Loading...
HomeMy WebLinkAbout20041818 Ver 2_Certification of Completion_20110720I/ A=COM July 19, 2011 401 Oversight Express Review Permits Unit Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 AECOM 701 Corporate Center Drive Suite 475 Raleigh, North Carolina 27607 www.aecom.com Re: Certification of Completion 2004 Sanitary Sewer System Improvements, 2004 Water System Improvements and Edgewood Drive Sewer System Improvements AECOM Project No. 84501 (60184521) DWQ Project No. 04-1818, Ver. 2 Gentlemen: 919-854-6250 tel 919-854-6259 fax A.o3ux? o'l 1 201 E2O DENR - WA _ Please find enclosed the Certification of Completion for the referenced project. If there are any questions, or if additional information is needed, please do not hesitate to contact me. Sincerely, AECOM Technical Services of North Carolina, Inc. Steve Scruggs, P.E. Project Manager cc: Mark Warren, Town of Louisburg Certification of Completion DWQ Project No.: r/. VeR..1 County: Nk LlAJ Applicant: row') 0 F ) Project Name: oZGU I SO L? eR X-Me it f) y e. me, ^/f 5 Date of Issuance of Certification or Authorization: &% usfi at . 0,0 7 Certificate of ComWetion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: . Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, b. STS eA/ J?G/?G[ S as a duly registered Professional /we.94.e., Engineer, Landscape Architect, Surveyor, etc.) ' e State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. /Oacli, Date '?9 ??