HomeMy WebLinkAbout20110619 Ver 1_More Info Received_20110712~"`~
~ m~~~
STATE OF NORTH CAROLINA
Sonia Carillo
NCDWQ Wetland Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
DEPARTMENT OF TRANSPORTATION ~ ~'H
BEVERLY EAVES PERDUE
GOVERNOR
July 7, 2011
~~~1,
~ii~ 1
•-t~ of 2~
~N~sq QS A~ROU
Q4~yAT~k..
EUGENE A. CONTI, JR.
SECRETARY
1. I- U~'
Subject: Correction to the PCN submission for SR-1331 Randolph County
Ms. Carillo,
Included in this package is some additional information, and corrections requested by Mr.
Ronnie Smith of the US Army Corps of Engineers, Wilmington Office for The PCN
submitted for SR-1331 Randolph County, dated June 28, 2011. We aze submitting 7
copies of a typical dewatering plan, and a corrected impact table (page 4 of 11) to account
for the temporary impacts from dewatering on this project. Please attach/add these sheets
to our original PCN submission.
Thank you,
e
King
DEO Highway Di
P.O. BOX 1067, ABERDEEN, NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 944-5623
ao~~
y~
00
~°'^~
z~zx
o ,~ s°, _-
'~ 3
n c~cb~~
We1~~4
~`~
L W N - Z
' O
'~ N 9 N m
O ~ ~ A ~ N
~n ~n
mrn ~
00
ti~Z~-1
m ~ y m m
~ m n A L
Z N ~
Onm-•
A Z O O W
no zm
AmA~Z
D m ~ N
opn m.
m~-~no
A r O Q m
v'r
o' '^mA
z rD
~ m N
O p -1
m m-m
< a ~'
~ nri
r' z
N o~
no
iF
a
z
z
m
Z
O
1
1
O
N
A
D
r
m
vti
~m
m~
pT ~ nm
2D O nG1
D m < Z A
ZS_i m Zn
mp a m
rr to rr
mm o z
n-' m - z ~^ n~
m O O O m O
A Z A Z
rim pm
nm T nm
m \
O A p a
m ~ m ~
A~ ~ 60 ~ a~
~~
r MOIJ
n
z I
1 :[.
- 6' 80' -~ 10'
m - `` \
r N IIU
yx
W N
n `y~\
i1]' V `
n ~ .
O
£~ ~
~~ ~
~ o
~ ~I I~I~
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
^ Wetlands ®Streams -tributaries ^ Buffers
^ Open Waters ^ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of Type of wetland Forested (Corps - 404, Area of impact (acres)
Permanent (P) or impact (if known) DWQ -non-404, other)
Tem ora T
W1 ^ P ^ T NA ^ Yes ^ No ^ Corps
^ DWG!
W2 ^ P ^ T ^ Yes ^ No ^ Corps
^ DWQ
W3 ^
P ^ T ^ Yes ^ No ^ Corps
. ^ DWQ
W4 ^ P ^ T ^ Yes ^ No ^ Corps
^ DWQ
W5 ^ P ^ T ^ Yes ^ No ^ Corps
^ DWQ
W6 ^ P ^ T ^ Yes ^ No ^ Corps
^ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f.
Stream impact Type of Stream name Perennial (PER) or Average stream width (feet) Impact
number - impact intermittent (INT)? length
Permanent (P) or (linear feet)
Temporary (T)
S1 ®P ®T pipe UT of Caraway
crk. ®pER ^INT 7 14P+25 T
S2 ®P ®T pipe UT of Caraway ^pER ®INT 3 16P+25T
crk.
S3 ®p ®T pipe UT of Caraway
crk. ®pER ^INT 8 20P=25T
S4 ^ P ^ T ®PER ®INT
S5 ^P^T ^PER ^INT
S6 ^ P ^ T ^PER ^INT
3g. Total stream and tributary impacts 50P+75T
3h. Comments: Total impacts: 50' Perm (Pipe replacement) + 75' Temp (Dewatering) total impact = 125'
Page 4 of 11
PCN Form -Version 1.0 November 2008 Version