Loading...
HomeMy WebLinkAbout20110635 Ver 1_More Info Received_20110808Allied Design, Inc. CIVIL ENGINEERING -: LAND SURVEYING August 2, 2011 Ms. Sue Homewood Division of Water Quality North Carolina Department of Environment & Natural Resources 585 Waughtown Street Winston-Salem, North Carolina 27107 SUBJECT: Dear Sue: TANGLEWOOD PARK PAVED MULTI-USE TRAILS, DWQ# 11 ADI PROJECT NO.: 11-012 We are in receipt of your letter dated July 21, 20 11 regarding review comments for the above referenced project, DWQ#11-0635. We believe we have addressed your comments on the impact drawings and also offer the following additional responses. Comment No. 1: Per the requirements of GC 3821, please enumerate all temporary impacts..... provide a restoration detail, specification.- Response/Action: The plan view impact drawings, Sketch. CIA, C2A and C3A, have been modified to better illustrate both permanent and temporary stream/wetland impacts. The temporary dewater.ng and erosion control measures have been shown. The area of wetlands impacts and the length of stream impacts have been listed on the impact drawings. An additional drawing, C5 "Streambank Restoration", is also being provided to illustrate how the temporary impact areas will be restored. The impacts have also been updated and clearly indicated on the impact table and a revised copy is being provided with this s-ubmittal. Comment No. 2: Per the requirements of GC 3821, all wort: must be done "in the dry". Therefore, dewatering.... Response/Action: Since the streams are intermittent, we have provided notation requiring, to the extent practical, that the culvert installation be performed "in the dry". With the realization that weather and/or the project schedule may not make this practical we have provided an additional drawing Sketch C4 "Stream Crossing with Pump Bypass" to detail how the culverts may be installed with the use of sandbags and a by-pass pump. The additional temporary impact limits to accommodate the pump around have been illustrated. This detail was provided on the revised erosion control plans as recently approved by the Land Quality Section. Use of temporary equipment crossings will not be required as the site can be easily accessed from either side and only the permanent pipes will be required for crossing. Comment No. 3: Please provide impact drawings that clearly indicate the location of all impacts to wetlands. We recommend...... Response/Action: It should be noted that we have had our environmental consultant from S&ME return to the site to delineate the wetlands at the actual point of the revised crossing for Culvert 1. Our surveyors field located the flagging they placed and the new limits have been illustrated on impact drawing Sketch CIA. As noted in the response to Comment No. 1 above, 4720 KESTER MILL ROAD WINSTON-SALEM, NORTH CAROLINA 27103 Phone: (336) 765-2377 -:- Fax: (336) 760-8886 www.allieddesign.com I `/` in5tor,-s"I"o M Regional Office Ms. Sue Homewood Tanglewood Park Paved Trails DWQ## 11-0635 August 2, 2011 Page 2 we have revised all the impact drawing sketches to better illustrate the locations and areas of the permanent and temporary impacts. The areas have been hatched in different colors to differentiate the difference. The construction limits are also now shown on these drawings to better define the limits. Comment No. 4: Please indicate whether an energy dissipation measure will be required........ Response/Action: Just to confirm as related in our telephone conversation, our drawings should be illustrating the flared end sections or outlet structures on the ends of the proposed culverts - no energy dissipation is illustrated. Our plans were approved by the Land Quality Section without the rip-rap aprons. Comment No. S: Please provide a construction sequence and details (plans/drawings) that detail the restoration........ Response/Action: As noted in the response to Comment No. 1, we are providing with this submittal copies of drawing C5 "Streambank Restoration" to illustrate the restoration of the temporary impacts. Please contact our office if you have any additional comments or questions. We have appreciated your communication and timely review on this project. Sincerely, Steve M. Causey, P.E. Enclosures: Sketch C1A (4 copies) Sketch C2A (4 copies) Sketch C3A (4 copies) Sketch C4 (4 copies) Sketch C5 (4 copies) Revised Page 5 of PCN Form (4 copies) cc: Mike Anderson, Forsyth County Parks and Recreation II-Otn3S OO 41 T O ????? \111 11 I I I ?p o co a' 1> m 1 1 1 I o lJ? \ / Otil. p l I I J \ / I a roI I I I ? / I ? I A I I I I I \?? ?, i ' ? ?\ I I ?I I I I I I I \ J/ r/ A otI I p l / I I V o I I I ?,' ??? ? o f r I ? ° r m bm bM om om Z En ,1 A I g r_ i?? "? m m m DD O D O 1 \ I\ 1 1 ?' Q ?r Xm nm nD m y I 1 I I yJI Y € `° `' I I POz go I j?? I I 1 o In O my m m 1 I I II I I' IJ o zm z m I _ _ rn I z r- D D y I II II I '0 1 1 1\'I Z m ?v o ? o n1z nmm z z K I I I I I < oIVr I ' D 0) 0 _ 2 \\ I z z v v I I I II 1 1 1 II II I II °? D D n n I I I II II li II ° \ "D \• o` ? -, cn m TANGLEWOOD PARK PAVED Allied Design, Inc. CIVIL ENGINEERING* LAND SURVEYING MULTI-USE TRAILS 4720 KESTER INSTON-SALEM, MILL ROAD W WINALEM, NORTH CAROLINA 27103 CULVERT 1 PLAN Phone: (336) 765-2377 Fax: (336) 760 -8886 e d-en http://www. allied-engsurv. com CLEMMONS, NORTH CAROLINA PROJECT NO. DATE: SCALE: SKETCH NO_ 11.012 06/27111 111=40' C1A X I I/ ,' ,' I I x / / I I I I , , , I Ix i ' ' ? I I , , / I I LID I I I I NEW HW/ I j INV=68$./0 I I I ? ?I 1 xIl n 30LF 5 124 HDPE @ 4.0% I / I I ??:16g2 .t>_? 20" DEAD CY) C) i? 700 NE? DI N / / 1 TOP-691.0\ m I INV W 686.8 ^INV 0Lj=686.6 I ?l %"/ war C X + / / ORE I'll " 24" N _// ? CEDAR Jl% - - _ - 'i? C 011 ??}}pp CEDAR + G / 2 ALNUT EN 24" k / / \ \ \pIC AGE // CEDAR (\ a kp POSSIBLE 02 " 0 k y ??c \ JUNCTION BOX ? DAR C \ k \ ( j / 11 APPROX. LOCATION/ / I CEDAR /35" ll \? 18" GATE ?g / WALNUT l/ 28" I a CEDAR I 6 /l 0 GUM I I? LEGEND LEGEND so - so STREAM DELINEATION - so - TEMPORARY STREAM IMPACT- 15 LF (PER S&ME, INC.) - so - PERMANENT STREAM IMPACT - 30 LF •''D- LAD WETLAND DELINEATION (PER S&ME, INC.) TEMPORARY WETLAND IMPACT 0.0085 AC .„ PERMANENT WETLAND IMPACT 0.0275 AC TANGLEWOOD PARK PAVED Allied Design, Inc. CIVIL ENGINEERING*LAND SURVEYING MULTI 4720 KESTER LROAD -USE TRAILS W INSTTON-SONS LE WINALEM, NORTH CAROLINA 27103 CULVERT 2 PLAN Phone: (336) 765-2377 Pax: (33 760-8886 http://www.all- allied-en engsurv.com CLEMMONS, NORTH CAROLINA PROJECT No. DATE: SCALE: SKETCH NO.: 12 06/27/!27/11 V=40' C2A 36" POPLAR 4-00 POPLAR,. POPLAR S?? SF? ?` S ° o 00 ?o o ° 13+pp ?? INV=715.74 C P20" `? S o o ° o ° 20" iPOPkA'R o O LAR t -?J /? SFSF\ 4 1 20"?? INVI717.41' i POPLAR 40" POPLAR / 30 LF @ 2.? o ,' T + NEV FES ?j I 715.2' 721.7' A, " 721.7' ' / 1 1 J -- l' 1 1 r I I ' I MA I LE - - - _ , ' / ,' I r I H I n 1722.3' C4/ ---- __ - -- '? LEGEND LEGEND sD - sc STREAM DELINEATION - sD - TEMPORARY STREAM IMPACT - 9 LF (PER S&ME, INC.) - sD - PERMANENT STREAM IMPACT - 30 LF .D - 'D WETLAND DELINEATION (PER S&ME, INC.) Allied Design, Inc. TANGLEWOOD PARK PAVED CIVIL ENGINEERING*LAND SURVEYING OAD 4720 KESTER MILL S ??,\\\ WINSTON-SALEM, N NORTH CAROLINA 27103 MULTI-USE TRAIL Phone: (336) 765-2377 d-en -8886 CULVERT 3 PLAN htt: (336) 760ttp://www. allie engsurv. com 12 11- DATE: 06/27//27/11 CLEMMONS, NORTH CAROLINA PROJECT No. SCALE: 1"=40' SKETCH NO: C3A o ?n INTERMITTENT STREAM o INTAKE PIPE c =c TEMPORARY SANDBAG DAM PUMP TEMPORARY SEDIMENT BASIN TEMPORARY SEDIMENT BASIN Off/ ?S??JG?\ 111 ? ? ?)) > > • GO?11 PROPOSED CULVERTS 1000, lll?l. 4 / 1 111 PAVED TRAIL 1 TEMPORARY SEDIMENT BASIN 0 ? 11 o J? s 1111 ' \,? \ 11. v ?a 111 JG"\o ROCK CHECK DAM G ° { INTERMITTENT STREAM y NOTES: 1 DISCHARGE PIPE TO SEDIMENT BASIN o P o ? I PUMP DISCHARGE TEMPORARY SEDIMENT BASIN 1. THIS IS AN INTERMITTENT STREAM AND WORK SHOULD BE SCHEDULED TO AVOID USE OF PUMP BYPASS. STREAM CROSSING WITH PUMP BYPASS SHALL ONLY BE USED IN THE EVENT THAT NORMAL WEATHER CONDITIONS AND THE PROJECT SCHEDULE DO NOT ALLOW INSTALLATION OF CULVERTS DURING PERIODS OF NO FLOW. 2. DETERMINE SUITABLE PUMP LOCATION AND VERIFY WORKING ORDER OF PUMP(S) PRIOR TO CONSTRUCTION OF TEMPORARY SANDBAG DAM. PUMP(S) SHALL BE ADEQUATELY SIZED TO HANDLE BASE STREAM FLOWS. WORK SHOULD NOT BE PERFORMED DURING ABNORMALLY HIGH OR EXCESSIVE FLOWS. ROUTE DISCHARGE PIPING TO TEMPORARY SEDIMENT BASIN TO PROVIDE ENERGY DISSIPATION AT PUMP DISCHARGE OUTLET. 3. INSTALL ROCK CHECK DAM AT DOWNSTREAM LOCATION. 4. INSTALL TEMPORARY SANDBAG DAM UPSTREAM OF CULVERTS. BEGIN BYPASS PUMPING AS WATER IS IMPOUNDED. 5. CONTINUE BYPASS PUMPING AND INSTALL PERMANENT PIPE CULVERTS AND END WALLS. BACKFILL CRITICAL ZONE AROUND PIPE WITH STONE AND BEGIN PLACEMENT OF FILL MATERIAL. 6. UPON STABILIZATION OF FILL SLOPES, BYPASS PUMP OPERATIONS CAN BE DISCONTINUED. REMOVE TEMPORARY SANDBAG DAM, PUMP(S), DISCHARGE PIPING AND DOWNSTREAM ROCK CHECK DAM. RESTORE STREAM BANKS TO ORIGINAL CONDITION AND PROVIDE REVEGETATION/STABILIZATION. TANGLEWOOD PARK PAVED Allied Design, Inc. CIVIL ENGINEERINGOLAND SURVEYING MULTI-USE TRAILS TAT 4720 KESTER INSTON-SALEM, MILL ROAD W WINALEM, NORTH CAROLINA 27103 STREAM CROSSING WITH PUMP BYPASS Phone: (336) 765-2377 Pax: (336)760- 8886 http://www. allied-en engsurv. com CLEMMONS, NORTH CAROLINA DATE: TNO_ DATE: SCALE: 11- 12 08//01/01/11 NTS NEW FLARED END SECTION OR ENDWALL NEW TOP OF BANK. GRADE TOP OF BANK TO TIE TO NEW I j CONCRETE FES OR ENDWALL. NEW STREAM CHANNEL. GRADE '., STREAM BOTTOM TO PROVIDE SMOOTH, LINEAR FLOW FROM OUTLET I END OF FES OR HEADWALL TO Y EXISTING STREAM BED. EX INTERMITTENT ISTREAM I NEW FLARED END SECTION OR ENDWALL NEW TOP OF BANK ADJACENT TO FES. GRADE TOP OF BANK TO TIE TO NEW CONCRETE FES OR ENDWALL. EX TOP OF BANK NEW STREAM CHANNEL. GRADE STREAM BOTTOM TO PROVIDE SMOOTH, LINEAR FLOW FROM OUTLET END OF FES OR HEADWALL TO EXISTING STREAM BED. NOTES: i i i RESTORE STREAM BANK TO ORIGINAL PROFILE AND DIMENSIONS. MATCH GRADES/SECTION OF STREAM IMMEDIATELY DOWNSTREAM. i RESTORE STREAM BANK TO ORIGINAL PROFILE AND DIMENSIONS. MATCH GRADES/SECTION OF STREAM IMMEDIATELY DOWNSTREAM. 1. UPON COMPLETION OF PIPE INSTALLATION AND PLACEMENT OF FILL MATERIAL ADJACENT TO STREAM, PROVIDE VEGETATIVE COVER ON DISTURBED AREAS. ALLOW PERMANENT VEGETATIVE COVER TO ESTABLISH BEFORE RESTORATION OF STREAM BANKS. 2. STREAMS ARE CLASSIFIED AS INTERMITTENT. WORK SHOULD BE SCHEDULED TO AVOID PERIODS OF FLOW IN STREAM BED. 3. REMOVE TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES FROM STREAM LIMITS TO BE RESTORED. 4. RE-GRADE AND RESHAPE STREAM BANKS, TOP AND BOTTOM TO RESTORE PROPER PROFILE AND DIMENSIONS. 5. RESEED DISTURBED AREAS IN ACCORDANCE WITH PERMANENT SEEDING SCHEDULE - DO NOT USE LIME OR FERTILIZER IN THESE AREAS. 6. INSTALL EROSION CONTROL MATTING OVER DISTURBED AREAS. MATTING SHALL BE NAG SC 150 AND SHALL BE A STRAW AND COCONUT FIBER BLANKET AS MANUFACTURED BY NORTH AMERICAN GREEN (OR EQUAL). LINING SHALL BE A MACHINE-PRODUCED MAT CONSISTING OF 70 % AGRICULTURAL STRAW AND 30 % COCONUT FIBER. THE BLANKET SHALL BE A CONSISTENT THICKNESS WITH THE STRAW AND COCONUT FIBER EVENLY DISTRIBUTED OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP SIDE WITH HEAVYWEIGHT PHOTODEGRADABLE NETTING HAVING ULTRAVIOLET ADDITIVES TO DELAY BREAKDOWN AND AN APPROXIMATE 5/8 INCH X 5/8 INCH MESH, AND ON THE BOTTOM SIDE WITH A LIGHTWEIGHT PHOTODEGRADABLE POLYPROPYLENE NETTING WITH AN APPROXIMATE 1/2 INCH X 1/2 MESH. THE BLANKET SHALL BE SEWN TOGETHER ON 1.5 INCH CENTERS WITH DEGRADABLE THREAD. WEIGHT SHALL BE 0.5 #/SY. 7. OWNER TO ALLOW RE-ESTABLISHMENT OF NATIVE GRASSES AND VEGETATION. THESE AREAS SHALL NOT BE RESEEDED AND FERTILIZER SHALL NOT BE USED ADJACENT TO STREAM. TANGLEWOOD PARK PAVED MULTI-USE TRAILS STREAMBANK RESTORATION CLEMMONS, NORTH CAROLINA I I ?m Ix O O I? T IW D IZ \I \I I I I Allied Design, Inc. CIVIL ENGINEERINGOLAND SURVEYING 4720 KESTER MILL ROAD WINSTON-SALEM, NORTH CAROLINA 27103 Phone: (336) 765-2377 Fax: (336) 760-8886 http://www.allied-engsurv.com PROJECT N0= 11-012 DATE: 08/01/11 SCALE: NTS SKETCH NO_: C5 EX INTERMITTENT STREAM C. Proposed Impacts Inventory 1. Impacts summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T C1, pipe ® Yes ® Corps 0.0854 installation and fill ? No ® DWQ W2 ®P ? T C2, pipe ? Yes ® Corps 0 0275 installation and fill ® No ® DWQ . W3 ® P ? T C3, pipe ? Yes ® Corps 0 00 installation and fill ® No ® DWQ . W4 ? P ®T C1, temp const ® Yes ® Corps and ec measures ? No ® DWQ 0.0568 W5 ? P ® T C2, temp const ? Yes ® Corps and ec measures ® No ® DWQ 0.0085 W6 ? P ®T C3, temp const ? Yes ® Corps and ec measures ® No ® DWQ 0.00 2g. Total wetland impacts 0.1782 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ - non-404 stream width length (linear Temporary (T) (INT)? , other) (feet) feet) S1 ®P ? T C1, pipe Unamed trib. to ? PER ® Corps ' ' installation and fill Johnson Creek ® INT ® DWQ 3 50 S2 ® P ? T C2, pipe Unamed trib. to ? PER ® Corps ' ' installation and fill Johnson Creek ® INT ® DWQ 2 30 S3 ® P ? T C3, pipe Unamed trib. to ? PER ® Corps ' installation and fill Johnson Creek ® INT ® DWQ 2 30' S4 ? P ®T C1, temp const Unamed trib. to ? PER ® Corps ' and ec measures Johnson Creek ® INT ® DWQ 3 30' S5 ? P ® T C2, temp const Unamed trib. to ? PER ® Corps ' ' and ec measures Johnson Creek ® INT ® DWQ 2 15 S6 ? P ® T C3, temp const Unamed trib. to ? PER ® Corps ' and ec measures Johnson Creek ® INT ® DWQ 2 9' 3h. Total stream and tributary impacts 164' 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version