Loading...
HomeMy WebLinkAbout20091318 Ver 2_Stormwater Approval_2011070674 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Dr. David Linzey Linzey Enterprises LLC 1267 Hopewell Church Road Boone, NC 28607 Division of Water Quality Coleen H. Sullins Director July 6, 2011 Subject Property: Boone Emergency Vet Clinic APPROVAL OF MODIFIED STORMWATER MANAGEMENT PLAN Dear Mr. Barron: Dee Freeman Secretary Watauga County DWQ Project No. 09-1318v2 On March 1, 2011, the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to impact 48 linear feet of Hodges Creek and 0.098 acre of riparian wetland in order to construct the Boone Emergency Vet Clinic and associated parking in Watauga County. In conjunction with the Water Quality Certification, the DWQ also approved a stormwater management plan for the site. A revised stormwater management plan that proposes modifications to Level Spreader Number One, dated June 7, 2011, was received by the DWQ on June 10, 2011. These proposed modifications to Level Spreader Number One have been reviewed and have been found satisfies the storrriwater management requirements of the Water Quality Certification program. You are required to meet the following conditions: 1. The stormwater management system (consisting of two level spreaders and all associated appurtenances), all stormwater conveyances and the grading and drainage patterns depicted on the plans, as approved by this office must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the DWQ. The stormwater management structures shall have maintenance access to allow for the ability to maintain the structures, and to perform corrective actions. The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners. 2. All operation and maintenance activities shall be followed as stipulated in the Operation and Maintenance Agreement signed by you and notarized on January 12, 2010, and received in our office on January 26, 2010. 3. The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 512 North Salisbury Street Floor 9 Raleigh, North Carolina 27603 Phone: 919.807-63011 FAX: 919-807-6494 Internet: www.ncwaterquality.org An Equal opportunity 1 Affirmative Action Employer Dr. David Linzey July 6, 2011 Page 2 of 2 future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. This letter completes the review of the DWQ under Section 401 of the Clean Water Act. If you have any questions, please contact me at 919-807-6381. Sincerely, Annette Lucas, PE Wetlands, Buffers and Stormwater Compliance and Permitting (WeBSCAPe) Unit AML/aml cc: Tasha McCormick, USACE, Asheville Sue Homewood, DWQ Winston-Salem Regional Office John Vilas, ENV-ECS, 3764 Rominger Road, Banner Elk, NC 28604 File Copy 09131 "oEiuergericyVetCIiaic(Watauga)_SW_Mod_Approve.doc