July 11, 2011
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
7011 01 10 0000 9947 6879
Pelican Pointe Association, Inc.
Robert Thomas/Danny Sawyer
PO Box 702
Elizabeth City NC 27907
Subject Property: Pelican Pointe Village
Pasquotank River (PAS50 30-3-(12); SB]
REQUEST FOR MORE INFORMATION
Dear Pelican Pointe HOA:
DWQ Project # 06-1917 V.2
Pasquotank County
On June 6, 2011, the Division of Water Quality (DWQ) Permitting Unit received your
CAMA Major Permit Application dated May 16, 2011 regarding your request for a
permit proposing to install 3,376 ft of bulkhead an construct 61 boat slips and
additional infrastructure subject property. DWQ has determined that your application
is incomplete and requests the following additional information in order to process your
application. Therefore, unless we receive the additional information requested below,
we will have to move toward denial of your application per 15A NCAC 2H .0506 and
will place this project on hold as incomplete until we receive this additional
information. Please provide the following information so that we may continue to
review your project.
Additional Information Requested:
1. Dissolved Oxygen (DO) Study
North Carolina Division of Water Quality Internet: www.ncwaterquali .orQ
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper
NorthCarolina
Naturallb,
Page 2 of 2
This Office requests a revised Dissolved Oxygen Study Plan be submitted to this office for
approval in order to characterize the existing water quality conditions and evaluate the
potential impacts from construction of 61 slips in this area. The DO Study Plan should
include sample sites within the existing system, at the mouth of the system within the
basin area, and within the main stem of Pasquotank River adjacent to the connection
between the basin and the main stem. This study should be conducted during the times
of lowest anticipated DO, typically June-September.
Response Required
Please respond in writing to the DWQ within 30 days of the date of this letter to verify that
you have received this letter and that you remain interested in continuing to pursue
permitting of your project and will be providing the DWQ the requested information at a
later date. Please contact me in writing at the DWQ Washington Regional Office. If we
do not hear from you within 30 days, we will assume that you no longer want to pursue
this project and we will consider the project as withdrawn.
Please be aware that you have no authorization under for this activity and any work
done within waters of the state would be a violation of North Carolina General Statutes
and Administrative Code. Please be advised, these violations and any future violations
are subject to a civil penalty assessment of up to $25,000.00 per day for each violation..
Please call Amy Adams of the Washington Regional Office at 252-948-3917or Ian
Mcmillian of the DWQ Central Office at 919-807-6364 if you have any questions
regarding or would like to set up a meeting to discuss this matter.
Sincerely,
-YY1,? C?rl'1?
;J
For Coleen H. Sullins
cc: Ian Mcmillian, WBSCAP Unit, Archdale Building Raleigh NC
WaRO File Copy
DCM, Roy Brownlow, Acting District Manager, Morehead City Office
Doug Hugget, Major Permits Coordinator, DCM, Morehead City Office
Brian Rubino, Quible & Assoc. PO Drawer 870 Kitty Hawk NC 27949
Filename: 06-19178V2_PelicanPointe_Hold/oa