Loading...
HomeMy WebLinkAbout20070966 Ver 1_USACE Correspondence_20110602DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: May 27, 2011 Regulatory Division Action ID: No. 2007-01700 Mr. Bernie Grenon USPG Portfolio Two, LLC 3665 Fishinger Boulevard Hilliard, Ohio 43026 Dear Mr. Grenon: o1-ogLcLo Vk_L?/5z'I0L p jUN 2 2011 DENR WATER OUAL This letter confirms the receipt of the May 15, 2011 request to modify your Department of the Army permit issued on September 30, 2008 to straighten Center Drive and to expand the existing parking facility in the Cypress Bay Plaza Shopping Center. The project site is located west of the US Highway 70 and NC Hwy 24 intersection, at the headwaters of an unnamed tributary to Newport River, in Morehead City, Carteret County, North Carolina. Please reference the several telephone conversations and e-mail exchanges in February, March, and April 2011 between your agent, Mr. Michael Gasque of SE Construction, and Mr. Mickey Sugg of my regulatory staff. Specifically, your modification request relates to Special Condition (12) that requires compensatory mitigation by providing payment to the North Carolina Ecosystem Enhancement Program (NC EEP) at a 2:1 ratio. Since the time authorization was granted, the North Carolina Department of Transportation (NC DOT) Croatan Wetland Mitigation Bank, located approximately 3.5 miles north of Havelock in Craven County, was developed and has been approved for credit release to compensate for impacts to non-riparian wetland communities similar to the wetland type associated with your project. Your request is to substitute the use of the Croatan Wetland Mitigation Bank for the in-lieu fee program, NC EEP. In the request, it is stated that all other project aspects remain unchanged. Upon reviewing your proposal, our office confirms debiting credits from Croatan Wetland Mitigation Bank, in lieu of NC EEP, at a 1:1 ratio for the planned 0.86 acres of non-riparian wetland impacts. Construction within jurisdictional areas of the project site shall begin only after full payment is made to NC DOT and a copy of the payment documentation is provided to, and verified by, our office. -2- All Special Conditions, as prescribed in the September 30, 2008 authorization and enclosed in this correspondence, remain valid including notifying our office in writing prior to construction, as stated in Special Condition (7). Additionally, please be reminded that all construction must be completed by December 31, 2011. It is strongly recommended that you contact Ms. Joanne Steenhuis of North Carolina Division of Water Quality, at (910) 796-7306, in Wilmington to discuss any State requirement to modify the State 401 Water Quality Certification. If you have any questions or comments concerning this permit modification, please contact Mr. Sugg at (910) 251-4811, Wilmington Regulatory Field Office. Sincerely, Enclosures Copies Furnished: Ms. Linda Stabb, Planning Director Town of Morehead City Post Office Drawer M Morehead City, North Carolina 28557 Mr. Ian McMillan 401 Oversight/Express Review Permitting Unit / Division of Water Quality North Carolina Department of Environment and Natural Resources 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 A;Kl? Dale Beter, Chief Wilmington Regulatory Field Office Ms. Jennifer Derby, Chief Wetlands Section-Region IV Water Management Division US Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Ms. Joanne Steenhuis Division of Water Quality North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Ms. Linda Lewis Division of Water Quality Stormwater Department North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Mr. Dan Sams Division of Land Quality North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 -3- Mr. Michael Gasque SE Construction Resource Post Office Box 428 Piedmont, South Carolina 29673 Ms. Leilani Paugh North Carolina Department of Transportation 1 South Wilmington Street Raleigh North Carolina 27699-1548 Ms. Kelly Williams North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, North Carolina 27699-1652