Loading...
HomeMy WebLinkAbout20051477 Ver 3_Approval Letter_20110615NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director June 15, 2011 Pilot View Resource Conservation and Development Earl Sheppard 2714 Henning Drive Winston-Salem NC 27106 Subject: 401 Water Quality Certification - Approval Linville Restoration Project-Phase III DWQ Project # 05-1477V3 Avery County CTB / Linville Rvr (and UT's) / 11-29-(1) / C;Tr Dear Mr. Sheppard: Dee Freeman Secretary The Division of Water Quality has completed the review of your 401 Water Quality Certification application associated with the subject project listed above. Approval has been granted to place fill within or otherwise impact 0.18 acres of wetlands and 3,236 feet of streams and 3.49 acres of open waters for the purpose of restoration and enhancement at the subject property. This approval requires you to follow the conditions listed in the attached Certification and any additional conditions listed below. Project impacts are covered by General Water Quality Certification Number 3689. This Certification allows you to use Nationwide Permit 27 when issued by the US Army Corps of Engineers (USACE). Authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the corresponding USACE Permit Verification. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you proceed with your project including (but not limited to) Erosion and Sediment Control and Trout Buffer regulations. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and may be required to submit a new application. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification are met. No other impacts are approved including incidental impacts: Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-45001 FAX: 828-299-70431 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally Earl Sheppard-Linville River June 15, 2011 Page 2 of 2 Amount Approved (Units) Plan Location or Reference Stream 3,236 (feet) S1, S2, S3 404/CAMA Wetlands 0.18 (acres) W1 Waters 3.49 (acres) 01, 02, 03 Additional Conditions 1. Post-project monitoring - Submit as-built plans to DWQ, Asheville regional Office along with reference photos. Cross sectional and longitudinal measurements of the relocated channels shall be conducted at the end of years one (1), three (3) and five (5) after project completion. Results shall be reported, along with photo documentation, to DWQ, Asheville regional Office. If the monitoring results indicate that structural modifications or repairs are needed, approval shall be sought from the DWQ prior to implementation. Vegetation assessments shall also be made and reported in accordance with this monitoring schedule. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699- 6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of your application by the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Linda Wiggs in the Asheville Regional Office at 828-296-450. Sincerely, Coleen H. Sullins, Director CHS/Isw Enc: GC3689 Certificate of Completion cc: USACE Asheville Regulatory Field Office 401 Permitting Unit - Central Office File Copy Linville Resorts, Inc. PO Box 99 Linville NC 28646 Wildlands Engineering, Inc.-Matt Jenkins 1430 South Mint Street Suite 104 Charlotte, NC 28203 S:\SWP\Avery\401s\Non-DOT\Linville River V3\APRVL1invilleV3.June201 Ldoc