HomeMy WebLinkAbout20110622 Ver 1_401 Application_20110711KLE/NFELOER Bright People. Right Solutions. June 29, 2011 File No. 118431 1 GS011 L082 Mr: Andrew Williams 210622 Raleigh.Regulatory Field Office U.S. Army Corps of Engineers 3331 Heritage Trade Drive I Suite 105 r?C1/r Wake Forest, NC 27587 RE: Connector to Bicentennial Greenway JUL 0 1 2011 NCDOT TIP No. EB-5517 oENR - vyq H East Fork Road and High Point City Lake s Bn Jamestown, North Carolina Dear Mr. Williams: Kleinfelder Southeast, Inc. prepared the attached PCN for a NWP42 and Categorical Exclusion of the Town of Jamestown, North Carolina. The proposed project includes construction of a timber pedestrian bridge across the East Fork of the Deep River (High Point City Lake) adjacent to the NCDOT bridge on East Fork Road and additional walkway pavement to connect pedestrian ways in town to the Bicentennial Trail. Impacts to surface waters include thirty-six 12-inch diameter timber piles driven into the lakebed for structural support at bents 2 through 17. The bridge will span approximately 390 feet of surface water. (station 2+30 to 6+20) with a bridge deck width of 6 feet. Alternative designs were investigated including a floating, deck, support cantilevered from the existing roadway bridge, and alternative locations. None of the alternative design allowed for lesser surface water impacts, except providing structural support from the existing roadway bridge. Unfortunately, the NCDOT will not approve the additional loads since the structure was not originally designed for this purpose. Following review of this submittal, please contact Chris Hay, 336.668.0093, if you have questions or require additional information. Sincerely, KLEINFELLDEER S UTHEAST, INC. Q3VV"IVY W. Hay, E.I. C Environmental Program CWH:cas Attachments: Pre-Construction Notification Categorical Exclusion Cc: Matthew Johnson, Town of Jamestown w/att. NCDENR, DWQ, w/att. 313 Gallimore Dairy Road, Greensboro, NC 27409 p 1336.668.0093 f 1336.668 3868 ? j 0622 To complete elec"nically - CLICK box of correct answer. Use "tab" key to move forward and "shift (ab" to move backward CATEGORICAL EXCLUSION FORM ENHANCEMENT PROJECTS While th s form represents the most common level of environmental documentation required for Enhancement projects, the environmental impacts may be greater than those typically associated Nvith this level of analysis. Always bare a gtialrfied professional deterrrne the scope of environmental impacts and complete the environmental documentation. General Information Project Name: Connector to Bicentennial Greenway TIP Number (E-XXXX): EB-5517 Federal Aid Number: Project Sponsor: Town of Jamestown Project Contact Name: Mr. Matthew Johnson Telephone: 336-454-1138 E-mail: mjohnson@jamestown-nc.gov iclude project scope and location with map) See Attachment A Purpose And Need See Attachment A Proposed Improvements (Provide details attach exhibits as necessary) See Attachment A Special Information (Include environmental commitments permits) See Attachment B Note: This document will be reviewed by the NCDOT and by FHlf1A incorrect or incomplete information could delay or disqual f, a project Rnise Fo.t - Dludt 2006 Threshold Criteria Instructions: Please answer each question. If a correct response falls within an enlarged box then supporting documentation of the impact must be included. No. ECOLOGICAL YES NO. 1 Will the project have a substantial impact on any unique or important natural resource? ? ?? Z Does the project involve habitat where federally listed endangered or threatened i ? El ?? es may occur spec 3 Will the project affect anadromous fish? ?, If the project involves wetlands, is the amount of permanent and/or temporary 4 wetland taking less than one-third (1/3) of an acre and have all practicable measures to ? avoid and minimize wetland takings been evaluated? If no wetlands are involved, write "N/A" 'V_ N/A 5 Will the project require the use of U. S. Forest Service lands? ? 6 Will the quality of adjacent water resources be adversely Impacted by proposed i i i ? i F ?? construct on act v t es 7 Does the project involve waters classified as Outstanding Water Resources and/or Hi h Qualit Waters? F Q? ' g y Will the project require fill in waters of the United States in any.of the designated $ mountain trout counties? ? MY( Does the project involve any known underground storage tanks (UST's) or hazardous ? materials sites? . PERMITS and COORDINATION If the project is located within a CAYIA county, will the Project significantly affect the " " 10 coastal zone and/or any Area of Environmental Concern (AEC)? F 11 Does the project involve Coastal Barrier Resources Act Resources? Q 12 Will a U. S Coast Guard permit be required? ? 13 Will the project result in the modification of any existing regulatory floodway? ? 14 Will the project require any stream relocations or channel changes? ? ? . Threshold Criteria Instructions: Please answer each question. If a correct response falls within an enlarged box then supporting documentation of the impact must be included. No. SOCIAL, ECONOMIC, AND CULTURAL RESOURCES YES NO 15 Will the project induce substantial impacts to planned growth or land use for the area? O 0? 16 Will the project require the relocation of any family or business? ? Q 17 Will the project have a disproportionately high and adverse human health and El ? environmental effect on an minority or low-income population? 18 If the project involves the acquisition of Right-of-Wav, is the amount of Right-of-Way © ? acquisition considered minor? 19 Will the project involve any changes in access control? ? 121 20 Will the project substantially alter the usefulness and/or land use of adjacent property? ? ? 21 Will the project have an adverse effect on permanent l l ff i h i ? ? ? tra ic patterns or commun veness oca ty co es 22 Is the project included in an approved thoroughfare plan and/or Transportation Improvement Program (and is therefore, in conformance with the Clean Air Act of 0 El 1990)? 23 Is the project anticipated to cause an increase in traffic volumes? ? Q 24 Will traffic be maintained during construction using existing roads, staged construction, or on-site detours? ?? ? 25 If the project is a bridge replacement project, will the bridge be replaced at its existing location (along the existing facility) and will all construction proposed in association with m the bridge replacement project be contained on the existing facility? 26 Is there substantial controversy on social, economic, or environmental grounds i h ? ? m concern ng t e project 27 Is the project consistent with all Federal, State, and local laws relating to the f i l h ? ?? e project env ronmenta aspects o t 28 Will the project have an "effect" on structures/properties eligible for or listed on the f Hi N ti l R i t t i Pl ? O Q a ona eg s er o s or c aces 29 Will the project affect any archaeological remains that are important to history or pre- hi ? ? story 30 Will the project require the use of Section 4(0 resources (public parks, recreation lands, wildlife and waterfowl Refuges, historic sites, or historic bridges, as defined in Section ? Q 4(f) of the U. S. DOT Act of 1966)? 31 Will the project result in any conversion of assisted public recreation sites or facilities to non-recreation uses, as defined by Section 6(0 of the Land and Water Conservation Act of 1965, as amended? 32 Will the project involve construction in, across, or adjacent to a river designated as a component of or proposed For inclusion in the Natural System of Wild and Scenic El ?? Rivers? Additional Documentation required for unfavorable Responses: "Checked" ENLARGED boxes indicate UNFAVORABLE responses. "Checked" smaller boxes indicate favorable responses. . Categorical Exclusion Approval (Note: Qualified Professional may be required to complete) Prepared by: Christopher W. Hay, E.I. Environmental Program Manager Name (print or rype) Signature ?r J 06/27/11 Date License Number For Official NCDOT Use Only Reviewed by: Date Reviewer's Signature Project Development & Environmental Analysis Branc North Carolina Department of Transportation Approved by: Date Division Administrator's Signature Federal Highway Administration ................................................................................................................................. Title Kleinfelder Southeast, Inc. Company'/Agency Firm License No. F-1143 Consultants should submit this completed form to the municipality- or organization that engaged their service. The Municipality or organization should submit to their assigned Transportation Program Consultant.. Please submit completed form within 90 days of die holding of your scoping meeting. ATTACHMENT A La m r;? , I 6T ?, 0 LXE ? 5 °? 'SPILLWAY , ?•?? ? C? p N 7 ? 123 ? I? '?' 4? ??? ????• ? 8? .0 .. \ 9PILCWAY EC 96(,A ,\\ ' D J/•a ? Q , 4 157 151 °? V\?] p1p1 ake p I I ,,. I f ? , \ J P ? ' . te i , .r FIGURE 1 SITE LOCATION AP M DER CONNECTOR TO BICENTENNIAL GREENWAY Bright People. Right Solutions. EAST FORK ROAD JAMESTOWN, NORTH CAROLINA 313 GALLIMORE DAIRY ROAD GREENSBORO, NORTH CAROLINA DATE: 4/28/2011 APPROVED BY: SCALE: 1" =2,000' PHONE: 336.668.0093 SOURCE: USGS Topographic Orthophoto Map, Guilford 1994, Hig h. PROJECT NO: 118431 Point 1993 T'''x F'alitlulo Ra "'—.J� f .',u' r'^c,ya'"r✓ '^' „ 7'041 .r "" AiTa (n F 4 K✓ �. FL '�. �i i r ray ,� •, ♦ 'u a r.rayl. /J' role Flofmnnl 4! t, i' 1:'j• Y¢ai��+%�� �`�l�' � � ��,F _ `. ` �4♦'.. ' 4`+Y:'1�,i.... a`I�y � � �r,C� ary ��0�� rr i L f "+•—xi`y sY. , !,} r r♦ 4 �my,L,ti! �i c��14'r ��l �f �+1r 'rf3 �C'N �J'af n' r '. r .i _ r r i •.`�� yey. , tl };'kICiZY ��y. j)/ i �`i F 6EfiW4, '! hr'f �IH ,A �~l�f r�v l} ♦ 'f' lv t'f�jS�'' r L`+y4 t 9"� ��',•f i � .jY r it ,r �`.r `' ..4r i ,4 431 [r a1 rGi4f`d brie j4W r.�Oa`��� i "r r A ♦�{: �""%� ��!� rr?F���1�t� tti�µ��%� �Ik�. I n�r1�,1: ♦ � fK� pFp�F.+� i5 l � �r y�•f17 +'71ci.f rA �f0 a�� se Rtl=Y%�`�� `�����-LLL f ' �✓" "�. ^l � 'tii)R {, 2 p�`� r *y*/ Y•S� �1+ rtj•\ k' _ !y `'�?•tL,,,.:x-if, 7 -. K ./�. 1� M9fl♦�,'.yd l' S,af "w..r'��`i,,� � � `T�� k s'r f�v�� !�a { %�.'�'iliVy r'�a ,;�+h i1rw. , , a r&�•, ,,t 7�+.+ J - La KC 1 i 1 . y L y.•• 1, � �neDr r}fir] 1 { +fti?>,..g vg: s ti A _ r •us n '�� 0�,},j1A�I/ ,3t{Gp`Q�n4'i s AA,i 1". w ti r r 4 rt t�t� 4 il.rvlr�s�f�^A . �'` t''. i 1-- J Y +i'YI f S �'�ff�4 "7S� �' 1 •�'l i t I y, SY U !r �` / %1Vj �� A�4•'ri:. Mpiuf rA 'Ov $ J ( ?� S,�{fj .- ,* ,I: f I rr df ,, y,M li x:Gt� M�lA �♦r�'I f�".�. i.t ''�Sy�'. t'S �.,� � F. A 7p n.! r-Ja�j ! [.,° N�1 rEery� Dj! `i • +r M1vY-.,.q ��_ �+�µ' ' '• :.- ., ..� I'i n r ..Foi nt4nlc Uq.-�---_.,•'(. ?f'� •<ii.t ic, �t ATTACHMENT A PURPOSE AND NEED This proposed project will connect the trails and walkways south of town all the way through town to the major existing Bicentennial Greenway on the north side of town. PROJECT DESCRIPTION The project is a connector from the existing walkway system in the Town of Jamestown on Main Street along East Fork Road to the existing Bicentennial Greenway. The proposed walkway must bridge an arm of High Point City Lake, the east fork of Deep River. The bridge and a portion of the walkway will be on City of High Point property. The remainder of the walkway will be on the right-or-way of the East Fork Road (S. R. 1545). ATTACHMENT B 0 W AT e9OC 1 1 O V 2 2 o ? Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 42 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ®No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Connector to Bicentennial Greenway 2b. County: Guilford 2c. Nearest municipality/ town: Jamestown D 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: TIP No. EB-5517 l(JI ) 3. Owner Information p f 3a. Name(s) on Recorded Deed: City of High Point d A1?k? 3b. Deed Book and Page No. PB 72 PG 402 8rarp? 3c. Responsible Party (for LLC if applicable): High Point Register of Deeds 3d. Street address: 325 East Russell Avenue, Room 155 3e. City, state, zip: High Point, NC 27261 3f. Telephone no.: (336)641-7556 3g. Fax no.: . 3h. Email address: Page I of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Local Municipality 4b. Name: Matthew Johnson 4c. Business name (if applicable): Town of Jamestown 4d. Street address: Town Hall, PO Box 848 4e. City, state, zip: Jamestown, NC 27282 4f. Telephone no.: (336)454-1138 4g. Fax no. 4h. Email address: mjohnson@jamestown-nc.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Christopher W. Hay 5b. Business name (if applicable): Kleinfelder Southeast, Inc. 5c. Street address: 313 Gallimore Dairy Road 5d. City, state, zip: Greensboro, NC 27409 5e. Telephone no.: (336)668=0093 5f. Fax no.: (336)668-3868 5g. Email address: chay@kleinfelder.com Page 2 of 11 PCN Form -Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): The property does not have a PIN 1 b. Site coordinates (in decimal degrees): Latitude: 36.009707 Longitude: - 79.94118 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: unknown acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to High Point City Lake (East Fork Deep River) proposed project: 2b. Water Quality. Classification of nearest receiving water: WS-IV CA 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site includes DOT right-of-way within the buffer area of High Point City Lake. Land use to the east is residential. Land use to the west includes a golf course and residential property. North and south of the project are undeveloped wooded areas buffering the lake. 3b. List the total estimated acreage of all existing wetlands on the property: Only open water is located within the project area. The area around the lake and the East Fork of the Deep River entering and exiting the lake is not defined by parcels. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: The project area only includes open water. 3d. Explain the purpose of the proposed project: To construct a pedestrian bridge to connect sidewalks in town to the Bicentennial Trail west of the lake. 3e. Describe the overall project in detail, including the type of equipment to be used: . The project includes construction of walkway pavements and a pedestrian bridge. The sidewalk and bridge approach will be graded with skid-steer and track-hoe equipment. Timber piles will be driven approximately 14 feet. Construction lifts will be used to place structural beams and assist in construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ? No Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type Preliminary ? Final El of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ? No ® Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form -Version 1.3 December 10, 2008 Version 6.. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes. explain. Page 4 of 11 PCN Form -Version 1.3 December 10. 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? PM T ? Yes ? Corps ? No ? DWQ W2 ? P M T ? Yes ? Corps ? No ? DWQ W3 ? P F1 T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? MIT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ®P ? T High Point City Thirty-six 12 inch diameter timber lake 0.0007 Lake piles 02 ® PEI T High Point City Area of bridge deck lake 0.05 Lake 03 ?P?T 04 ?P?T 4f. Total open water impacts 0.0507 4g. Comments: The total footprint of the 36 timber piles is 28 square feet. No temporary construction impacts are anticipated. The portion of the bridge deck over open water will be 390 feet in length and 6 feet in width (2,340 square feet). 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5L Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 51. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts b l If i e ow. an mpacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. Buffer impact 6e. 6f. 6g. number - Reason Permanent (P) or for Stream name T Buffer Zone 1 impact Zone 2 impact mitigation (square feet) (square feet) emporal/ T impact required? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Alternative designs were investigated, however, no feasible designs were identified with lesser impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techni ue q s. With the exception of driving the timber piles, construction will have no impacts on the surface water. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for El Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation ooptioo nn will be used for this ? Mitigation bank ; project? Payment to in-lieu fee program ? Permittee Responsible Mitigation t 3. Complete if Using a aion Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version Comments: Complete if Making a Payment to In-lieu Fee Program Approval letter from in-lieu fee program is attached. ? Yes . Stream mitigation requested: linear feet If using stream mitigation, stream temperature: ? warm ? cool ?cold _. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ®No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c.. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version Stormwater Management and Diffuse Flow Plan (required by DWQ) Diffuse Flow Plan . Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? . If yes, then is a diffuse flow plan included? If no, explain why. El Yes ®No Comments: The project does not require a Stormwater management plan. 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? % 2b . Does this project require a Stormwater Management Plan? ? Yes ®No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project consists of the construction of brick and concrete sidewalk and a timber pedestrian bridge. 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase 11 ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form -Version 1.3 December 10, 2008 Version I' F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ® No letter.) Comments: A Categorical Exclusion has been prepared and submitted . 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? , 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of.the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement), 5a. Will this project occur in or near an area with federally protected species or El Yes ®No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No impacts? Raleigh ® 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? , USFWS website 6. Essential Fish Habitat (Corps Requirement) 6a . Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b . What data sources did you use to determine whether your site would impact Essential Fish Habitat? South Atlantic Fishery Management Council website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b . What data sources did you use to determine whether your site would impact historic or archeological resources? Department of Cultural Resources website 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b . If yes, explain how project meets FEMA requirements: The eastern bridge approach is in zone AE. The bridge deck elevation is outside the 100 year floodplain. 8c. What source(s) did you use to make the floodplain determination? Guilford County GIS website Matthew Johnson 6/29/11 Applicant/Agent's Printed Name Appt antl Signature Date (Agent's signature is valid only if an aration letter from the applicant 7t ? is rov d.) U f 11 Page 11 o PCN Form - Version 1.3 December 10,.2008 Version