HomeMy WebLinkAbout20110625 Ver 1_Approval Letter_20110809NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
August 9, 2011
US Marine Corps Base Camp Lejeune
Attn: Mr. Carl Baker, Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28542
Dee Freeman
Secretary
DWQ Project # 01 0625
Onslow County
Subject Property: Gonzales Boulevard Extension (P1265), Jacksonville
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Baker:
You have our approval, in accordance with the attached conditions; to permanently impact 0.30 acres of
wetlands and the hand clearing of 2.21 acres of wetlands for a road crossing and the construction of an
877 foot bridge over wetlands to be built using top down construction on the subject property. These
crossings are described in your application dated June 27, 2011 received by DWQ Wilmington Regional
Office (WiRO) on July 8, 2011. After reviewing your application, it has been determined that the
impacts are covered by General Water Quality Certification Number(s) 3820 (GC3820). The
Certification allows you to use Nationwide Permit 14 when issued by the US Army Corps of Engineers
(USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or
local permits before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of
the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is
sold, the new owner must be given a copy of this Certification and approval letter and is thereby
responsible for complying with all conditions. If total fills for this project (now or in the future) exceed
one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described
in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed on the following pages.
Wilmington Regional Office
127 Cardinal Drive Extension Wilmington, NC 28405
Phone: 910-796-7215 / FAX: 910-350-2004
Internet: www.ncwaterquality.org
An Equal Opportunity/Affirmative Action Employer
50% Recycled/ 10% Post Consumer Paper
NorthCarolina
Ammally
Customer Service 1-877-623-6748
Page Two
US Marine Corps Base Camp Lejeune
Attn: Mr. Carl Baker, Public Works Officer
DWQ # 11 0625
August 9, 2011
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount Approved (Units) Plan Location or Reference
Stream N/A (feet)
404 Wetlands
1 (Permanent) 0.01 acres Sheet Permit 101 and 103
1 (Temporary) 0.02 acres (attached)
2 (Permanent) 0.028 acres
2 (Temporary) 0.00 acres
3 (Permanent) 0.01 acres
3 (Temporary) 2.02 acres
2. Sedimentation and Erosion Control
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. Sediment and Erosion Control Measures
Sediment and erosion control measures shall be in place prior to ANY land disturbing activities
commencing. The silt fences shall be installed in accordance to plan and the side cast from the
trenching shall be placed on the impacted side of the fence and NOT the side of the wetland that
is to be left undisturbed.
Page Three
US Marine Corps Base Camp Lejeune
Attn: Mr. Carl Baker, Public Works Officer
DWQ # 11 0625
August 9, 2011
4. Wetland Boundary Identification
The wetland boundary must be clearly identified within 50 feet of the project corridor as
depicted on the jurisdictional determination map signed by the US Army Corps of Engineers.
The wetland boundary identification (flagging, fencing, etc.) must be maintained until the project
is completed.
5. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. No staging
areas or stock piling of construction materials are allowed in wetlands. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water
quality standards, statutes, or rules occur.
6. No Sediment & Erosion Control Measures within Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in wetlands
and waters is unavoidable, they shall be removed and the natural grade restored within six
months of the date that the Division of Land Resources has released the project.
7. Dewatering of Construction Site
Dewatering of the construction site, if required, shall be accomplished by pumping to a
maintained silt bag or approved silting basin. Silt bags are not allowed to overcharge and release
sediment to surface waters or wetlands. Silt bags will not be located within any wetland or
surface water.
8. Continuing Compliance:
The US Marine Corps Base Camp Lejeune and its authorized agents and/or contractors, shall
conduct construction activities in a manner consistent with State water quality standards (including
any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any
other appropriate requirements of State law and federal law. If the Division determines that such
standards or laws are not being met (including the failure to sustain a designated or achieved use) or
that State or federal law is being violated, or that further conditions are necessary to assure
compliance, the Division may reevaluate and modify this Certification to include conditions
appropriate to assure compliance with such standards and requirements in accordance with 15A
NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify the US Marine
Corps Base Camp Lejeune and its authorized agents and/or contractors and the US Army Corps of
Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity
for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be
provided to the US Marine Corps Base Camp Lejeune and its authorized agents and/or contractors in
writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit
Page Four
US Marine Corps Base Camp Lejeune
Attn: Mr. Carl Baker, Public Works Officer
DWQ # 11 0625
August 9, 2011
issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404
Permit for the project;
9. Construction Stormwater Permit NCG010000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an
NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued
to the project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by
this permit [applicable to construction projects that disturb one (1) or more acres], full
compliance with permit conditions including the sedimentation control plan, self-monitoring,
record keeping and reporting requirements are required.
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality,
1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or
to conduct impacts to waters as depicted in your application and as authorized by this Certification shall
expire upon expiration of the 404 or CAMA Permit.
If you wish to contest any conditions in the enclosed certification (associated with the approved wetland
or waters impacts) you must file a petition for an administrative hearing. You may obtain the petition
form from the office of Administrative hearings. You must file the petition with the office of
Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed
when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5:00
pm, except for official state holidays. The original and one (1) copy of the petition must be filed with
the Office of Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office
of Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-733-2698, Facsimile: (919)-733-3478
Page Five
US Marine Corps Base Camp Lejeune
Attn: Mr. Carl Baker, Public Works Officer
DWQ # 11 0625
August 8, 2011
A copy of the petition must also be served on DENR as follows:
Ms. Mary Penny Thompson, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Ian McMillan in the Central Office in Raleigh at
919.807.6364 or Joanne Steenhuis in the DWQ Wilmington Regional Office at 910.796.7215.
Sincerely,
Coleen H. Sullins, Director
Division of Water Quality
Attachments
Enclosures: GC 3820
Certificate of Completion
cc: Ron Johnson - AECOM
Marty Korenek - Camp Lejeune
Ian McMillan - DWQ 401 Oversight Unit, Raleigh
Richard Spencer - USACE Wilmington Regulatory Field Office
Stephen Rynas, DCM Morehead City
WiRO
LO
N-)
N
z
,
U
F 0-
Z O
3w
0 /
o u m Q
xea. "? "??WJS14 "? ,? 89'£L•6l 'V1S 01 00'00.01 d1S OAlB HOf1H3W
0000.91 'V1S 01 U'4l•S V1S OAlB Z31VZN00
SNOISN31X3 OliVA31f108 Z3lb2NOJ ? H_
VNIl021V'J H1210N '3NI13f31 dY1Y0 3W Sdi100 3NRlYYV d
? Y>
?d?? Vmbvn xtuox '3xn3rn drm - 3se sdaa 3rawn gal MOM xuwx
t ? ? Z ^
[ 4? ? ? pp 1NVlaIW Otl?AVN - ONVWWOOJNIH33NI?JN3 S3111lIOVd W
ltlAtlN a
ONYYI YIOJ 6NI833N17N3 5311111?Ya IVAVN MYN 3x1 30 1N3W1NYd30 9
O
O
JN
O C, LL
^ ^ry^ry^? r1r
Q ^ry^N^ry 3
LLI
mo `
3
S
o
-n
dl?.. rn
? I
O
I II
(V I LLI
O X. Q Z
~
J w°0 3 rj) w
?JI I
S\ U ? 'aOo?I LLI i
1
n
0
3
2
N
S$x?
k-
1? sZ! _
08 ,ZL L
c
,ZG
?• 'Z? o
N
SAT U ?wia j?
J T
a a
\ w k >'i
w
z
J
w
Q
w
a
O
z
10
wo I
NW
¢? I?I
zw °o
3 1
(7 F-
a?
J
Z
O
U
7
K
I-
tn
Z
O
U
O7
m ?
W LO
Q
I-
J U)
Z
o°
O?c P,.
. ?N
¦?\V
V?
F uli
p00?
fno UJ
moo aU ?
-j
Z
inu- Z O O
LL
?
g?
W
U
ZoZ
/ \? Y
Y
Qa' Q
/ \1 ?N Z
0( w Z m
aU
0
"
?
1 \
a v o
LL
J?
4
z
wN
c
W
I
Z
I 9 +0 1 w
\ 1 > w
\ z ~ z
a U) O
W M
U
?I a_U U °O v o
F-
NLL F >°?°•? > JO o Z
(n a' F? OLLo Q JO 3 0
o g? O WJW z LL> r' ,
U ULL zZ1 cm, W1 On UW O ?
OH. CO W a0 Z
U zz
U (n Q Q a
w W Z
A a.
N O 3
U)
w
2 ? x21 ??
O QG S?P W
3
iV U.
(7
(\\ \\ a
2
J W co
?' LL\ d z
O
U
\ ?. U D Z
\\ \ $ W Om U
\ Z
z
a \ OU ZU O r
o
W? µ
+miV Fp Q
w
U)
yod.? \ z
d ys \ ? ?
a \ \\ ?I a
c \ o a
o
3
3 ?
N
. ? U m
Q
u6ploFllMa3d-Z9S961-XXXXPW&XgO-uaTu6O\PPO.?VbBZ9l09\'0 'N90
nd 09:10:01 '3d/1
IAV/Bl/S :31YO
.U)
o U)
? J
U
N
o
CJ
d In
N
o
N
M
N
a
U
M
0
F??,s a
U
U
ww 22 O Z z 2
WZ ZQ ? w
LLI
04 QQ w
00 ON WQ?QOJ U N In
00 0o QKLL zz
a
W F-F HI- ROK Z J U.
W: X999 99 CWL 9 N,99 LL~'W v? FFF-- a d_
LLO Z
OZ z}- z}F (n UN W J
IL< Om a W O W w< O LL wu)
a? ai ZaI QQUU
04 - ZU Wmix w? O aQLL
\ a -
5
/M .90 ALE .Z91J
? T >
Opp
1 ? O N
a +
U p
? F
z 0- l-
O wc, X
?---
N O
O
In Z
V
w
X J
r A 1 Fels
J o0
0 4
?/1
V U
00'00+L6 d1S'OAl9 HsnHOW 3NIlHDiVVY
o I
X ?a I N I
z0: I
l I N
co U?
U ?O
°°
I
3F e II I x
N
a e
I I
i I
WN I
O? ado
~ UZ
g
I N I a
UI
I n
o
J?
I5 V
59- W z zo
I I a
UJ
0
W Q
Q
Q
J
Y
Z
t7
I
I
n
OO N I
I
-F-W ~
a
1 F W
? I o? N N N 90+
UNN
`\ X O
U)? I
UJ. 00
/
10ASO?JZ
DATE: 511612011
1W& 12,09:18 PM
OGN: O:Ib016294?GaeA?Tkjn?Ogn_GSWeoaXXXX-7A5562-PERM/T 103dgn
D
o I n I D
s? m
y r
Z
m
N \
-TT- T \T
a ANA- ,._ \
ONj I w / D • D • .
N _ I+C D
W/'J m oa ?. o \
mo???Ox ) /?/ s 2S• / ? 42.89 ?? \\\\
0000
yib ,n mDD / ?s AT
Z mz / /E7 Sl n
Doug ?/ / lgxr Zmm?
m`? n+wi yc? ?? ?/ // s38 ?OpN
C-) c
--f 0
01
-go
yli
le
?I
of
I 5
.01
Fnr_?
10
(!III -<°?_
m?N
I I II III ?p
I I I I I I I o mD ? m
,lio?io ? oo?l? ?No,I??AC?
I I I I I I ' I rt I ; s I o
I ' I I I I I I N N D? rO I mma
I I I I I I I F n m I NrrO
I I I I I I I I I _( m ( v
I I I I ? T? I
I?11 Till o ? Z ??
a III IIII , ,. ? ,?I
I of I I I I I I I4 0 NAZI
I I I I I I I I >-b f CD M/
N III III 020
JT = I I I I I I I I c /
?., I IIII I , I ,o o,
III o l of ?o. ??, D ,
o I I I o
TI 00 0
C?A E, I
I I I I
I o I I ? I
°I I I I I 2 02
rv^Ir I I / Nm0 V/Ul p) I T '
I I I -m{
I I I r TZ mD? I 03 03
I Z F(rn mmD I a Z-
I w ):1 D F_ I I 88.88N
TY)
DEPARTMENT OF THE NA- NAVAL FACILITIES ENGINEERING COMMAND
Q ?mE a NAVAL FACILITIES ENGINEERING COMMAND - NAVFAC MIDLANT R g ?ea
[ N l ` $ NORM CAADLINA IPf WINE CORPS WE - CAYP lfJEUNE, NORTR CMOLINA . v N f '
D
A[ '
I o N MARINE CORPS BASE CAMP LEJEUNE. NORTH CAROLINA
m A t
Z I 0 o GONZALEZ BOULEVARD EXTENSIONS 1 I 1
O
o
GONZALEZ BOULEVARD
W STA. 3000.00 TO STA. 4400.00 2 z 3
00.! zo=z
I A mZ
?v "A' o?
O 7,14
v w0
y mm
I G)O
mm
mmo
mmoOXN
m? 04
D
2 OD
z
m°No
-4 wz
0
VO -
40
0
n
lot,
ZOD
T
0
X
m
3
O
O
w
m
m
z
O
m
0
m
z
Z
co
O
C
z
D Ul
{
ah ASR
D I OJ I n