Loading...
HomeMy WebLinkAbout20110691 Ver 1_Information Letter_20040809~~~ ~~ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor August 9, 2004 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director MEMORANDUM TO: John Conforti, NCDOT Project Development Engineer FROM: Brian L. Wrenn, NC Division of Water Quality ~3GJ SUBJECT: Scoping Review of NCDOT's proposed bridge replacement projects: B-4293 In reply to your correspondence dated July 16, 2004 (received July 23,2004) in which you requested comments for the referenced projects, the NC Division of Water Quality has the following comments: !. Project-Specific Comments B-4293 Bridge No. 2l9 over Twelve Mile Creek, Union Co. `~ DWQ has no specific concerns regazding this bridge replacement. l7. General Comments Re~ardinA Bride Replacement Projects 1. If corrugated metal pipe arches, reinforced concrete pipes, or concrete box culverts are used to replace the bridge, then DWQ recommends the use of Nationwide Permit No. 14 rather than Nationwide Permit 23. 2. If the old bridge is removed, no discharge of bridge material into surface waters is preferred. Strict adherence the Corps of Engineers guidelines for bridge demolition will be a condition of the 401 Water Quality Certification. 3. DWQ prefers spanning structures. Spanning structures usually do not require work within the stream and do not require stream channel realignment. The horizontal and vertical cleazances provided by bridges allows for human and wildlife passage beneath the structure, does not block fish passage, and does not block navigation by canoeists and boaters. 4. Bridge deck drains should not dischazge directly into the stream; stormwater should be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour . holes, vegetated buffers, etc.) before entering the stream. Please refer to NCDOT Best Management Practices for the Protection of Surface Waters 5. Live concrete should not be allowed to contact the water in or entering into the stream. Concrete is mostly made up of lime (calcium cazbonate) and when in a dry or wet state (not hardened) calcium carbonate is very soluble in water and has a pH of approximately 12. In an unhazdened state concrete or cement will change the pH of fresh water to very basic and will cause fish and other macroinvertebrate kills. 6. If possible, bridge supports (bents) should not be placed in the stream. 401 Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 one 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 NorthCarolina Phone: 919-733-1786 /FAX 919-733-6893 /Internet: h~~//h2o cnr state nc us/ncwetlands a'~ 1~~ `//~ If temporary access roads or detours are constructed, they should be removed back to original ground elevations immediately upon the completion of the project. Disturbed areas should be seeded or mulched to stabilize the soil and native tree species should be planted with a spacing of not more than 10'x10'. If possible, when using temporary structures the area should be cleazed but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact, allows the area to re-vegetate naturally and minimizes disturbed soil. 8. A cleaz bank (rip rap-free) area of at least 10 feet should remain on each side of the steam underneath the bridge. 9. Sedimentation and erosion control measures sufficient to protect water resources must be implemented prior to any ground disturbing activities. Structures should be maintained regularly, especially following rainfall events. 10. Baze soil should be stabilized through vegetation or other means as quickly as feasible to prevent sedimentation of water resources. 11. All work in or adjacent to stream waters should be conducted in a dry work area. Sandbags, rock berms, cofferdams, or other diversion structures should be used where possible to prevent excavation in flowing water. ` 12. Heavy equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment should be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. ILL General Comments if Replacing the Bride with a Culvert 1. The culvert must be designed to allow for aquatic life and fish passage. Generally, the culvert or pipe invert should be buried at least 1 foot below the natural streambed (measured from the natural thalweg depth). If multiple barrels are required, barrels other than the base flow barrel(s) should be placed on or neaz stream bankfull or floodplain bench elevation (similar to Lyonsfield design). These should be reconnected to floodplain benches as appropriate. This may be accomplished by utilizing sills on the upstream end to restrict or divert flaw to the base flow barrel(s). Sufficient water depth should be provided in the base flow barrel during low flows to accommodate fish movement: -b` culverts aze longer than 40-50 lineaz feet, alternating or notched baffles should be installed in a manner that mimics existing stream pattern. This should enhance aquatic life passage: 1) by depositing sediments in the barrel, 2) by maintaining channel depth and flow regimes, and 3) by providing resting places for fish and other aquatic organisms. In essence, the base flow barrel(s) should provide a continuum of water depth and channel width without substantial modifications of velocity. 2. If multiple pipes or cells are used, at least one pipe or box should be designed to,remain dry during normal flows to allow for wildlife passage. 3. Culverts or pipes should be situated along the existing channel alignment whenever possible to avoid channel realignment. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 4. Riprap should not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be professionally designed, sized, arid installed. In most cases, we prefer the replacement of the existing structure at the same location with road closure. If road closure is not feasible, a temporary detour should be designed and located to avoid wetland impacts, minimize the need for clearing and to avoid destabilizing stream banks. If the structure:-will be on a new alignment, the old structure should be removed and the approach fills removed from the 100- year floodplain. Approach fills should be removed down to the natural ground elevation. The area should be stabilized with grass and planted with native tree species. Tall fescue should not be used in riparian areas. If the area that is reclaimed was previously wetlands, NCDOT should restore the area to wetlands. If successful, the site may be used as wetland mitigation for the subject project or other projects in the watershed. Thank you for requesting our input, at this time. The DOT is reminded that issuance of a 401 Water Quality Certification requires [hat appropriate measures be instituted to ensure that water quality standards are met and designated uses are not degraded or lost. If you have any questions or require additional information, please contact Brian Wrenn 919-733-5715. pc: Steve Lund, USACE Asheville Field Office Chris Militscher, USEPA Marla Chambers, NCWRC File Copy `'~ ~ ~~ STATE OF NORTH CAROLINA' DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR July 16, 2004 Mr. Brian Wrenn Department of Environment & Natural Resources Department of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1621 Dear Mr. Wrenn: LYNDO TIPPETT SECRETARY WETLANDS 140? GROUP JUL 2 3 2004 WATER QUALITY SECTI0~1 SUBJECT: Notification of Start of Study and Request for Environmental Input NCDOT Bridge Replacement Group #48 The Project Development and Environmental Analysis Branch (PDEA) of the North Carolina Department of Transportation (NCDOT), has begun studying alternatives for the proposed replacement of the bridge listed below. The project is included in the 2004 - 2010 North Cazolina Transportation Improvement Program (TIP) and is scheduled for right of way acquisition to begin in Federal Fiscal Yeaz 2005 (FFY05) and construction to begin in Federal Fiscal Year 2006 (FFY06). A site location map and other project information are attached for your review. TIP No. Federal Aid No. Slate Projec[ NCDOT County Project Description No. Division B-4293 BRSTP-1008(11) 8.2693101 10 Union Replace Bridge No. 219 on SR 1008 (Howie Mine Road) over Twelve Mile Creek We would appreciate any information you might have that would be helpful in evaluating the potential social, economic, and/or environmental impacts of the project. If applicable, please identify any permits or approvals that may be required by your agency. Your comments will be used in the prepazation of a federally funded Categorical Exclusion (CE) document for each project. The document will be prepazed in accordance with the National Environmental Policy Act. It is desired that your agency respond by August 20, 2004 so that your comments can be used in the preparation of this document. Please note that there will be no formal interagency scoping meetings for this project. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699-1546 TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE: WWYV.NCDOT.ORG LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC G z If you have any questions concerning the project, please contact Mr. John Conforti, Project Development Engineer, of this Branch at (919) 733-7844, Extension 208. Sincerely, Gregory J. Thorpe, Ph.D., Director Project Development and Environmental Analysis Branch GJT/plr z661 `\\\\ ..~ \ '6 2529 ~ O) 1066 w BRIDGE N0. 219 .~ 269] _~~~ ~v 26]] N.T.S. 0 2818 O~ 26]] II 11 ` i ': ~ a , xl `•L 66(, uuxa "M `~ ° \\\ 511 w~ _i1Mt~ilif - ~''~ ' "~ ~' ~ PiIECKLE1dBl7`~ ~7~ ' ` .~... 1...n ~' 11 I ~~ I I x, a ~^ x as .1 ~ ~~ CIIF00 it mn 1 WrH-' ~ 7i~ 1 W~ p ~ 1 _ I >. ~~( `WW.v ]~Y.MW11 ruxti '~WWO I _ U N I ISO N i 661 I~ ~ u uw ' .'6 u: r~i ~ p AR~I n "°"°' 3 n , . '~~ . ~ 9 • ~.' "axW ~• rq .. _ B '}°~ .gip ~, •. ~ ; 9 .~- !ka ` ' ~~ NORTH CAROLINA 1. DEPARTMMQdT OF TRANSPORTATION I\, PROJECT DEVELOPMENT & `~ ENVIRONMIIJ'fAL ANALYSIS BRANCH iJNION COUNTY ~ ~ BRIDGE NO. 219 ON SR 1008 OVER ,~ TWELVE MILE CREEK TIP NO. B-4293 LOCATION MAP FIGURE I