Loading...
HomeMy WebLinkAbout20110521 Ver 1_Triage Comments_20110617Use this form instead of writing inside the folder Triage Comment Sheet DwQ# LDI-j 2 Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Date: Date: Date: ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) Issue with conditions (R ? iewer 1) Issue with conditions (Reviewer 2) V 11 ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage FormsMiage Issue Sheet.doc PLEASE PRINT CLEARLY Lucas, Annette From: Lucas, Annette Sent: Wednesday, June 15, 2011 12:14 PM To: Mcmillan, Ian Cc: Lucas, Annette Subject: 11-0521 Firestone Complete Auto Care Site condition Attachments: 11-0521 Firestone Complete Auto Care Site condition.docx Ian, I recommend conditional approval for this project. The condition is attached. Annette Annette M. Lucas, PE Environmental Engineer NCDENR DWQ Wetlands and Stormwater Branch 1650 Mail Service Center, Raleigh, NC 27699-1650 (1'Iail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (1,w >01,m (-v. P??rcF isj Phone: (919) 807-6381 1 Fax: (919) 807-6494 1 Email: Website http://portal.ncdenr.org/web/wq/swp/ws/401 k,A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 11-0521 Firestone Complete Auto Care Site condition AML comments June 15, 2011 1. Stormwater Management Plan (SMP) Approval Required You are required to provide documentation of the Town of Apex's approval of the stormwater management plan for this project by providing EITHER: A valid approval letter from the Town of Apex indicating that the proposed activity has an approved SMP and one copy of the approved SMP, including plan details on full-sized plan sheets, calculations and other supporting information, OR A set of stormwater plan details on full-sized plan sheets, calculations and operation and maintenance agreements stamped as "Approved" by the Town of Apex. The approved SMP must be submitted to the DWQ WEBSCAPE Unit before any impacts authorized in this certification occur. The following requirements also apply: The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site.. The approved SNIP as well as drainage patterns must be maintained in perpetuity. The SMP may not be modified without prior written authorization from the Town of Apex. A copy of the approval letter and the modified SMP must be submitted to the DWQ WEBSCAPE Unit prior to the commencement of the modifications.