Re: Goldsboro Milling Railyard Expansion
Keller Environmental Job No. 1104
DWQ Project 11-0436
Goldsboro, North Carolina
Dear Mr. McMillan:
We are submitting the additional information requested from written correspondence
on June 22, 2011. We are requesting for NC Division of Water Quality (DWQ) written 401
approval under Section 404, Clean Water Act, 33 USC 1344. We have addressed your
included written comments in the following paragraphs.
Please re-submit your site plans on full plan sheets at a scale of no smaller
than 1"=50' with topographic contours shown.
Please refer to the attached C400 plan sheet.
2. Please indicate all wetland impacts including fill slopes on the site plan.
Please refer to the attached C400 plan sheet. Existing wetlands and the
proposed wetland disturbance areas have been identified.
3. Please locate all isolated or non-isolated wetlands, streams, and other
waters of the State as overlays on the site plan.
Please refer to the attached C400 plan sheet. The existing non-isolated wetland
has been identified. There are no isolated wetlands on the property.
DWQ 401 Certification &
Neuse R. Buffer Rules Re-Submittal
Goldsboro Milling
July 26, 2011
Page 2 of 2
4. Per the requirements of the Neuse River Riparian Buffer Rule, you must
show that this site meets diffuse flow requirements with a level spreader or
other BMP per Chapter 8 of the BMP Manual.
Diffuse flow from this site is anticipated without level spreaders or BMP device. I
spoke with Ms. Lyn Hardison of the Washington regional office prior to submitting
the original package. There are no streams on the property and it is surrounded by
large wetland areas. No erosive velocities are anticipated from the rail expansion
project.
If you should have questions or require additional clarification please feel free to contact
me at 749-8259 (cell) or email: jay@kellerenvironmental.com.
Sincerely,
Keller Environmental, LLC
Oo ?
Jay Keller
Principal
Cc: Lorenz Falls
Attachments:
• June 22, 2011 DWQ Request for More Information letter
C400 Plan Sheet
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H Sullins Dee Freeman
Governor Director Secretary
June 22, 2011
CERTIFIED RETURN RECEIPT REQUESTED
Mr. Lorenz Falls
Goldsboro Milling
938 Millers Chapel Road
Goldsboro, North Carolina 27534
Subject Property: Goldsboro Milling Railyard Expansion
Ut to Bear Creek [030405, 27-72-(0.1), C, SW, NSW]
Dear Mr. Falls:
DWQ Project 1 1-0436
Wayne County
On May 9, 2011, the Division of Water Quality (DWQ) received your application dated April 28, 2011, and
Public Notice issued by the USACE on May 6, 2011, and received by the DWQ on May 6, 2011, to place
fill within or otherwise impact 1.74 acres of 404/wetland and and 0.00 square feet of Zone 1 Neuse River
protected riparian buffer, and 0.00 square feet of Zone 2 Neuse River protected riparian buffer, to construct
a rail expansion at the site. The DWQ has determined that your application was incomplete and/or provided
inaccurate information as discussed below. The DWQ will require additional information in order to
process your application to impact protected wetlands and/or streams on the subject property. Therefore,
unless we receive five copies of the additional information requested below, we will place this project on
hold as incomplete until we receive this additional information. If we do not receive the requested
information, your project will be formally returned as incomplete. Please provide the following information
so that we may continue to review your project.
Additional Information Requested:
1. Please re-submit your site plans on full plan sheets at a scale of no smaller than 1 "=50' with
topographic contours shown.
2. Please indicate all wetland impacts including fill slopes on the site plan.
3. Please locate all isolated or non-isolated wetlands, streams, and other waters of the State as
overlays on the site plan.
4. Per the requirements of the Neuse River Riparian Buffer Rule, you must show that this site meets
diffuse flow requirements with a level spreader or other BMP per Chapter 8 of the BMP Manual
(see http://portal.nedenr.org/web/wq/ws/su/binp-inanual).
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (INeBSCaPe)
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 512 North Salisbury Street Floor 9 Raleigh, North Carolina 27603
Phone: 919$07-63011 FAX: 919-807-6494
Internet: www.ncwaterqua)ity.org
An Equal opportunity 1 Affirmative Action Employer
Goldsboro Milling
June 22, 2011
Page 2 of 2
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or
protected buffers. Please be aware that any impacts requested within your application are not authorized (at
this time) by the DWQ. Please call Ms. Karen Higgins or Mr. Ian McMillan at 919-807-6301 if you have
any questions regarding or would like to set up a meeting to discuss this matter.
r
Sin fly,
Il
Karen Higgins, Supervisor
etlands, Buffers, Stormwater, Compliance and
Permitting Unit
KH/ijm
CC: USACE Raleigh Regulatory Field Office
Jay Keller, Keller Environmental, 7921 Haymarket Lane, Raleigh, NC 27615
File copy
Lauren Witherspoon, DWQ Raleigh Regional Office
Filename: 110436GoldsboroMillingRailyardExpansion(Wayne)On_Hold
W__ _ W
H
~ o
Q o
o c ~ _
W x ~ ~ JUI. ~ t 201
~ _ ~ a ~ ~ 3~ ~ ~A F? ~t9a3~.i'~;'
r-a
H
W
0 ~
Z
N®RF®LK S®UT ERN RAILR®A - ~ - -
m---- ~ 200 R.®.~J.
~ r
~----T-
1
~ _ ~ ~
n _ . T w~._.~_ .~-_.m~_ -_..s_~- ~ ~ _ .
,.~.-w-
l - - n ~ _
~.._m_~ _ .........m..m........ _,.,_..,.,...~,.W.. ..,.,.....m.,„ .s'ue'-. ~^",..m^--~•
1 ( ~ it ,-m
~d - T ~ I~ W - ~ _ :-~___-W_._ _ r -
.......m.....-.~~. _ _ _ ~ ---..r... fie.. tea. .,,...m.~-..•~_r- - - - _ ~---p--...m.. ~ - _ _ w.. _ .m _ 1 ~ - + LIMITS
~ ~
-mm___. I
o~""'"
r ~ W/ OUTLET PR H
~ ~1
' ~ ~ti, = : ff ~ N
~ - •W--~.~~.._~. `a'te- - Np~
~ . -°w--- W
--w-mm-_ _ y~
a
PROP TRK -3 _ _ ~
-4 - - - PROP
_ ~ T~~ r 1 f
~i - - n _.r___~ - T
r -
_ ~1 ! j~ - - TLET PROTECTION ~ ~ T ~ -F ~V/ OU
~ t SEE DETAIL ~
~ ~ ) ~r r t ~ ~ ~ ~ - ,i rte``"` \ 0 a~ t = ~ ° w ° ~
~ ! ~ , ~
~,~~~~~innin~\~~
//6 S q
i
' "•Y` !
f j( r \ 1 1 ~ ~ ~.a„a
\s'
~I
~e /(J) d`' J' ~f" ?
~ ~ ~
t i ~
w~ / ~ jj E
r~ ~ f t t j
~ o
~ N
"i @~ ~
"7
o~ ~z ~rl1.~m ~ ~ x „
w~-----w~,.
S,LII~II'T QN~ZL
~i ~
r--- _ ~ Qoo
~ rw ® ~ r~'" rah
a \ ``,w I--+~-I ~ w
C.~ ~
I W
i
EXISTING WETLANDS
m
f
PROPOSED WETLAND DISTURBANCE
DATE: 04/05/11
(;7 I'S DRAWN: RWB
k
'T'T~T~' ~T'~T`~ .nn~ rn~ n ~nnP CuF~T'
1 1111.7 x.71 1 1i luu Du u luu ""-'x•
MIR 1 40
SCALE: 1"=50'
ALL CONSTRUCTION SHALL BE TO NORFOLK SOUTHERN
RAILWAY COMPANY STANDARDS PR FOR PRELIMINARY 7 CONSTRUCTION