HomeMy WebLinkAbout20041818 Ver 2_Certification of Completion_20110720I/
A=COM
July 19, 2011
401 Oversight Express Review Permits Unit
Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699-1650
AECOM
701 Corporate Center Drive
Suite 475
Raleigh, North Carolina 27607
www.aecom.com
Re: Certification of Completion
2004 Sanitary Sewer System Improvements,
2004 Water System Improvements and
Edgewood Drive Sewer System Improvements
AECOM Project No. 84501 (60184521)
DWQ Project No. 04-1818, Ver. 2
Gentlemen:
919-854-6250 tel
919-854-6259 fax
A.o3ux? o'l
1
201
E2O
DENR - WA _
Please find enclosed the Certification of Completion for the referenced project. If there are
any questions, or if additional information is needed, please do not hesitate to contact me.
Sincerely,
AECOM Technical Services of North Carolina, Inc.
Steve Scruggs, P.E.
Project Manager
cc: Mark Warren, Town of Louisburg
Certification of Completion
DWQ Project No.: r/. VeR..1 County: Nk LlAJ
Applicant:
row') 0 F )
Project Name: oZGU I SO L? eR X-Me it f) y e. me, ^/f 5
Date of Issuance of Certification or Authorization: &% usfi at . 0,0 7
Certificate of ComWetion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: . Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, b. STS
eA/ J?G/?G[ S as a duly registered Professional /we.94.e., Engineer,
Landscape Architect, Surveyor, etc.) ' e State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Registration No. /Oacli, Date '?9 ??