Loading...
HomeMy WebLinkAbout20100253 Ver 1_Information Letter_20110726North Carolina Beverly Eaves Perdue Governor ~~~ ~~~~~b ( ~ NCDENR ~ z ~ ,o~~ ~ Department of Environment and Natur~t~ DiviColeen H.aSull~nsailty ~os~oq RBRy~e Freeman Director Secretary July 25, 2011 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection-US Highway 19-74 TIP No. B-4286 D WQ Project No. 20 ] 00253 Swain County Dear Mr. Setzer: On July ] 4, 2011, I inspected the construction work for the new bridge over the Nantahala River on US Highway 19-74 in Swain County. The temporary bridge has been constructed and most of the old bridge had been removed except for one section on the west side of [he river. Sediment and erosion control structures appeared to be working properly with no sediment loss to the Nantahala River. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Trent Anderson, PE Mark Davis, Division l4, DEO Ed Ingle, Roadside Environmental (electronic copy) Transportation Permitting Unit Mike Parker, Asheville Regional Office (Selzer) US Highway 19-74 B-4286 Inspection Letter July 201 I SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211 Phone: 828-296-0500 \ FAX :826-299.7043 i. r~Re t, Customer Service: 1-877-623-6746 1 V Ohtl l CarOhTla Internet: www.ncwatemualitv.ora QL{~f/~LpQ [/U An Equal Opponunityl ARnmalive Action Employer ~"-"""" "-l"a/ DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: July 14, 2011 County: Swain Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ^ Complaint ^DWQ Follow Up Evaluation ^ Other DWQ 401 #: 20100253 NW Permit # 23 & 33 IP #: Project Name: B-4286 Over Nan[ahala River Location of Project: US 19-74 in Nantahala Gorge approximately 8 miles east of Andrews, NC Project Complete: ^Yes X No If no, estimated date of completion: Activities fDOTI: X^ Bridge ^ Culvert ^ Bottomless Culvert ^ Bottomless Arch ^ Riprap Inlet/Outlet Stabilization ^ Spoil Pile ^ Borrow Pit ^ Wetland Mitigation ^ Stream Restoration ^ On-site Stream Relocation ^ Buffer Restoration X^ Bank Stabilization ^ Other Water Quality Concerns (DWQ): ^ Steam Standards Violation X^ Turbidity ^ Evidence of spills ^ Oil/Petroleum ^ Solid Waste ^ Failed E & S control measures X^ Sedimentation Impacts ^ Stotmwater Permit Violation X^ Fill ^ Buffer Impacts (see below) ^ Other Additional Wetland Impacts: ^ yes X^ no Estimated Acres ^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres Additional Stream Impacts: ^ yes X^ no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba Zone 1: ^Yes ^No Est linear ft/ acreage of buffer impact ~ ac Zone 2: ^Yes ^No Est linear fU acreage of buffer impact ft/ ac Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited