HomeMy WebLinkAbout20081754 Ver 1_Site Inspection_20110711North Carolina
Beverly Eaves Perdue
Governor
e~~
~~-
NCDENR
Department of Environment and
Division of Water Quality
Coleen H. Sullins
Director
July 11, 2011
Mr. J. B. Setzer. P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sytva, North Carolina 28779
Subject: Inspection
US Highway 25
DWQ Project 08-1754
TIP No. R-505
Henderson County
Dear Mr. Setzer:
Dee Freeman
Secretary
On July 7, 2011, I inspected the construction work on US Highway 25 between Interstate 26 and NC Highway
225 in Henderson County. Roadway paving and shoulder work are taking place along the entire length of the
project.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect downstream waters. Please refer to the attached copy of the inspection report
for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
~~~~~
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
~ Transportation-Permitting-Unit'
Mike Parker, Asheville Regional Office
US 25 Inspection Letter July 201 I
SURFACE WATER PROTECTION SECTION -Asheville Regional ONlce
2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX:828-299-7043
Customer Service: 1 A77-fi23-6748
Internet www.ncwatemualiN.om
An Equal OpDOtluniry \ Affirmative Action Employer
l
Natural Resources
NorthCarolina
~Vaturallr~
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: lulu 7, 201 I
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ^ Complaint
^DWQ Follow Up Evaluation ^ Other
DWQ 401 #: OS-1754 NW Permit #. IP #:
Project Name
Location of Project:
U S Hiehwav 25-1-26 Connector R-505
U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County
Project Complete: ^Yes X No
Activities (DOT):
^ Bridge
X^ Culvert
^ Bottomless Culvert
^ Bottomless Arch
X^ Riprap Inlet/Outlet Stabilization
^ Spoil Pile
^ Borrow Pit
^ Wetland Mitigation
^ Stream Restoration
^ On-site Stream Relocation
^ Buffer Restoration
X^ Bank Stabilization
^ Other
If no, estimated date of completion:
Steam Standards Violation
~ Turbidity
Evidence of spills
Oil/Petroleum
Solid Waste
Failed E & S control measures
] Sedimentation Impacts
Stormwater Permit Violation
~ Fill
Buffer Impacts (see below)
Other
Additional Wetland Impacts: ^ yes X^ no Estimated Acres
^ Zone I Est Acres ~ ^ Zone 2 Est Acres
Additional Stream Impacts: ^ yes X^ no Est Linear feet
Estimated linear feet of impact:
Bulfer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba
Zone 1: ^Yes ^No Est linear ft/ acreage of buffer impact ~ ac
Zone 2: ^Yes ^No Est linear f~/ acreage of buffer impact ft/ ac
Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited
DWO Site Visits for DOT Projects
Background Info
Name of Waterway(s):
Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek ,
Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch,
Jones Creek
Basin/ Subbasin: Broad 030501
Wetland Type: ^Isolated x^Non-Isolated (Waters of US)
Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB
X^Class C ^ORW X^Trout ^WS-F[I ^NSW
X^HQW ^WS-1 ^WS-fV ^SA ^CA
Type of Authorized Impact: X^Culvert ^Bottomless Culvert
^Bridge ^Bottomless Arch
X^Riprap Inlet/Outlet Stabilization X^Fill
Authorized Wetland Impacts: X^0- 1/10`h acre ^1/I ld'to 1/3`d acre
^ 1/3rd to 1.0 acre ^> 1.0 acre
Authorized Stream Impacts: ^< 150 linear feet X^> I50 linear feet 1,346 linear feet
Additional comments:
1. Construction work is complete except for paving, shoulder work and fmal seeding.
2. Seed, mulch and/or matt all disturbed areas on the project.
3. Continue to maintain all sediment and erosion control devices and seed, mulch and matt all disturbed areas to
protect State surface waters.
US Highway 25 Inspection July 2011