Loading...
HomeMy WebLinkAbout20090535 Ver 1_Certification of Completion_20110726NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director DWQ Project No.: 09-0535 County: Brunswick Applicant: City of Southport Dee Freeman Secretary Project Name: Wastewater Transmission Facilities Date of Issuance of 401 Water Quality Certification: June 1, 2009 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Regina Alexander, Interim Town Manager, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: 114 Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, T. Carter Hubard , as a duly registered Professional Engineer (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date gl?l Registration No. l JUL 2 6 2011 i 1650 Mail Service Center. Raleigh, North Carolina 27699-1650 Location: 512 N Salisbury St Floor 9 Raleigh North Carolina 27603 Phone: 919-807-63011 FAX: 919-8076494 Internet: www.ncwaterquality.org An Equal Opportunity Affirmative Achon''_mp?oycr TYATIER QUAt t'IY One . . >we + ? NorthCarolina Aaturally J WWK LETTER OF TRANSMITTAL WDICKSON community infrastructure consultants 909 Market Street Wilmington, North Carolina 28401 910.762.4200 tel. 910.762.4201 fax TO: 401/Wetlands Unit NC Division of Water Quality 1650 Mail Service Center Raleip-h, North Carolina 27699-1650 DATE: July 25, 2011 RE: Wastewater Transmission Facilities DWQ Project No. 09-0535 City of Southport, NC PROJECT NO: 60120.00.WL We are sending via: ? Overnight ® Regular Mail ? Pick-up ? Hand Delivered The following items: ? Correspondence ? Plans ? Specifications ® Other as listed below: COPIES I DATE NO. I DESCRIPTION 1 Certificate of Completion for 401 Water Quality Certification THESE ARE TRANSMITTED as checked below: ? For Approval ? As Requested ? Approved as Submitted ? Returned for Corrections ® For Your Use ? For Review and Comment ? Approved as Noted ? Forward to Subcontractor REMARKS: COPY TO: SIGNED: T. rter Hubard, P