HomeMy WebLinkAbout20110755 Ver 1_401 Application_20110811201 1 0755
Transmittal Sheet
DAVIS & FLOYD, INC.
1305 North Center Street, Hickory, NC 28601
T 828.322.2290 F 828.322.3129
To: NCDWQ
401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
DAVIS
R&IJI
ED
Date 8-11'-2011
RE: Reidsville Ops Center-Moss Street Entrance
Project No. 012829.02
Phase:
We are sending you copies of the following enumerated ®Prints ?Sepias ?Shop Drawing
?Samples ?Brochures ?Cat. Cuts ® Application ?Letters ?Specifications
5- PCN Permit Package
5- Sets of plans (2 Full Size, 3 Half Size)
1- Check
Our Comment:
Please see permit package and associated plans. D ?k?u V
D
AUGYS 2011
DENR • WATER QUALITY
WEIIA 6 MD "A4VATER WANCH
Distribution For Your ®Action ?Corrections ?General Information
1. ?Request ?Resubmission ?
2.
3.
4.
5.
Davis & Floyd
Transmitted By ?Mail Signature
®UPS Name Josh Jones
? Title Staff Engineer
201 1 0755
ot WAT FR
O?
IG
o ?
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form Lt' ??
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the Corps: ?X Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ? Yes ?X No
1d. Type(s) of approval sought from the DWQ (check all that apply):
?X 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ
401 Certification:
NX Yes ? No For the record only for Corps Permit:
N Yes ?X No
If. Is payment into a mitigation bank or in-lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in-lieu fee program.
N Yes ? No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. N Yes N No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes 0 No
2. Project Information
2a. Name of project: Duke Energy - Reidsville Op Center - Moss Street Entrance
2b. County: Rockingham
2c. Nearest municipality / town: Reidsville, NC
2d. Subdivision name: NA
2e. NCDOT only, T.I.P. or state project no:
3. Owner Information
3a. Name(s) on Recorded Deed: Duke Energy Carolinas, LLC AUG
3b. Deed Book and Page No. D.B. 691 PG. 353
3c. Responsible Party (for LLC if
applicable): Leo A. Furlong, III "CILWSAN'D QUA1I7y
'IftfiWERftw,
3d. Street address: STD-30/PO BOX 1007
3e. City, state, zip: Charlotte, NC 28201
3f. Telephone no.: 980-373-4911
3g. Fax no.: 704-382-4119
3h. Email address: leo.furlong@duke-energy.com
Page 1 of 10
PCN Form - Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name: Duke Energy Carolinas, LLC
4c. Business name
(if applicable): Duke Energy Carolinas, LLC
4d. Street address: STD-30/PO Box 1007
4e. City, state, zip: Charlotte, NC 28201
4f. Telephone no.: 980-373-4911
4g. Fax no.: 704-382-4119
4h. Email address: leo.furlong@duke-energy.com
5. Agent/Consultant Information (if applicable)
5a. Name: P. Scott Bell
5b. Business name
(if applicable): Davis & Floyd, Inc
5c. Street address: 1305 N. Center Street
5d. City, state, zip: Hickory, NC 28601
5e. Telephone no.: 828-322-2290
5f. Fax no.: 828-322-3129
5g. Email address: sbell@davisfloyd.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 799516933640
1 b. Site coordinates (in decimal degrees): Latitude: 36.367917 Longitude: -79.681236
1c. Property size: 16 acres
2. Surface Waters
2a. Name of nearest body of water to proposed project: UT to Wolf Island Creek
2b. Water Quality Classification of nearest receiving water: Class "C"
2c. River basin: Roanoke
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The existing site is a Duke Energy Operations Center. The site is gently sloping, mostly wooded. The site includes building, asphalt parking area, and
gravel storage yard.
3b. List the total estimated acreage of all existing wetlands on the property: 0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 790
3d. Explain the purpose of the proposed project:
The project is to connect the Duke Energy Op Center to Moss St. due to NCDOT impvts on Freeway Dr which creates controlled access to the site.
3e. Describe the overall project in detail, including the type of equipment to be used:
724 LF of asphalt drive and assoc. storm drainage structures. Eq. will consist of backhoe, track loader, bulldozer, roller, paving eq., and logging eq.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ? Yes ?X No ? Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ?Yes ?X No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ?X No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T 2b.
Type of impact 2c.
Type of wetland 2d.
Forested 2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other) 2f.
Area of
impact
(acres)
W1 Choose one Choose one Yes/No
W2 Choose one Choose one Yes/No
W3 Choose one Choose one Yes/No -
W4 Choose one Choose one Yes/No -
W5 Choose one Choose one Yes/No -
W6 Choose one Choose one Yes/No -
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T) 3b.
Type of impact 3c.
Stream name 3d.
Perennial (PER) or
intermittent (INT)? 3e.
Type of
jurisdiction 3f.
Average
stream
width
(feet) 3g.
Impact
length
(linear
feet)
S1 T Culvert UT to Wolf Spring Ck PER DWQ 3 140
S2 Choose one
S3 Choose one
S4 Choose one
S5 Choose one
S6 Choose one -
3h. Total stream and tributary impacts 140
3i. Comments:
Page 4 of 10
PCN Form - Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individual) list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number (if applicable) Type of impact Waterbody Area of impact (acres)
Permanent (P) or type
Temporary T
01 Choose one Choose
02 Choose one Choose
03 Choose one Choose
04 - Choose one Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland
purpose of pond (acres)
Flooded Filled Excavated Flooded Filled Excavated
P1 Choose one
P2 Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin? ? Neuse ? Tar-Pamlico ? Catawba ? Randleman ? Other:
6b. 6c. 6d. 6e. 6f. 6g.
Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2
number - mitigation impact impact
Permanent (P) or required? (square (square
Temporary T feet feet
B1
Yes/No
B2
Yes/No
B3
Yes/No
B4 Yes/No
B5 Yes/No
B6 Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Proposed road grade lowered as much as possible to minimize length of stream disturbed.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Erosion control measures: Headwalls are to be installed on both ends of culvert, thus reducing disturbance by 24 feet.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ?X No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type: Choose one
Type: Choose one
Type: Choose one Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Makin a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: Choose one
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
? Yes ?X No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ?X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 16%
2b. Does this project require a Stormwater Management Plan? 0 Yes ? No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
Stormwater management plan will be covered under NCDENR DLR - Erosion and Sediment Control Permit
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Please see attached Erosion Control Narrative
2e. Who will be responsible for the review of the Stormwater Management Plan? NCDENR-DLR
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
apply (check all that apply): ? USMP
? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ?Yes ? No
attached?
4. DWQ Stormwater Program Review
?Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ?HQW
?ORW
(check all that apply): ?Session Law 2006-246
?Other:
4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes Q No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the
?Yes
? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ? No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ?Yes ?X No
or Riparian Buffer Rules (15A NCAC 2B.0200)?
2b. Is this an after-the-fact permit application? ?Yes ?X No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality? ?Yes ?X No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
There will be no wastewater generated from the proposed project.
Page 9 of 10
PCN Form - Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ?X No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ?X Yes ? No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS Contact and Website
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ?X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
http://ocean.floridamarine.org/efh_coral/ims/veiwer.htm
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ?X No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
http://wv,/w.hpo.dcr.state.ne.us
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ?X No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
FEMA Flood Maps / Existing Conditions Survey (Firm Map 3710799500J/Panel 7995)
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
Page 10 of 10
DAVI S
FLUYD
REIDSVILLE OPERATIONS CENTER
Sediment, Erosion Control & Stormwater
Project Narative
Duke Energy plans to construct a new entrance drive, off of Moss Street, for access to the existing Reidsville
Operations Center in Rockingham County, NC. The site is located off of Moss Street, north of the intersection of
Moss Street and Highway 29/158. It consists of 1 parcel; 168272.
The existing site is gently sloping, mostly wooded. The site is bordered on the west by Moss Street and on the
South by Hwy 29/158.
The project will consist of construction of 724 LF of asphalt drive, associated storm drainage, and all
appurtenances connecting the Reidsville Operation Center to Moss Street.
Soil erosion will be controlled with the use of perimeter silt fence, two sediment traps, and a series of diversion
swales. Approximately 2.35 acres of area will be disturbed during construction. Several temporary diversions
will be utilized to direct flow into the sediment basins. Silt fence inlet protection will be installed concurrently with
the installation of the new storm drain piping. Calculations for temporary sediment trap sizing are found under
Tab 5.
Erosion control measures were designed in accordance with NDDENR Erosion and Sediment Control Planning
and Design Manual, 2006 edition.
Y) M1, V
DA ISEngineering 1305 N CENTER STREET
HICKORY, NC 28601
Architecture 828-322-2290
FL DEnvironmental & Laboratory Services
GREENWOOD, SC • CHARLESTON, SC &COLUMBIA, SC &GREENVILLE. SC
FLORENCE, SC HICKORY, NO
Owner
Duke Energy Carolinas, LLC
LOCATION MAP
Sketch Reference
Reidsville Opt Center
Moss Street Entrance
REIDSVILLE, NC
NOT TO SCALE
07.29.2011
Job No.
012829.02
C-001
Sht. 1 of 1
NOT TO SCALE
D ISEngineering 1? N C" M= DUKE ENERGY CAROLINAS, LLC
HICKORY, NC 18801
Architecture an-=-1z80 DraWing Tltle
FL DEnvironmental & Laboratory gervicep USGS MAP
GREENWOOD, SC • CHARLESTON, SC COLUMBIA, SC • GREENVILLE. SC Sketch Reference
FLORENCE, SC HICKORY, NO
REIDSVILLE OP CENTER 07.29.2011
MOSS STREET Job No.
CONNECTION 012829.02
P-1-+ I -fl- C-001
REIDSVILLE, NC I Sht. 1 of 1