HomeMy WebLinkAbout20110413 Ver 1_Triage Comments_20110728Use this form instead of writing inside the folder
Triage Comment Sheet
/
DWQ# 4r? c
Triaged By:
Reviewer 1
Reviewer 2
Reviewer 3
? Issue Project (Reviewer 1)
Issue i conditions (Revi
Ar\ r- A .n Ai
1 l
--„ Date:
Date: 71/2:?d I I
Date:
? Issue Project (Reviewer 2)
1)
'® Issue with conditions (Reviewer 2)
A 4A A0 's A 'n P,
? More Information (Reviewer 1)
? Return Application (Reviewer 1)
? Send to Regions (Reviewer 1)
? Send to Regions (Reviewer 2)
? More Information (Reviewer 2)
? Return Application (Reviewer 2)
SATriage FormsUriage Issue Sheet.doc
PLEASE PRINT CLEARLY
11-0413 Hodge Road Widening
AML Comments
July 28, 2011
1. For Phase One of the widening project, please extend the outlet pipe so that it discharges to the
edge of the wetland boundary rather than on a side slope. Please provide outlet flow
calculations that show that the discharge velocity will not exceed two feet per second during the
ten-year storm.
2. Please provide the full set of stormwater plans and details that were approved by the Town of
Knightdale.