HomeMy WebLinkAbout20110527 Ver 1_More Info Received_20110708A WA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
June 17, 2011
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Chester Griffin
53 Lake Royale
Louisburg, NC 27549
Subject Property: 731 Sagamore Drive
Lake Royale [030301, 28-31-(1), B, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Griffin:
Dee Freeman
Secretary
DWQ Project # 201 1-0527
Franklin County
DENR
VYetlnd ?ATEp C)T,%l._(Tv }
'?--??? ?„?-rr?a:ar Baanrt??
On May 27, 2011, the Division of Water Quality (DWQ) received your application dated May 23, 2011 to
impact an unknown amount of Zone 1 and Zone 2 protected riparian buffers to construct the proposed
retaining wall at the site. The DWQ has determined that your application was incomplete and/or provided
inaccurate information as discussed below. The DWQ will require additional information in order to
process your application to impact protected wetlands and/or streams on the subject property. Therefore,
unless we receive five copies of the additional information requested below, we will place this project on
hold as incomplete until we receive this additional information. If we do not receive the requested
information, your project will be formally returned as incomplete. Please provide the following
information so that we may continue to review your project.
Additional Information Requested:
1. Please complete Section C.6 of your application (Buffer Impacts Table).
2. Please locate all the protected riparian buffers as overlays on the site plan, clearly showing Zone
1 and Zone 2.
Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this
information to me. If you will not be able to provide the requested information within that timeframe,
please provide written confirmation that you intend to provide the requested information, and include a
specific timetable delineating when the requested materials will be provided. If we do not hear from you
in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider
the project as returned.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or
protected buffers. Please be aware that any impacts requested within your application are not authorized (at
this time) by the DWQ. Please call Ms. Amy Chapman or Ms. Karen Higgins at 919-807-6301 if you have
C/h -1
NorthCarofina
Nahlrallaff
Griffin
Page 2 of 2
June 17, 2011
any questions regarding or would like to set up a meeting to discuss this matter.
Sincerely,
c?
K en Higgi Supervisor
tlands, Bu ers, Stormwater, Compliance and Permitting Unit
KAH/asc
Enclosures: Section C.6 of your application
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
Harry Lee, leecarpenter@hughes.net
File Copy
Filename: 110527_731 SagamoreDrive(Franklin)TPBR_On_Hold
To whom it may concern
I would like to build a 6' high retaining wall 4' behind an existing seawall and I need the
forms for the permit. My land is slowly moving forward to the water and the proposed
retaining wall would hopefully stop this action. Attached are drawings of the proposed
retaining wall. I need to know what permits I need and where can I get the forms. You
may contact me at the following:
Chet Griffin
Mailing address: 53 Lake Royale, Lake Royale Subdivision, Louisburg NC 27549
Physical address: 731 Sagamore drive, Lake Royale Subdivision, Louisburg NC 27549
Cell: 919-610-7124
Home: 252-478-5336
Email: chetgriffm@hotmail.com
..a ? r
0
OENR -VA1i ?tl?f7r
a!e?ancls 8?n??e; Rirn;;i:
li-C)5a-)
Open Water Impacts
there are pro posed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or an other
e U.S. then ' list am open water, t?elow Y open water of
i• 4b.
Open water Name of waterbody 4c. 4d.
Mpact 4e.
(if applicable) Type of impact Waterbody Area of impact (acres)
mpanent (P or type
?e
I -
_ Choose one Choose
Choose one Choose
Choose one Choose
Choose one Choose
4f. Total open water ='z l?
V VI l n I lOt 115. _ --'-
Pond or Lake construction
and or lake construction . then the chart bekaw.
5a. 5b. 5c-5d. Se.
nd ID number Proposed use or Welland Impacts (acres)
Purpose of pond ) Stream impacts (feet) Upland
Choose one Flooded Filled Excavated Flooded Filled Excavated (mss)
Choose one
Page 5 of 10
View from top
House
Top of proposed retaining wall
I I
---------------
DE R
r®ua??& N TES`'' t
i I I
I_existmg _ I I
20' V L steps i_V 35'
--------------------------------------------I i---------------------------------------------
Top of existing sea wall
I
V
lllllllllllllUll/lll/l//llllllllll111lfllllllllllll6l'llUllllllllllllll/ll1/Ull/ll/li/llll111lllllllllll/l/l/lllllllllllllll
existing DOCK
I
I
VIEW FROM SIDE
house
Lm 0
l _! l 0 1 01, ' 1
DENR
WntlAntic. E4 .?sznr:'rSL i; a.t': 3rar9lXt
Proposed retaining wall 6' high 61' long----4
Land between proposed
retaining wall & sea
wall
L4'_V
jF------- Existing sea wall
61' long
WATER
VIEW FROM WATER
i l a naG
mS.?. ?.^a??u??iCr4
I I
i HOME I
I
Land
TOP of proposed retaining wall 6' high 55' long
exiting
!li111111!llllllllllllll11111111111111111111!!IIIIIillllllilllll_steps1111111111111111111111111111111!1111!!IIIIIIIlIIli1111i1111illlllllllllllllllll11111!liilllllll
1111111!11Ill 1!111111111Ill 1111111!11111111VIIIII IIIIIIIIIll IIII 6'?I1111111111!IIIIiIIIIII111111111111111111111111L1l1111111111111!1!!lIIIII lllll!I!!iil!1111iii
IIIIIIIIIIIIIIIIIIIIILIIIIIIIIIIIIIIIIIIIIIIIIIIIII!Illllllllllil LiIIIIIIII11Ill11!11111111III!IIIII!IIIIIIIi1111111.llllllHill IIIlllillIIIIIIIIIIIIHIMIII1.11
Top of existing sea wall 61'
Ivvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvlvvvlvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvwvvvvvwvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvl
iwvvvvvvwvvvvvvvvvvvvvvvwvlvvvvvvvvvvvvvvvlvvvvvvvvvvvvvvvvvvvvvvvvuvvvlvvvwvvvvvvvvvvvvvvvvvvvwvvvvvvvvvvvvvvvvvvvvvvvvwl
',
)))))))))))))))))))))))))))))))WATER))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))
I i - OS a-7
Open Water knpacts -
there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
e U.S. then individual list all open water im below.
1. 4b. 4c. 4d. 4e.
Open water Name of waterbody
mpact number d a
:rmanent (P) or pplble) TYP@ of impact Waterbody area of impact (acres)
tYPe
rempgrag
Choose one
Choose
Choose one Choose
Choose one Choose
Choose one Choose
4f. Total open water impacts
%;omments: -
Pond or Lake Construction
and or lake construction then the chart below. .49 5a. 5b. 5c. 5d.
nd ID number Proposed use or 5e.
purpose of pond Wetland Impacts (acres) Stream Impacts (feet) Upland
Flooded Filled Excavated Flooded Filled Excavated aaw)
Choose one
Choose one
5f. Total:
comments: d
s a dam high hazard permit
required? 0 Yes No If yes, permit ID no:
Apected pond surface area (acres): i
.¢e of pond watershed (acres); .,
1Aethod of construction:
rf / ws& YeslNo
Yesft
Yes/No
Yesft
YesMo
6h. Total Buffer knoacts.
e
c ?- L1 tJi!
f
Page 5 of 10