Loading...
HomeMy WebLinkAboutSR 1660 and SR 1662 (15).., Beverly Eaves Perdue Governor ~~~~ ~~{I~ NCDENR North Carolina Department of Environment and Division of Water Quality Coleen H. Sullins Director July 25, 201 I Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer: ~~~4/ ~~~ Natural Resour~s.,~~,Q ! 2 ~l`ol :;n,, qT~c R ''`13P~~eeman ary Subject: Inspection-NCSR 1660 (Sher Road) T[P No. R-4748 Macon County On July 14, 201 I, 1 inspected the construction work'for the new route of NCSR 1660 (Sher Road) in Macon County. Construction includes heavy grading and bridge site preparation. Sediment and erosion control structures appear to be working properly. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, /~ Michael R. Parker Environmental Senior Specialist Attachment cc: Mitchell Bishop, PE Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Selzer) NCSR 1660 (Silo Road) Inspection Lener July 201 I SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Hghway, Swannanoa, NC 28778-8271 Phone: 828-296-45001 FAX :828-299-7043 One Customer Service: 1-87723-6748 North Caroli na Internet: www.ncwelerouallN.oro '~ 1~ /~~iy //~ An Equal Opportunity\Affrmative Action Employer ~~/ ` Ff" .~ DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: July 14, 2011 County: Macon Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ^ Complaint ^DWQ Follow Up Evaluation ^ Other DWQ 401 #: 09-045] NW Permit # IP #: ~~ Project Name: Location of Project: R-4748 NCSR ] 660 New Route From NCSR 1660 Siler Road [o NCSR 1662 Wiley Brown Road in Macon County i Project Complete: ^Yes X No ~ Bridge Culvert Bottomless Culvert U Bottomless Arch ^ Riprap Inlet/Outlet Stabilization ^ Spoil Pile ^ Borrow Pit ^ Wetland Mitigation ^ Stream Restoration ^ On-site Stream Relocation ^ Buffer Restoration ^ Bank Stabilization, ^ Other If no, estimated date of completion: ~~ LJ Steam Standards Violation X^ Turbidity ^ Evidence of spills ^ Oil/Petroleum ^ Solid Waste ^ Failed E & S control measures X^ Sedimentation Impacts ^ Stormwater Permit Violation X^ Fill ^ Buffer Impacts (see below) ^ Other Additional Wetland Impacts: ^ yes X^ no Estimated Acres ^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres Additional Stream Impacts: ^ yes X^ no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba Zone 1: ^Yes ^No Est linear ft/ acreage of buffer impact ~ ac Zone 2: ^Yes ^No Est linear fU acreage of buffer impact fU ac Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited f .. «., Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Little Tennessee River Basin/ Subbasin: Little Tennessee 040401 Wetland Type: ^Isolated x^Non-Isolated (Waters of US) Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB X^ClassC ^ORW ^Trout ^WS-III ^NSW ^HQW ^WS-1 ^WS-IV ^SA ^CA Type of Authorized Impact: ^Culvert ^Bottomless Culvert ^Bridge ^Bottomless Arch ^Riprap InIeUOutlet Stabilization ^Fill Authorized Wetland Impacts: ^0- 1/IOd' acre ^1/11'" to I/3rd acre ^1/3`d to I.0 acre ^> 1.0 acre Authorized Stream Impacts: ^< 150 linear feet ^> 150 linear feet Additional comments: Work is underway on the project and includes heavy grading and drilling shafts in preparation for bridge construction. Sediment and erosion control structures have been installed and appear to be working properly. Continue to maintain erosion control devices and continue with seeding, matting and mulching as required to protect State surface waters. NCSR 1660 (Sher Road) Inspection July 2011.