HomeMy WebLinkAbout20110237 Ver 1_Stormwater Approval_20110705Beverly Eaves Perdue
Governor
i?
RUM
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
July 5, 2011
Dee Freeman
Secretary
DWQ Project # 11-0237
Watauga County
Mr. Steve Price
P.O. Box 2895
Boone, NC 28607
Subject Property:
Temple of the High Country
STORMWATER MANAGEMENT PLAN APPROVAL
Dear Mr. Price:
On March 7, 2011, the Division of Water Quality (DWQ) received a courtesy copy (dated March 7, 2011)
of your Pre-Construction Notification (PCN) form to impact 0.091 acre of wetland for the purpose of
constructing the proposed Temple of the High Country in Watauga County.
On June 10, 2011, the Division of Water Quality (DWQ) received a stormwater management plan
(dated June 6, 2011) for the Temple of the High Country project in order to meet the requirements of
General Water Quality Certification 3821 and the Protocol for 401 SMP Approval and
Implementation.
The DWQ has reviewed your SMP and supporting information, and approves the revised SMP to satisfy
the stormwater condition required by the 401 Certification.. This approval is for the purpose and design
described in your application. If you change your project, you must notify us and you may be required to
send us a new application. If the property is sold, the new owner must be given a copy of this approval
letter and is thereby responsible for complying with all conditions.
In order to maintain compliance with the approved SMP, please follow the conditions listed below:
1. Description of the SMP: The SMP approved by this office consists of one infiltration system and
all associated stormwater conveyances, inlet and outlet structures, the grading and drainage
patterns depicted on plan sheets dated June 3, 2011 (engineer's sealed date). No changes to the
structural stormwater practices shall be made without written authorization from the DWQ. The
stormwater management structures shall have maintenance access and at least a 10-foot drainage
easement on each side to allow for the ability to maintain the structures, and to perform corrective
actions. The stormwater easements shall be recorded to provide protection of the structures from
potential alterations by future property owners.
2. Operation and Maintenance of BMPs: The approved SMP must be maintained in perpetuity in
accordance with wet detention basin operation and maintenance (O & M) agreements signed by
Mr. Steven C. Price. The O & M agreements must transfer with the sale of the property or
transfer of ownership/responsibility for the BMP facilities. DWQ must be notified promptly of
every transfer.
Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe)
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Phone: 919-807-6301 1 FAX: 919-807-6494
Internet: http://portal.ncdenr.org/web/wq/ws
An Equal Opportunity \ Affirmative Action Employer t
Temple of the High Country
Page 2 of 2
July 5, 2011
Notification of Completion: The applicant and/or authorized agent shall contact the DWQ
WeBSCaPE Unit in writing at the letterhead address within thirty (30) calendar days of the
completion of construction.
Thank you for your attention to this matter. If you have any questions or wish to discuss these
matters further please do not hesitate to contact me at 919-807-6381.
Sincerely,
Annette M. Lucas, P.E.
Wetlands, Buffers and Stormwater Compliance and
Permitting (WeBSCaPe) Unit
AML/aml
cc: Sue Homewood, DWQ Winston-Salem Regional Office
Tasha McCormick, USACE Asheville Regulatory Field Office
File Copy
Mr. Chuck Lieberman, Board of Directors - President, P.O. Box 289, Boone, NC 286077
Filename: 100237TempleoftheHlghCountry(W atauga)_SW_Approve