From: Lucas, Annette
Sent: Wednesday, June 15, 2011 3:47 PM
To: Mcmillan, Ian; Phil May
Cc: 'Stephanie Sudano'; 'Canfield, Jim'; Lucas, Annette
Subject: RE: Town of Holly Springs - Friendship Site DWQ Project No. 10-0692
Phil,
I concur with your summary and your proposed plan for addressing the stormwater management on the site.
Thanks,
Annette
Annette M. Lucas, PE
Environmental Engineer
NCDENR DWQ Wetlands and Stormwater Branch
1650 Mail Service Center, Raleigh, NC 27699-1650 ?,l:ul)
512 N. Salisbury St, Raleigh, NC 27604 9th Floor -,, :ii i0>rn <?. I'. Phone: (919) 807-6381 1 Fax: (919) 807-6494 1 Email:
Website. http://portal.ncdenr.org/web/wq/swp/ws/401
?A Before printing this email, please consider your budget and the environment.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
From: Mcmillan, Ian
Sent: Wednesday, June 15, 2011 1:22 PM
To: Phil May; Lucas, Annette
Cc: 'Stephanie Sudano'; 'Canfield, Jim'
Subject: RE: Town of Holly Springs - Friendship Site DWQ Project No. 10-0692
Phil, that all sounds correct to me. - Ian McMillan
Ian J. McMillan, PWS, GISP
NCDENR/Division of Water Quality - Wetlands and Stormwater Branch
1650 Mail Service Center
Raleigh, NC 27699-1650
Office: (919) 807-6364
Fax: (919) 807-6494
Email: ian.mcmillan(a?nedenr.gov
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records I,aw and may be disclosed to third parties.
From: Phil May Imailto:phil.may(?)carolinaeco.com]
Sent: Wednesday, June 15, 20119:31 AM
To: Mcmillan, Ian; Lucas, Annette
Cc: 'Stephanie Sudano'; 'Canfield, Jim'
Subject: Town of Holly Springs - Friendship Site DWQ Project No. 10-0692
Ian & Annette,
As Annette and I discussed on the phone yesterday, this email is summarizing our recent conversations and gives an
overview of the response to your request for additional information.
The Town of Holly Springs plans to construct the utility lines to the Friendship Site. They will not be constructing any of
the infrastructure (roads, buildings, etc) on the site. However, based on numerous discussions over the last year or so,
the project purpose involves the Friendship Site therefore a NWP 39 was required. This made it necessary to deal with
both the eventual impacts on the site in our permit application. Withers & Ravenel have developed a conceptual site plan
that minimizes impacts as much as possible while presenting what we hope is the most accurate depiction of road
crossing locations. The site plan details will almost assuredly change once an industry chooses this site, but this plan
allowed the Corps to issue the 404 as a single and complete project.
In discussions with Ian, the NWP 39 requirements for a 401 Certification require a stormwater management plan. He
suggested that we provide a first phase stormwater design but the utilities alone could not be that first phase. Therefore,
W&R have developed a conceptual stormwater plan for the ring road on the site, and the Town has approved that concept
plan under condition that final designs will be submitted prior to construction of anything besides the utility lines, and this
submission would include a full stormwater design with BMP information. In talking with you both it seems like this was an
acceptable compromise that allows the Town to provide the utilities without someone having to pay for full engineering
design of the site more than one time.
I hope this summarizes where we are on this project. If you have any additional questions please let me know.
Thanks
Phil