Loading...
HomeMy WebLinkAbout20081754 Ver 1_Site Inspection_20110711North Carolina Beverly Eaves Perdue Governor e~~ ~~- NCDENR Department of Environment and Division of Water Quality Coleen H. Sullins Director July 11, 2011 Mr. J. B. Setzer. P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sytva, North Carolina 28779 Subject: Inspection US Highway 25 DWQ Project 08-1754 TIP No. R-505 Henderson County Dear Mr. Setzer: Dee Freeman Secretary On July 7, 2011, I inspected the construction work on US Highway 25 between Interstate 26 and NC Highway 225 in Henderson County. Roadway paving and shoulder work are taking place along the entire length of the project. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. Please refer to the attached copy of the inspection report for additional comments regarding the inspection. If you have questions, please call me at 828-296-4500. Sincerely, ~~~~~ Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental ~ Transportation-Permitting-Unit' Mike Parker, Asheville Regional Office US 25 Inspection Letter July 201 I SURFACE WATER PROTECTION SECTION -Asheville Regional ONlce 2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX:828-299-7043 Customer Service: 1 A77-fi23-6748 Internet www.ncwatemualiN.om An Equal OpDOtluniry \ Affirmative Action Employer l Natural Resources NorthCarolina ~Vaturallr~ DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: lulu 7, 201 I County: Henderson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ^ Complaint ^DWQ Follow Up Evaluation ^ Other DWQ 401 #: OS-1754 NW Permit #. IP #: Project Name Location of Project: U S Hiehwav 25-1-26 Connector R-505 U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County Project Complete: ^Yes X No Activities (DOT): ^ Bridge X^ Culvert ^ Bottomless Culvert ^ Bottomless Arch X^ Riprap Inlet/Outlet Stabilization ^ Spoil Pile ^ Borrow Pit ^ Wetland Mitigation ^ Stream Restoration ^ On-site Stream Relocation ^ Buffer Restoration X^ Bank Stabilization ^ Other If no, estimated date of completion: Steam Standards Violation ~ Turbidity Evidence of spills Oil/Petroleum Solid Waste Failed E & S control measures ] Sedimentation Impacts Stormwater Permit Violation ~ Fill Buffer Impacts (see below) Other Additional Wetland Impacts: ^ yes X^ no Estimated Acres ^ Zone I Est Acres ~ ^ Zone 2 Est Acres Additional Stream Impacts: ^ yes X^ no Est Linear feet Estimated linear feet of impact: Bulfer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba Zone 1: ^Yes ^No Est linear ft/ acreage of buffer impact ~ ac Zone 2: ^Yes ^No Est linear f~/ acreage of buffer impact ft/ ac Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited DWO Site Visits for DOT Projects Background Info Name of Waterway(s): Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek , Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch, Jones Creek Basin/ Subbasin: Broad 030501 Wetland Type: ^Isolated x^Non-Isolated (Waters of US) Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB X^Class C ^ORW X^Trout ^WS-F[I ^NSW X^HQW ^WS-1 ^WS-fV ^SA ^CA Type of Authorized Impact: X^Culvert ^Bottomless Culvert ^Bridge ^Bottomless Arch X^Riprap Inlet/Outlet Stabilization X^Fill Authorized Wetland Impacts: X^0- 1/10`h acre ^1/I ld'to 1/3`d acre ^ 1/3rd to 1.0 acre ^> 1.0 acre Authorized Stream Impacts: ^< 150 linear feet X^> I50 linear feet 1,346 linear feet Additional comments: 1. Construction work is complete except for paving, shoulder work and fmal seeding. 2. Seed, mulch and/or matt all disturbed areas on the project. 3. Continue to maintain all sediment and erosion control devices and seed, mulch and matt all disturbed areas to protect State surface waters. US Highway 25 Inspection July 2011