Loading...
HomeMy WebLinkAbout20110671 Ver 1_More Info Received_20110725wv'? 1Lc?wte July 22, 2011 NC DWQ, 401 /Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 ? D LP 11 Re: Pre-Construction Notification Modification (DWQ Project #11-60771) Written Approval - 401 Water Quality Certification Transco - Bank Stabilization and Maintenance of Exposed 36-inch Pipeline in Abernethy Creek Gaston County, Bessemer City, North Carolina Submar Job #SB2998 On behalf of Transco, Submar, Inc. is submitting this request for Section 401 Water Quality Certification Written Approval to conduct bank stabilization activities and restore cover to natural gas pipelines within waters of the United States. The attached letter and check was returned to us indicating the subject application had the "Incorrect Permitting Fee." I had a phone conversation with Mr. Ian McMillan on July 22, 2011 to discuss the Incorrect Permitting Fee Letter. Mr. McMillan advised me to adjust the Stream Impacts (3a)(S1/S2) on Page 5 of the Pre-Construction Notification (PCN) to accurately identify total impacts of the proposed project - which is 146 linear feet. Please refer to the enclosed modified Page 5 of the PCN (5 copies provided) which has the corrections and the enclosed check for $240.00 for permit fees associated with minor water quality application. Your prompt attention and approval of this permit request will be appreciated. If you have any questions, or if I may be of further service, please call me at (800) 978-2627. Thank you in advance for your assistance in this matter. Sincerely, SUBMAR Brandon M. Clark Regulatory and Compliance Manager Enclosures cc: Mr. Randall Flowers, Transco 2800 Post Oak Boulevard, Houston, Texas 77056 C 2 5 2011 ?IyR ?"? s ?'ATEk QU 805 Dunn Street - Houma, LA 70360 - 985-868-0001 . Fax 985-851-0108 - www.submar.com Ak ;F i; NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary July 18, 2011 6071 DWQ Project # 11-0771 Gaston County CERTIFIED RETURN RECEIPT REQUESTED Submar, Inc. JUL 2 3 2011 Brandon Clark 805 Dunn Street Houma, Louisiana 70360 Subtnar Job # SB2998 Subject Property: Abernethy Creek Bank Stabilization & Maintenance Exposed 36" Pipeline Incorrect Permitting Fee Dear Mr. Clark, On July 13, 2011 the Division of Water Quality (DWQ) received the application sets for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. Additional Information Requested: ® This project based on the noted stream impact of 282 linear feet will require a permitting fee of $570. Check # 28622 for $240 is enclosed. You may submit the original check with another one for $330; or you may submit one check for the full amount. Please submit this information within 30 calendar days of the date of this letter. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call me at 919-807-6360 or Ian McMillan at 919-807-6364 if you have any questions. Sincerely, Karen A. Higgins, SuPPTZSOr Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) Wetlands, Buffers, Stormwater, Compliance and Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 512 N Salisbury Street Floor 9 Raleigh North Carolina 27604-1170 Phone: 919-807-6301 1 FAX: 919-807-6494 Internet: www.nmaterquality,org North Carolina Aaturall?r An Equal Opportunity t Affirmative Action Employer o t,-1 \ nb"ne4i,1 Cree=k - Dw- Q prof ec.?r i:t 11- ? C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P M T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps 10 IR N ? No ? DWQ P W3 ? P ? T ? Yes ? Corps F ? No ? DWQ 7 , W4 ? P ? T ? Yes ? Corps JuL 11 ? No ? DWQ W5 El P F-1 T El Yes ? Corps yy A K UAL ? No ? DWQ Nea?(Bnr W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: No known wetlands on site 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - PER or (Corps - 404, 10 stream r Permanent (P) or intermittent DWQ - non-404, (linea Temporary T () (INT)? other) (feet) feet) S1 ®P ? T _Fa aceari tion 6L, Aber eek ® PER ® Corps 25 136 ? INT ® DWQ S2 ®P [] T III ?,C. Abernethy Creek ® PER INT El ® Corps ® DWQ 25 146 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Impacts associated with excavation of the banks to create more gentle 2:1 slopes will be approximately 136 linear feet. Approximately 123 linear feet of impacts will be a result of fill associated with the installation of the pre-formed concrete mattresses and 23 linear feet due to the installation of rock to create the Longitudinal Peaked Stone Toe Protection on the upstream end of the system. Page 5 of 12 PCN Form -Version 1.3 December 10, 2008 Version