300 1073 0.290 1088 0.281 (Printed values- 1.00% of Qp. Print interval =15) 13 'Hydrograph Report Hydraflow Hydrographs by IntelisoNe v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOP MENT RTE Hydrograph type = Reservoir Peak discharge = 7.851 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 81,514 cuft Inflow hyd. No. = 2 - P ost De velopment Q Reservoir name = POOL VOLUME POND Max. Elevation = 136.20 ft Max. Storage = 13,228 cuft Storage Indication method used. Hydrograph Discharge Table tPdntedvalues >=1.00%ofQp. Pdntinterval =l5) Time Inflow Elevation Clv A Civ B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) ds ft ds ds ds ds ds ds ds ds ds ds 705 6.124 135.09 4.310 0.036 ----- ---- 4.038 ___ ____ _____ ----- 4.074 720 16.77 136.06 7.704 0.002 ----- ----- 7.625 ----- ----- ----- ----- 7.627 735 2.397 135.80 7.284 0.003 ----- ----- 7.245 ----- ----- ----- ----- 7.248 750 1.566 135.15 5.330 0.023 ---- ----- 5.306 ----- ----- ----- ----- 5.329 765 1.179 134.99 3.350 0.040 ----- ----- 1.297 ----- ----- ----- ----- 1.337 780 0.987 134.98 3.350 0.039 ----- -- 1.013 - ----- ---- --- 1.052 795 0.857 134.97 3.350 0.039 ----- ---- 0.854 ---- ----- __-_ -__ 0.893 810 0.752 134.97 3.350 0.039 ---- ----- 0.746 ----- ----- ----- ----- 0.786 825 0.668 134.96 3.350 0.039 ----- ---- 0.654 ----- ----- ----- ----- 0.693 840 0.593 134.96 3.350 0.039 ----- ----- 0.578 ---- ----- ----- ----- 0.617 855 0.552 134.95 3.350 0.039 0.523 ----- ----- ----- ----- 0.562 870 0.526 134.95 3.350 0.039 ----- -- 0.495 ----- ----- ----- ----- 0.534 885 0.500 134.95 3.350 0.039 ----- ---- 0.469 0.508 900 0.474 134.95 3.350 0.039 ----- ----- 0.443 ----- ----- ----- ---- 0.482 915 0.447 134.95 3.350 0.039 ----- ----- 0.421 ----- ----- ----- ----- 0.460 930 0.420 134.95 3.350 0.039 ---- --- 0.400 ----- ----- ----- ----- 0.439 945 0.394 134.94 3.350 0.039 ----- ----- 0.375 ----- ----- ----- ----- 0.413 960 0.367 134.94 3.350 0.039 ----- ---- 0.348 --- ----- ----- ----- 0.387 975 0.352 134.94 3.350 0.039 ----- ----- 0.326 ----- ----- ----- ----- 0.365 990 0.343 134.94 3.350 0.039 ----- ----- 0.313 ----- ----- ----- ----- 0.351 1005 0.333 134.94 3.350 0.039 ----- ----- 0.302 ----- ----- ----- ----- 0.341 1020 0.324 134.93 3.350 0.039 ----- ----- 0.293 ----- ----- ----- ----- 0.331 1035 0.314 134.93 3.350 0.039 ----- ----- 0.283 0.322 1050 0.305 134.93 3.350 0.038 ---- ---- 0.274 ----- ---- ----- ---- 0.312 1065 0.295 134.93 3.350 0.038 ----- ----- 0.264 ----- ----- ---- ---- 0.303 1080 0.286 134.93 3.350 0.038 ----- ----- 0.255 ----- ----- ----- ----- 0.293 1095 0.276 134.93 3.350 0.038 ---- ----- 0.245 ----- ----- ----- ----- 0.283 1110 0.267 134.93 3.350 0.038 ----- ---- 0.235 ----- ----- ----- ----- 0.274 1125 0.257 134.93 3.350 0.038 --- ---- 0.226 ---- ----- ----- ----- 0.264 1140 0.247 134.93 3.350 0.038 -- ---- 0.216 ---- ---- ---- ----- 0.255 1155 0.238 134.92 3.350 0.038 --- ----- 0.206 ----- ----- ---- ----- 0.245 1170 0.228 134.92 3.350 0.038 ----- ----- 0.197 ----- ----- ----- ----- 0.235 1185 0.218 134.92 3.350 0.038 ----- ----- 0.187 ----- ----- ----- ----- 0.225 1200 0.208 134.92 3.350 0.038 ----- ----- 0.177 ----- ----- ----- ----- 0.216 1215 0.204 134.92 3.350 0.038 ----- ----- 0.170 ----- ----- ----- ----- 0.208 1230 0.202 134.92 3.350 0.038 --- ---- 0.166 ----- ---- ----- ----- 0.204 1245 0.200 134.92 3.350 0.038 ----- ---- 0.164 ---- ----- ----- ----- 0.202 1260 0.198 134.92 3.350 0.038 ----- ----- 0.162 ----- ----- ---- ----- 0.200 1275 0.197 134.92 3.350 0.038 ----- ----- 0.160 ----- ----- ----- ----- 0.198 Continues on next page... 14 POST DEVELOPMENT RTE Hydrograph Discharge Table Time Inflow Elevation (min) cfs ft 1290 0.195 134.92 1305 0.193 134.92 1320 0.191 134.92 1335 0.189 134.92 1350 0.187 134.92 1365 0.185 134.92 1380 0.183 134.92 1395 0.181 134.92 1410 0.179 134.92 1425 0.178 134.92 1440 0.176 134.92 Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D ExHI Outflow cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.350 0.038 ----- ----- 0.158 ----- ----- ----- ----- 0.196 3.350 0.038 ---- ----- 0.156 ---- ----- ----- ----- 0.194 3.350 0.038 ----- ----- 0.154 ----- ----- ----- ----- 0.192 3.350 0.038 ----- ----- 0.152 ----- ----- ----- ----- 0.190 3.350 0.038 ----- ----- 0.150 ----- ----- ----- ----- 0.189 3.350 0.038 ---- ----- 0.149 ---- ----- ----- ----- 0.187 3.350 0.038 ----- ----- 0.147 ----- ----- ----- ----- 0.185 3.350 0.038 ----- ----- 0.145 ----- ----- ----- ----- 0.183 3.350 0.038 ----- ----- 0.143 ----- ----- ----- ----- 0.181 3.350 0.038 ----- ----- 0.141 ----- ----- ----- ----- 0.179 3.350 0.038 ----- ----- 0.139 ----- ----- ----- ----- 0.177 ...End Hydrograph Report 15 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 4 POST DEV. WESTSIDE Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 1 min = 0.950 ac = 5.0% = LAG = 5.44 in = 24 hrs Sunday, Apr 25, 2010 Peak discharge = 5.107 cfs Time to peak = 717 min Hyd. volume = 21,606 cuft Curve number = 75 Hydraulic length = 200 ft Time of conc. (Tc) = 4.6 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 624 0.051 1149 0.065 639 0.068 1164 0.062 654 0.091 1179 0.060 669 0.127 1194 0.057 684 0.188 1209 0.055 699 0.750 1224 0.055 714 4.307 1239 0.054 729 0.677 1254 0.054 744 0.472 1269 0.053 759 0.322 1284 0.053 774 0.273 1299 0.052 789 0.233 1314 0.052 804 0.206 1329 0.051 819 0.182 834 0.163 ... End 849 0.148 864 0.141 879 0.135 894 0.128 909 0.121 924 0.114 939 0.107 954 0.100 969 0.095 984 0.093 999 0.090 1014 0.088 1029 0.085 1044 0.083 1059 0.080 1074 0.078 1089 0.075 1104 0.073 1119 0.070 1134 0.067 (Printed values >=1.00% of Qp. Print interval = 15) 'Hydrograph Report 16 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 5 POST DEV. SOUTHSIDE Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 1 min = 1.230 ac = 5.0% = LAG = 5.44 in = 24 hrs Sunday, Apr 25, 2010 Peak discharge = 7.409 cfs Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 607 0.074 1132 0.087 622 0.093 1147 0.084 637 0.118 1162 0.080 652 0.152 1177 0.077 667 0.205 682 0.293 ... End 697 1.033 712 5.512 727 0.908 742 0.634 757 0.425 772 0.361 787 0.306 802 0.271 817 0.238 832 0.213 847 0.193 862 0.184 877 0.175 892 0.166 907 0.157 922 0.148 937 0.139 952 0.130 967 0.123 982 0.120 997 0.116 1012 0.113 1027 0.110 1042 0.107 1057 0.103 1072 0.100 1087 0.097 1102 0.094 1117 0.090 Time to peak = 715 min Hyd. volume = 28,323 cuft Curve number = 79 Hydraulic length = 100 ft Time of conc. (Tc) = 2.3 min Distribution = Type II Shape factor = 484 ( Printed values >= 1.00% of Qp. Print interval =15) Hydrograph Report 17 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 3, 4, 5 Peak discharge = 19.49 cfs Time to peak = 716 min Hyd. volume = 131,443 cuft Contrib. drain. area= 2.180 ac Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 + Hyd. 5 = (min) (cfs) (cfs) (cfs) ( Printed values >= 1.00% of Qp. Print interval =15) Outflow (cfs) 645 0.026 0.077 0.136 0.238 660 0.029 0.102 0.173 0.303 675 0.032 0.150 0.250 0.432 690 0.035 0.217 0.347 0.599 705 4.074 1.451 2.365 7.889 720 7.627 3.514 3.238 14.38 735 7.248 0.597 0.764 8.609 750 5.329 0.386 0.482 6.197 765 1.337 0.302 0.391 2.030 780 1.052 0.253 0.326 1.632 795 0.893 0.222 0.287 1.402 810 0.786 0.195 0.252 1.232 825 0.693 0.174 0.225 1.092 840 0.617 0.155 0.199 0.971 855 0.562 0.145 0.188 0.896 870 0.534 0.139 0.179 0.853 885 0.508 0.132 0.171 0.811 900 0.482 0.125 0.162 0.769 915 0.460 0.118 0.153 0.731 930 0.439 0.111 0.143 0.693 945 0.413 0.104 0.134 0.652 960 0.387 0.097 0.125 0.609 975 0.365 0.094 0.121 0.580 990 0.351 0.092 0.118 0.561 1005 0.341 0.089 0.115 0.545 1020 0.331 0.087 0.112 0.529 1035 0.322 0.084 0.108 0.514 1050 0.312 0.082 0.105 0.499 1065 0.303 0.079 0.102 0.483 1080 0.293 0.077 0.098 0.468 1095 0.283 0.074 0.095 0.453 1110 0.274 0.072 0.092 0.437 1125 0.264 0.069 0.089 0.422 1140 0.255 0.066 0.085 0.406 1155 0.245 0.064 0.082 0.391 1170 0.235 0.061 0.078 0.375 1185 0.225 0.059 0.075 0.359 1200 0.216 0.056 0.072 0.343 1215 0.208 0.055 0.071 0.334 1230 0.204 0.055 0.070 0.329 1245 0.202 0.054 0.070 0.326 Continues on next page... 18 TOTAL POST DEV. Q Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 + Hyd. 5 = Outflow (min) WS) WS) WS) WS) 1260 0.200 0.054 0.069 0.322 1275 0.198 0.053 0.068 0.319 1290 0.196 0.053 0.068 0.316 1305 0.194 0.052 0.067 0.313 1320 0.192 0.052 0.066 0.310 1335 0.190 0.051 0.066 0.307 1350 0.189 0.051 0.065 0.304 1365 0.187 0.050 0.064 0.301 1380 0.185 0.050 0.064 0.298 1395 0.183 0.049 0.063 0.295 1410 0.181 0.049 0.062 0.292 1425 0.179 0.048 0.062 0.289 1440 0.177 0.048 0.061 0.286 ...End Hydrograph Report 19 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 Predevelopment Q Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 25 yrs = 1 min = 5.310 ac = 5.0% = LAG = 6.80 in = 24 hrs Sunday, Apr 25, 2010 Peak discharge = 31.11 cfs Time to peak = 719 min Hyd. volume = 113,492 cuft Curve number = 72 Hydraulic length = 400 ft Time of conc. (Tc) = 8.6 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 611 0.311 1136 0.483 626 0.403 1151 0.464 641 0.522 1166 0.446 656 0.692 1181 0.427 671 0.944 1196 0.409 686 1.385 1211 0.395 701 4.662 1226 0.391 716 26.41 1241 0.388 731 6.257 1256 0.384 746 3.555 1271 0.381 761 2.360 1286 0.377 776 1.997 1301 0.374 791 1.690 1316 0.370 806 1.497 1331 0.366 821 1.319 1346 0.363 836 1.179 1361 0.359 851 1.065 1376 0.356 866 1.017 1391 0.352 881 0.968 1406 0.349 896 0.920 1421 0.345 911 0.871 1436 0.341 926 0.821 941 0.771 ...End 956 0.721 971 0.680 986 0.662 1001 0.645 1016 0.627 1031 0.609 1046 0.592 1061 0.574 1076 0.556 1091 0.538 1106 0.519 1121 0.501 ( Printed values -1.00% of OP. Print interval =15) Hydrograph Report 20 Hydraflow Hydrographs by Intellsolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 2 Post Development Q Hydrograph type = SCS Runoff Peak discharge = 26.27 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 83,484 cuft Drainage area = 3.070 ac Curve number = 83 Basin Slope = 5.0% Hydraulic length = 400 ft Tc method = LAG Time of conc. (Tc) = 6.2 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 540 0.264 1065 0.381 555 0.288 1080 0.368 570 0.304 1095 0.356 585 0.347 1110 0.343 600 0.407 1125 0.331 615 0.487 1140 0.318 630 0.582 1155 0.306 645 0.719 1170 0.293 660 0.885 1185 0.281 675 1.200 1200 0.268 690 1.612 705 8.527 ... End 720 22.19 735 3.134 750 2.041 765 1.535 780 1.283 795 1.112 810 0.976 825 0.866 840 0.768 855 0.715 870 0.681 885 0.647 900 0.612 915 0.578 930 0.543 945 0.508 960 0.474 975 0.455 990 0.442 1005 0.430 1020 0.418 1035 0.405 1050 0.393 ( Printed values -1.00% of Qp. Print interval =15) 21 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOPMENT RT E Hydrograph type = Reservoir Peak discharge = 15.20 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 81,514 cuft Inflow hyd. No. = 2 - Post Development Q Reservoir name = POOL VOLUME POND Max. Elevation = 136.66 ft Max. Storage = 16,714 cuft Storage Indication method used. Hydrograph Discharge Table (PdnWvalues -1.00%ofOp. PdntiMerval=l5) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfi1 Outflow (min) cfs ft cfs ds cfs ds ds cfs ds cfs cfs cfs 675 1.200 134.97 3.350 0.039 ----- ----- 0.870 ----- ----- ----- ----- 0.910 690 1.612 135.00 3.350 0.040 ----- ----- 1.432 ----- ----- ----- ----- 1.472 705 8.527 135.17 5.570 0.020 ----- ----- 5.549 ----- ----- ----- ----- 5.569 720 22.19 136.57 8.447 0.001 ----- ----- 8.354 3.872 ----- ----- ----- 12.23 735 3.134 136.19 7.904 0.002 ---- ----- 7.852 ----- ---- ----- ----- 7.854 750 2.041 135.57 6.895 0.004 ----- ----- 6.885 -- ---- ---- ----- 6.889 765 1.535 135.04 3.789 0.038 ----- ----- 2.629 2.667 780 1.283 135.00 3.350 0.040 ----- ----- 1.339 ----- ----- ----- ----- 1.379 795 1.112 134.98 3.350 0.040 ----- ----- 1.121 ----- ---- ----- ----- 1.161 810 0.976 134.98 3.350 0.039 ----- ----- 0.980 ---- ----- ----- ----- 1.019 825 0.866 134.97 3.350 0.039 ----- ----- 0.860 ---- ----- ----- ----- 0.899 840 0.768 134.97 3.350 0.039 ----- ----- 0.760 --- ----- ----- ----- 0.799 855 0.715 134.96 3.350 0.039 ----- ----- 0.689 ----- ----- ----- ----- 0.728 870 0.681 134.96 3.350 0.039 ----- ----- 0.653 ----- ----- ----- ----- 0.692 885 0.647 134.96 3.350 0.039 ----- ----- 0.618 ----- ----- ----- ----- 0.657 900 0.612 134.96 3.350 0.039 ----- ----- 0.584 ----- ----- ----- ----- 0.623 915 0.578 134.96 3.350 0.039 ----- ----- 0.550 ---- ----- ----- ----- 0.589 930 0.543 134.95 3.350 0.039 ---- ----- 0.515 -- ---- ----- ----- 0.554 945 0.508 134.95 3.350 0.039 ---- ----- 0.481 ----- ----- ----- ----- 0.519 960 0.474 134.95 3.350 0.039 ----- ----- 0.446 ----- ----- ----- ----- 0.485 975 0.455 134.95 3.350 0.039 ----- ----- 0.423 ----- ----- ----- ----- 0.462 990 0.442 134.95 3.350 0.039 ----- ----- 0.412 ----- ----- ----- ----- 0.451 1005 0.430 134.95 3.350 0.039 ---- ----- 0.400 ----- ----- ----- ----- 0.439 1020 0.418 134.95 3.350 0.039 ----- ----- 0.388 ----- ----- ----- ---- 0.427 1035 0.405 134.94 3.350 0.039 --- ----- 0.376 ---- ----- ----- ----- 0.415 1050 0.393 134.94 3.350 0.039 ---- ----- 0.364 ----- ----- ----- ----- 0.402 1065 0.381 134.94 3.350 0.039 ----- ----- 0.351 ----- ----- ----- ----- 0.390 1080 0.368 134.94 3.350 0.039 ----- ----- 0.339 ---- ----- ----- ----- 0.378 1095 0.356 134.94 3.350 0.039 ---- ----- 0.327 --- ----- ----- ----- 0.365 1110 0.343 134.94 3.350 0.039 ----- ---- 0.314 0.353 1125 0.331 134.94 3.350 0.039 ----- ----- 0.302 ----- ----- ----- ---- 0.340 1140 0.318 134.93 3.350 0.039 ----- ----- 0.289 ----- ----- ----- ----- 0.328 1155 0.306 134.93 3.350 0.038 ----- ----- 0.277 ----- ----- ----- ----- 0.315 1170 0.293 134.93 3.350 0.038 ----- ----- 0.264 ----- ----- ----- ----- 0.303 1185 0.281 134.93 3.350 0.038 ----- ---- 0.252 0.290 1200 0.268 134.93 3.350 0.038 ----- ----- 0.239 ----- ---- ----- ----- 0.277 1215 0.262 134.93 3.350 0.038 ----- ----- 0.229 ----- ----- ----- ----- 0.267 1230 0.260 134.93 3.350 0.038 ----- ----- 0.224 ----- ----- ----- ----- 0.263 1245 0.258 134.93 3.350 0.038 ----- ----- 0.221 ----- ----- ----- ----- 0.260 Continues on next page... 22 POST DEVELOPMENT RTE Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D ELI Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1260 0.255 134.93 3.350 0.038 ----- ----- 0.219 ----- ----- ----- ----- 0.257 1275 0.253 134.93 3.350 0.038 ----- ----- 0.216 ----- ----- ----- ----- 0.255 1290 0.250 134.93 3.350 0.038 ----- ----- 0.214 ----- ----- ----- ----- 0.252 1305 0.248 134.92 3.350 0.038 ----- ----- 0.211 ----- ----- ----- ----- 0.250 1320 0.245 134.92 3.350 0.038 ----- ----- 0.209 ----- ----- ----- ----- 0.247 1335 0.243 134.92 3.350 0.038 ----- ----- 0.206 ----- ----- ----- ----- 0.245 1350 0.240 134.92 3.350 0.038 ----- ---- 0.204 ----- ----- ----- ----- 0.242 1365 0.238 134.92 3.350 0.038 ----- ----- 0.201 ----- ----- ---- ----- 0.240 1380 0.235 134.92 3.350 0.038 ----- ----- 0.199 ----- ----- ----- ----- 0.237 1395 0.233 134.92 3.350 0.038 ----- ----- 0.196 ----- ----- ----- ----- 0.235 1410 0.230 134.92 3.350 0.038 ----- ----- 0.194 ----- ----- ----- ----- 0.232 1425 0.228 134.92 3.350 0.038 ----- ----- 0.192 ----- ----- ----- ----- 0.230 1440 0.225 134.92 3.350 0.038 ----- ----- 0.189 ----- ----- ----- ----- 0.227 ...End 23 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 4 POST DEV. WESTSIDE Hydrograph type = SCS Runoff Peak discharge = 7.113 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 21,606 cuft Drainage area = 0.950 ac Curve number = 75 Basin Slope = 5.0% Hydraulic length = 200 ft Tc method = LAG Time of conc. (Tc) = 4.6 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 605 0.072 1130 0.090 620 0.091 1145 0.087 635 0.114 1160 0.083 650 0.148 1175 0.080 665 0.192 1190 0.076 680 0.279 1205 0.073 695 0.621 1220 0.073 710 3.800 1235 0.072 725 1.155 1250 0.071 740 0.716 755 0.454 ... End 770 0.386 785 0.323 800 0.286 815 0.251 830 0.225 845 0.201 860 0.192 875 0.182 890 0.173 905 0.164 920 0.155 935 0.145 950 0.136 965 0.127 980 0.124 995 0.121 1010 0.117 1025 0.114 1040 0.111 1055 0.107 1070 0.104 1085 0.100 1100 0.097 1115 0.094 ( Printed values - 1.00% of Qp. Print interval =15) 24 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 5 POST DEV. SOUTHSIDE Hydrograph type = SCS Runoff Peak discharge = 10.08 cfs Storm frequency = 25 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 28,323 cuft Drainage area = 1.230 ac Curve number = 79 Basin Slope = 5.0% Hydraulic length = 100 ft Tc method = LAG Time of conc. (Tc) = 2.3 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 589 0.102 1114 0.119 604 0.122 1129 0.114 619 0.150 1144 0.110 634 0.183 1159 0.106 649 0.232 1174 0.101 664 0.296 679 0.420 ...End 694 0.941 709 5.363 724 1.289 739 0.917 754 0.580 769 0.494 784 0.413 799 0.366 814 0.321 829 0.287 844 0.256 859 0.244 874 0.233 889 0.221 904 0.209 919 0.197 934 0.185 949 0.173 964 0.162 979 0.157 994 0.153 1009 0.149 1024 0.145 1039 0.140 1054 0.136 1069 0.132 1084 0.127 1099 0.123 (Printed values -1.00% of Qp. Print interval =15) Hydrograph Report 25 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 1 min Inflow hyds. = 3, 4, 5 Peak discharge = 24.74 cfs Time to peak = 716 min Hyd. volume = 131,443 cuft Contrib. drain. area= 2.180 ac Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 + Hyd. 5 = (min) (cfs) (cfs) (cfs) ( Printed values >= 1.00% of Qp. Print interval =15) Outflow (cfs) 615 0.030 0.084 0.142 0.256 630 0.032 0.105 0.172 0.309 645 0.034 0.136 0.218 0.388 660 0.037 0.174 0.272 0.483 675 0.910 0.248 0.385 1.543 690 1.472 0.347 0.522 2.341 705 5.569 2.177 3.385 11.13 720 12.23 4.840 4.339 21.41 735 7.854 0.811 1.016 9.681 750 6.889 0.522 0.639 8.050 765 2.667 0.408 0.517 3.592 780 1.379 0.341 0.430 2.151 795 1.161 0.299 0.379 1.838 810 1.019 0.262 0.331 1.613 825 0.899 0.234 0.296 1.428 840 0.799 0.207 0.262 1.268 855 0.728 0.195 0.247 1.170 870 0.692 0.185 0.236 1.113 885 0.657 0.176 0.224 1.058 900 0.623 0.167 0.212 1.002 915 0.589 0.158 0.200 0.947 930 0.554 0.148 0.188 0.891 945 0.519 0.139 0.176 0.834 960 0.485 0.130 0.164 0.778 975 0.462 0.125 0.159 0.746 990 0.451 0.122 0.154 0.727 1005 0.439 0.118 0.150 0.708 1020 0.427 0.115 0.146 0.688 1035 0.415 0.112 0.142 0.668 1050 0.402 0.108 0.137 0.648 1065 0.390 0.105 0.133 0.628 1080 0.378 0.102 0.129 0.608 1095 0.365 0.098 0.124 0.588 1110 0.353 0.095 0.120 0.567 1125 0.340 0.091 0.115 0.547 1140 0.328 0.088 0.111 0.527 1155 0.315 0.085 0.107 0.506 1170 0.303 0.081 0.102 0.486 1185 0.290 0.078 0.098 0.466 1200 0.277 0.074 0.093 0.445 1215 0.267 0.073 0.092 0.433 Continues on next page... 26 TOTAL POST DEV. Q Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 + Hyd. 5 = Outflow (min) (cfs) (cfs) (cfs) (cfs) 1230 0.263 0.072 0.091 0.426 1245 0.260 0.072 0.091 0.422 1260 0.257 0.071 0.090 0.418 1275 0.255 0.070 0.089 0.414 1290 0.252 0.070 0.088 0.410 1305 0.250 0.069 0.087 0.406 1320 0.247 0.068 0.086 0.402 1335 0.245 0.068 0.085 0.398 1350 0.242 0.067 0.085 0.394 1365 0.240 0.066 0.084 0.390 1380 0.237 0.066 0.083 0.386 1395 0.235 0.065 0.082 0.382 1410 0.232 0.064 0.081 0.378 1425 0.230 0.064 0.080 0.374 1440 0.227 0.063 0.079 0.370 ..End Hydrograph Report 27 Hydraflow Hydrographs by Intelisolve V9.1 Hyd. No. 1 Predevelopment Q Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 1 min = 5.310 ac = 5.0% = LAG = 9.34 in = 24 hrs Sunday, Apr 25, 2010 Peak discharge = 49.43 cfs Time to peak = 719 min Hyd. volume = 113,492 cuft Curve number = 72 Hydraulic length = 400 ft Time of conc. (Tc) = 8.6 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 580 0.495 1105 0.768 595 0.598 1120 0.741 610 0.722 1135 0.714 625 0.890 1150 0.686 640 1.099 1165 0.659 655 1.400 1180 0.631 670 1.822 1195 0.604 685 2.576 1210 0.581 700 7.342 1225 0.576 715 39.01 1240 0.570 730 11.20 1255 0.565 745 5.553 1270 0.560 760 3.621 1285 0.554 775 3.045 1300 0.549 790 2.562 1315 0.544 805 2.265 1330 0.538 820 1.990 1345 0.533 835 1.777 1360 0.528 850 1.597 1375 0.522 865 1.521 1390 0.517 880 1.448 1405 0.512 895 1.374 1420 0.506 910 1.300 1435 0.501 925 1.225 940 1.150 ...End 955 1.074 970 1.010 985 0.983 1000 0.956 1015 0.930 1030 0.903 1045 0.876 1060 0.849 1075 0.822 1090 0.795 (Printed values -1.00% of Qp. Print interval =15) 28 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 2 Post Development Q Hydrograph type = SCS Runoff Peak discharge = 38.48 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 83,484 cuft Drainage area = 3.070 ac Curve number = 83 Basin Slope = 5.0% Hydraulic length = 400 ft Tc method = LAG Time of conc. (Tc) = 6.2 min Total precip. = 9.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 512 0.387 1037 0.571 527 0.443 1052 0.554 542 0.502 1067 0.536 557 0.530 1082 0.518 572 0.551 1097 0.500 587 0.629 1112 0.483 602 0.725 1127 0.465 617 0.858 1142 0.447 632 1.008 1157 0.429 647 1.234 1172 0.412 662 1.492 1187 0.394 677 2.022 692 2.751 ... End 707 15.44 722 22.72 737 4.289 752 2.718 767 2.144 782 1.783 797 1.559 812 1.364 827 1.214 842 1.074 857 1.009 872 0.960 887 0.911 902 0.862 917 0.813 932 0.763 947 0.714 962 0.665 977 0.642 992 0.624 1007 0.606 1022 0.589 ( Printed values >= 1.00% of Op. Print interval =15) Hydrograph Report 29 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOPM ENT RTE Hydrograph type = Reservoir Peak discharge = 33.15 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 81,514 cuft Inflow hyd. No. = 2 - Post Development Q Reservoir name = POOL VOLUME POND Max. Elevation = 137.00 ft Max. Storage = 19,357 cuft Storage Indication method used. Hydrograph D ischarge Table (NnW values >= 1.00% of Op. Print interval = 15) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D EAU Outflow (min) ds ft as ds as cfs cfs ds ds ds ds cfs 600 0.712 134.95 3.350 0.039 ----- ----- 0.417 ----- ----- ----- ----- 0.456 615 0.839 134.97 3.350 0.039 ----- ----- 0.747 ----- ___ _____ 0.786 630 0.987 134.97 3.350 0.039 ----- ----- 0.900 ----- ----- ----- ----- 0.939 645 1.201 134.98 3.350 0.040 ----- ----- 1.088 ----- ----- ----- ----- 1.127 660 1.455 134.99 3.350 0.040 ----- ---- 1.333 ----- ----- ---- ----- 1.373 675 1.942 135.01 3.469 0.039 ---- -- 1.762 ---- ----- ---- ---- 1.801 690 2.564 135.03 3.694 0.038 ----- --- 2.371 ----- ---- ----- ----- 2.409 705 13.10 135.34 6.465 0.007 ----- ----- 6.456 ----- ----- ----- ----- 6.463 720 32.25 137.00 << 9.020 0.001 ----- ----- 8.896 24.25 ----- ----- ----- 33.15 << 735 4.498 136.33 8.106 0.002 ----- ----- 7.977 ----- ----- ----- ----- 7.979 750 2.921 135.84 7.356 0.003 ----- ----- 7.304 7.307 765 2.192 135.24 6.200 0.011 ----- ----- 6.186 ---- ----- ----- -- 6.197 780 1.830 135.02 3.562 0.039 ---- ----- 2.012 ----- ----- ----- ----- 2.051 795 1.585 135.01 3.409 0.040 ----- ----- 1.598 ----- ----- ----- ----- 1.638 810 1.389 135.00 3.350 0.040 ----- ----- 1.404 ----- ----- ----- ----- 1.444 825 1.232 134.99 3.350 0.040 ----- ----- 1.239 ----- ----- ----- ----- 1.279 840 1.092 134.98 3.350 0.040 ----- ----- 1.097 ----- ----- ----- ----- 1.137 855 1.016 134.98 3.350 0.039 ---- -- 0.995 ----- ----- ----- --- 1.035 870 0.967 134.98 3.350 0.039 ----- ----- 0.943 --- ----- ----- --- 0.982 885 0.918 134.97 3.350 0.039 ----- ----- 0.894 ----- ----- ----- ----- 0.933 900 0.869 134.97 3.350 0.039 ----- ----- 0.845 ---- ----- ----- ----- 0.884 915 0.819 134.97 3.350 0.039 ----- ----- 0.796 ----- ---- ----- ----- 0.835 930 0.770 134.97 3.350 0.039 ----- ----- 0.746 ----- ---- ---- ----- 0.786 945 0.721 134.96 3.350 0.039 ----- ----- 0.697 0.736 960 0.671 134.96 3.350 0.039 ----- ----- 0.648 ---- ----- ----- ----- 0.687 975 0.644 134.96 3.350 0.039 ----- ----- 0.612 ----- ----- ----- ----- 0.651 990 0.626 134.96 3.350 0.039 ----- ----- 0.593 ---- ----- ----- ----- 0.632 1005 0.609 134.96 3.350 0.039 ----- ----- 0.575 ----- ----- ----- ----- 0.614 1020 0.591 134.96 3.350 0.039 ----- ----- 0.558 ----- ---- ----- ----- 0.597 1035 0.574 134.96 3.350 0.039 -- ----- 0.540 ----- ----- ---- ---- 0.579 1050 0.556 134.95 3.350 0.039 ----- ----- 0.523 ----- ----- ----- ----- 0.562 1065 0.538 134.95 3.350 0.039 ----- ----- 0.505 ----- ----- ----- ----- 0.544 1080 0.521 134.95 3.350 0.039 ----- ----- 0.487 ----- ----- ----- ----- 0.526 1095 0.503 134.95 3.350 0.039 ----- ----- 0.469 ----- ----- ----- ----- 0.508 1110 0.485 134.95 3.350 0.039 ----- ----- 0.452 ----- ----- ----- ----- 0.491 1125 0.467 134.95 3.350 0.039 ----- ----- 0.434 ----- ----- ----- ----- 0.473 1140 0.450 134.95 3.350 0.039 ---- ----- 0.420 ----- ----- ----- ----- 0.459 1155 0.432 134.95 3.350 0.039 ----- ----- 0.405 ----- ----- ----- ----- 0.444 1170 0.414 134.95 3.350 0.039 ----- ----- 0.388 ----- ----- ----- ----- 0.427 Continues on next page... 30 POST DEVELOPMENT RTE Hydrograph Discharge Table Time Inflow Elevation (min) cfs ft 1185 0.396 134.94 1200 0.378 134.94 1215 0.370 134.94 1230 0.367 134.94 1245 0.363 134.94 1260 0.360 134.94 1275 0.356 134.94 1290 0.353 134.94 1305 0.349 134.94 1320 0.346 134.94 1335 0.342 134.94 1350 0.339 134.94 1365 0.335 134.94 1380 0.332 134.93 Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfi1 Outflow cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.350 0.039 ----- ----- 0.371 ----- --- ----- --?- 0.409 3.350 0.039 ----- ----- 0.353 ----- ----- ----- ----- 0.392 3.350 0.039 ----- ----- 0.339 ----- ----- ----- ----- 0.377 3.350 0.039 ----- ----- 0.332 ----- ----- ----- ----- 0.371 3.350 0.039 ----- ----- 0.328 ----- ----- ----- ----- 0.366 3.350 0.039 ----- ----- 0.324 ----- ----- ----- ----- 0.363 3.350 0.039 ----- ---- 0.321 ----- ----- ----- ---- 0.359 3.350 0.039 ----- ----- 0.317 ----- ---- ----- ----- 0.356 3.350 0.039 ----- ----- 0.314 ----- ----- ----- ----- 0.352 3.350 0.039 ----- ----- 0.310 ----- ----- ----- ----- 0.349 3.350 0.039 ----- ----- 0.306 ----- ----- ----- ----- 0.345 3.350 0.039 ----- ----- 0.303 ----- ----- ----- ----- 0.341 3.350 0.039 ----- ----- 0.299 ----- ----- ----- ----- 0.338 3.350 0.039 ----- ----- 0.296 ----- ----- ----- ----- 0.334 ...End Hydrograph Report 31 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 4 POST DEV. WESTSIDE Hydrograph type = SCS Runoff Peak discharge = 10.98 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 1 min Hyd. volume = 21,606 cuft Drainage area = 0.950 ac Curve number = 75 Basin Slope = 5.0% Hydraulic length = 200 ft Tc method = LAG Time of conc. (Tc) = 4.6 min Total precip. = 9.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 577 0.110 1102 0.141 592 0.131 1117 0.136 607 0.157 1132 0.131 622 0.190 1147 0.126 637 0.232 1162 0.121 652 0.292 1177 0.115 667 0.376 1192 0.110 682 0.526 697 1.519 ... End 712 7.754 727 1.440 742 1.011 757 0.658 772 0.559 787 0.470 802 0.416 817 0.365 832 0.326 847 0.293 862 0.280 877 0.266 892 0.252 907 0.239 922 0.225 937 0.211 952 0.197 967 0.185 982 0.180 997 0.175 1012 0.171 1027 0.166 1042 0.161 1057 0.156 1072 0.151 1087 0.146 ( Printed values >=1.00% of Qp. Print interval =15) Hydrograph Report 32 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 5 POST DEV. SOUTHSIDE Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 1 min = 1.230 ac = 5.0% = LAG = 9.34 in = 24 hrs Sunday, Apr 25, 2010 Peak discharge = 15.11 cfs Time to peak = 715 min Hyd. volume = 28,323 cuft Curve number = 79 Hydraulic length = 100 ft Time of conc. (Tc) = 2.3 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 550 0.152 1075 0.186 565 0.160 1090 0.180 580 0.179 1105 0.174 595 0.209 1120 0.167 610 0.248 1135 0.161 625 0.296 1150 0.155 640 0.362 655 0.446 ...End 670 0.590 685 0.797 700 3.516 715 15.11 << 730 1.668 745 1.117 760 0.794 775 0.667 790 0.572 805 0.503 820 0.444 835 0.395 850 0.363 865 0.346 880 0.328 895 0.311 910 0.294 925 0.276 940 0.259 955 0.241 970 0.230 985 0.224 1000 0.218 1015 0.211 1030 0.205 1045 0.199 1060 0.193 (Printed values >=1.00% of Qp. Print interval= 15) Hydrograph Report 33 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 6 TOTAL POST DEV. Q Sunday, Apr 25, 2010 Hydrograph type = Combine Peak discharge = 51.10 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 131,443 cuft Inflow hyds. = 3, 4, 5 Contrib. drain. area= 2.180 ac Hydrograph Discharge Table (Printed values >=1.00% of Qp. Print interval =15) Time Hyd. 3 + Hyd. 4 + Hyd. 5 = Outflow (min) (cfs) (cfs) (cfs) (cfs) 600 0.456 0.143 0.220 0.820 615 0.786 0.174 0.264 1.224 630 0.939 0.210 0.313 1.462 645 1.127 0.263 0.389 1.780 660 1.373 0.327 0.475 2.176 675 1.801 0.454 0.657 2.912 690 2.409 0.614 0.871 3.894 705 6.463 3.620 5.356 15.44 720 33.15 << 7.345 6.393 46.89 735 7.979 1.212 1.486 10.68 750 7.307 0.777 0.931 9.014 765 6.197 0.605 0.752 7.554 780 2.051 0.505 0.624 3.181 795 1.638 0.441 0.549 2.627 810 1.444 0.387 0.480 2.310 825 1.279 0.344 0.428 2.051 840 1.137 0.305 0.378 1.820 855 1.035 0.286 0.357 1.678 870 0.982 0.272 0.340 1.595 885 0.933 0.259 0.323 1.515 900 0.884 0.245 0.305 1.435 915 0.835 0.231 0.288 1.354 930 0.786 0.217 0.270 1.273 945 0.736 0.203 0.253 1.193 960 0.687 0.189 0.235 1.112 975 0.651 0.183 0.228 1.061 990 0.632 0.178 0.222 1.031 1005 0.614 0.173 0.215 1.003 1020 0.597 0.168 0.209 0.974 1035 0.579 0.163 0.203 0.945 1050 0.562 0.158 0.197 0.916 1065 0.544 0.153 0.191 0.887 1080 0.526 0.148 0.184 0.858 1095 0.508 0.143 0.178 0.829 1110 0.491 0.138 0.172 0.800 1125 0.473 0.133 0.165 0.771 1140 0.459 0.128 0.159 0.746 1155 0.444 0.123 0.153 0.720 1170 0.427 0.118 0.146 0.691 1185 0.409 0.113 0.140 0.662 1200 0.392 0.108 0.134 0.633 Continues on next page... 34 TOTAL POST DEV. 0 Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 + Hyd. 5 = Outflow (min) (cfs) (cfs) (cfs) (cfs) 1215 0.377 0.106 0.132 0.615 1230 0.371 0.105 0.131 0.606 1245 0.366 0.104 0.129 0.600 1260 0.363 0.103 0.128 0.594 1275 0.359 0.102 0.127 0.588 1290 0.356 0.101 0.126 0.582 1305 0.352 0.100 0.124 0.577 1320 0.349 0.099 0.123 0.571 1335 0.345 0.098 0.122 0.565 1350 0.341 0.097 0.121 0.559 1365 0.338 0.096 0.119 0.553 1380 0.334 0.095 0.118 0.548 1395 0.331 0.094 0.117 0.542 1410 0.327 0.093 0.116 0.536 1425 0.324 0.092 0.114 0.530 1440 0.320 0.091 0.113 0.525 ...End 35 Hydraflow Rainfall Report Hydraflow Hydrographs by Intelisolve v9.1 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 132.0000 18.0000 1.0000 3 0.0000 0.0000 0.0000 5 169.0000 21.0000 1.0000 10 195.0000 22.0000 1.0000 25 232.0000 23.0000 1.0000 50 261.0000 24.0000 1.0000 100 290.0000 25.0000 1.0000 File name: RDU NC.IDF Intensity = B / (Tc + D)"E Sunday, Apr 25, 2010 Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.74 4.71 4.00 3.47 3.07 2.75 2.49 2.28 2.10 1.94 1.81 1.69 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.50 5.45 4.69 4.12 3.67 3.31 3.02 2.77 2.56 2.38 2.22 2.09 10 7.22 6.09 5.27 4.64 4.15 3.75 3.42 3.15 2.91 2.71 2.53 2.38 25 8.29 7.03 6.11 5.40 4.83 4.38 4.00 3.68 3.41 3.18 2.97 2.80 50 9.00 7.68 6.69 5.93 5.33 4.83 4.42 4.08 3.78 3.53 3.30 3.11 100 9.67 8.29 7.25 6.44 5.80 5.27 4.83 4.46 4.14 3.87 3.63 3.41 To = time in minutes. Values may exceed 60. PreCio_ file name: Citv of Wilson.DcD Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.91 3.52 0.00 4.55 5.44 6.80 7.99 9.34 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff-1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff4h 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 1.75 0.00 2.80 3.90 5.25 6.00 7.10 Hydraflow Table of Contents 8300-F BATTS FARM-II WQP-REV 112-3-10.gpw Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hydrograph Return Period Recap ...................................................................... 1 - Year Hydrograph Reports ........................................................................................................ 2 Hydrograph No. 1, SCS Runoff, Predevelopment Q ...................................................... 2 Hydrograph No. 2, SCS Runoff, Post Development Q .................................................. 3 Hydrograph No. 3, Reservoir, POST DEVELOPMENT RTE ......................................... 4 Pond Report - POOL VOLUME POND A .................................................................. 6 Hydrograph No. 4, SCS Runoff, POST DEV. WESTSIDE ............................................. 7 Hydrograph No. 5, SCS Runoff, POST DEV. SOUTHSIDE ........................................... 8 Hydrograph No. 6, Combine, TOTAL POST DEV. Q ..................................................... 9 10 -Year Hydrograph Reports ...................................................................................................... 11 Hydrograph No. 1, SCS Runoff, Predevelopment Q .................................................... 11 Hydrograph No. 2, SCS Runoff, Post Development Q ................................................ 12 Hydrograph No. 3, Reservoir, POST DEVELOPMENT RTE ....................................... 13 Hydrograph No. 4, SCS Runoff, POST DEV. WESTSIDE ........................................... 15 Hydrograph No. 5, SCS Runoff, POST DEV. SOUTHSIDE ......................................... 16 Hydrograph No. 6, Combine, TOTAL POST DEV. Q ................................................... 17 25 - Year Hydrograph Reports ...................................................................................................... 19 Hydrograph No. 1, SCS Runoff, Predevelopment Q .................................................... 19 Hydrograph No. 2, SCS Runoff, Post Development Q ................................................ 20 Hydrograph No. 3, Reservoir, POST DEVELOPMENT RTE ....................................... 21 Hydrograph No. 4, SCS Runoff, POST DEV. WESTSIDE ........................................... 23 Hydrograph No. 5, SCS Runoff, POST DEV. SOUTHSIDE ......................................... 24 Hydrograph No. 6, Combine, TOTAL POST DEV. Q ................................................... 25 100 - Year Hydrograph Reports ...................................................................................................... 27 Hydrograph No. 1, SCS Runoff, Predevelopment Q .................................................... 27 Hydrograph No. 2, SCS Runoff, Post Development Q ................................................ 28 Hydrograph No. 3, Reservoir, POST DEVELOPMENT RTE ....................................... 29 Hydrograph No. 4, SCS Runoff, POST DEV. WESTSIDE ........................................... 31 Hydrograph No. 5, SCS Runoff, POST DEV. SOUTHSIDE ......................................... 32 Hydrograph No. 6, Combine, TOTAL POST DEV. Q ................................................... 33 IN Report .......................................................................................................... 35 Hydrograph Report 36 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 4.486 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 1 min Hyd. volume = 13,849 cuft Inflow hyd. No. = 2 - Post Development Q Max. Elevation = 135.10 ft Reservoir name = POOL VOLUME POND A Max. Storage = 5,892 cuft Storage Indication method used. POST DEVELOPMENT RTE Q (cfs) Hyd. No. 3 -- 1 Year 8.00 6.00 4.00 2.00 0.00 1 1 -." 0 2 4 - Hyd No. 3 Q (cfs) 8.00 6.00 4.00 2.00 ,. 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) - Hyd No. 2 f- - Total storage used = 5,892 cult Hydrograph Report 37 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 7.851 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 39,123 cuft Inflow hyd. No. = 2 - Post Development Q Max. Elevation = 136.20 ft Reservoir name = POOL VOLUME POND A Max. Storage = 13,228 cuft Storage Indication method used. Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 ' 0 2 4 - Hyd No. 3 POST DEVELOPMENT RTE Hyd. No. 3 -- 10 Year 6 8 10 - Hyd No. 2 12 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 14 16 18 20 22 24 26 Time (hrs) Total storage used = 13,228 cult 38 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Sunday; Apr 25; 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 15.20 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 1 min Hyd. volume = 53,651 cuft Inflow hyd. No. = 2 - Post Development Q Max. Elevation = 136.66 ft Reservoir name = POOL VOLUME POND A Max. Storage = 16,714 cuft Storage Indication method used. POST DEVELOPMENT RTE Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) - Hyd No. 3 Hyd No. 2 Total storage used = 16,714 cult Hydrograph Report 39 Hydraflow Hydrographs by Intelisolve v9.1 Sunday; Apr 25; 2010 Hyd. No. 3 POST DEVELOPMENT RTE Hydrograph type = Reservoir Peak discharge = 33.15 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 81,514 cuft Inflow hyd. No. = 2 - Post Development Q Max. Elevation = 137.00 ft Reservoir name = POOL VOLUME POND A Max. Storage = 19,357 cuft Storage Indication method used. POST DEVELOPMENT RTE Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hrs) - Hyd No. 3 Hyd No. 2 1 Total storage used = 19,357 cult Hydrograph Report 40 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Peak discharge = 5.990 cfs Storm frequency = 1 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 21,662 cuft Inflow hyds. = 3, 4, 5 Contrib. drain. area: 2.180 ac TOTAL POST DEV. Q Q WS) Hyd. No. 6 -- 1 Year Q WS) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 6 Hyd No. 3 Hyd No. 4 Hyd No. 5 Hydrograph Report 41 Hydraflow Hydrographs by Intelisolve v9.1 Sunday, Apr 25, 2010 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Peak discharge = 19.49 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 62,143 cuft Inflow hyds. = 3, 4, 5 Contrib. drain. area= 2.180 ac TOTAL POST DEV. Q Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs} - Hyd No. 6 Hyd No. 3 ---- Hyd No. 4 Hyd No. 5 42 Hydrograph Report Hydraflow Hydrographs by fnteHsoW v9.1 Sunday, Apr 25, 2010 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Peak discharge = 24.74 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 85,779 cuft Inflow hyds. = 3, 4, 5 Contrib. drain. area= 2.180 ac TOTAL POST DEV. Q Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) - Hyd No. 6 - Hyd No. 3 Hyd No. 4 - Hyd No. 5 43 Hydrograph Report Hydraflow Hydrographs by lntelisoNe v9.1 Sunday, Apr 25, 2040 Hyd. No. 6 TOTAL POST DEV. Q Hydrograph type = Combine Peak discharge = 51.10 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 131,443 cuft Inflow hyds. = 3, 4, 5 Contrib. drain. area= 2.180 ac Q WS) 60.00 50.00 40.00 30.00 20.00 10.00 0 00 TOTAL POST DEV. Q Hyd. No. 6 -- 100 Year Q WS) 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 6 Hyd No. 3 Hyd No. 4 - Hyd No. 5