Loading...
HomeMy WebLinkAbout20050732 Ver 22_Stormwater Info_20110719?NICIQM&CREED TO: NCDENR - DWQ 401 Unit 512 N Salisbury Street Archdale Building -911, Floor Raleigh, NC 27604 ATTENTION: Ms. Annette Lucas WE ARE SENDING: ? Originals ? Specifications ?s-o?3a vaa LETTER OF TRANSMITTAL DATE: July 15, 2011 PROJECT NO: 2735-0073 TASK NO: EXP RE: Briar Chapel - Phase 6 South Subdivision Plans TRANSMITTAL NO: 1 PAGE I OF 1 ® Prints ? Shop Drawings ? Samples ? Calculations ? Other - Quantity Drawing No. Rev. I Description Status 2 Stormwater Design Plans C3.1-3.3, D4.1-D4.3 G 2 Narrative & Supporting Calculations G 2 Wet Detention Basin O&M Agreement (1 Original, 1 copy) G 2 BMP#9 Wet Detention Pond Design Supplement G 2 Impervious Surface Area Table G Issue Status Code REMARKS: A. Preliminary E. Construction Annette, Please find the enclosed documents for comments. Thank you. JUL 1 9 2 if you have any questions or 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 919/233-8091 Fax 919/233-8031 Cc: McKIM & CREED, INC. F Signed - Grant M. Livengood, PE B. Fabrication Only C. For Information D. Bid F. For Review & Comments G. For Approval H. See Remarks Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. Z ?_. ae ? r- ?1(J ce c=7 N O - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will rernediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.50 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 462.50 Sediment Removal t.458.000 Pe anen ---------V Volume Bottom Elevaft Mi n. Sediment Storage FOREBAY Pool --Sediment-Removal-Elevation-458.00- - -- Volume Bottom Elevation 457.00 2 1-ft Mon Sedimer Storage MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Briar Chapel Subdivision, Phase 6 South BMP drainage area number:# 9 Print name:Bill Mumford Title:Assistant Vice President NNP-Briar Chapel LLC Address: 16 Windy Knoll Circle, Chapel Hill NC 27516 Phone:(919) 951-0700 Signature: c? Date: -1- I Z - Zv Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Gfo+r ' A- deffion , a Notary Public for the State of No" roLc, y , County of l Af 04f nb , do hereby certify that _P111 YY U'Wm Wcl personally appeared before me this day of fi,? ly ao and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires 3? 0/1 a Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 uS-O13a- 1) 20, 401 NARRATIVE & SUPPORTING CALCULATIONS Briar Chapel Development Phase 6 South Chatham County, North Carolina July 18, 2011 Prepared for BRIAR CHAPEL'S Newland COMMU M c r ca _ D 0 Gin? Q NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 4. Prepared By: 4e,# MCKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 02735-0073 PROJECT DESCRIPITON ' The purpose of the project is to continue development in planned residential areas within the Briar Chapel masterplanned development. Phase 6 South will provide roadway, water and ' sewer infrastructure for 134 residential lots. All lots will have limited impervious surfaces based on lot classification and size. ' Future public roadways are set at widths of 27' measured from back of curb to back of curb. Each public road will contain a 2.5' curb and gutter section on each side. All private alleys will be 15' wide and have been designed to be inverted crown in order direct water flow to the center of the alley where it will be caught and piped to the main storm drainage system. Based on the conditions of the approved 401 Water Quality Certification, NCDENR-DWQ will require runoff from the roads to be captured and treated for 85% TSS removal before being ' discharged into the existing stream buffer. To meet this requirement, one wet detention pond has been designed to remove 90% TSS and to hold the volume from the 1 inch storm and discharge the peak runoff from the 1-year, 24-hour storm at a rate below the pre-development peak discharge rate. The wet detention ponds has been designed based upon the guidelines in ' the most recent edition of the North Carolina Stormwater Best Management Practices Manual. Upon completion of the project's construction, the proposed public roads will be turned over to ' and maintained by NCDOT. SITE DESCRIPTION ' The existing site is an approximately 38 acre tract that is a part of the Briar Chapel development in Chatham County, North Carolina. The site is along Briar Chapel Parkway approximately two ' miles west of its intersection with US 15-501. Two existing streams are located on each side of the proposed denuded area. No stream areas are to be impacted during these earth moving activities. Chatham County has determined that ' both streams will require 50' riparian buffers, as measured from the top of the bank. The lower portion of the western stream requires a 100' buffer. Both streams are within the Cape Fear River Basin and are tributaries to Pokeberry Creek (WS-IV; NSW). The site generally slopes from northwest to southeast. The slopes in the site range from 5-20% in localized areas. ' SOILS According to the Chatham County Generalized Soil Survey, the soils located on the site are ' classified as Wedowee sandy loam, 2% to 15% slopes (WeB, WeB, WeD). The following soil descriptions are associated with the soils found on the site: ' We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges and side slopes. Permeability is moderate and the soils are well drained. Soils have a low shrink/swell potential. The seasonal high water is generally more than 6.0 feet below the ' surface. F 1 1 1 1 1 WET DETENTION DESIGN The wet detention pond on this site has been designed to remove 90% of the total suspended solids entering from the surrounding impervious drainage areas before discharging into the adjacent stream. Areas downstream of the ponds exceeded the new slope limitations required by the BMP Manual for level spreaders and vegetated filter strips. Treated runoff will be dissipated via a riprap outlet protection device before entering any stream buffers. Design parameters were taken from the BMP manual and from DWQ's design supplement forms. MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all temporary erosion control measures devices. Any measure that fails to function as intended shall be repaired immediately. I recipitation Frequency Data Server http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buiIdout.perl?type=idf&units=us&s... POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 CHAPEL HILL 2 W, NORTH CAROLINA (31-1677) 35.9086 N 79.0794 W 462 feet from "Precipitation-Frequency Atlas ot'the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Wed Jan 20 2010 Confidence Limits Seasonality Y Location Maps 11 Other Info. GIS data Maps Docs 1 t Return to State Map Precipitation Intensity Estimates (in/hr) F = 5 min F3" 60 F 0 3 hr hr 12 hr 24 hr 48 hr 4 day 7 day 20 ? 30 45 60 ( ) 4.93 rrun 3.94 mmm 3.28 2.25 m m 1.40 mm 0.84 - - 0.60 0.36 0.21 0.12 0.07 0.04 da 0.03 0.02 da 0.01 a d 0.01 da 0.01 da 0.01 I ` 5.81 4.64 3.89 2.69 1.69 1.01 0.72 0.43 0.25 0.15 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 F 5 6.70 5.36 4.52 3.21 2.06 1.25 0.89 0.53 0.32 0.19 0.11 0.06 0.04 0.03 0.02 0.02 0.01 0.01 10 7.38 5.90 4.98 3.61 2.35 1.43 1.03 0.62 0.37 0.22 0.12 0.07 0.04 0.03 0.02 0.02 0.01 0.01 25 11 6.46 5.46 4.04 2.69 1.66 1.20 0.73 0.44 0.25 0.15 0.08 0.05 0.04 0.03 0.02 0.02 0.01 50 8.62 6.86 5.79 4.36 2.95 1.85 1.34 0.82 0.50 0.29 0.16 0.09 0.06 0.04 0.03 0.02 0.02 0.02 F 100 9.07 7.21 6.07 4.65 3.20 2.02 1.48 0.91 0.56 0.32 0.18 0.10 0.06 0.05 0.03 0.02 0.02 0.02 200 F 9.44 7.49; 6.30 4.90 3.44 2.20 1.63 1.01 0.62 0.35 0.20 0.11 0.07 0.05 0.03 0.03 0.02 0.02 500 9.85 7.79 6.54 5.21 3.73 2.43 1.82 1.14 0.71 0.40 0.22 0.12 0.08 0.06 0.04 0.03 0.02 0.02 1000 ! 10.19 8.02 6.71 5.43 3.96 2.62 1.98 1.24 0.78 0.43 0.24 0.13 0.08 0.06 0.04 0.03 0.02 0.02 ` These precipitation frequency esti mates are based on a partial duration series. ARI is the Average Recurrence Interval. Please referto NOAAAffas 14 Documentfor more information. NOTE: Formatting forces estimates near zero to appearas xro. * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) ARI** 5 10 F15 30 60 0 3 - l2 24 F 48 4 7 F l0 20 F 30 45 60 (Years) min min min min min hr h hr hr hr day day day day day [ day day ( 5.39 4.31 3.59 2.46 ! 1.53 0.92 0.65 0.39 0.23 ! 0.13 0.08 0.04 0.03 0.02 0.01 0.01 0.01 0.01 I 2 6.36 5.08 4.26 2.94 1.85 1.1 1 0.79 0.47 0.28 0.16 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 7.31 5.86 4.94 3.51 2.25 1.37 0.97 0.58 0.34 0.20 0.12 0.06 0.04 0.03 0.02 0.02 0.01 0.01 F 10 8.06 6.44 5.43 3.94 2.56 1.57 1.12 0.68 0.40 0.23 0.13 ! 0.07 0.05 0.04 0.02 0.02 0.02 0.01 25 8.83 7.04 5.95 4.41 2.93 1.82 1.31 0.79 0.48 0.27 0.16 ! 0.09 0.05 0.04 0.03 0.02 0.02 0.01 50 9.38 7.48 6.31 4.75 3.22 2.02 1.47 0.89 0.54 0.31 0.17 0.10 0.06 0.05 0.03 0.02 0.02 0.02 100 9.89 7.85 6.62 5.07 3.49 2.22 1.62 0.99 0.60 0.34 0.19 0.11 0.07 0.05 0.03 0.02 0.02 0.02 200 10.32 8.18 6.88 5.35 3.75 2.41 1.78 1.09 0.67 0.38 0.21 0.12 0.07 0.06 0.04 0.03 0.02 0.02 500 F 10.78 8.52 7.15 5.69 4.08 2.66 1.99 1.23 0.76 0.43 0.24 0.13 0.08 0.06 0.04 . 0.0 3 0. 02 0.02 1 1000 111.14 18.77 17.34 15.94 14.34 12.87 2.16 1.36 0.85 0.46 0.26 0.14 0.09 0.07 0.04 0.03 0.02 0.02 The upper bound ofthe confidence interval at 90% confidence level is the value which 5%ofthe simulated quanfile values fora given frequencyare greater than. "These precipitation kequencyestimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appear as zero. Lower bound of the 90%o confidence interval Precipitation Intensity Estimates (in/hr) 5 10 15 30 60 120 3 6 l2 24 48 4 7 10 20 30 45 60 (yews)min min min min min min hr hr hr hr hr day [day day day day day day 1 of4 1/20/2010 8:55 AM I recipitation Frequency Data Server 1 L. http: //hdsc.nws.noaa.gov/cgi-bin/hdsc/bui 1 dout.perl?type=pf&units=us&se... ;' POINT PRECIPITATION' FREQUENCY ESTIMATES FROM NOAA ATLAS 14 CHAPEL HILL 2 W, NORTH CAROLINA (31-1677) 35.9086 N 79.0794 W 462 feet from'Precipilation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2. Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yckta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracte : Tue Jan 1 10 Confidence Limits , Seasonality Location Maps ?j Other Info. GIS data Maps Docs Return to State Map Precipitation Frequency Estimates (inches) ARI* 5 10 15 30 60 120 [Lhr 6 hr 12 hr 20 30 45 60 24 hr 48 hr 4 day 7 day F 10 (years) I mm min 0.41 0.66 mm 0.82 mm rn m 1.12 1.40 1.68 - 1.79 2.15 2.54 y 2.96 3.46 3.87 4.44 5.05 6.76 8.39 10.69 12.84 F 2 0.48 0.77 0.97 1.34 1.69 2.02 2.16 2.59 3.06 3.58 4.17 4.64 5.30 6.00 ' 7.97 9.88 12.52 14.97 0.56 0.89 1.13 1.60 2.06 2.49 2.66 3.20 3.80 4.47 5.17 5.71 6.44 7.21 9.41 11.47 14.32 16.89 10 0.61 0.98 1.25 1.80 2.35 2.87 3.08 3.71 4.44 5.17 5.95 6.54 7.34 8.15 10.56 12.72 15.72 18.37 25 0.68 1.08 1.36 2.02 2.69 3.33 3.61 4.37 5.28 6.11 6.99 7.68 8.57 9.42 12.11 14.36 17.55 20.28 F 50 0.72 1.14 1.45 2.18 2.95 3.70 4.04 4.92 5.99 6.86 7.81 8.57 9.54 10.43 13.34 15.62 18.95 21.72 F 100 _ 0.76 1.20 1.52 2.33 3.20 4.05 4.46 5.47 6.71 7.62 8.64 9.49 10.53 11.44 14.57 16.87 20.31 23.11 200 0.79 1.25 1.57 2.45 3.44 4.40 4.89 6.03 7.47 8.41 9.49 10.44 11.56 12.47 15.83 18.12 21.67 24.46 F 500 0.82 1.30 1.64 2.60 3.73 4.86 5.46 6.80 8.53 9.50 10.66 11.73F12 96 13.87 17.55 19.80 23.46 26.21 1000 0.85 1.34 1.68 2.72 3.96 5.23 5.93 7.44 9.43 10.35 11.58 12.76 14.06 14.97 18.89 21.09 24.83 27.53, `These precipitation frequencyestmates are based on a partial duration series. ARI is the Average Recurrence Interval. Please referto NOAAAfIas 14 Documentfor more information. NOTE: Formatting forces estimates near zero to appearas zgro. 10 0.67 1.07 1.36 1.97 2.56 3.14 3.37 4.05 4.83 5.51 6.36 6.99 7.82 8.66 1 1.1713.41 16.51 19.25 25 0.74 1.17 1.49 2.20 2.93 3.64 3.94 4.76 5.73 6.54 7.47 8.22 9.14 10.02 12.82 15.15 18.44 21.26 50 0.78 1.25 1.58 2.38 3.22 4.04 4.41 5.35 6.47 7.34 8.35 9.19 10.19 11.11 14.14 16.50 19.92 22.80 100 ! 0.82 1.31 1.66 2.53 ! 3.49 4.43 4.87 5.94 7.25 8.17 19.27 " 10.19 11.26 12.21 15.48 17.85 21.39 24.28 200 0.86 1.36 1.72 2.68 ! 3.75 4.82 5.34 6.56 8.06 9.03 10.19 11.22 12.3813.33 16.86 19.21 22.85 25.73 500 0.90 1.42 79 1. 2.84 4.08 5.32 5.96 7.39 9.20 110.21 11.47 12.65 13.91 1 4.86 18.72 21.04 24.81 27.63 F 1000 0.93 1.46 1.83 2.97 4.34 5.74 6.50 8.1 1 10.19 11.15 12.4913.7915.14 16.07 20.20 22.46 26.31 29.07 * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI ? 30 60 120 3 6 12 24 48 4 7 5 10 m5 [ 10 20 30 45 60 (years) in min mn min nun min hr hr hr hr hr day [day i [. day day day day day 0.45 .0.72 0.90 1.23 1.53 ! 1.84 1.96 2.35 2.77 3.16 3.70 4.14 4.73 5.37 7.14 8.87 11.24 13.44 0.53 0.85 1.06 1.47 1.85 2.22 2.37 2.83 3.34 3.82 4.46 4.96 5.64 6.38 8.43 10.42 13.15 15.68 I 5 0.61 0.98 1.23 1.75 2.25 2.73 2.92 3.50 4.15 4.77 5.53 6.09 6.86 7.66 9.95 12.10 15.04 17.69 The upper bound ofthe confidence interval at 90%confidence level is the valuewhich 5%a ofthe simulated quantile values fora given frequencyare greater than. " These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAAAtIas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appearas zero. ' >< Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) [ARI *'S 10 15 30 60 120 3 6 l2 24 48 4 7 10 20 F30 45 60 ears) min min min min I [ [ [ min min hr hr hr hr hr day day day day day day day I of 4 1/19/2010 9:12 AM MAPS u / 40 ga, t 1 ? ? •' ate. is\ 1 ?? Q w 3 3 r o_ 8aM ? 0 a o ? s'atro?' o w t,1u a XV 3 4'i ?yG i; r ??? ? ? f phi _ ., { ' a a r U Ri.. .,? w I? U rrTy" _G. a i > c c m 9a Q) 0 ' N m. U N N 'S ? •J? r. U ? 'O J ,J y m U ?' U y > 'S U U m 3 U U m 1 /T I ? 1F J W?i U m e ? L ? q ?my o ti ?. 3 U ?? ? i cs w 1 > ?- ?? a d ` WBE v v ? o r ?e 3P, l 1 - _ _._- -- O O ' LO co m uinuAS b zaays BMP #1 DESIGN 1 1 1 1 WATER QUALITY POND #9 CALCULATIONS Project Name Briar Chapel - Phase 6 S Project Number 02735-0073 Date July 8, 2011 3rd revision 2nd revision 1st revision 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Drainage Area Data Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Total site area 1,639,766 square feet = 37.64 acres Drai nage area to and Other Drainage Area Impervious areas Existing s Proposed s Change s Existing s Proposed s On-site buildings lots 0 473,100 473,100 0 0 On-site streets 0 188,789 188,789 0 0 On-site sidewalks 0 50,332 50,332 0 0 On-site future (open space) 0 20,000 20,000 0 0 Off-site buildings 0 42,500 42,500 0 0 Off-site streets 0 40,655 40,655 0 0 Off-site sidewalks 0 71489 7,489 0 0 Total Impervious 0 822,865 822,865 0 0 Drainage area to and Other Drainage Area Non-impervious areas Existing s Proposed s Change s Existing s Proposed s On-site grass/landscape 0 785,984 785,984 0 0 On-site woods 1,639,768 30,917 -1,608,851 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 1,639,768 816,901 -822,867 0 0 Total -Drainage Area 1,639,766 1,639,766 0 3,167,850 3,167,850 Percent Impervious 0.0 50.2 50.2 0.0 0.0 Notes: 2011.07.08.Wet Detention Pond #9.xls Site Drainage Area Data Page 1 of 1 Printed 7/18/2011 9:26 AM 1 1 Water Quality Pond Surface Area Calculations Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Total on-site drainage area to pond 1,639,766 square feet Total impervious area in drainage area 822,865 square feet Average water depth of basin at normal pool 3.5 feet Location of site Chatham County Site region Piedmont % Impervious cover 50.2 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont (85%) 1.9 percent For a site in the Piedmont (90%) 2.8 percent For a site in a Coastal County w/ Vegetative Filter 3.8 percent For a site in a Coastal County w/out Vegetative Filter 5.0 percent Required surface area of pond: For a site in the Piedmont (85%) 31,170.0 square feet For a site in the Piedmont (90%) 45,220.0 square feet For a site in a Coastal County w/ Vegetative Filter 61,690.0 square feet For a site in a Coastal County w/out Vegetative Filter 81,530.0 square feet Notes: 2011.07.08.Wet Detention Pond #9.xls Pond Surface Area Calcs Page 1 of 1 Printed 7/18/2011 9:26 AM Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Drainage area 1,639,766 square feet Impervious area 822,865 square feet Rainfall depth 1.00 inches Percent Impervious 50.2 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.50 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 68,547.2 cubic feet Notes: 2011.07.08.Wet Detention Pond #9.xls Runoff Volume Calcs Page 1 of 1 Printed 7/18/2011 9:27 AM 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 462.5 0 46,957.0 1.078 46,957.0 1.1 0.0 0.0 0.0 0.0 463 0.5 51,331.0 1.178 4,374.0 0.1 24,572.0 0.6 24,572.0 0.6 463.9 1.4 53,758.0 1.234 2,427.0 0.1 47,290.0 1.1 71,862.0 1.6 464 1.5 54,030.0 1.240 272.0 0.0 5,389.4 0.1 77,251.5 1.2 465 2.5 56,787.0 1.304 2,757.0 0.1 55,408.5 1.3 132,660.0 1.4 466 3.5 59,599.0 1.368 2,812.0 0.1 58,193.0 1.3 190,853.0 2.6 467 4.5 62,468.0 1.434 2,869.0 0.1 61,033.5 1.4 251,886.5 2.7 468 5.5 65,394.0 1.501 2,926.0 0.1 63,931.0 1.5 315,817.5 2.9 2011.07.08.Wet Detention Pond #9.xls Stage Storage (Temp Pool) Page 1 of 1 Printed 7/18/2011 9:27 AM 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Permanent Pool Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 457 0 22,273.0 0.511 22,273.0 0.5 0.0 0.0 0.0 0.0 458 1 25,689.0 0.590 3,416.0 0.1 23,981.0 0.6 23,981.0 0.6 459 2 29,243.0 0.671 3,554.0 0.1 27,466.0 0.6 51,447.0 1.2 460 3 32,937.0 0.756 3,694.0 0.1 31,090.0 0.7 82,537.0 1.3 461 4 36,771.0 0.844 3,834.0 0.1 34,854.0 0.8 117,391.0 1.5 462 5 40,741.0 0.935 3,970.0 0.1 38,756.0 0.9 156,147.0 1.7 462.5 5.5 46,957.0 1.078 6,216.0 0.1 21,924.5 0.5 178,071.5 1.4 2011.07.08.Wet Detention Pond #9.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 7/18/2011 9:27 AM 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebays Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 457 0 3,700.0 0.085 3,700.0 0.1 0.0 0.0 0.0 0.0 458 1 4,465.0 0.103 765.0 0.0 4,082.5 0.1 4,082.5 0.1 459 2 5,297.0 0.122 832.0 0.0 4,881.0 0.1 8,963.5 0.2 460 3 6,196.0 0.142 899.0 0.0 5,746.5 0.1 14,710.0 0.2 461 4 7,163.0 0.164 967.0 0.0 6,679.5 0.2 21,389.5 0.3 462 5 8,195.0 0.188 1,032.0 0.0 7,679.0 0.2 29,068.5 0.3 462.5 5.5 9,706.0 0.223 1,511.0 0.0 4,475.3 0.1 33,543.8 0.3 2011.07.08.Wet Detention Pond #9.xls Stage Storage (Forebays) Page 1 of 1 Printed 7/18/2011 9:27 AM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Maximum surface area of basin 53,758 square feet Maximum head of water above dewatering hole 1.40 feet Orifice coefficient 0.60 Diameter of each hole 5.0 inches Number of holes 1 Cross sectional area of each hole = 0.136 square feet Cross sectional area of each hole = 19.6 square inches Cross sectional area of dewatering hole(s) = 0.136 square feet Cross sectional area of dewatering hole(s) = 19.6 square inches Dewatering time for basin = 53.8 hours Dewatering time for basin = 2.24 days Notes: Water Quality Pond Summary Information Project Briar Chapel - Phase 6 S Project No. 02735-0073 Date July 8, 2011 Drainage area to pond 1,639,766 square feet = 37.64 acres Impervious area in drainage area 822,865 square feet = 18.89 acres Bottom of pond elevation 457.00 feet Normal pool elevation 562.50 feet Pond volume at normal pool 178,071 cubic feet Required volume for design rainfall 68,547 cubic feet Required surface area for pond 45,220 square feet Volume provided for storage of design rainfall = 71,862 cubic feet at elevation 463.9 Surface area provided at normal pool 46,957 square feet 2011.07.08.Wet Detention Pond #9.xis Summary Data Page 1 of 1 Printed 7/18/2011 9:27 AM 1S Pre-Development 2S Post-Development 3P BMP #9 Subca Reach and Lin k BMP #9 Type 11 24-hr 1-inch Rainfall=1.00" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 8 Summary for Pond 3P: BMP #9 Inflow Area = 37.644 ac, 50.18% Impervious, Inflow Depth = 0.20" for 1-inch event Inflow = 7.99 cfs @ 12.10 hrs, Volume= 0.620 of Outflow = 0.26 cfs @ 19.78 hrs, Volume= 0.422 af, Atten= 97%, Lag= 460.8 min Primary = 0.26 cfs @ 19.78 hrs, Volume= 0.422 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 462.86' @ 19.78 hrs Surf.Area= 50,111 sf Storage= 17,499 cf Plug-Flow detention time= 677.6 min calculated for 0.421 of (68% of inflow) Center-of-Mass det. time= 554.1 min ( 1,452.1 - 898.0 ) T Volume Invert Avail.Storage Storage Description ' #1 462.50' 315,819 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 462.50 46,957 0 0 463.00 51,331 24,572 24,572 464.00 54,030 52,681 77,253 ' 465.00 56,787 55,409 132,661 466.00 59,599 58,193 190,854 467.00 62,468 61,034 251,888 468.00 65,394 63,931 315,819 Device Routing Invert Outlet Devices #1 Primary 459.25' 36.0" Round Culvert L= 48.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 459.25'/459.00' S=0.0052'/' Cc= 0.900 n= 0.013 #2 Device 1 462.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 463.90' 90.0 deg x 5.0' long x 0.35' rise Sharp-Crested Vee/Trap Weir C=2.50 #4 Device 1 464.25' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 1 #5 Secondary 466.00' 60.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.26 cfs @ 19.78 hrs HW=462.86' (Free Discharge) t-1=Culvert (Passes 0.26 cfs of 43.41 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.26 cfs @ 2.04 fps) ' 3=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) -Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=462.50' (Free Discharge) ' t-5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) BMP #9 Type 11 24-hr 1-inch Rainfall=1.00" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 9 Pond 3P: BMP #9 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) BMP #9 Type 1124-hr 1-year Rainfall=2.96" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1S: Pre-Development ' Runoff = 18.96 cfs @ 12.28 hrs, Volume= 2.171 af, Depth= 0.69" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=2.96" Area (sf) CN Description 1,639,776 70 Woods, Good, HSG C 1,639,776 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment 1S: Pre-Development 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) BMP #9 Type 11 24-hr 1-year Rainfall=2.96" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 13 Summary for Pond 3P: BMP #9 Inflow Area = 37.644 ac, 50.18% Impervious, Inflow Depth = 1.63" for 1-year event Inflow = 78.69 cfs @ 12.07 hrs, Volume= 5.108 of Outflow = 17.41 cfs @ 12.42 hrs, Volume= 4.181 af, Atten= 78%, Lag= 21.0 min Primary = 17.41 cfs @ 12.42 hrs, Volume= 4.181 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 464.55' @ 12.42 hrs Surf.Area= 55,535 sf Storage= 107,166 cf Plug-Flow detention time= 373.7 min calculated for 4.181 of (82% of inflow) Center-of-Mass det. time= 295.2 min ( 1,126.4 - 831.2 ) Volume Invert Avail.Storage Storage Description #1 462.50' 315,819 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 462.50 46,957 0 0 463.00 51,331 24,572 24,572 464.00 54,030 52,681 77,253 465.00 56,787 55,409 132,661 466.00 59,599 58,193 190,854 467.00 62,468 61,034 251,888 468.00 65,394 63,931 315,819 Device Routing Invert Outlet Devices #1 Primary 459.25' 36.0" Round Culvert L= 48.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 459.25'/459.00' S=0.0052'/' Cc= 0.900 n= 0.013 #2 Device 1 462.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 463.90' 90.0 deg x 5.0' long x 0.35' rise Sharp-Crested Vee/Trap Weir C=2.50 #4 Device 1 464.25' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 466.00' 60.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=17.31 cfs @ 12.42 hrs HW=464.54' (Free Discharge) t1=Culvert (Passes 17.31 cfs of 66.30 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.89 cfs @ 6.52 fps) 3=Sharp-Crested Vee/Trap Weir (Orifice Controls 5.95 cfs @ 3.18 fps) -Orifice/Grate (Weir Controls 10.46 cfs @ 1.78 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=462.50' (Free Discharge) 1-5=Broad-Crested Rectangular Weir (Controls 0.00 cfs) it BMP #9 Type 1124-hr 1-year Rainfall=2.96" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 14 Pond 3P: BMP #9 0 LL 78.69 cfs Inflow Area=37.644 ac - Peak Elev=464.55' Storage=107,166 cf ® Inflow Iv OUfflOW 0 Primary Seconca,y BMP #9 Type 11 24-hr 10-year Rainfall=5.17" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 18 Summary for Pond 3P: BMP #9 Inflow Area = 37.644 ac, 50.18% Impervious, Inflow Depth= 3.63" for 10-year event Inflow = 171.91 cfs @ 12.07 hrs, Volume= 11.375 of Outflow = 77.43 cfs @ 12.25 hrs, Volume= 10.406 af, Atten= 55%, Lag= 11.1 min Primary = 77.43 cfs @ 12.25 hrs, Volume= 10.406 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 465.93'@ 12.25 hrs Surf.Area= 59,391 sf Storage= 186,452 cf Plug-Flow detention time= 188.0 min calculated for 10.406 of (91 % of inflow) Center-of-Mass det. time= 143.0 min ( 951.4 - 808.4 ) Volume Invert Avail.Storage Storage Description #1 462.50' 315,819 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 462.50 46,957 0 0 463.00 51,331 24,572 24,572 464.00 54,030 52,681 77,253 465.00 56,787 55,409 132,661 466.00 59,599 58,193 190,854 467.00 62,468 61,034 251,888 468.00 65,394 63,931 315,819 Device Routing Invert Outlet Devices #1 Primary 459.25' 36.0" Round Culvert L= 48.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 459.25'/459.00' S=0.0052'/' Cc= 0.900 n= 0.013 #2 Device 1 462.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 463.90' 90.0 deg x 5.0' long x 0.35' rise Sharp-Crested Vee/Trap Weir C=2.50 #4 Device 1 464.25' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 466.00' 60.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=77.42 cfs @ 12.25 hrs HW=465.92' (Free Discharge) t-1=Culvert (Inlet Controls 77.42 cfs @ 10.95 fps) 2=Orifice/Grate (Passes < 1.18 cfs potential flow) 3=Sharp-Crested Vee/Trap Weir (Passes < 11.92 cfs potential flow) -Orifice/Grate (Passes < 141.76 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=462.50' (Free Discharge) t-5=Broad-Crested Rectangular Weir (Controls 0.00 cfs) BMP #9 Type 11 24-hr 10-year Rainfall=5.17" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 19 1 ? 3 0 LL iI Pond 3P: BMP #9 Hydrograph ¦ Inflow [- Outflow ? Primary C Secondary 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) BMP #9 Type 11 24-hr 100-year Rainfall=7.62" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 23 Summary for Pond 3P: BMP #9 [82] Warning: Early inflow requires earlier time span Inflow Area = 37.644 ac, 50.18% Impervious, Inflow Depth > 5.95" for 100-year event Inflow = 276.19 cfs @ 12.06 hrs, Volume= 18.680 of Outflow = 210.36 cfs @ 12.16 hrs, Volume= 17.689 af, Atten= 24%, Lag= 6.0 min Primary = 84.14 cfs @ 12.16 hrs, Volume= 15.241 of Secondary = 126.23 cfs @ 12.16 hrs, Volume= 2.448 of Routing by Stor-Ind method, Time Span= 5.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 466.86'@ 12.16 hrs Surf.Area= 62,069 sf Storage= 243,224 cf Plug-Flow detention time= 131.3 min calculated for 17.688 of (95% of inflow) Center-of-Mass det. time= 100.5 min ( 895.8 - 795.3 ) Volume Invert Avail.Storage Storage Description #1 462.50' 315,819 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 462.50 46,957 0 0 ' 463.00 51,331 24,572 24,572 464.00 54,030 52,681 77,253 465.00 56,787 55,409 132,661 466.00 59,599 58,193 190,854 467.00 62,468 61,034 251,888 468.00 65,394 63,931 315,819 ' Device Routing Invert Outlet Devices #1 Primary 459.25' 36.0" Round Culvert L= 48.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 459.25'/459.00' S=0.0052'/' Cc= 0.900 n= 0.013 #2 Device 1 462.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 463.90' 90.0 deg x 5.0' long x 0.35' rise Sharp-Crested Vee/Trap Weir C=2.50 ' #4 Device 1 464.25' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 466.00' 60.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=84.01 cfs @ 12.16 hrs HW=466.84' (Free Discharge) L1=Culvert (Inlet Controls 84.01 cfs @ 11.89 fps) ' 2=Orifice/Grate (Passes < 1.33 cfs potential flow) 3=Sharp-Crested Vee/Trap Weir (Passes < 14.59 cfs potential flow) =Orifice/Grate (Passes < 193.84 cfs potential flow) Secondary OutFlow Max=122.57 cfs @ 12.16 hrs HW=466.84' (Free Discharge) t5=Broad-Crested Rectangular Weir (Weir Controls 122.57 cfs @ 2.42 fps) 1 1 BMP #9 Type 11 24-hr 100-year Rainfall=7.62" Prepared by McKim & Creed Printed 7/18/2011 HydroCAD® 9.10 s/n 04927 @2010 HydroCAD Software Solutions LLC Page 24 Pond 3P: BMP #9 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) LOCATION: Chatham County, NC Pond Name= BMP #9 Riser Outer Width = 6 ft Riser Outer Length = 6 ft Riser Inner Width = 5 ft Riser Inner Length = 5 ft Riser Height = 5.5 ft Concrete Base Length = 8 ft Concrete Base Width = 8 ft Concrete Base Depth = 18 in TE: 07/11/2011 DESIGNED BY: GCA Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety 9,075 lb 14,400 lb 23,475 lb 12,355 lb 5,990 lb 18,346 lb 1.28 Design Acceptable 1 C 1 DATE: 07/14/11 DESIGNED BY: 1 I GCA PROJECT NAME: Briar Chapel Phase 6 S PROJECT NO: CHECKED BY PROJECT LOCATION. Chatham County, NC 02735-0073 GIVIL Storm Outlet Structure Structure= BMP #9 Inlet FES #1 Q10/Qfull = 0.69 Size= 60 in VNfull = 1.073 Qio = 161.40 cfs V= 12.7 fps Qfull = 232.55 cfs Vfull = 11.84 fps From Fig. 8.06.b.1: Zone = 5 From Fig. 8.06.b.2: D50 = 14 in DMAx = 21 in Riprap Class = 2 Apron Thickness = 36 in Apron Length = 50.0 ft s, r Apron Width = 3 x Dia = 15.0 ft Storm Outlet Structure Structure= BMP #9 Outlet Quo/Qfull = 1.61 Size= 36 in VNfull = MAX Quo = 77.43 cfs V = 10.9 fps Qfull = 48.02 cfs Vfull = 6.79 fps From Fig. 8.06.b.1: Zone = 6 From Fig. 8.06.b.2: D50 = 14 in DMAx = 21 in Riprap Class = 2 Apron Thickness = 36 in ` Apron Length = 30.0 ft - T Apron Width = 3 x Dia = 9.0 ft ` 1 7 I WET DETENTION BASIN SUPPLEMENT i I ' Permit No. (to be provided by DWQ) 1 i ATA OF WATF9 oz o? _ ? _ _ NCDENR ' ST ORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. ' The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Briar Chapel Development - Phase 6 South ' Contact person Grant Livengood, PE Phone number 919..233.8091 Date 8-Jul-2011 Drainage area number #9 ' 11. DESIGN INFORMATION Site Characteristics Drainage area 1,639,766 ft2 ' Impervious area, post-development 822,865 ft2 % impervious 50.18 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters ' Minimum volume required 68,547 ft3 OK Volume provided 71,862 ft3 OK, volume provided is equal to or in excess of volume required. ' Storage Volume: SA Waters 1.5' runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 ' Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations ' Is the pre/post control of the lyr 24hr storm peak flow req uired? Y (Y or N) 1-yr, 24-hr rainfall depth 3.0 in Rational C, pre-development 0.40 (unitless) Rational C, post-development 0.76 (unitless) ' Rainfall intensity: 1-yr, 24-hr storm 0.12 in/hr Insufficient. Check intensity calculation. Pre-development 1-yr, 24-hr peak flow 18.96 ft3/sec Post-development 1-yr, 24-hr peak flow 78.69 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 59.73 ft3/sec ' Elevations Temporary pool elevation 463.90 fmsl Permanent pool elevation 462.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl ' Top of 1 Oft vegetated shelf elevation 463.00 fmsl Bottom of 1Oft vegetated shelf elevation 462.00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment cleanout, top elevation (bottom of pond) 458.00 fmsl Sediment cleanout, bottom elevation 457.00 fmsl Data not needed for calculation option #1, but OK if provided. ' Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? N (Y or N) ' Elevation of the top of the additional volume fmsl ' Form SW401-Wet Detention Basin-Rev 8-9117/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by D WQ) ' 11, DESIGN INFORMATION Surface Areas Area, temporary pool 53,758 ft2 Area REQUIRED, permanent pool 45,913 ft2 ' SAIDA ratio 2.80 (unitless) Area PROVIDED, permanent pool, Ap rm_pwi 46,957 ft2 OK Area, bottom of 10ft vegetated shelf, Ate, sheu 48,936 12 ' Area, sediment cleanout, top elevation (bottom of pond), Abo, road 7,949 ftZ Volumes Volume, temporary pool 71,862 ft3 OK Volume, permanent pool, Vcerm_p.i 178,072 ft3 ' Volume, forebay (sum of forebays if more than one forebay) 33,544 13 Forebay % of permanent pool volume 18.8% % OK ' SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) ' SAIDA ratio Average depth (used in SAIDA table): 2.80 (unitless) Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vpem_pwl 178,072 ft3 Area provided, permanent pool, Amrm_p?i 46,957 ft2 ' Average depth calculated 3.79 ft OK Average depth used in SAIDA, day, (Round to nearest 0.5ft) 3.5 ft Insufficient. Check calculation. Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A$,m_pool 46,957 12 Area, bottom of 1 Oft vegetated shelf, kt shell 48,936 ft2 Area, sediment cleanout, top elevation (bottom of pond), Ab,,_,,d 7,949 ft2 ' "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 4.00 ft Average depth calculated ft Average depth used in SAIDA, day, (Round to nearest 0.5ft) ft ' Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 5.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (Cc)) 0.60 (unitless) ' Driving head (Ho) 0.47 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C„,) (unitless) ' Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 18.96 ft3/sec Post-development 1-yr, 24-hr peak flow 78.69 ft3/sec ' Storage volume discharge rate (through discharge orifice or weir) 0.09 ft3/sec Storage volume drawdown time 2.24 days OK, draws down in 2-5 days. ' Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK ' Length of flowpath to width ratio 3 :1 OK Length to width ratio 1.5 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.1 ft OK ' Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: 8" DIP with gate valve ' Form SW401-Wet Detention Basin-Rev 8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 1 0 1 Permit (to be provided by DWQ) 111. REQUIRED ITEMS CHECKUST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. ' Initials GCA 0 1 1 P Page/ Plan Sheet No. C3.1-3.3 GCA D4.1-D4.3 GCA D4.1-D4.3 GCA C3.1 1 GCA Calc Booklet GCA C3.1 1? GCA Calc Booklet GCA Included GCA Included 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 1 1 1 1 1 1 1 1 IMPERVIOUS SURFACE AREA TABLE 1 1 1 1 1 1 1 1 1 1 1 1 1 7/18/2011 Briar Chapel - Phase 6 South Impervious Surface Area Table Lot # Lot Type Impervious Surface Area (SF) 461 40' Lot 3,000 462 40' Lot 3,000 463 40' Lot 3,000 464 40' Lot 3,000 465 40' Lot 3,000 466 40' Lot 3,000 467 40' Lot 3,000 468 40' Lot 3,000 469 40' Lot 3,000 470 40' Lot 3,000 471 40' Lot 3,000 472 40' Lot 3,000 473 40' Lot 3,000 474 40' Lot 3,000 475 40' Lot 3,000 476 40' Lot 3,000 477 40' Lot 3,000 478 40' Lot 3,000 479 40' Lot 3,000 480 40' Lot 3,000 481 40' Lot 3,000 482 40' Lot 3,000 483 40' Lot 3,000 484 40' Lot 3,000 485 40' Lot 3,000 486 40' Lot 3,000 487 40' Lot 3,000 488 40' Lot 3,000 489 40' Lot 3,000 490 60' Lot 3,800 491 60' Lot 3,800 492 60' Lot 3,800 493 60' Lot 3,800 494 60' Lot 3,800 495 60' Lot 3,800 496 60' Lot 3,800 497 60' Lot 3,800 498 60' Lot 3,800 499 60' Lot 3,800 500 60' Lot 3,800 501 60' Lot 3,800 502 60' Lot 3,800 503 60' Lot 3,800 504 60' Lot 3,800 505 60' Lot 3,800 506 60' Lot 3,800 507 60' Lot 3,800 508 60' Lot 3,800 509 60' Lot 3,800 510 60' Lot 3,800 511 60' Lot 3,800 512 60' Lot 3,800 513 60' Lot 3,800 514 60' Lot 3,800 515 60' Lot 3,800 516 60' Lot 3,800 517 60' Lot 3,800 518 60' Lot 3,800 519 60' Lot 3,800 520 60' Lot 3,800 521 60' Lot 3,800 1 of 3 1 1 1 1 1 1 1 1 Briar Chapel - Phase 6 South Impervious Surface Area Table Lot # Lot Type Impervious Surface Area (SF) 522 60' Lot 3,800 523 60' Lot 3,800 524 60' Lot 3,800 525 60' Lot 3,800 526 60' Lot 3,800 527 60' Lot 3,800 528 60' Lot 3,800 529 60' Lot 3,800 530 60' Lot 3,800 531 60' Lot 3,800 532 60' Lot 3,800 533 60' Lot 3,800 534 60' Lot 3,800 535 60' Lot 3,800 536 60' Lot 3,800 537 60' Lot 3,800 538 60' Lot 3,800 539 60' Lot 3,800 540 60' Lot 3,800 541 50' Lot 3,500 542 50' Lot 3,500 543 50' Lot 3,500 544 50' Lot 3,500 545 50' Lot 3,500 546 50' Lot 3,500 547 50' Lot 3,500 548 50' Lot 3,500 549 50' Lot 3,500 550 50' Lot 3,500 551 50' Lot 3,500 552 50' Lot 3,500 553 50' Lot 3,500 554 50' Lot 3,500 555 50' Lot 3,500 556 50' Lot 3,500 557 50' Lot 3,500 558 50' Lot 3,500 559 50' Lot 3,500 560 50' Lot 3,500 561 50' Lot 3.500 562 50' Lot 3,500 563 50' Lot 3,500 564 50' Lot 3,500 565 50' Lot 3,500 566 50' Lot 3,500 567 50' Lot 3,500 568 50' Lot 3,500 569 50' Lot 3,500 570 50' Lot 3,500 571 50' Lot 3,500 572 50' Lot 3,500 573 50' Lot 3,500 574 50' Lot 3,500 575 50' Lot 3,500 576 50' Lot 3,500 577 50' Lot 3,500 578 50' Lot 3,500 579 50' Lot 3,500 580 50' Lot 3.500 581 50' Lot 3,500 582 50' Lot 3,500 2of3 7/18/2011 Briar Chapel - Phase 6 South Impervious Surface Area Table Lot # Lot Type Impervious Surface Area (SF) 583 50' Lot 3,500 584 60' Lot 3,800 585 60' Lot 3,800 586 60' Lot 3,800 587 60' Lot 3,800 588 60' Lot 3,800 589 60' Lot 3,800 590 60' Lot 3,800 591 60' Lot 3,800 592 60' Lot 3,800 593 60' Lot 3,800 594 60' Lot 3,800 Total Lot ISA 473,100 Roadways ISA 188,789 Sidewalks ISA 50,332 I Otal IsA /'Iz,zzl Notes: 1. ISA = Impervious Surface Area (SF). 2. Total Lot Impervious Surface Area includes building footprint, 3of3