Loading...
HomeMy WebLinkAbout20110653 Ver 1_CAMA Application_20110712Beverly Eaves Perdue Governor July 7, 2011 A?? 20110 NCDENt North Carolina Department of Environment and Natural Resources Division of Coastal Management James H. Gregson Director MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Karen Higgins Division of Water Quality Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Carrot Island Properties Family Limited Partnership 65a Dee Freeman Secretary Carteret County, 805 Front Street, adjacent to Taylor's Creek, in the Town of Beaufort. Proposed Project: Proposes maintenance excavation, the addition of two finger piers, covered gazebo and two additional slips with boatlifts at the existing one slip docking facility. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 27, 2011. If you have any questions regarding the proposed project, please contact Heather Styron at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Ave., Morehead City, NC 28557 One Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nccoastalmanagement.net NofthCarohna An Equal Opportunity \ Affirmative Action Employer Naturallb, DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Carrot Island Properties Family Limited Partnership (Doug Brady) 2. LOCATION OF PROJECT SITE: 805 Front Street adjacent to Taylors Creek, Beaufort, Carteret County Photo Index - 2000: 42-541 grid E (8), F (8) 2006: 42-6408 grid T (6) State Plane Coordinates - X: 2702878.685 Y: 359188.930 Rover # J062116A LAT 34°42'51.01608 LON 76°39'39.16327 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE:Dates of Site Visit- 6/7/11, 6/21/11 Was Applicant Present No, No 5. PROCESSING PROCEDURE: Application Received - 6/9/11 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Town of Beaufort 11/26/2007 Land Classification from LUP - Medium Density Residential with Conservation (B) AEC(s) Involved: Public Trust Area, Estuarine Water (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Town of Beaufort Planned - none (F) Type of Structures: Existing - Existing dock with one slip, floating platform, deck, retaining wall and walkway Planned - Maintenance excavation, finger piers, platform with covered gazebo, addition of two slips with boatlifts. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water N/A N/A 340 ft2 Inc./shaded (B) Shallow Bottom 4,800 ft2 N/A N/A (D) Total Area Disturbed: 5,140 ft' (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The applicant is proposing maintenance excavation, the addition of two finger piers, covered gazebo and two additional slips with boatlifts at the existing one-slip docking facility. 9. Narrative Description: The Carrot Island Properties Limited Family Partnership project is located at 805 Front Street Carrot Island Properties Family Limited Partnership 805 Front Street Page 02 in Beaufort, Carteret County. Front Street is found by turning right off of Hwy 70 East (Cedar Street) onto Turner Street. Follow Turner Street until you come to the stop sign. Turn Left on Front Street and follow until you reach the 800 block. The site will be located on the north side of Taylors Creek at 805 Front Street. The entire tract is 14,484 square feet and is divided by Front Street. The project site (waterside parcel of Front Street) is 4,716 square feet and averages 3' in elevation above NHW. Currently on the site is an existing one-slip docking facility, retaining wall, kayak racks and walkway. The shoreline has a total length along the NHW contour of 68'. Along the shoreline is a 32' wide x 68' long expanse of Coastal Marsh that contains Smooth Cordgrass (Spartina alterniflora), Salt Meadow Cordgrass (Spartinapatens), Carolina Sea Lavender (Limonium carolinianum) and Glasswort (Salicomia). The high ground portion of the tract is vegetated with upland grasses, landscaped vegetation and one cedar tree. The Division of Water Quality classifies this area as SC Waters. Taylors Creek is not a Primary Nursery Area and is closed to the taking of shellfish. The Town of Beaufort's 2007 Land Use Plan classifies this area as Medium Density Residential with Conservation within the AECs. There is a Federal Channel within Taylors Creek with a setback of 61'. The width of Taylors Creek within this area is approximately 500'. There are residential docks to the east and west of the proposed project. Carrot Island is located across Taylors Creek (south) from the project property. 10. Protect Description: The applicant is proposing the addition of two slips with boatlifts to the existing one-slip facility (three slips total), maintenance excavation, two finger piers and one platform with a covered gazebo for private residential use. The site was previously permitted for high ground development thru Minor permit 03-11 which authorized grading and filling, a deck, wooden walkway, brick walkways, landscaping, landscape wall and wooden fence. The applicants are not proposing any new high ground development at this time. The existing docking facility currently has a 6' x 61' pier with a 10' x 40' floating platform, one slip and three existing tie pilings. The pier is approximately 18' from the existing floating platform which is accessed by an existing gangway. The existing tie pilings and a portion of the floating platform encroach within the USACOE channel harbor line setback approximately 1' to 33'( existing tie pilings), however are remaining as previously constructed. The existing floating platform is a distance of 30' from the edge of marsh. The applicants are proposing the addition of two slip areas directly behind the existing platform, to the existing one-slip docking facility. There would be two 10' x 10' boatlifts installed within the proposed slips. There would be two 3' x 10' finger piers, one 11' x 10' platform (which includes one of the 3' x 10 finger piers) with a covered, unenclosed gazebo (8' x 16'). The covered, unenclosed gazebo would incorporate the proposed platform, finger pier and a portion of the existing pier; however the roof drip line would remain within the new platform and existing pier boundaries. All parts of the new development would be approximately 1' to Carrot Island Properties Family Limited Partnership 805 Front Street Page 03 11' landward of the USACOE channel setback. According to the applicant the typical boat to be served would be center console, open runabout and have a typical length of 25'. The applicants are proposing to maintenance excavate an 80' wide x 60' long area to a final depth of -4' nlw. The average water depths are -1.2' nlw with connecting water depths an average of -6' nlw. A total of 497 cubic yards of sandy, silty material would be removed by a bucket to barge method and would be taken offsite to a preapproved spoil area, however the applicant did not specify if this area would be outside of any AEC. Per the applicants the excavation would remain a minimum of 5' from the existing coastal wetlands. There was no evidence of any shellfish resource or sav within this area. 11. Anticipated Impacts: The maintenance excavation would disturb an 80' wide x 60' long area (4,800 ft') of shallow bottom habitat. The final depth would be -4' nlw with a total of 497 cubic yards of material removed. The average water depths are -1.2' nlw with connecting water depths an average of -6' nlw. Installation of the new finger piers, new platform and new boatlifts would incorporate and shade an additional 340 ft' of open water and provide 3 permanent slip areas. No coastal marsh would be filled or excavated during this project. The maintenance excavation and installation of the platform, finger piers and boatlifts have the potential to cause temporary increases in turbidity during placement. There would be no new impacts and no new encroachment into the USACE harbor line setback with this project. HEATHER STYRON Morehead City July 6, 2011 BOOM uruemeN for Nalor Development Permit (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Carrot Island Properties Family Limited Partnership Project Name (if applicable) 805 Front Street Applicant 1: First Name Doug MI Last Name Brady Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 805 Front Street PO Box City Beaufort State NC ZIP 28516 Country USA Phone No. 252 - 241 - 2780 ext. FAX No. - - Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Stroud Engineering Pa Agent/ Contractor 1: First Name MI Last Name Ronald D Cullipher Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 151A Highway 24 - Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 247 - 747 9 ext. - - ext. FAX No. Contractor # Street Address (if different from above) City State ? RACE C IP Email JUN 9 2011 rcullipher@stroudengineer.com . <Form continues on back> DCM-MHD CITY' 252-808-2808 .. 1-888-4RCOAST :: www.necoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for. Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 805 Front Street SR 1312 Subdivision Name City State Zip Beaufort NC 28516- Phone No. Lot No. (s) (if many, attach additional page with list) 252 - 241 - 2780 ext. 1, , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Whiteoak Taylors Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. NNatural []Manmade []Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed NYes ?No work falls within. Beaufort 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 66 FT 4716 sf c. Size of individual lot(s) d. Approximt to elevation of tract above NHW (normal high water) or 4716 sf, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3 ®NHW or ?NWL e. Vegetation on tract Coastal Marsh, Grass, Coastal Scrub, Trees f. Man-made features and uses now on tract Residential Existing Dock, Floating Platform, Deck, 1 wetslip, retaining wall, 6 ft wood walkway g. Identify and describe the existing land uses adiacent to the proposed project site. Residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R8 (Attach zoning compliance certificate, if applicable) - NYes ?No ?NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes NNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ? s NNo ?NA RE WrVED If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a EjYe o 91gfll National Register listed or eligible property? I DCrvt-MRI) Crrx <Form continues on next page> 252-808-2808 :: +1-888-4RCOAST :. www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ?No (ii) Are there coastal wetlands on the site? ®Yes ?No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Town of Beaufort o. Describe existing drinking water supply source. Town of Beaufort p. Describe existing storm water management or treatment systems. None Existing 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Covered Gazebo and 2 boat lifts for residential use. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Standard construction methodology, Barge, backhoe, Excavator, Stored onsite d. List all development activities you propose. Dredging, Covered Gazebo, Two 3 ft wide wood finger piers, and two boatlifts e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 0 ®Sq.Ft or ?Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ?No ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None Existing, None Proposed i. Will wastewater or stormwater be discharged into a wetland? es If yes, will this discharged water be of the, same salinity as the receiving water? YesJDNo j. Is there any mitigation proposed? 4Yes ®No. ?NA If yes, attach a mitigation proposal. - "...u 411 f <Form continues on back> 252-808-2808 .. 1-888-4RCOAST :. www.necoastaimanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for, Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name N. B. Barnhardt Phone No. Address 2506 Silas Creek Pkwy, Winston Salem, NC 27103 Name Loretta Taylor Phone No. Address 21 E. Custis Ave, Alexandria, VA 22301 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Minor # 03-11 Dated 3/30/11 Carrot Island Properties Family Limited Partnership h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7, Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Doug Brady ?y (A-9 Signature ? °"?'`e/ G??`??ll _ P-ECEIVED f Please indicate application attachments pertaining to your proposed project. ? j? ®DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and CulvueNs 9 2011 ?DCM MP-3 Upland Development ®DCM MP-4 Structures Information DCA;-jVI1-ID CITE' 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization) Length 60 Width 80 Avg. Existing -1 2 NLW NA NA -` Depth . Final Project -4 NLW NA NA Depth 9. EXCAVATION ?This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Silt and Sand 497 c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ®None (ii) Describe the purpose of the excavation in these areas: d. High-ground excavation in cubic yards. 0 2. DISPOSAL OF EXCAVATED MATERIAL ?This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Bucket to Barge. Taken to DCM pre approved spoils area NA c. (i) Do you claim title to disposal area? ?Yes ?No NNA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW) submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ®None (ii) Describe the purpose of disposal in these areas: d. (i) Will a disposal area be available for future maintenance? ?Yes NNo ?NA (ii) If yes, where? f. (i) Does the dispospi incluQ>Mg in the water? ?Yes NNo IONA (ii) If yes, how much waVrea i a7?jtrd? FJt::ivi-MHD Cffy 252-808-2808 :: 1-888-4RCOAST :: www.ncc02st2lm2nagement.net revised: 12/26106 ? -ail E,.COVa ti a ... ?.:..$.-caFJ:atu'S5'i a :Ed u': tty Pa je t of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: ?Bulkhead ?Riprap ?Breakwater/Sill ?Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level Bulkhead backfill Riprap Breakwater/Sill Other L Source of fill material. b. Length: Width: d. Maximum distance waterward of NHW or NWL: f. (i) Has there been shoreline erosion during preceding 12 months? ?Yes ?No ?NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) s. (i) Will fill material be brouqht to the site? ?Yes ?No ?NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Bucket to Barge, No spoils will be stored onsite. Spoils will be Excavator & barge deposited at DCM preapproved spoils site c. (i) Will navigational aids be required as a result of the project? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. RECEIVED d. (i) Will wetlands be crossed in transporting equipment to project site? ?Yes ®No ?NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Date 805 Front Street Doug Brady Appli t Name 0CM-M Z DCI Applicant Signature Project Name 252-808-2808:- 1-888-4RCOAST :: www.nccoastaImanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ?This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ?Commercial ?Public/Government NPrivate/Community ?Yes NNo c. (i) Dock(s) and/or pier(s) (ii) Number NA (iii) Length NA (iv) Width NA (v) Floating ?Yes ?No e. (i) Are Platforms included? NYes ?No If yes: (ii) Number 1 (iii) Length 10 FT (iv) Width 8 FT (v) Floating ?Yes NNo Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 2 (ii) Number of slips existing 1 d. (i) Are Finger If yes: (ii) Number (iii) Length (iv) Width (v) Floating Piers included? NYes ?No 2 10 FT 3 FT ?Yes NNo i. Check the proposed type of siting: ? Land cut and access channel NOpen water; dredging for basin and/or channel ?Open water; no dredging required ?Other; please describe: k. Typical boat length: 25' m. (i) Will the facility have tie pilings? ?Yes NNo (ii) If yes number of tie pilings? f. (i) Are Boatlifts included? NYes ?No If yes: (ii) Number 2 (iii) Length 10 FT (iv) Width 10 FT h. Check all the types of services to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies N Dockage ("wet slips") only, number of slips: 3 ? Dry storage; number of boats: ? Boat ramp(s); number of boat ramps: ? Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Center Console, Open Runabout RECEWED JUN 9 `1011 1. (i) Will the facility be;3t -td"Ql ral public? ?Yes NNo 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 u k.ara'a`'. v.rM OT1- °4 (.::tY:ses64res, Pcgge 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS 0This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ? Office Toilets ? Toilets for patrons; Number: ; Location: ? Showers ? Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? RECEIVED 711 1. If this project is an expansion of an existing marina, what types of services are currently provided? DCM-MHD CITY m. Is the marina/docking facility proposed within a primary or secondary nursery area? ?Yes ?No 252-808-2808 :: 1-888-4RCOAST :: www.necoastaimanagement.net revised: 12/27/06 x.. "s:u.atc%es, ea;, a 3 of mr n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ?No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW [--ISAV MSB ?WL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Isthe boathouse structure(s): []Commercial ?Public/Government []Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) 0This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ` NThis section not applicable' a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS 0This `section not applicable a. Is the structure(s): []Commercial ?Public/Government []Private/Community c• Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. b. Number d. Description of buo (color, ft' size, anchor, etc.) IUN lii! DCMf-M-H e. Arc of the swing 7. GENERAL 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27106 (?-.euce€.i3'ds, Page Ga of err a. Proximity of structure(s) to adjacent riparian property lines 15 Ft b. Proximity of structure(s) to adjacent docking facilities. 104 FT EAST, 150 FT WEST Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body +- 500 FT d. Water depth at waterward end of structure at NLW or NWL 1.0 NLW e. (i) Will navigational aids be required as a result of the volecs? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ®This section not applicable a. Give complete description: 8 ft by 10 ft covered gazebo D Date 805 Front Street Project Name Doug Brady Applicant Name e a/01 ue"- Applicant Signature ItECEWED JUN 9 '1f111 i DCM-MHD CITY 252-808-2808:.- 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12127/06 STROUD ENGINEERING, RA. CONSULTING ENGINEERS HESTRON PLAZA TWO 151-A HWY. 24 MOREHEAD CITY, NORTH CAROLINA 28557 (252) 247-7479 May 25, 2011 Heather Styron Morehead City DCM 400 Commerce Ave. Morehead City, NC 28557 RE: 805 Front Street Major CAMA Narrative rkl. c?o?a `l7 Carrot Island Properties Family Limited Partnership proposes to construct two boat lifts, with associated finger piers and dredge, at 805 Front Street in Beaufort, NC as shown in the attached plans. The existing 6 foot wide fixed wooden dock and 10'x40 existing floating platform will not be modified or removed. Currently there is 1 boat slip in use with associated tie piles. The two proposed boat lifts will be constructed landward of the existing floating platform. Two 3 foot wide finger piers will be constructed to access the boat lifts. A covered gazebo is also proposed as shown in the attached plans. All new work shall be constructed landward of the US Army Corps of Engineers established Harbor Line. The owner also proposes to dredge approximately 497 CY of silt and sand in the vicinity of the existing floating dock and two proposed boat lifts with a bucket to barge contractor. All dredging will maintain a 10 foot setback off of the existing wetlands areas ensuring that no wetlands will be impacted. The proposed dredge depth is a -4.0 at NLW. David Gambardella 107 COMMERCE ST. HESTRON PLAZA TWO SUITE B 102-D CINEMA DRIVE 151-A HWY. 24 GREENVILLE, NC 27858 WILMINGTON, NC 28403 MOREHEAD CITY, NC 28557 (252) 756-9352 (910) 815-0775 (252) 247-7479 V ~ ~ \ e .:urn v 4~` Q`4 r d• " (9Wo ~ Z a x.• O 9' ~ ' ~ ~N~('p ` \ ' 1 „9 ~ EX. CONCRETE ,,\,~Sqc ~ ~ t10~ I ~ 1Df 1 = RETAiN1NG WALL ~ . ~y ' ~ l F yq9 ~w~® "gw.' A K F R B C 0 CU 8 e OR ~Q'• a '~F, ` ~ ` ~ /,y ~ tiG ~ ~ \ ~ \ / \ / \ \ ~ 4 \ \ \ \ 9 \ \`F ~ EX ADJACENT OOF DOCK ~ ~ A \ 0,c ~ , ~ 9 ~Sq ~ ~ sire E3P \ Co \ \ CF Oy~~~ ` ~ ~ / 6g N/F \ /~F S 9 \ \ TAY~ORSCHEEK BAANHARDT.N 8 EXISTING LANDSCAPE / \wq( F~ \ \ D$527 PG92 TIMBER WALL ~ ® \ \ NCPINt730506298206000 6'~ \ \ \ \ ® SC° LINER N \ \ ~ \ \ ® i ~ ~ V Y N MA /i \ \ ~ R(PARI ~ LfNE PORTION OF THE TOWN OF BEAUFORT ~ o° ~ EX. WOODEN FENCE ® \ \ \ ~ 8 GATE ® \ \ \ ® \ \ 9 o \ \ \ ,0 GRASS \ I ~ \ \ • ~ \ \ e / \ \ ~ OOC OJACENT / / ~ ~ ~ \ / / v ® \ / ~ / \ /~o~ \ EXISTING WOOD ® / \ ~ Q / ® \ e \ ~ ~ RETAINING WALL \ p \ ~ ,o ~ eee \ \e f,9 \OS TOP OF WALL 3,8 F / ` ~ \ C Tp \ Q Q~ / ee® \ \ \ \ i ~ ~ • ~STgMF CF yq \ ~!y \ / GRASS / qY \ / / ® \ \ i ~ ~ !y F \ -C. / \ ~ \ / ~ ~Fp ~ \ \ 30' \ / / a \A _ - ~ ~ OF0~0 \ \ S ~~F \ F \ ~ ~ A~ q ~ \ \ 1 \ USAGE GHANNEL " USAGE Mh;•. 0 F CygM -EDGE OF MARKER 7 y:• F 0 ~F( \ / GRASS \ / ~ / \ \ / / \ \ / T '0F \ / \ \ eR'~M \ \ / \ /c~ rT \ ~ EXISTING LANDSCAPE NOTE: OSACF 4.19 \ \ FQ \ / N33° 37' 00"E / / \ ~q( \ / ~°j TIMBER WALL \ ~ l / \ / \ 4 \ / ~ \ / r / / ~.°j t . USAGE CHANNEL AL I GNMENT d MARKERS cHA^'NFi , / ~ FROM USAGE: TAYLORS CREEK RANGE 9 SURVEY ~y / ~ / \ / 2. ADJACENT DOCKAGE HAS BEEN DIGITIZED FROM USAGE BACK RANGE ~ \ cRass \ / \ / \ / \ / ~ i CARTERET COUNTY GIS LIGHT - BEAUFORT / ~ - , ~ \ r /4 INLET 4~ ~ ~ ~ / b' N/F ~ ~ ~ ~ TAYLOR,LORETTA L/T _ / _ _ S 3 EX. SIGN / BUFF 08654 PG32 ~ ~ ~ ~ ~ • - SS° 4 \ fR / ~ NCPIN:730506299266000 ~ ~ ~ ~ ~ ~ ~ ~ ~ 4S' ~ / PERMITTED 20 SF WOOD DECK / ~ / F ~ °'o ~ / ~ / / \y / / ~ ~ EXISTING MARSH / ~ / - _ - - ° EXlST1NG MARSH / / y' ~ I / ~ ~ COASTAL -COASTAL WETLANDS ~ \ - - _ ~ \ \ \ ~ ~ J~ ~ ~ J~~ ~ ~ ~ ~ \ ~s / / s 9 q S CARROT ISLAND \ / zs-of , ' ,.eo v / ~ ~ / f \ 00 / ~ / V/ f' _ _ ~ S73°27'00"E \ / ~ N / / 6.80 ' , - \ ~ / ~ - - ECM S33°39' 19"W USAGE CHANNEL UIEW \ / ~ SCALE: 1 " = 100` \ / -0.90 / ~ ~ I i ~ / ~ / ~ ~ ~ ~ ~ / ~ / / / / _ ~ ~ - / OP~9 f D ~ B TL If~T A ~G ~L~ ~ ~C-~ / SL ( u2 \ sIT~ NOTES / PROPERTY AREA = 40716 SF ,A A • oo ~ xacaly~ ~ \ \ / EXISTING DOCK. P ROX v' EX. FLO ING / \ \ / ELEV. 4.3 ~ LENGTH OF SHORELINE = 68 FT `p`',/ DOCK TOR AIN \ O / ~ y07~ DECKING ALLOWED = 544 SF Q / \ ,y / PROPOSED v. / \ \ / EREO / \ GAZ WATERWARD EDGE OF MARSH EXa FLOATING BOCK = 400 SF \ \ ~c~~mCr~ PROPOSED GAZEBp PIERS _ 80 SF \ \p / PROPOSED 3 FT -2sra / ~ \ ~e\ j o \ WOOD f INGER PIER TOTAL = 540 S1: / \ \ \ PROPOSED./ / V -0.88 \ FINGER / z PROPOSED / \ \ / PIER z \ PROPOSED BOAT LIFT DREDGING SF = q ®800 SF covEREO EXm AVG. DEPTH= -1.2 NLW GAZEBO PROPOSED DEPTH= -4.0 NLW / / 3 . \ \ \ PROPOS / 9s \ \ BOATL I F / \ / SLIP st3 oocKTING - DREDGE AMOUNT = 497 CY / / \ BULKHEAD 6.30 / \ / 0 - EX. SLlP \ / 0.00 EX. MARSH so A ~ \ AREA EX. FLOATING DOCK TO REMAIN 0 / -2.10 1 / A ~ urdt~ i~ ~ i i vv f vH w, h~ 0 / \ i ~ - N.H.W. EL 3.1 - ~ `r fi i . ir~ fr r \ ~~ACRES ~y -1.2~ \ ' ~ ~~i~ ~ 7 ~ N.L.W. 0.00 AEC -AREA OF ENVIRONMENTAL CONCERN / ~ II ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ COE -CORPS OF ENGINEERS EX. TIE PILES / ~ f r ~ ~ ~ ~ ~ ` r ` ~ EX. GRADE REVISIONS D8 -DEED BOOK Tp REMAIN / / ~ pREGING AREA SqC I{' % ' ?.r~,, EIR -EXI5T)NG IRON RDD _q / -4.00 NLW Fy - - - i. ~ . , , • ;y `fi`g, ~ r l - - , /n~ ~ 1, 0 ~ ~ Na 8Y DATE DESCRIPTION ELEC -ELECTRIC qy EX -EXISTING 'tiQ ~~9 , ~ ~ r r~~ ; ~ DREDGE TO r DW 6.8-11 CAMA REV~S~ONS • ~ ~ ~ -4.0 NLW INV -INVERT 0 / ,/P IRS -IRON ROD STAKE 7.9D 0 /~Q tiF MB -MAP BOOK 0 , Q, NHW -NORMAL HIGH WATER -I,y~ NLW -NORMAL LOW WATER / N/f -NOW OR FOR?~RLY -4.80 PG -PACE POB -POINT OF BEGINNING j RCP -REINFORCED CONCRETE PIPE R/w -RIGHT OF war / SED -SEDIMENT 0 ~ / MAJOR CAMA PLAN SF -SQUARE FEET ~ -5.&0 TELE PED TELEPHONE PEDESTAL /S B" TIP PILES 805 FRONT STREET 0~ ° / 8 FT MIN EMBEDMENT wErLANOS eELOw NHw BEAUFORT, CARTERET COUNTY, NORTH CAROLINA WETLANDS ABOVE NHW i DREDGING 0 0 -5.90 4.60 DOCK SECTION - A A CL [ENT ® F AMR~Y L SM I T~DPP~RTNERSH I P DERDCNED ; NHW/AEC LINE NTS ADDRESS 805 FRONT STREET DRAWN: SCAE,E: - - - EI(15TING STRUCTURES 0 ®®®®®iolilehP/p~® BEAUFORT, NC 28516 ROC .®_~cH CaRn,°®o rhurubtu DiKULiunto -5.em Q~,•°Ftissie•titi9•®® PHONE: 252-241-2780 CHECKED: 0- ac Ex. DEPTHS N LW eQO tit's $ RDC APPROVED: SEAL ST U ENGINEERING, PA. 10 5 0 10 20 13343 RDC SHEET #j OF 1 ISIA HIGHWAY 24 MOREHEAD CITY, N.C. 28557 D4A PROJECT #:PM1070-6 SCALE:1"=10' GI( 47-7479 CENSE NO. C-0647 DESIGN FILE #:1070-*PM1070-6 FRONT STREET*PM1070 TOPO.DGN 44 S: AL D. CULL PHER .E. 1 "=10'