HomeMy WebLinkAbout20100253 Ver 1_Information Letter_20110726North Carolina
Beverly Eaves Perdue
Governor
~~~ ~~~~~b ( ~
NCDENR ~ z ~ ,o~~ ~
Department of Environment and Natur~t~
DiviColeen H.aSull~nsailty ~os~oq RBRy~e Freeman
Director Secretary
July 25, 2011
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection-US Highway 19-74
TIP No. B-4286
D WQ Project No. 20 ] 00253
Swain County
Dear Mr. Setzer:
On July ] 4, 2011, I inspected the construction work for the new bridge over the Nantahala River on US
Highway 19-74 in Swain County. The temporary bridge has been constructed and most of the old bridge had
been removed except for one section on the west side of [he river. Sediment and erosion control structures
appeared to be working properly with no sediment loss to the Nantahala River.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Trent Anderson, PE
Mark Davis, Division l4, DEO
Ed Ingle, Roadside Environmental (electronic copy)
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Selzer) US Highway 19-74 B-4286 Inspection Letter July 201 I
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211
Phone: 828-296-0500 \ FAX :826-299.7043 i. r~Re t,
Customer Service: 1-877-623-6746 1 V Ohtl l CarOhTla
Internet: www.ncwatemualitv.ora QL{~f/~LpQ [/U
An Equal Opponunityl ARnmalive Action Employer ~"-"""" "-l"a/
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: July 14, 2011
County: Swain Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ^ Complaint
^DWQ Follow Up Evaluation ^ Other
DWQ 401 #: 20100253 NW Permit # 23 & 33 IP #:
Project Name: B-4286 Over Nan[ahala River
Location of Project: US 19-74 in Nantahala Gorge approximately 8 miles east of Andrews, NC
Project Complete: ^Yes X No If no, estimated date of completion:
Activities fDOTI:
X^ Bridge
^ Culvert
^ Bottomless Culvert
^ Bottomless Arch
^ Riprap Inlet/Outlet Stabilization
^ Spoil Pile
^ Borrow Pit
^ Wetland Mitigation
^ Stream Restoration
^ On-site Stream Relocation
^ Buffer Restoration
X^ Bank Stabilization
^ Other
Water Quality Concerns (DWQ):
^ Steam Standards Violation
X^ Turbidity
^ Evidence of spills
^ Oil/Petroleum
^ Solid Waste
^ Failed E & S control measures
X^ Sedimentation Impacts
^ Stotmwater Permit Violation
X^ Fill
^ Buffer Impacts (see below)
^ Other
Additional Wetland Impacts: ^ yes X^ no Estimated Acres
^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres
Additional Stream Impacts: ^ yes X^ no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba
Zone 1: ^Yes ^No Est linear ft/ acreage of buffer impact ~ ac
Zone 2: ^Yes ^No Est linear fU acreage of buffer impact ft/ ac
Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited