Loading...
HomeMy WebLinkAbout20061292 Ver 2_More Info Received_2011061611111 11111 Jill 1111 FAST LANE PICKUP DATE t I PICKUP TIME 36627 DRIVER # OF PIECES-/WEIGHT _ 1jAM E D-A Z"-' BILL TO ' 'SHIPPER' RECEIVER 3RD PARTY NEXT DAY CAR VAN ROUND TRIP CHARGES FROM S & EC 11010 RAVEN RIDGE ROAD RALEIGH, NC 27614 846-5900 PROJECTI_ ?r? SIGNATURE ` l PRINT 828-0303 TO COMPANY NAME STREET ADDRESS!-,, 0 N. (I i?tjy CITY ST t. ZIP,--, 4:,u CONTACT NAME < r c:) 1 1,141 ?7 S / L. L J r .-?-!` , . r PHONE # ?;bq- L2 w DATE i r TIME Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com June 15, 2011 S&EC Project # 11258.P1 DWQ #: EXP 06-1292v2 NC Department of Environment and Natural Resources Division of Water Quality Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) Attn: Karen Higgins/Lia Gilleski 512 N. Salisbury Street (9th floor) Raleigh, NC 27604 Re: Request for More Information Response-EXPRESS REVIEW Fairfield Farms Subdivisions (Sections 4, 5 & 6) Cumberland County, NC To Ms. Higgins and Mrs. Gilleski: l?? n r '(f?UJ/? l0l? On June 7, 2011, S&EC received a copy of the Request for More Information letter for the Fairfield Farms Subdivision (Sections 4, 5 & 6). Since that time, the project engineer has been working on the requested information. As such, please see the attached response letter from Moorman, Kizer & Reitzel, Inc. along with referenced attachments. We anticipate that this answers all of the DWQ's questions in order to complete the final review process requested for the written concurrence of Water Quality Certification 3821. If you have any further questions or any additional explanation is needed, please don't hesitate to call. Sincerely, SOIL & ENVIRONMENTAL CONSULTANTS, PA Debbie Edwards Environmental Specialist ENGINEERS • PLANNERS ? SURVEYORS MOORN! KIZER & REITZEL, INC. June 14, 2011 North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands, Buffers, Stormwater, Compliance and Permitting Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Attn: Ms. Ua Gilleski Re: Fairfield Farms Subdivision (Sections 4, 5 and 6) DWQ #: EXP. 06-1292v2 Ms. Gilleski: 115 Broadfoot Ave. P.O. Box 53774 Fayetteville, NC 28305 (910) 484-5191 Fax:(910) 484-0388 www.mkrinc.com We are in receipt of your letter dated June 7, 2011, and offer the following responses to your comments: 1) Wet/and Impacts: Lots 64 and 109 show portions of the proposed houses being constructed on steep fill slopes It appears that these lots are not realistically developable without additional lot fill or retaining walls Please revise the fill on these lots and update the PCN wetland impacts if additional wetland impacts are necessary. Conversations with the developer indicate that the overwhelming majority of the homes built in previous sections of the subdivision are over crawl spaces, and it is certainly possible to build a home on slopes as shown by utilizing a crawl space design or retaining walls. Also, please remember that the lot layout drawings are meant to shown that a home could be built on the lot, not what is actually proposed. It is possible that a floor plan could be designed to better fit the lot. It should also be noted that the perimeter of the wetlands to be preserved shall be protected by installing continuous silt fence along and outside of the delineated wetland boundary, and that no construction activity shall be allowed in any wetland area that is not specifically permitted. This is indicated on the revised Grading Plans and on the Erosion Control Plan. 2) Please provide documentation that you have permission to place rip rap from the outlet of the wet pond on the Tonya Strickland property. The graphics for the rip rap apron were not drawn to scale. The apron can be installed without extending onto the adjacent property, and the graphics have been revised to reflect the actual design. (Please see Item #3 below.) 3) Please provide velocity calculations for the 10-storm discharge from both wet ponds, and the sizing information for the energy dissipater pads. In particular, please ensure that the discharge velocity from pond 2 to the adjacent wetland is less than 2fps Velocity calculations and energy dissipater sizing for all discharge points are attached. Response to DWQ WeRScaPe Comments Fairfield Farms, Section 4, 5 & 6 June 14, 2011 4) Please show the permanent pole top and bottom elevations of the vegetated shelf in the plan views for both wet detention basins (and probably hatch the shelf differently). Moreover, please correct the discrepancy in the permanent pool elevation for wet pond 1(126.5 vs 127) so that both the report and the grading plan match. The requested information has been added to the plans, the normal pool areas and vegetated shelf have been re-hatched to be more clearly understood and the elevation discrepancies have been corrected. 5) The width at the top of the forebay berm measures 4 tt in the plan view and not the 5 ft indicated in the cross section. Please revise the grading to ensure a minimum of 5 ft. The grading has been revised as requested. Please note that the additional width for the forebay weir reduced the volume of the temporary pool (VWQ) to less than the minimum required. The discharge control weir elevation has therefore been raised to provide additional storage volume. A revised PondPack report and Narrative of Design are attached. I trust that these responses will satisfy your request for more information. If you should have additional comments or questions, please do not hesitate to contact me or Mr. Jimmy Kizer at (910)484-5191. Thank you for your assistance with this project. Respectfully submitted, Reitzel, Inc. Mo man, Kizer & Blake Ball Senior Civil Designer Attachments: 2 copies Revised Plan Sheets 2 copies Revised Narrative 2 copies Revised Wet Detention Basin Supplement for Basin 1 2 copies Revised PondPack report for Basin 1 - Developed Condition 2 copies each velocity calculations and rip rap dissipater calculations Cc: File 98-1702-01 Brolanco (Mr. Dohn Broadwell, Sr.) Soil and Environmental Consultants, PA (Mr. Bob Zarzecki) g. Icurrentjobslbrolanco corporationl98-1702-01 fairfield farm - future sectionsicorrespondencelsection fourlresponse to dwq wetlands 9june2011.doc 2 Narrative of Design for Stormwater Management Facilities At Fairfield Farms Subdivision Sections Four, Five & Six Brolanco Corporation Carver's Creek Township Cumberland County, North Carolina May 2011 Revised June 2011 Prepared by., Moorman, Kizer & Reitzel, Inc. NC Firm License F-0106 P.O. Box 53774 115 Broadfoot Avenue Fayetteville, North Carolina 28305 (910) 484-5191 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Proiect Description The project involves the construction of up to 110 lots on West Summerchase Road off of Ramsey Street, at the rear of the existing Fairfield Farms Subdivision. Work will include sewer and water for Public Works Commission, storm drainage for the City of Fayetteville and streets to City of Fayetteville standards with 27 foot back to back asphalt pavement with concrete curb and gutter. Due to portions of the streets being designed in very deep cut, this project will include lot aradina. The in areas of deep roadway cut, lots will be graded to eliminate steep banks from the lots to the street and create a more favorable house construction area. In area where the building envelopes are below street grade, the lots will, to the maximum extent possible, be filled to direct runoff from impervious surfaces toward the streets, where it will be collected and conveyed to the treatment facilities. The wet detention basin will be sized to accommodate the maximum impervious area allowed by the Homeowner's Association documents and treat the runoff to remove 90% of the Total Suspended Solids (TSS). There are some areas that cannot be drained to the Wet Detention Basin, but by treating the runoff from the majority of the site to remove 90% of the TSS, rather than the required minimum of 85%, the "average" removal rate will meet the 85% minimum. All construction projects exceeding one acre in area, as this project does, are required to comply with the National Pollution Discharge Elimination System (NPDES) Phase II Stormwater Program. The City of Fayetteville (NC) is the "Regulated Entity", and has adopted a Stormwater Control Ordinance and related development regulations, in part, to meet the requirements of the Phase II Program (Sec.23-20(b)). To determine the design requirements for compliance with the various ordinances, the project must be classified in regards to the receiving watercourse designation, the proposed use and the impervious cover expected at buildout. Desian Reauirements The City of Fayetteville Stormwater Ordinance and Water Supply Watershed Management and Protection Ordinance require that the peak stormwater discharge rates for High Density Projects within the "non-Critical" Water Supply Watershed Protection Area be limited to the predeveloped rate, and that the discharge from the runoff produced by a one-inch rainfall event be treated to remove a minimum of 85 percent of the Total Suspended Solids conveyed. The primary treatment system will be Wet Detention Basins in accordance with the Water Supply Watershed Management and Protection Ordinance. The stored volume must be released over a period of at least two days, but less than five days. The design and construction of the stormwater management facilities must be in accordance with the requirements of the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NC DENR-DWQ) Stormwater Best Management Practices Manual (BMP Manual). Existing topography dictates that the project will require two Wet Detention Basins. The larger basin, designated as Basin 1, is located near the southeastern corner of the project, and the smaller basin, designated as Basin 2, is located near the northwestern corner of the property. The peak flow analysis will be performed at the two main discharge points from the site. Discharge Point 1 will represent the flow that leaves the site near the southeastern corner of the project, near Basin 1. Discharge Point 2 will represent the flow that leaves the site near the northwestern corner of the project, near Basin 2. 2of17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Existing Conditions Site Description The site is located at the western end of the previously developed phases of Fairfield Farms Subdivision, west of Ramsey Street (U. S. Highway 401 North), north of Andrews Road and South of McCloskey Road. The site has been timbered in the past, and is mostly wooded with medium sized pines and scrub oaks in "fair" condition (some leaf litter and brush). Existing grades vary from 0.5% to 12%. The majority of the site drains from west to east towards the existing subdivision, into an existing swale which flows to the south. A small portion at the northwestern corner of the property drains towards the north. A drainage map is attached. There are jurisdictional wetlands on the site, as shown on the attached copy of the Wetlands Map signed by a representative of the U.S. Army Corps of Engineers (USACE) on February 26, 2004. The proposed wetlands impact areas are as shown on the attached Wetlands Impact Map, dated February 27, 2008. A copy of the General Permit (Nationwide Permit 29) under Section 404 of the Clean Water Act (33 USC 1344) to impact up to 0.488 acres of Jurisdictional Wetlands, dated September 25, 2008 (SAW-2003-01163) is attached. Adiacent Property The adjacent property to the east is the existing Fairfield Farms Subdivision with existing single family homes and is zoned R10. Property to the north is zoned PND (Planned Neighborhood Development - Conditional Use) and R10 and is currently undeveloped. The property to the west is owned by the State of North Carolina and the Nature Conservancy and will not be developed. The property to the south is developed as large single family home tracts with existing homes, but is zoned PND. The only offsite area tributary to the proposed stormwater management facilities is a small area to the west, within the property owned by the State and Nature Conservancy to the west of the site. Soils The Natural Resources Conservation Service (NRCS) Web Soil Survey was used to determine the predominant soils on the site. The soils shown in this project area are as follows, listed according to the coverage on the site: Vauduse loamy sand, 8 to 15 peroent dopes (VaD, N39% owe-age, Hydrologic Group C) Gilead loamy sand, 2 to 8 percent slope (GdB, N30% coverage, Hydrologic Group C) Candor sand,l to 8 percent slopes (CaB, N 17% aoverage, Hydrologic Group A) Johnston loam QT, N60/o ooverage, Hydrologic Group D) Blaney loamy sand, 8 to 15 percent slopes (BaD, N20/o coverage, Hydrologic Group B) Blaney loamy sand, 2 to 8 percent slopes (BaB, N30/o overage, Hydrologic Group B) Pantego loam (Pg, N3% oa)erage, Hydrologic Group B/D) A copy of the Web Soils Report and an excerpt from the Cumberland-Hoke Soil Survey for the area is attached. 3of17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Watershed Classification The receiving watercourses are tributaries of Carvers Creek (Cape Fear Basin, Stream Index No.18- 24), which is currently classified as WS-IV, B waters. This is a Water Supply Watershed designation, which is confirmed by review of the City of Fayetteville Watershed Protection Map. Therefore the project is also subject to the Watershed Protection Ordinance of the City of Fayetteville, which limits the density and impervious cover of the development in addition to the water quality and peak discharge requirements of the Stormwater Ordinance. Proposed Developed Condition The proposed use is detached single family residential. The project will include up to 110 single family lots. The proposed impervious cover will be estimated using the design areas of roadway and sidewalk and an estimate of the areas to be covered by homes, driveways, porches, etc. as follows: This project covers a total area of 2,381,318 square feet (54.668 acres). Areas outside of the project boundaries that are tributary to the Wet Detention Basins cover 135,623 square feet (3.113 acres). Areas within the boundaries of the project that are not tributary to the Wet Detention Basins cover 262,376 square feet (6.023 acres). The proposed streets (27' back of curb to back of curb with 24" "rolled" curb and gutter) will cover 207,522 square feet (4.764 acres) and the proposed public sidewalk will cover 27,073 square feet (0.622 acres). Assuming half of the lots will have sidewalk along the frontage, the average driveway length within the rights of way is 9.5 feet (11.5' w/sidewalk & 7.5' w/o). At 25' wide, there will be 26,125 square feet of driveway (25'W x 9.5L x 110 Lots) within the rights of way. This totals 260,720 square feet (5.985 acres) of impervious cover for the rights of way. A typical lot will include a detached residence with an average impervious cover of 2,550 square feet, a 25 foot wide by 31 foot long drive (775 square feet), a 4 foot wide by 35 foot long walkway (140 square feet) and a 10 foot by 12 foot patio (120 square feet). This is a total of 3,585 square feet of impervious area per lot, which will be rounded up to 4,000 square feet for calculation purposes to take into account the installation of storage sheds, additional walkways and other hardscape by homeowners. The maximum impervious cover of 4,000 square feet per lot will be mandated by restrictive covenants in the Homeowner's Association documents. For 110 lots, this equates to 440,000 square feet (10.101 acres) of impervious area for the lots within the project. Adding the 440,000 square feet of impervious cover from the lot construction to the 260,720 square feet of impervious cover in the streets and sidewalks results in a maximum total impervious cover of 700,720 square feet (16.086 acres) for the development, or 29.43% coverage. Developments within the Water Supply Watershed Protection Areas with 24% or greater coverage, or those with curb, gutter and storm drainage are considered High Density developments for purposes of determining the stormwater management requirements under the Watershed Protection Ordinance. For purpose of estimating the runoff from the developed site, it is assumed that, with protective covenants in the Homeowners Association documents, the condition of the wooded areas within the wetlands not impacted by construction, and the offsite area within the property to the west owned by the State of North Carolina and the Nature Conservancy will improve over time from "fair" 4 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation condition to "good" condition (leaf litter or brush cover over the majority of the area). It is further assumed that lot areas and rights of way outside of the wetland areas that are not covered with impervious surface will be cleared or maintained as "open space" (lawns, landscaping, etc.) in "good" condition. The total right of way area is 365,194 square feet. The rights of way will include 260,720 square feet of impervious cover, as outlined above. The areas within the rights of way will be calculated as 71.39% impervious and 28.61% "open space". Because the location of the driveways is not set, the impervious cover percentage will be used to determine runoff potential from all areas within rights of way. The lot areas, excluding the stormwater management areas, that are not protected as wetlands cover 1,547,329 square feet. Using the previously calculated 440,000 square feet of impervious cover for the lots, the average impervious cover for the lot areas is 28.44%. Because the location of the improvements on each lot are not set, the impervious cover percentage will be used to determine runoff potential from all areas within lots that are not protected as wetlands. The areas within the lots dedicated to stormwater management contain 116,639 square feet (2.678 acres). 101,277 square feet will be used to construct and maintain the wet detention basin and will considered "open space" in "good" condition for the purpose of runoff calculations. The remaining 15,362 square feet of this area are protected wetlands, and will be left undisturbed. Areas that are protected as wetlands cover 265,544 (6.096 acres) square feet. These areas are currently covered with small pines and "scrub" oak with some brush and leaf litter covering the soil and are classified as being in "fair" condition for the predeveloped condition. With protective covenants, the area should revert to a more natural state, with a good cover of leaf litter or brush and will be classified as being in "good" condition for the developed condition. The remaining 101,974 square feet (2.341 acres) of the site will be "open space". 70,511 square feet will be used as drainage easements. The open space areas will be modeled as lawn and landscaping in "good" condition. Design of Stormwater Management Facilities The Best Management Practices manual outlines the requirements for the design of wet detention basins for water quality purposes. The requirements are met as follows: Required Surface Area The required surface are of the permanent pool is based on the size and impervious cover of the area tributary to the basin and the average depth of the basin. The drainage areas and impervious cover for each of the basins are as follows: Basin Drainage Area A SF Impervious Area SF Impervious Cover Ia Basin 1 1,987,431 598,404 30.11 Basin 2 2671134 70,982 26.57 5of17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation The BMP Manual requires that the permanent pool elevation be within 0.5' of the Seasonal High Water Table. The seasonal high water table was determined by KAM Engineering Services. A copy of the report is attached. The lower of the two values given for each basin were used to determine if additional measures would be required to prevent adverse impacts to wetlands, surface waters or groundwater elevations. The seasonal high water elevations and corresponding permanent pool elevations for each basin are as follows: Relation of Seasonal High Water Table to Permanent Pool Basin Seasonal High Water Table Elevation 1 Seasonal High Water Table Elevation 2 Proposed Permanent Pool Elevation Basin 1 127.2 130.3 127.00 Basin 2 164.6 161.3 161.50 The basins were modeled in AutoCAD with and the stage/storage values were calculated from the areas of the contours. The proposed grading for the basins is shown on the attached plans. The calculated storage capacities for the basins are shown in the tables below. Basin 1 Stage/Storage tage epth (FT) Forebay Surface Area (SF) Forebay Incremental Volume (CF) Forebay Total Volume (CF) Non- Forebay Surface Area (SF) Non- Forebay Incremental Volume (CF) Non- Forebay Total Volume (CF) Total Surface Area (SF) Total Volume (CF) omments 120.00 -1.00 2,605 0 0 12,744 0 0 15,349 121.00 0.00 3,417 3,002 3,002 14,158 13,445 13,445 17,575 16,446 Top of Sediment Storage 122.00 1.00 3,930 3,671 6,672 15,628 14,887 28,332 19,558 35,004 123.00 2.00 4,496 4,210 10,882 17,155 16,386 44,717 21,651 55,600 124.00 3.00 5,033 4,762 15,644 18,739 17,941 62,658 23,772 78,303 125.00 4.00 5,622 5,325 20,969 20,379 19,553 82,212 26,001 103,181 126.00 5.00 6,236 5,926 26,895 22,075 21,221 103,433 28,311 130,328 126.50 5.50 6,552 3,197 30,092 22,945 11,254 114,687 29,497 144,779 Toe of Safety Bench 127.00 6.00 6,875 3,356 33,448 32,800 13,863 128,550 39,675 161,999 Permanent Pool 127.50 6.50 36,160 17,233 145,784 36,160 179,232 Top of Safety Bench 128.00 7.00 37,480 18,409 164,193 37,480 197,641 128.50 7.50 38,725 19,050 183,243 38,326 216,691 128.60 7.60 39,005 3,886 183,911 39,005 214872 Top of Riser 129.00 8.00 40,738 19,864 203,107 40,738 236,555 129.50 8.50 41,826 20,640 223,747 41,826 257,195 130.00 9.00 42,919 21,186 244,933 42,919 278,381 131.00 10.00 45,164 44,037 288,969 45,164 322,417 132.00 11.00 47,992 46,571 335,540 47,992 368,988 133.00 12.00 50,351 49,166 384,706 50,351 418,154 To of Dike 6 of 17 A,orii 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Basin 2 Stage/Storage tage epth (FT) Forebay Surface Area (SF) Forebay Incremental Volume (CF) Forebay Total Volume (CF) Non- Forebay Surface Area (SF) Non- Forebay Incremental Volume (CF) Non- Forebay Total Volume (CF) Total Surface Area (SF) Total Volume (CF) omments 155.00 -1.00 218 0 0 296 0 0 514 0 156.00 0.00 312 0 0 709 0 0 1,021 0 Top/ Sediment Storage 157.00 1.00 420 365 365 1,268 975 975 1,688 1,340 158.00 2.00 541 480 844 1,914 1,580 2,555 2,455 3,399 159.00 3.00 675 607 1,451 2,588 2,242 4,797 3,262 6,248 160.00 4.00 820 746 2,197 3,294 2,934 7,731 4,114 9,928 161.00 5.00 979 899 3,096 4,021 3,651 11,382 5,000 14,478 Toe of Vegetated Shelf 161.50 5.50 1,063 510 3,606 5,302 2,323 13,706 6,365 17,312 Permanent Pool 162.00 6.00 7,856 3,269 16,974 7,856 20,581 Top of Vegetated Shelf 162.60 6.60 8,533 4,915 21,889 8,533 25,496 Top of Riser 163.00 7.00 8,995 3,505 25,395 8,995 29,001 163.50 7.50 9,586 4,645 30,039 9,586 33,646 Emergency Spillway 164.00 8.00 10,191 4,944 34,983 10,191 38,589 165.00 9.00 11,444 10,811 45,794 11,444 49,401 Top of Dike The average depth is calculated using Method 2 from the BMP manual. Method 2 is as follows: d - 0.25 x ?1 + f?bot shelf + C Abot shelf + Abot pond X C Depth ave - Aperm _ pool 2 Abot _ shelf where: ddVe = average depth in feet rounded to closest 0.5 foot Abot shelf = area at bottom of vegetated shelf (includes forebay) in Square Feet Apertn pool = area at Permanent Pool elevation (includes forebay) in Square Feet Abot pond = area of bottom of pond at top of sediment storage (does not include forebay) in Square Feet Depth = depth between bottom of vegetated shelf and top of sediment storage For each basin, the calculations are as follows: Description Basin 1 Basin 2 Permanent Pool Elevation (ft, MSL) 127.00 161.50 Permanent Pool Area (A erm ool )(SF) 32,799 6,635 Bottom of Vegetated Shelf Elevation (ft, MSL) 126.50 161.00 Bottom of Shelf Area (Abot shelf) (SF) 29,078 5,000 Bottom of Pond Elevation (ft, MSL) 121.00 156.00 Bottom of Pond Area (Abot ond)(SF) 14158 709 Depth (Bottom of Shelf-Bottom of Pond)(ft) 5.50 5.00 Average Depth (Method 2)(ft) 4.561 (4.5) 3.301(3.5) 7 of 17 A,orll 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation From the Surface Area/Drainage Area tables (SA/DA) for 90% Total Suspended Solid (TSS) removal, the reauired ratios for each basin are as follows: Description Basin 1 Basin 2 Impervious Cover (%) 30 27 Average Depth (ft) 4.5 3.5 SA/DA ratio (%) (min) 1.50 1.65 Drainage Area (SF) 1,987,434 267,134 Minimum Surface Area Required (SF) 29,812 4,408 Surface Area Provided (SF) 32,799 6,365 SA/DA ration (%) provided 1.65(OK) 2.38(OK) Reauired Storaae (Water Ouality) The required volume of water to be stored (Water Quality Volume) is equal to the runoff from the first 1 inch of a storm event, and is calculated as follows: VwQ = 3630 xRDxRvxA where: VwQ = Water Quality Volume (Cubic Feet) 3630 = cubic feet per acre inch RD = Rainfall Depth (inches) R, = Runoff Depth (inches per inch of rainfall) A = Drainage Area (acres) and; Rv = 0.05 + 0.9(Ia ) where: Ia = Impervious Cover Ratio The required water quality storage volume (VWQ) is for the first one inch of rainfall (RD =1'). The following table summarized the required volume calculations. Basin Basin 1 Basin 2 Drainage Area (SF) 1,987,431 267,134 Drainage Area (A) (Acres) 45.625 6.133 Impervious Area (SF) 598,404 69,504 Impervious Cover Ratio (Ia) .3011 .2657 Runoff Depth (R,)(in./in of rainfall) 0.3210 0.2842 Required Water Quality Volume (VW Q)( ft3) 53,162 5,915 Quality Volume (Vw) Provided ( ft3) 56,909 (OK) 8,184 (OK) The preceding calculations support that the basins have been designed with adequate surface area and volume to provide 90% removal of Total Suspended Solids. 8of17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation The requirements of the ordinance state that the runoff from the Built-Upon Area (BUA) be treated to remove 85% of the total suspended solids. Review of the calculations above shows that of 77,720 square feet of proposed impervious area, runoff from 669,386 square feet is directed to the wet detention basins (95.5% of the total). Treating that runoff to capture 90% of the TSS results in an overall capture rate of approximately 86%, which meets the intent of the ordinance. Hydraulic Calculations The hydraulic performance must be analyzed to determine if the stored volume is released at an appropriate rate; and that the basins are adequately designed to attenuate the peak flow from the developed condition to no more that the peak rate from the predeveloped condition for the design storms, and to safely accommodate the flows from larger storms up to the 100-year 24-hour event. Runoff Calculations The performance of the basin will be calculated using precipitation data from the National Weather Service (NOAH-NWS) with Type II distribution for the 1-year, 10-year, 25-year and 100-year storm events. Hydrographs will be developed for both the predeveloped and developed condition. The 1- year and 10-year storm hydrographs for the predeveloped condition will be compared to the hydrographs for the same storms to determine compliance with the peak flow attenuation requirements. The hydrographs for the developed condition of the areas tributary to the basins will be routed through the basins to develop hydrographs representing the attenuated flow from the basins. These hydrographs will be added to those from the areas that are not tributary to the basin to determine the peak discharge from the site, as a whole, for the developed condition. The peak discharge for the developed condition may not exceed that from the predeveloped condition. The hydrographs for the 25-year and 100-year storm events will be used to determine the adequacy of the outlet structure and emergency spillway. The drainage areas were modeled using the NRCS (formerly SCS) method in PondPack M (Bentley Systems). The required information includes the drainage areas and subareas, the existing and proposed ground cover to determine a composite Runoff Curve Number and the time of concentration for each of the subareas. The drainage areas for both the existing (predeveloped) and proposed (developed) conditions were delineated in AutoCAD and curve numbers assigned based on the conditions outlined above. Please reference the drainage area map for the location of the subareas. A summary of the data used to determine the runoff curve number for the project is as follows. 9of17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Runoff Curve Number Calculation Predeveloped Condition Draina a Area Subarea Area SF Curve Number Not Tributary 1 Woods Fair Condtion "A" Soils 7,183 36 Woods Fair Condtion "B" Soils 21 60 Woods Fair Condtion "C" Soils 43,161 73 Woods Fair Condtion "D" Soils 54,825 79 Total 105,190 74 Not Tributary 2 Woods Fair Condtion "C" Soils 74,364 73 Woods Fair Condtion "D" Soils 22,598 79 Total 96,963 74 Not Tributary 3 Woods Fair Condtion "B" Soils 20,487 60 Woods Fair Condtion "C" Soils 15,770 73 Woods Fair Condtion, "D" Soils 23,977 79 Total 60,235 71 Tributary to Basin 1 Newly Graded, "A" Soils 34,857 77 Woods Fair Condtion, "A" Soils 219,792 36 Woods Fair Condtion, "B" Soils 59,357 60 Woods Fair Condtion, "C" Soils 1,574,753 73 Woods Fair Condtion, "D" Soils 98,675 79 Total 1,987,434 69 Tributary to Basin 2 Newly Graded "A" Soils 62,230 77 Woods Fair Condtion, "A" Soils 65,580 36 Woods Fair Condtion, "B" Soils 36,380 60 Woods Fair Condtion, "C" Soils 78,937 73 Woods Fair Condtion, "D" Soils 24,008 79 Total 267,134 64 10 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six broianco Corporation Developed Condition Not Tributary 1 Impervious Cover 13,271 98 Basin Lot "C" Soils 257 74 Basin Lot "D" Soils 7,450 80 Open Space Good Condition "A" Soils 2,133 39 Open Space Good Condition, "B" Soils 15 61 Open Space Good Condition "C" Soils 20,831 74 Open Space Good Condition, "D" Soils 10,420 80 Woods Good Condtion "A" Soils 4,203 30 Woods Good Condtion "C" Soils 13,794 70 Woods Good Condtion "D" Soils 32,816 77 Total 105,190 76 Not Tributary 2 Impervious Cover 7,520 98 Drainage Swale "C" Soils 50,797 74 Drainage Swale "D" Soils 19,705 80 Open Space Good Condition "C" Soils 16,863 74 Open Space Good Condition "D" Soils 2,064 80 Total 96,949 77 Not Tributary 3 Impervious Cover 10,544 98 Basin Lot "B" Soils 9,727 61 Basin Lot "C" Soils 1,951 74 Basin Lot "D" Soils 11,479 80 Open Space Good Condition "B" Soils 7,700 61 Open Space Good Condition "C" Soils 9,892 74 Open Space Good Condition "D" Soils 8,944 80 Total 60,237 76 Tributary to Basin 1 Impervious Cover 598,404 98 Basin Lot "B" Soils 30,794 61 Basin Lot "C" Soils 15,751 74 Basin Lot "D" Soils 894 80 Open Space Good Condition "A" Soils 125,774 39 Open Space Good Condition "C" Soils 817,904 74 Open Space Good Condition "D" Soils 65,338 80 Woods Good Condtion "A" Soils 55,420 30 Woods Good Condtion "B" Soils 28,563 55 Woods Good Condtion "C" Soils 248,588 70 Total 1,987,431 77 11 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Tributary to Basin 2 Impervious Cover 70,982 98 Basin Lot "C" Soils 1,424 74 Basin Lot "D" Soils 21,549 80 Open Space Good Condition "A" Soils 60,030 39 Open Space Good Condition "B" Soils 15,095 61 Open Space Good Condition "C" Soils 47,314 74 Open Space Good Condition "D" Soils 1,487 80 Woods GoodCondtion "A" Soils 34,102 30 Woods Good Condtion "B" Soils 15,151 55 The Time of Concentration for each subarea is calculated using the SCS Lag method for overland flow and, if applicable, a calculated flow time in the storm drainage system from the StormCAD model. The results are as follows: Predeveloned Time of Concentration Subarea Hydraulic Length (ft) Slope (ft/ft) Runoff Curve Number Time of Concentration (Min.) Not Tributary 1 648 0.039 74 14 Not Tributary 2 2715 0.012 74 78 Not Tributary 3 1250 0.035 72 26 Tributary to Basin 1 1637 0.042 72 29 Tributary to Basin 2 1362 0.033 72 28 Develoned Time of Concentration Subarea Hydraulic Length (ft) Slope (ft/ft) Runoff Curve Number Overland Time (Min.) System Time (Min.) Time of Concentration (Min.) Not Tributary 1 648 0.039 72 14 n/a 14 Not Tributary 2 2715 0.012 74 78 n/a 78 Not Tributary 3 1250 0.035 72 16 n/a 26 Tributary to Basin 1 308 0.017 72 12.1 13.8 26 Tributary to Basin 2 507 0.011 74 22.1 1.1 23 The following table provides a summary of the peak discharges for each of the modeled storms. Complete results are included in the attached Pond Pack printouts, 12 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Basin 1 Predeveloped Peak Discharge Rates Description 1-year Storm 10-year Storm 25-year Storm 100-year Storm Basin 1 Peak Flow CFS 22.18 89.73 126.36 192.31 Basin 1 Time to Peak Min 732 732 732 730 Not Tributary 2 Peak Flow CFS 0.81 2.66 3.64 5.36 Not Tributary 2 Time to Peak Min 766 766 758 758 Not Tributary 3 Peak Flow (CFS) 0.88 3.20 4.44 6.63 Not Tributary 3 Time to Peak Min 730 730 730 728 Discharge Point 1 Peak Flow* CFS 23.40 94.25 132.65 201.77 Discharge Point 1 Time to Peak Min 732 732 732 730 *Please note that the total peak discharge does not equal the sum of the peak discharges from the subareas due to the difference in times to peak. Basin 2 Predeveloped Peak Discharge Rates Description 1-year Storm 10-year Storm 25-year Storm 100-year Storm Basin 2 Peak Flow CFS 1.81 9.83 14.54 23.16 Basin 2 Time to Peak (Min) 734 730 730 730 Not Tributary 1 Peak Flow CFS 2.64 8.40 11.36 16.50 Not Tributary 1 Time to Peak (Min) 722 722 722 722 Discharge Point 2 Peak Flow* CFS 3.79 16.28 23.36 35.84 Discharge Point 2 Time to Peak (Min) 726 726 726 726 *Please note that the total peak discharge does not equal the sum of the peak discharges from the subareas due to the difference in times to peak. Outlet Structure Desian Basin 1 The outlet structure for Basin 1 consists of a concrete box riser with 60" x 60" interior dimensions. The top of the structure is to be set at elevation 130.80. A 6-inch diameter drawdown pipe will be installed in the riser at the normal pool elevation of 127.00 and will extend to 12 inches below the normal pool to minimize clogging during drawdown periods. The drawdown pipe will have an orifice 3.125 inches (3-1/8") in diameter to control the drawdown rate. 2-foot wide rectangular weirs are to be cut into each side of the riser with inverts of 128.60. These four weirs will control the 1-year and 10-year peak flows. The basin volume between the control weir elevation of 128.60 and the normal pool elevation of 127.00 is the treatment volume and equals 56,909 cubic feet, which exceeds the required minimum of 53,131 cubic feet. Flow from the riser structure will be conveyed using a 48" reinforced concrete pipe (RCP) with an upstream invert of 123.00 (at the riser) and a downstream invert of 122.36. The riser structure shall have an anti-vortex/trash rack assembly provided that will extend from elevation 131.50 (above the maximum water elevation for the 25-year storm) to elevation 126.50 (6" below the normal pool elevation). An emergency spillway will be provided to minimize the chance of catastrophic failure of the dike. This spillway will be a 20 feet wide broad crested trapezoidal weir, with 3:1 side slopes, and will have a weir elevation of 131.40. The top of dike elevation is 133.00. 13 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Basin 2 The outlet structure for Basin 2 consists of a corrugated aluminum riser with a diameter of 30 inches. The top of the riser is to be set at elevation 162.60. A 4-inch diameter drawdown pipe will be installed in the riser at the normal pool elevation of 161.50 and will extend to 12 inches below the normal pool to minimize clogging during drawdown periods. The drawdown pipe will have an orifice 4.00 inches (4') in diameter to control the drawdown rate. The basin volume between the top of riser elevation of 162.60 and the normal pool elevation of 161.50 is the treatment volume and equals 8,184 cubic feet, which exceeds the required minimum of 8,016 cubic feet. Flow from the riser structure will be conveyed using a 60 foot long, 24" diameter corrugated aluminum pipe with an upstream invert of 157.00 (at the riser) and a downstream invert of 156.40. The riser structure shall have an anti-vortex/trash rack assembly provided that will extend from elevation 163.30 (above the maximum water elevation for the 25-year storm) to elevation 161.00 (6" below the normal pool elevation). An emergency spillway will be provided to minimize the chance of catastrophic failure of the dike. This spillway will be a 20 feet wide broad crested trapezoidal weir, with 3:1 side slopes, and will have a weir elevation of 163.50. The top of dike elevation is 165.00. Buoyancy Calculations The outlet structures must be designed so as to be negatively buoyant with a minimum safety factor of 1.1. The uplift is calculated using the outside dimensions of the structure and the weight is calculated based on the volume and unit weight of the construction materials. Basin 1 The inside dimension of the precast concrete structure is 5.0' square. The height is 130.80' (top of riser, ignoring the weirs) minus 123.00 (invert out of 48" reinforced concrete pipe culvert), or 7.80. With a 6-inch thick bottom slab and 6-inch thick walls, the outside dimensions are 6.0'x 6.0'x 8.30'. The uplift is calculated based on the weight an equal volume of water displaced at 62.4 pounds per cubic foot as follows:. Uplift = (6.0'x 6.0'x 8.3) x 62.4 PCF = 298.8 CF x 62.4 PCF = 18,645 pounds The weight of the structure is the displaced volume less the inside volume times the unit weight of concrete. The unit weight of concrete is 150 pounds per cubic foot. Weight = ((6.0'x 6.0'x 8.3? - (5.0'x 5.0'x 7.8')) x 150 PCF _ (298.8 CF - 195.0 CF) x 150 PCF = 15,570 pounds Additional volume is to provide for ballast concrete. The structure will be deepened by 3.7 feet (12.0' total depth) to provide this volume. The additional inside volume will be filled with concrete. Calculations including the additional depth are as follows: Uplift = (6.0'x 6.0'x 12.0') x 62.4 PCF = 432.0 CF x 62.4 PCF = 26,957 pounds 14 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Weight = ((6.0'x 6.0'x 12.0 - (5.0'x 5.0'x 11.5 + (5.0'x 5.0'x 3.7')) x 150 PCF _ (432.0 CF - 287.5 CF + 92.5) x 150 PCF = 35,550 pounds (1.32 safety factor> 1.1 (OK)) Basin 2 The inside dimension of the corrugated aluminum pipe structure is 30 inches (2.50 in diameter (14 gauge with 3" x 1" corrugation). The height is 162.60' (top of riser) minus 157.00' (invert out of 24" corrugated aluminum pipe culvert), or 5.6. The uplift is calculated based on the weight an equal volume of water displaced at 62.4 pounds per cubic foot as follows:. Uplift = [(II x (2.5?2)/4)x 5.61 x 150 PCF = 27.5 CF x 62.4 PCF = 1,716 pounds The weight of the structure is negligible (approximately 64 pounds) and will be ignored. A 4.0' x 4'0' x 2.0' cast-in-place concrete base will be provided to provide ballast. Calculations are based on the submerged weight (in water) of concrete. Weight = (4.0'x 4.0'x 2.0') x (150 - 62.4) PCF = 32.0 CF x 87.6 PCF = 2,803 pounds (1.63 safety factor>1.1 (OK)) Peak Flow Attenuation (Pre/Post Analysis) The developed condition flows tributary to the basins was routed through the basins with the following results: Basin 1 Return Event Peak Flow In (CFS) Peak Flow Out (CFS) Time to Peak (Out) (Min) Maximum Water Surface Elevation (ft, MSL) 1-year 43.62 9.58 768 129.13 10-year 128.51 84.06 740 130.87 25-year 171.60 130.90 738 131.44 100-year 245.97 205.21 736 132.23 Basin 2 Return Event Peak Flow In (CFS) Peak Flow Out (CFS) Time to Peak (Min) Maximum Water Surface Elevation (ft, MSL) 1-year 2.67 .18 996 162.61 10-year 12.51 8.55 738 163.09 25-year 18.00 15.03 734 163.32 100-year 27.99 21.53 734 163.82 15 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation Discharge Point 1 Developed Peak Discharge Rates Description 1-year 10-year 25-year 100-year Basin 1 Peak Flow Out (CFS) 9.58 84.06 130.90 205.21 Basin 1 Time to Peak (Out) (Min) 768 740 738 736 Not Tributary 2 Peak Flow (CFS) 0.99 2.95 3.96 5.71 Not Tributary 2 Time to Peak (Min) 766 758 758 756 Not Tributary 3 Peak Flow (CFS) 1.26 3.80 5.11 7.37 Not Tributary 3 Time to Peak (Min) 730 730 728 728 Discharge Point 1 Peak Flow* (CFS) 10.84 88.83 137.53 215.11 Discharge Point 1 Time to Peak (Min) 764 740 738 736 *Please note that the total peak discharge does not equal the sum of the peak discharges from the subareas due to the difference in times to peak. Discharge Point 2 Developed Peak Discharge Rates (CFS) Description 1-year 10-year 25-year 100-year Basin 2 Peak Flow Out (CFS) 2.67 8.55 17.00 26.66 Basin 2 Time to Peak (Out) (Min) 730 738 728 728 Not Tributary 1 Peak Flow (CFS) 2.96 8.85 11.83 16.97 Not Tributary 1 Time to Peak (Min) 724 722 722 722 Discharge Point 2 Peak Flow* (CFS) 2.96 11.76 21.64 36.13 Discharge Point 2 Time to Peak (Min) 724 734 730 724 *Please note that the total peak discharge does not equal the sum of the peak discharges from the subareas due to the difference in times to peak. The table below compares the predeveloped condition peak flows to the developed condition peak flows, and indicates that the basins, as designed, meet the requirements of the ordinance. Pre/Post Comparison 1-year Return Storm 10-year Return Storm Discharge 1 Discharge 2 Discharge 1 Discharge 2 Predevelo ed 23.40 3.79 94.25 16.28 Developed 10.84 (OK) 2.96 (OK) 88.83 (OK) 11.76 (OK) Drawdown The basins must be designed to release the stored water quality volume over a period of two to five days (48 to 120 hours). The average drawdown rate is calculated using the following formula: Q = CA4 2gHo where. Q = flow in CFS Co = coefficient of discharge (unitless)=0.60 A = orifice area in square feet g = gravity (ft/sect) = 32.2 ft/sect Ho = driving head (Maximum head / 3) in feet 16 of 17 April 12, 2011 Stormwater Management Plan Fairfield Farms Subdivision Phases Four, Five & Six Broianco Corporation The table below summarized the results of these calculations. Basin Basin 1 Basin 2 Orifice Diameter in 3.375 1.375 Orifice Area (SF) 0.0668 0.0103 Water Quality Elevation Ew ft MSL 128.60 162.60 Permanent Pool Elevation (Epp)(ft, MSL) 127.00 161.50 Driving Head Ew Epp /3 ft 0.5333 0.3667 Average Orifice Flow CFS 0.2185 0.0319 Water Quality Volume (CF) 56,909 8,184 Drawdown Time Hrs 72.36 OK 71.31 OK SUMMARY The City of Fayetteville Stormwater Ordinance and Water Supply Watershed Management and Protection Ordinance require that the peak stormwater discharge rates for High Density Projects within the "non-Critical" Water Supply Watershed Protection Area be limited to the predeveloped rate, and that the discharge from the runoff produced by a one-inch rainfall event be treated to remove a minimum of 85 percent of the Total Suspended Solids conveyed. The primary treatment system will be Wet Detention Basins in accordance with the Water Supply Watershed Management and Protection Ordinance. The stored volume must be released over a period of at least two days, but less than five days. The design and construction of the stormwater management facilities must be in accordance with the requirements of the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NC DENR-DWQ) Stormwater Best Management Practices Manual (BMP Manual). The preceding calculations support that the stormwater management facilities, specifically wet detention basins, are properly sized and configured to meet the requirements of stormwater peak flow attenuation. The peak stormwater discharge for the entire site, in developed condition, is less than the peak discharge for the predeveloped condition for the one-year and ten-year storm events, as required by the ordinance. The attached Construction Drawings indicate that the stormwater runoff from the Built-Upon Area is, to the greatest extent possible, to be collected and treated before release. The basins are designed to capture and treat the runoff from the one-inch of rainfall event. The storm drainage system captures the runoff from approximately 95.5% of the maximum impervious area within the project, and the wet detention basins are designed in accordance with the BMP Manual for 90% removal of Total Suspended Solids (TSS). The resulting reduction in TSS for the site as a whole should be approximately 86%, which meets the 85% requirement of the ordinance. The stored volume from the first one inch of rainfall is released in approximately three days, which meets the requirements of the ordinance to release the volume over two to five days. Therefore, the Stormwater Management Plan for Fairfield Farms, Section Four, Five & Six, as designed, meets the requirements set forth in the City of Fayetteville Stormwater Ordinance and Water Supply Watershed Management and Protection Ordinance. 17 of 17 April 12, 2011 Designed By: BGB Date: Checked By: JMKjr Date: Company: MKR, Inc. Project Name: Fairfield Farms Section 4-6 Project No.: 98-1702-01 Site Location (City/Town) Fayetteville, NC Culvert Id. Basin 1 Out Total Drainage Area (acres) 45.6 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter. it is classified nunimdun tailwater condition. If it is greater than half the pipe diameter. it is classified maximum condition. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a miniiumn tailwater condition unless reliable flood stage elevations shoe- otherwise- Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 48 21 Min TW (Fig. 8.06a) 84.1 11.8 Step 2. Based on the tallwater conditions deternuned in step 1. enter Figure 8.06a or Figure 8.06b, and determine d5o riprap size and minimum apron length (L',). The d,. size is the median stone size in a well-graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step '. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 12 User Input Data Calculated Value Reference Data Minimum apron length, La (ft.) 26 Apron width at pipe outlet (ft.) 12 Apron shape Apron width at outlet end (ft.) 30 Step 4. Determine the maximiun stone diameter: d,, = 1.5 x dFo Minimum TW Max Stone Diameter, dmax (ft.) 18 Step 5. Deternune the apron thickness: Apron thickness = 1.5 x dmax Apron Thickness(ft.) Minimum TW 27 12 4 Maximum TW 0 Maximum TW 0 Step 6. Fit the riprap apron to the site by making it level for the 1111inIM M length, Ld. from Figure 8.06a or FieLUe 8.06b. Extend the apron farther downstream and along channel banks until stability is assured- Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary. alignment bends near the pipe outlet so that the entrance into the receiving stream is straight- Some locations may require linung of the entire channel cross section to assure stability. It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (9ppen-r*x 8.05). Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered, see page 8068 13-Jun-11 13-Jun-11 Permit No. (to be provided by DWQ) ©?,?'? ? F WA7F OHO 9QG t? r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Fairfield Farms Section 4, 5 & 6 Contact person James Kizer, Jr./ Blake Ball Phone number 910-484-5191 Date Revised 14June2011 Drainage area number Basin 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,987,431 ft2 Impervious area, post-development 598,404 ft2 % impervious 30.11 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 53,162 ft3 OK Volume provided 56,909 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.0 in Rational C, pre-development 0.18 (unitless) Rational C, post-development 0.46 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.13 in/hr OK Pre-development 1-yr, 24-hr peak flow 1.07 ft3/sec Post-development 1-yr, 24-hr peak flow 2.73 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 1.66 ft3/sec Elevations Temporary pool elevation 128.60 fmsl Permanent pool elevation 127.00 fmsl SHWT elevation (approx. at the perm. pool elevation) 127.20 fmsl Top of 1 Oft vegetated shelf elevation 127.50 fmsl Bottom of 1 Oft vegetated shelf elevation 126.50 fmsl Sediment cleanout, top elevation (bottom of pond) 121.00 fmsl Sediment cleanout, bottom elevation 120.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 3 Permit No. (to be provided by DWQ) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, Apsnn pW Area, bottom of 1 Oft vegetated shelf, Abot shelf Area, sediment cleanout, top elevation (bottom of pond), Abotyond Volumes Volume, temporary pool Volume, permanent pool, Vpennyool Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpennyool Area provided, permanent pool, Als-,ool Average depth calculated Average depth used in SA/DA, d.„ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Als-,ool Area, bottom of 1 Oft vegetated shelf, Abot shelf Area, sediment cleanout, top elevation (bottom of pond), Abotyond "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, d.„ (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is Form SW401-Wet Detention Basin-Rev.8-9/17/09 39,005 ftz 29,811 ftz 1.50 (unitless) 32,799 ftz OK 29,078 ftz 13,445 ftz 56,909 ft3 OK 157,963 ft3 30,962 ft3 19.6% % OK 90 % N (Y or N) Y (Y or N) 1.50 (unitless) N (Y or N) 157,963 ft3 32,799 ftz ft Need 3 ft min. ft Y (Y or N) 32,799 ftz 29,078 ftz 13,445 ftz 5.50 ft 4.56 ft OK 4.5 ft OK Y (Y or N) 3.38 in inz 0.60 (unitless) 0.53 ft N (Y or N) (unitless) (unitless) ft ft 1.07 ft3/sec 2.73 ft3/sec 0.22 ft3/sec 3.02 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 1.6 ft OK N (Y or N) OK Y (Y or N) OK N (Y or N) Required to capture all runoff from the ultimate build-out Drain Valve and portable pump Parts I. & II. Design Summary, Page 2 of 3 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. JMK Jr. 26 & 27 of 27 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. JMK Jr. 23 of 27 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. JMK Jr. 5 of 27 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. JMK Jr. 5 of 27 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. JMK Jr. narrative pg 6 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. JMK Jr. 5 of 27 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. JMK Jr. narrative 7. The supporting calculations. JMK Jr. attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. JMK Jr. attached 9. A copy of the deed restrictions (if required). JMK Jr. attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 3 of 3 Designed By: BGB Date: Checked By: JMKjr Date: Company: MKR, Inc. Project Name: Fairfield Farms Section 4-6 Project No.: 98-1702-01 Site Location (City/Town) Fayetteville, NC Culvert Id. Basin 2 Out Total Drainage Area (acres) 6.13 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter. it is classified nunimdun tailwater condition. If it is greater than half the pipe diameter. it is classified maxmi nun condition. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a mi'm'ni un tailwater condition unless reliable flood stage elevations shoe- otherwise- Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 24 11 Min TW (Fig. 8.06a) 8.2 4.2 Step 2. Based on the tallwater conditions determined in step 1. enter Figure 8.06a or Figure 8.06b, and determine d5o riprap size and minimum apron length (L',). The d,. size is the median stone size itn a well-graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step Z. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 0.42 User Input Data Calculated Value Reference Data Minimum apron length, La (ft.) 13 Apron width at pipe outlet (ft.) 6 Apron shape Apron width at outlet end (ft.) 15 Step 4. Determine the nlaximtuln stone diameter: dl,%=1.5xdFo Minimum TW Max Stone Diameter, dmax (ft.) 0.63 Step 5. Determine the apron thickness: Apron thickness = 1.5 x d.. Apron Thickness(ft.) Minimum TW 0.945 6 2 Maximum TW 0 Maximum TW 0 Step 6. Fit the riprap apron to the site by making, it level for the 11111111 UM length, Ld. from Flowe 8_06a or Figure 8.06b. Extend the apron farther downstrearn and along channel banks tintil stability is assured- Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight- Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (9ppV7(*a- 3.05). Waere overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered, see page 806.8 13-Jun-11 13-Jun-11 FAIRFIELD FARMS - Basin 1 Developed Condition Project Summary Title FAIRFIELD FARMS Engineer M KR\bgb Company Moorman, Kizer & Reitzel, Inc. Date 6/1/2010 Notes Basin 1 - Developed Condition Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 1 of 65 Watertown, CT 06795 USA +1-203-755-1666 Table of Contents Fayetteville Basin 1 (Developed) Not Tributary 2 Not Tributary 3 Basin 1 (Developed) Not Tributary 2 Not Tributary 3 Basin 1 (Developed) Not Tributary 2 Not Tributary 3 User Notifications Master Network Summary TypeII 24hr (3.0 in) Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve TypeII 24hr (3.0 in) Time of Concentration Calculations TypeII 24hr (3.0 in) Time of Concentration Calculations TypeII 24hr (3.0 in) Time of Concentration Calculations TypeII 24hr (3.0 in) Runoff CN-Area TypeII 24hr (3.0 in) Runoff CN-Area TypeII 24hr (3.0 in) Runoff CN-Area TypeII 24hr (3.0 in) Unit Hydrograph Summary Unit Hydrograph Summary Unit Hydrograph Summary Unit Hydrograph Summary TypeII 24hr (3.0 in) Unit Hydrograph Summary Unit Hydrograph Summary Unit Hydrograph Summary Unit Hydrograph Summary TypeII 24hr (3.0 in) Unit Hydrograph Summary 2 3 5 7 9 11 13 15 17 19 20 21 22 24 26 28 30 32 34 36 38 Table of Contents Unit Hydrograph 40 Summary Unit Hydrograph 42 Summary Unit Hydrograph 44 Summary Basin 1 TypeII 24hr (3.0 in) Elevation-Area Volume 46 Curve Volume Equations 47 Basin 1 Outlet TypeII 24hr (3.0 in) Composite Rating Curve 48 Outlet Input Data 59 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: User Notifications No user User Notifications? notifications generated. Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 2 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft') Basin 1 (Developed) Developed 1-yr 1 179,685 730.000 43.62 Basin 1 (Developed) Developed 10-yr 10 507,402 728.000 128.51 Basin 1 (Developed) Developed 25-yr 25 677,107 728.000 171.60 Basin 1 (Developed) Developed 100-yr 100 975,903 728.000 245.97 Not Tributary 2 Developed 1-yr 1 8,765 766.000 0.99 Not Tributary 2 Developed 10-yr 10 24,752 758.000 2.95 Not Tributary 2 Developed 25-yr 25 33,030 758.000 3.96 Not Tributary 2 Developed 100-yr 100 47,606 756.000 5.71 Not Tributary 3 Developed 1-yr 1 5,163 730.000 1.26 Not Tributary 3 Developed 10-yr 10 14,908 730.000 3.80 Not Tributary 3 Developed 25-yr 25 19,991 728.000 5.11 Not Tributary 3 Developed 100-yr 100 28,969 728.000 7.37 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft') Out Developed 1-yr 1 190,298 768.000 10.84 Out Developed 10-yr 10 543,706 740.000 88.83 Out Developed 25-yr 25 726,762 738.000 137.53 Out Developed 100-yr 100 1,049,100 736.000 215.11 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft') Maximum Maximum Water Pond Storage Surface (ft') Elevation (ft) Basin 1 (IN) Developed 1- 1 179,685 730.000 43.62 (N/A) (N/A) Basin 1 Developed 1- 1 176 370 768.000 9.58 129.13 237 622 (OUT) yr , , Basin 1 (IN) Developed 10- 10 507,402 728.000 128.51 (N/A) (N/A) Basin 1 Developed 10- 10 504 046 740.000 84.06 130.87 312 601 (OUT) yr , , Basin 1 (IN) Developed 25- 25 677,107 728.000 171.60 (N/A) (N/A) Basin 1 OUT Developed 25- 25 673,741 738.000 130.90 131.44 338,529 ( ) yr Basin 1 (IN) Developed 100 100 975,903 728.000 245.97 (N/A) (N/A) -yr Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 3 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft') Maximum Maximum Water Pond Storage Surface (ft') Elevation (ft) Basin 1 I Developed 100 I 100 I 972,525 I 736.000 I 205.21 I 132.23 I 375,835 (OUT) -yr Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 4 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 1 years Label: Fayetteville Storm Event: TypeII 24hr (3.0 in) Time-Depth Curve: TypeII 24hr (3.0 in) Label TypeII 24hr (3.0 in) Start Time 0.000 min Increment 6.000 min End Time 1,440.000 min Return Event 1 years CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 30.000 0.0 0.0 0.0 0.0 0.0 60.000 0.0 0.0 0.0 0.0 0.0 90.000 0.0 0.1 0.1 0.1 0.1 120.000 0.1 0.1 0.1 0.1 0.1 150.000 0.1 0.1 0.1 0.1 0.1 180.000 0.1 0.1 0.1 0.1 0.1 210.000 0.1 0.1 0.1 0.1 0.1 240.000 0.1 0.1 0.2 0.2 0.2 270.000 0.2 0.2 0.2 0.2 0.2 300.000 0.2 0.2 0.2 0.2 0.2 330.000 0.2 0.2 0.2 0.2 0.2 360.000 0.2 0.2 0.3 0.3 0.3 390.000 0.3 0.3 0.3 0.3 0.3 420.000 0.3 0.3 0.3 0.3 0.3 450.000 0.3 0.3 0.3 0.3 0.4 480.000 0.4 0.4 0.4 0.4 0.4 510.000 0.4 0.4 0.4 0.4 0.4 540.000 0.4 0.5 0.5 0.5 0.5 570.000 0.5 0.5 0.5 0.5 0.5 600.000 0.5 0.6 0.6 0.6 0.6 630.000 0.6 0.6 0.6 0.7 0.7 660.000 0.7 0.7 0.8 0.8 0.8 690.000 0.9 0.9 1.1 1.3 1.7 720.000 2.0 2.1 2.1 2.2 2.2 750.000 2.2 2.2 2.3 2.3 2.3 780.000 2.3 2.3 2.4 2.4 2.4 810.000 2.4 2.4 2.4 2.5 2.5 840.000 2.5 2.5 2.5 2.5 2.5 870.000 2.5 2.5 2.5 2.6 2.6 900.000 2.6 2.6 2.6 2.6 2.6 930.000 2.6 2.6 2.6 2.6 2.7 960.000 2.7 2.7 2.7 2.7 2.7 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 5 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 1 years Label: Fayetteville Storm Event: TypeII 24hr (3.0 in) CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 990.000 2.7 2.7 2.7 2.7 2.7 1,020.000 2.7 2.7 2.7 2.7 2.7 1,050.000 2.8 2.8 2.8 2.8 2.8 1,080.000 2.8 2.8 2.8 2.8 2.8 1,110.000 2.8 2.8 2.8 2.8 2.8 1,140.000 2.8 2.8 2.8 2.8 2.9 1,170.000 2.9 2.9 2.9 2.9 2.9 1,200.000 2.9 2.9 2.9 2.9 2.9 1,230.000 2.9 2.9 2.9 2.9 2.9 1,260.000 2.9 2.9 2.9 2.9 2.9 1,290.000 2.9 2.9 2.9 2.9 2.9 1,320.000 3.0 3.0 3.0 3.0 3.0 1,350.000 3.0 3.0 3.0 3.0 3.0 1,380.000 3.0 3.0 3.0 3.0 3.0 1,410.000 3.0 3.0 3.0 3.0 3.0 1,440.000 3.0 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 6 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 10 years Label: Fayetteville Storm Event: TypeII 24hr (5.5 in) Time-Depth Curve: TypeII 24hr (5.5 in) Label TypeII 24hr (5.5 in) Start Time 0.000 min Increment 6.000 min End Time 1,440.000 min Return Event 10 years CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 30.000 0.0 0.0 0.0 0.0 0.1 60.000 0.1 0.1 0.1 0.1 0.1 90.000 0.1 0.1 0.1 0.1 0.1 120.000 0.1 0.1 0.1 0.1 0.1 150.000 0.2 0.2 0.2 0.2 0.2 180.000 0.2 0.2 0.2 0.2 0.2 210.000 0.2 0.2 0.2 0.2 0.3 240.000 0.3 0.3 0.3 0.3 0.3 270.000 0.3 0.3 0.3 0.3 0.3 300.000 0.3 0.4 0.4 0.4 0.4 330.000 0.4 0.4 0.4 0.4 0.4 360.000 0.4 0.5 0.5 0.5 0.5 390.000 0.5 0.5 0.5 0.5 0.5 420.000 0.5 0.6 0.6 0.6 0.6 450.000 0.6 0.6 0.6 0.6 0.7 480.000 0.7 0.7 0.7 0.7 0.7 510.000 0.7 0.7 0.8 0.8 0.8 540.000 0.8 0.8 0.8 0.9 0.9 570.000 0.9 0.9 0.9 1.0 1.0 600.000 1.0 1.0 1.0 1.1 1.1 630.000 1.1 1.2 1.2 1.2 1.3 660.000 1.3 1.3 1.4 1.4 1.5 690.000 1.6 1.7 2.0 2.4 3.1 720.000 3.7 3.8 3.9 3.9 4.0 750.000 4.1 4.1 4.1 4.2 4.2 780.000 4.3 4.3 4.3 4.4 4.4 810.000 4.4 4.4 4.5 4.5 4.5 840.000 4.5 4.5 4.6 4.6 4.6 870.000 4.6 4.6 4.7 4.7 4.7 900.000 4.7 4.7 4.7 4.8 4.8 930.000 4.8 4.8 4.8 4.8 4.8 960.000 4.9 4.9 4.9 4.9 4.9 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 7 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 10 years Label: Fayetteville Storm Event: TypeII 24hr (5.5 in) CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 990.000 4.9 4.9 4.9 5.0 5.0 1,020.000 5.0 5.0 5.0 5.0 5.0 1,050.000 5.0 5.0 5.1 5.1 5.1 1,080.000 5.1 5.1 5.1 5.1 5.1 1,110.000 5.1 5.1 5.2 5.2 5.2 1,140.000 5.2 5.2 5.2 5.2 5.2 1,170.000 5.2 5.2 5.2 5.2 5.2 1,200.000 5.3 5.3 5.3 5.3 5.3 1,230.000 5.3 5.3 5.3 5.3 5.3 1,260.000 5.3 5.3 5.3 5.3 5.4 1,290.000 5.4 5.4 5.4 5.4 5.4 1,320.000 5.4 5.4 5.4 5.4 5.4 1,350.000 5.4 5.4 5.4 5.4 5.5 1,380.000 5.5 5.5 5.5 5.5 5.5 1,410.000 5.5 5.5 5.5 5.5 5.5 1,440.000 5.5 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 8 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 25 years Label: Fayetteville Storm Event: TypeII 24hr (6.7 in) Time-Depth Curve: TypeII 24hr (6.7 in) Label TypeII 24hr (6.7 in) Start Time 0.000 min Increment 6.000 min End Time 1,440.000 min Return Event 25 years CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 30.000 0.0 0.0 0.0 0.1 0.1 60.000 0.1 0.1 0.1 0.1 0.1 90.000 0.1 0.1 0.1 0.1 0.1 120.000 0.1 0.2 0.2 0.2 0.2 150.000 0.2 0.2 0.2 0.2 0.2 180.000 0.2 0.2 0.2 0.3 0.3 210.000 0.3 0.3 0.3 0.3 0.3 240.000 0.3 0.3 0.3 0.3 0.4 270.000 0.4 0.4 0.4 0.4 0.4 300.000 0.4 0.4 0.4 0.5 0.5 330.000 0.5 0.5 0.5 0.5 0.5 360.000 0.5 0.5 0.6 0.6 0.6 390.000 0.6 0.6 0.6 0.6 0.6 420.000 0.7 0.7 0.7 0.7 0.7 450.000 0.7 0.7 0.8 0.8 0.8 480.000 0.8 0.8 0.8 0.8 0.9 510.000 0.9 0.9 0.9 0.9 1.0 540.000 1.0 1.0 1.0 1.0 1.1 570.000 1.1 1.1 1.1 1.2 1.2 600.000 1.2 1.2 1.3 1.3 1.3 630.000 1.4 1.4 1.4 1.5 1.5 660.000 1.6 1.6 1.7 1.7 1.8 690.000 1.9 2.1 2.4 2.9 3.8 720.000 4.4 4.6 4.7 4.8 4.9 750.000 4.9 5.0 5.0 5.1 5.1 780.000 5.2 5.2 5.2 5.3 5.3 810.000 5.3 5.4 5.4 5.4 5.5 840.000 5.5 5.5 5.5 5.6 5.6 870.000 5.6 5.6 5.6 5.7 5.7 900.000 5.7 5.7 5.7 5.8 5.8 930.000 5.8 5.8 5.8 5.9 5.9 960.000 5.9 5.9 5.9 5.9 5.9 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 9 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 25 years Label: Fayetteville Storm Event: TypeII 24hr (6.7 in) CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 990.000 6.0 6.0 6.0 6.0 6.0 1,020.000 6.0 6.0 6.1 6.1 6.1 1,050.000 6.1 6.1 6.1 6.1 6.1 1,080.000 6.2 6.2 6.2 6.2 6.2 1,110.000 6.2 6.2 6.2 6.3 6.3 1,140.000 6.3 6.3 6.3 6.3 6.3 1,170.000 6.3 6.3 6.3 6.4 6.4 1,200.000 6.4 6.4 6.4 6.4 6.4 1,230.000 6.4 6.4 6.4 6.4 6.4 1,260.000 6.5 6.5 6.5 6.5 6.5 1,290.000 6.5 6.5 6.5 6.5 6.5 1,320.000 6.5 6.5 6.6 6.6 6.6 1,350.000 6.6 6.6 6.6 6.6 6.6 1,380.000 6.6 6.6 6.6 6.6 6.6 1,410.000 6.7 6.7 6.7 6.7 6.7 1,440.000 6.7 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 10 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Return Event: 100 years Label: Fayetteville Storm Event: TypeII 24hr (8.7 in) Time-Depth Curve: TypeII 24hr (8.7 in) Label TypeII 24hr (8.7 in) Start Time 0.000 min Increment 6.000 min End Time 1,440.000 min Return Event 100 years CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 30.000 0.0 0.1 0.1 0.1 0.1 60.000 0.1 0.1 0.1 0.1 0.1 90.000 0.1 0.1 0.2 0.2 0.2 120.000 0.2 0.2 0.2 0.2 0.2 150.000 0.2 0.3 0.3 0.3 0.3 180.000 0.3 0.3 0.3 0.3 0.3 210.000 0.4 0.4 0.4 0.4 0.4 240.000 0.4 0.4 0.4 0.5 0.5 270.000 0.5 0.5 0.5 0.5 0.5 300.000 0.5 0.6 0.6 0.6 0.6 330.000 0.6 0.6 0.6 0.7 0.7 360.000 0.7 0.7 0.7 0.7 0.8 390.000 0.8 0.8 0.8 0.8 0.8 420.000 0.9 0.9 0.9 0.9 0.9 450.000 0.9 1.0 1.0 1.0 1.0 480.000 1.0 1.1 1.1 1.1 1.1 510.000 1.1 1.2 1.2 1.2 1.2 540.000 1.3 1.3 1.3 1.4 1.4 570.000 1.4 1.4 1.5 1.5 1.5 600.000 1.6 1.6 1.6 1.7 1.7 630.000 1.8 1.8 1.9 1.9 2.0 660.000 2.0 2.1 2.2 2.3 2.4 690.000 2.5 2.7 3.1 3.7 4.9 720.000 5.7 5.9 6.1 6.2 6.3 750.000 6.4 6.4 6.5 6.6 6.6 780.000 6.7 6.7 6.8 6.8 6.9 810.000 6.9 7.0 7.0 7.0 7.1 840.000 7.1 7.1 7.2 7.2 7.2 870.000 7.3 7.3 7.3 7.3 7.4 900.000 7.4 7.4 7.5 7.5 7.5 930.000 7.5 7.5 7.6 7.6 7.6 960.000 7.6 7.6 7.7 7.7 7.7 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 11 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time-Depth Curve Label: Fayetteville Return Event: 100 years Storm Event: TypeII 24hr (8.7 in) CUMULATIVE RAINFALL (in) Output Time Increment = 6.000 min Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 990.000 7.7 7.7 7.8 7.8 7.8 1,020.000 7.8 7.8 7.9 7.9 7.9 1,050.000 7.9 7.9 7.9 8.0 8.0 1,080.000 8.0 8.0 8.0 8.0 8.0 1,110.000 8.1 8.1 8.1 8.1 8.1 1,140.000 8.1 8.1 8.2 8.2 8.2 1,170.000 8.2 8.2 8.2 8.2 8.2 1,200.000 8.3 8.3 8.3 8.3 8.3 1,230.000 8.3 8.3 8.3 8.3 8.4 1,260.000 8.4 8.4 8.4 8.4 8.4 1,290.000 8.4 8.4 8.4 8.4 8.5 1,320.000 8.5 8.5 8.5 8.5 8.5 1,350.000 8.5 8.5 8.5 8.6 8.6 1,380.000 8.6 8.6 8.6 8.6 8.6 1,410.000 8.6 8.6 8.6 8.7 8.7 1,440.000 8.7 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 12 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time of Concentration Calculations Return Event: 10 years Label: Basin 1 (Developed) Storm Event: TypeII 24hr (3.0 in) Time of Concentration Results Segment #1: User Defined Tc Time of Concentration 13.800 min Segment #2: SCS Lag Hydraulic Length 308.00 ft CN 72.000 Slope 0.017 ft/ft Average Velocity 0.42 ft/s Segment Time of 12.108 min Concentration Time of Concentration (Composite) Time of Concentration 25 908 min (Composite) . Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 13 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time of Concentration Calculations Label: Basin 1 (Developed) ==== User Defined Tc = Value entered by user Where: Tc= Time of concentration, hours ==== SCS Lag Tc = 0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5) Tc= Time of concentration, hours Where: Lf= Flow length, feet CN= SCS Curve Number Sf= Slope, ft/ft Return Event: 10 years Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 14 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time of Concentration Calculations Label: Not Tributary 2 Time of Concentration Results Segment #1: SCS Lag Hydraulic Length 2,715.00 ft C N 74.000 Slope 0.012 ft/ft Average Velocity 0.58 ft/s Segment Time of 77.694 min Concentration Time of Concentration (Composite) Time of Concentration 77 694 min (Composite) . Return Event: 10 years Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 15 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time of Concentration Calculations Return Event: 10 years Label: Not Tributary 2 ==== SCS Lag Tc = 0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5) Tc= Time of concentration, hours Where: Lf= Flow length, feet CN= SCS Curve Number Sf= Slope, ft/ft Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 16 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time of Concentration Calculations Label: Not Tributary 3 Time of Concentration Results Segment #1: SCS Lag Hydraulic Length 1,250.00 ft CN 72.000 Slope 0.035 ft/ft Average Velocity 0.81 ft/s Segment Time of 25.577 min Concentration Time of Concentration (Composite) Time of Concentration 25 577 min (Composite) . Return Event: 10 years Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 17 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Time of Concentration Calculations Return Event: 10 years Label: Not Tributary 3 ==== SCS Lag Tc = 0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5) Tc= Time of concentration, hours Where: Lf= Flow length, feet CN= SCS Curve Number Sf= Slope, ft/ft Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 18 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Runoff CN-Area Return Event: 10 years Label: Basin 1 (Developed) Storm Event: TypeII 24hr (3.0 in) Runoff Curve Number Data Soil/Surface Description CN Area C UC Adjusted CN (ft2) (%) (%) Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil 98.000 598,404 0.0 0.0 98.000 A Open space (Lawns,parks etc.) - Good 61.000 30 794 0.0 0.0 61.000 condition; grass cover > 75% - Soil B , Open space (Lawns,parks etc.) - Good 74.000 15 751 0.0 0.0 74.000 condition; grass cover > 75% - Soil C , Open space (Lawns,parks etc.) - Good 80 000 894 0 0 0 0 80 000 condition; grass cover > 75% - Soil D . . . . Woods - good - Soil A 30.000 55,420 0.0 0.0 30.000 Woods - good - Soil B 55.000 28,563 0.0 0.0 55.000 Woods - good - Soil C 70.000 248,588 0.0 0.0 70.000 Open space (Lawns,parks etc.) - Good 39.000 125 774 0.0 0.0 39.000 condition; grass cover > 75% - Soil A , Open space (Lawns,parks etc.) - Good 74.000 817 904 0.0 0.0 74.000 condition; grass cover > 75% - Soil C , Open space (Lawns,parks etc.) - Good 80.000 65 338 0.0 0.0 80.000 condition; grass cover > 75% - Soil D , COMPOSITE AREA & WEIGHTED CN ---> (N/A) 1,987,430 (N/A) (N/A) 77.009 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 19 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Runoff CN-Area Return Event: 10 years Label: Not Tributary 2 Storm Event: TypeII 24hr (3.0 in) Runoff Curve Number Data Soil/Surface Description CN Area C UC Adjusted CN (ft2) (%) (%) Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil 98.000 7,520 0.0 0.0 98.000 A Open space (Lawns,parks etc.) - Good 74.000 50 797 0.0 0.0 74.000 condition; grass cover > 75% - Soil C , Open space (Lawns,parks etc.) - Good 80.000 19 705 0.0 0.0 80.000 condition; grass cover > 75% - Soil D , Open space (Lawns,parks etc.) - Good 74.000 16 863 0.0 0.0 74.000 condition; grass cover > 75% - Soil C , Open space (Lawns,parks etc.) - Good 80.000 2 064 0.0 0.0 80.000 condition; grass cover > 75% - Soil D , COMPOSITE AREA & WEIGHTED CN ---> (N/A) 96,949 (N/A) (N/A) 77.209 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 20 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Runoff CN-Area Return Event: 10 years Label: Not Tributary 3 Storm Event: TypeII 24hr (3.0 in) Runoff Curve Number Data Soil/Surface Description CN Area C UC Adjusted CN (ft2) (%) (%) Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil 98.000 10,544 0.0 0.0 98.000 A Open space (Lawns,parks etc.) - Good 61.000 727 9 0.0 0.0 61.000 condition; grass cover > 75% - Soil B , Open space (Lawns,parks etc.) - Good 74.000 1 951 0.0 0.0 74.000 condition; grass cover > 75% - Soil C , Open space (Lawns,parks etc.) - Good 80.000 11 479 0.0 0.0 80.000 condition; grass cover > 75% - Soil D , Open space (Lawns,parks etc.) - Good 61.000 7 700 0.0 0.0 61.000 condition; grass cover > 75% - Soil B , Open space (Lawns,parks etc.) - Good 74.000 9 892 0.0 0.0 74.000 condition; grass cover > 75% - Soil C , Open space (Lawns,parks etc.) - Good 80.000 8 944 0.0 0.0 80.000 condition; grass cover > 75% - Soil D , COMPOSITE AREA & WEIGHTED CN ---> (N/A) 60,237 (N/A) (N/A) 76.474 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 21 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 1 years Label: Basin 1 (Developed) Storm Event: TypeII 24hr (3.0 in) Storm Event TypeII 24hr(3.0 in) Return Event 1 years Duration 7,200.000 min Depth 3.0 in Time of Concentration 25 908 min (Composite) . Area (User Defined) 1,987,430 ft2 Computational Time 3.454 min Increment Time to Peak (Computed) 728.885 min Flow (Peak, Computed) 44.01 ft3/s Output Increment 2.000 min Time to Flow (Peak 730 000 min Interpolated Output) . Flow (Peak Interpolated 43.62 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 1,987,430 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 1 1 in (Pervious) . Runoff Volume (Pervious) 179,683 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 179,685 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 908 min (Composite) . Computational Time 3.454 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 22 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Basin 1 (Developed) Return Event: 1 years Storm Event: TypeII 24hr (3.0 in) SCS Unit Hydrograph Parameters Unit peak, qp 119.72 ft3/s Unit peak time, Tp 17.272 min Unit receding limb, Tr 69.089 min Total unit time, Tb 86.361 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 23 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 10 years Label: Basin 1 (Developed) Storm Event: TypeII 24hr (5.5 in) Storm Event TypeII 24hr(5.5 in) Return Event 10 years Duration 7,200.000 min Depth 5.5 in Time of Concentration 25 908 min (Composite) . Area (User Defined) 1,987,430 ft2 Computational Time 3.454 min Increment Time to Peak (Computed) 728.885 min Flow (Peak, Computed) 129.83 ft3/s Output Increment 2.000 min Time to Flow (Peak 728 000 min Interpolated Output) , Flow (Peak Interpolated 128.51 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 1,987,430 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 3 1 in (Pervious) . Runoff Volume (Pervious) 507,393 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 507,402 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 908 min (Composite) . Computational Time 3.454 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 24 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Basin 1 (Developed) Return Event: 10 years Storm Event: TypeII 24hr (5.5 in) SCS Unit Hydrograph Parameters Unit peak, qp 119.72 ft3/s Unit peak time, Tp 17.272 min Unit receding limb, Tr 69.089 min Total unit time, Tb 86.361 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 25 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 25 years Label: Basin 1 (Developed) Storm Event: TypeII 24hr (6.7 in) Storm Event TypeII 24hr(6.7 in) Return Event 25 years Duration 7,200.000 min Depth 6.7 in Time of Concentration 25 908 min (Composite) . Area (User Defined) 1,987,430 ft2 Computational Time 3.454 min Increment Time to Peak (Computed) 728.885 min Flow (Peak, Computed) 173.10 ft3/s Output Increment 2.000 min Time to Flow (Peak 728 000 min Interpolated Output) , Flow (Peak Interpolated 171.60 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 1,987,430 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 4 1 in (Pervious) . Runoff Volume (Pervious) 677,093 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 677,107 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 908 min (Composite) . Computational Time 3.454 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 26 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Basin 1 (Developed) Return Event: 25 years Storm Event: TypeII 24hr (6.7 in) SCS Unit Hydrograph Parameters Unit peak, qp 119.72 ft3/s Unit peak time, Tp 17.272 min Unit receding limb, Tr 69.089 min Total unit time, Tb 86.361 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 27 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 100 years Label: Basin 1 (Developed) Storm Event: TypeII 24hr (8.7 in) Storm Event TypeII 24hr(8.7 in) Return Event 100 years Duration 7,200.000 min Depth 8.7 in Time of Concentration 25 908 min (Composite) . Area (User Defined) 1,987,430 ft2 Computational Time 3.454 min Increment Time to Peak (Computed) 728.885 min Flow (Peak, Computed) 247.72 ft3/s Output Increment 2.000 min Time to Flow (Peak 728 000 min Interpolated Output) , Flow (Peak Interpolated 245.97 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 1,987,430 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 5 9 in (Pervious) . Runoff Volume (Pervious) 975,882 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 975,903 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 908 min (Composite) . Computational Time 3.454 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 28 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Basin 1 (Developed) Return Event: 100 years Storm Event: TypeII 24hr (8.7 in) SCS Unit Hydrograph Parameters Unit peak, qp 119.72 ft3/s Unit peak time, Tp 17.272 min Unit receding limb, Tr 69.089 min Total unit time, Tb 86.361 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 29 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 1 years Label: Not Tributary 2 Storm Event: TypeII 24hr (3.0 in) Storm Event TypeII 24hr(3.0 in) Return Event 1 years Duration 7,200.000 min Depth 3.0 in Time of Concentration 77 694 min (Composite) . Area (User Defined) 96,949 ft2 Computational Time 10.359 min Increment Time to Peak (Computed) 766.578 min Flow (Peak, Computed) 0.99 ft3/s Output Increment 2.000 min Time to Flow (Peak 766 000 min Interpolated Output) . Flow (Peak Interpolated 0.99 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 96,949 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 1 1 in (Pervious) . Runoff Volume (Pervious) 8,765 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 8,765 ft3 SCS Unit Hydrograph Parameters Time of Concentration 77 694 min (Composite) . Computational Time 10.359 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 30 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 2 Return Event: 1 years Storm Event: TypeII 24hr (3.0 in) SCS Unit Hydrograph Parameters Unit peak, qp 1.95 ft3/s Unit peak time, Tp 51.796 min Unit receding limb, Tr 207.183 min Total unit time, Tb 258.979 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 31 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 10 years Label: Not Tributary 2 Storm Event: TypeII 24hr (5.5 in) Storm Event TypeII 24hr(5.5 in) Return Event 10 years Duration 7,200.000 min Depth 5.5 in Time of Concentration 77 694 min (Composite) . Area (User Defined) 96,949 ft2 Computational Time 10.359 min Increment Time to Peak (Computed) 756.219 min Flow (Peak, Computed) 2.95 ft3/s Output Increment 2.000 min Time to Flow (Peak 758 000 min Interpolated Output) . Flow (Peak Interpolated 2,95 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 96,949 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 3 1 in (Pervious) . Runoff Volume (Pervious) 24,751 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 24,752 ft3 SCS Unit Hydrograph Parameters Time of Concentration 77 694 min (Composite) . Computational Time 10.359 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 32 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 2 Return Event: 10 years Storm Event: TypeII 24hr (5.5 in) SCS Unit Hydrograph Parameters Unit peak, qp 1.95 ft3/s Unit peak time, Tp 51.796 min Unit receding limb, Tr 207.183 min Total unit time, Tb 258.979 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 33 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 25 years Label: Not Tributary 2 Storm Event: TypeII 24hr (6.7 in) Storm Event TypeII 24hr(6.7 in) Return Event 25 years Duration 7,200.000 min Depth 6.7 in Time of Concentration 77 694 min (Composite) . Area (User Defined) 96,949 ft2 Computational Time 10.359 min Increment Time to Peak (Computed) 756.219 min Flow (Peak, Computed) 3.96 ft3/s Output Increment 2.000 min Time to Flow (Peak 758 000 min Interpolated Output) . Flow (Peak Interpolated 3.96 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 96,949 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 4 1 in (Pervious) . Runoff Volume (Pervious) 33,029 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 33,030 ft3 SCS Unit Hydrograph Parameters Time of Concentration 77 694 min (Composite) . Computational Time 10.359 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 34 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 2 Return Event: 25 years Storm Event: TypeII 24hr (6.7 in) SCS Unit Hydrograph Parameters Unit peak, qp 1.95 ft3/s Unit peak time, Tp 51.796 min Unit receding limb, Tr 207.183 min Total unit time, Tb 258.979 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 35 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 100 years Label: Not Tributary 2 Storm Event: TypeII 24hr (8.7 in) Storm Event TypeII 24hr(8.7 in) Return Event 100 years Duration 7,200.000 min Depth 8.7 in Time of Concentration 77 694 min (Composite) . Area (User Defined) 96,949 ft2 Computational Time 10.359 min Increment Time to Peak (Computed) 756.219 min Flow (Peak, Computed) 5.72 ft3/s Output Increment 2.000 min Time to Flow (Peak 756 000 min Interpolated Output) . Flow (Peak Interpolated 5.71 ft3/s Output) Drainage Area SCS CN (Composite) 77.000 Area (User Defined) 96,949 ft2 Maximum Retention 3 0 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 5 9 in (Pervious) . Runoff Volume (Pervious) 47,605 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 47,606 ft3 SCS Unit Hydrograph Parameters Time of Concentration 77 694 min (Composite) . Computational Time 10.359 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 36 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 2 Return Event: 100 years Storm Event: TypeII 24hr (8.7 in) SCS Unit Hydrograph Parameters Unit peak, qp 1.95 ft3/s Unit peak time, Tp 51.796 min Unit receding limb, Tr 207.183 min Total unit time, Tb 258.979 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 37 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 1 years Label: Not Tributary 3 Storm Event: TypeII 24hr (3.0 in) Storm Event TypeII 24hr(3.0 in) Return Event 1 years Duration 7,200.000 min Depth 3.0 in Time of Concentration 25 577 min (Composite) . Area (User Defined) 60,237 ft2 Computational Time 3.410 min Increment Time to Peak (Computed) 729.806 min Flow (Peak, Computed) 1.27 ft3/s Output Increment 2.000 min Time to Flow (Peak 730 000 min Interpolated Output) . Flow (Peak Interpolated 1.26 ft3/s Output) Drainage Area SCS CN (Composite) 76.000 Area (User Defined) 60,237 ft2 Maximum Retention 3 2 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 1 0 in (Pervious) . Runoff Volume (Pervious) 5,163 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 5,163 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 577 min (Composite) . Computational Time 3.410 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 38 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 3 Return Event: 1 years Storm Event: TypeII 24hr (3.0 in) SCS Unit Hydrograph Parameters Unit peak, qp 3.68 ft3/s Unit peak time, Tp 17.052 min Unit receding limb, Tr 68.206 min Total unit time, Tb 85.258 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 39 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 10 years Label: Not Tributary 3 Storm Event: TypeII 24hr (5.5 in) Storm Event TypeII 24hr(5.5 in) Return Event 10 years Duration 7,200.000 min Depth 5.5 in Time of Concentration 25 577 min (Composite) . Area (User Defined) 60,237 ft2 Computational Time 3.410 min Increment Time to Peak (Computed) 729.806 min Flow (Peak, Computed) 3.82 ft3/s Output Increment 2.000 min Time to Flow (Peak 730 000 min Interpolated Output) . Flow (Peak Interpolated 3.80 ft3/s Output) Drainage Area SCS CN (Composite) 76.000 Area (User Defined) 60,237 ft2 Maximum Retention 3 2 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 3 0 in (Pervious) . Runoff Volume (Pervious) 14,908 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 14,908 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 577 min (Composite) . Computational Time 3.410 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 40 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 3 Return Event: 10 years Storm Event: TypeII 24hr (5.5 in) SCS Unit Hydrograph Parameters Unit peak, qp 3.68 ft3/s Unit peak time, Tp 17.052 min Unit receding limb, Tr 68.206 min Total unit time, Tb 85.258 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 41 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 25 years Label: Not Tributary 3 Storm Event: TypeII 24hr (6.7 in) Storm Event TypeII 24hr(6.7 in) Return Event 25 years Duration 7,200.000 min Depth 6.7 in Time of Concentration 25 577 min (Composite) . Area (User Defined) 60,237 ft2 Computational Time 3.410 min Increment Time to Peak (Computed) 729.806 min Flow (Peak, Computed) 5.12 ft3/s Output Increment 2.000 min Time to Flow (Peak 728 000 min Interpolated Output) , Flow (Peak Interpolated 5.11 ft3/s Output) Drainage Area SCS CN (Composite) 76.000 Area (User Defined) 60,237 ft2 Maximum Retention 3 2 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 4 0 in (Pervious) . Runoff Volume (Pervious) 19,991 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 19,991 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 577 min (Composite) . Computational Time 3.410 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 42 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 3 Return Event: 25 years Storm Event: TypeII 24hr (6.7 in) SCS Unit Hydrograph Parameters Unit peak, qp 3.68 ft3/s Unit peak time, Tp 17.052 min Unit receding limb, Tr 68.206 min Total unit time, Tb 85.258 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 43 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Return Event: 100 years Label: Not Tributary 3 Storm Event: TypeII 24hr (8.7 in) Storm Event TypeII 24hr(8.7 in) Return Event 100 years Duration 7,200.000 min Depth 8.7 in Time of Concentration 25 577 min (Composite) . Area (User Defined) 60,237 ft2 Computational Time 3.410 min Increment Time to Peak (Computed) 726.395 min Flow (Peak, Computed) 7.38 ft3/s Output Increment 2.000 min Time to Flow (Peak 728 000 min Interpolated Output) , Flow (Peak Interpolated 7.37 ft3/s Output) Drainage Area SCS CN (Composite) 76.000 Area (User Defined) 60,237 ft2 Maximum Retention 3 2 in (Pervious) . Maximum Retention 0 6 in (Pervious, 20 percent) . Cumulative Runoff Cumulative Runoff Depth 5 8 in (Pervious) . Runoff Volume (Pervious) 28,970 ft3 Hydrograph Volume (Area under Hydrograph curve) Volume 28,969 ft3 SCS Unit Hydrograph Parameters Time of Concentration 25 577 min (Composite) . Computational Time 3.410 min Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Cente r [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 44 of 65 Watertown, CT 06795 US A +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Unit Hydrograph Summary Label: Not Tributary 3 Return Event: 100 years Storm Event: TypeII 24hr (8.7 in) SCS Unit Hydrograph Parameters Unit peak, qp 3.68 ft3/s Unit peak time, Tp 17.052 min Unit receding limb, Tr 68.206 min Total unit time, Tb 85.258 min Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.54] Page 45 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Elevation-Area Volume Curve Return Event: 10 years Label: Basin 1 Storm Event: TypeII 24hr (3.0 in) Elevation Planimeter Area Al+A2+sqr Volume Volume (Total) (ft) (ftz) (ftz) (A1*A2) (ft') (ft') (ftz) 120.00 0.0 15,349 0 0 0 121.00 0.0 17,237 48,852 16,284 16,284 122.00 0.0 19,205 54,636 18,212 34,496 123.00 0.0 21,256 60,665 20,222 54,718 124.00 0.0 23,389 66,942 22,314 77,032 125.00 0.0 25,603 73,463 24,488 101,520 126.00 0.0 27,899 80,228 26,743 128,262 126.50 0.0 29,078 85,459 14,243 142,506 127.00 0.0 32,799 92,760 15,460 157,965 127.50 0.0 36,160 103,398 17,233 175,198 128.00 0.0 37,480 110,454 18,409 193,607 128.50 0.0 38,725 114,302 19,050 212,658 128.60 0.0 39,006 116,596 3,887 216,544 129.00 0.0 40,738 119,607 15,948 232,492 129.50 0.0 41,826 123,842 20,640 253,132 130.00 0.0 42,919 127,114 21,186 274,318 131.00 0.0 45,164 132,110 44,037 318,355 132.00 0.0 47,992 139,713 46,571 364,926 133.00 0.0 50,351 147,500 49,167 414,092 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 46 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Volume Equations Return Event: 10 years Label: Basin 1 Storm Event: TypeII 24hr (3.0 in) Pond Volume Equations * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2 - Eli) * (Areal + Area2 + sgr(Areal * Area2)) where: ELi, EL2 Lower and upper elevations of the increment Areal, Area2 Areas computed for ELi, EL2, respectively Volume Incremental volume between ELi and EL2 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 47 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Storm Event: TypeII 24hr (3.0 in) Composite Outflow Summary Water Surface Flow Tailwater Elevation Convergence Error Elevation (ft3/s) (ft) (ft) (ft) 120.00 0.00 (N/A) 0.00 120.10 0.00 (N/A) 0.00 120.20 0.00 (N/A) 0.00 120.30 0.00 (N/A) 0.00 120.40 0.00 (N/A) 0.00 120.50 0.00 (N/A) 0.00 120.60 0.00 (N/A) 0.00 120.70 0.00 (N/A) 0.00 120.80 0.00 (N/A) 0.00 120.90 0.00 (N/A) 0.00 121.00 0.00 (N/A) 0.00 121.10 0.00 (N/A) 0.00 121.20 0.00 (N/A) 0.00 121.30 0.00 (N/A) 0.00 121.40 0.00 (N/A) 0.00 121.50 0.00 (N/A) 0.00 121.60 0.00 (N/A) 0.00 121.70 0.00 (N/A) 0.00 121.80 0.00 (N/A) 0.00 121.90 0.00 (N/A) 0.00 122.00 0.00 (N/A) 0.00 122.10 0.00 (N/A) 0.00 122.20 0.00 (N/A) 0.00 122.30 0.00 (N/A) 0.00 122.40 0.00 (N/A) 0.00 122.50 0.00 (N/A) 0.00 122.60 0.00 (N/A) 0.00 122.70 0.00 (N/A) 0.00 122.80 0.00 (N/A) 0.00 122.90 0.00 (N/A) 0.00 123.00 0.00 (N/A) 0.00 123.10 0.00 (N/A) 0.00 123.20 0.00 (N/A) 0.00 123.30 0.00 (N/A) 0.00 123.40 0.00 (N/A) 0.00 123.50 0.00 (N/A) 0.00 123.60 0.00 (N/A) 0.00 123.70 0.00 (N/A) 0.00 123.80 0.00 (N/A) 0.00 123.90 0.00 (N/A) 0.00 124.00 0.00 (N/A) 0.00 124.10 0.00 (N/A) 0.00 124.20 0.00 (N/A) 0.00 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 48 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Water Surface Elevation (ft) 124.30 124.40 124.50 124.60 124.70 124.80 124.90 125.00 125.10 125.20 125.30 125.40 125.50 125.60 125.70 125.80 125.90 126.00 126.10 126.20 126.30 126.40 126.50 126.60 126.70 126.80 126.90 127.00 127.10 127.20 127.30 127.40 127.50 127.60 127.70 127.80 127.90 128.00 128.10 128.20 128.30 128.40 128.50 98_1702_01 Basin 1 May2010.ppc 6/9/2011 Storm Event: TypeII 24hr (3.0 in) Flow Tailwater Elevation Convergence Error (fta/S) (ft) (ft) 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.00 (N/A) 0.00 0.02 (N/A) 0.00 0.06 (N/A) 0.00 0.12 (N/A) 0.00 0.15 (N/A) 0.00 0.18 (N/A) 0.00 0.20 (N/A) 0.00 0.22 (N/A) 0.00 0.24 (N/A) 0.00 0.26 (N/A) 0.00 0.28 (N/A) 0.00 0.29 (N/A) 0.00 0.31 (N/A) 0.00 0.32 (N/A) 0.00 0.33 (N/A) 0.00 0.35 (N/A) 0.00 Bentley S ystems, Inc. Haestad Method s Solution Center 27 Si emon Company Drive Suite 20 0 W Waterto wn, CT 06795 USA +1-203-7 55-1666 Bentley PondPack V8i [08.11.01.54] Page 49 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Water Surface Elevation (ft) 128.60 128.70 128.80 128.90 129.00 129.10 129.20 129.30 129.40 129.50 129.60 129.70 129.80 129.90 130.00 130.10 130.20 130.30 130.40 130.50 130.60 130.70 130.80 130.90 131.00 131.10 131.20 131.30 131.40 131.50 131.60 131.70 131.80 131.90 132.00 132.10 132.20 132.30 132.40 132.50 132.60 132.70 132.80 98_1702_01 Basin 1 May2010.ppc 6/9/2011 Storm Event: TypeII 24hr (3.0 in) Flow Tailwater Elevation Convergence Error (fta/S) (ft) (ft) 0.36 (N/A) 0.00 1.13 (N/A) 0.00 2.53 (N/A) 0.00 4.34 (N/A) 0.00 6.48 (N/A) 0.00 8.90 (N/A) 0.00 11.59 (N/A) 0.00 14.48 (N/A) 0.00 17.62 (N/A) 0.00 20.95 (N/A) 0.00 24.49 (N/A) 0.00 28.18 (N/A) 0.00 32.05 (N/A) 0.00 36.09 (N/A) 0.00 40.24 (N/A) 0.00 44.60 (N/A) 0.00 49.11 (N/A) 0.00 53.74 (N/A) 0.00 58.46 (N/A) 0.00 63.34 (N/A) 0.00 68.37 (N/A) 0.00 73.54 (N/A) 0.00 78.81 (N/A) 0.00 86.09 (N/A) 0.00 95.06 (N/A) 0.00 105.22 (N/A) 0.00 114.35 (N/A) 0.00 121.50 (N/A) 0.00 127.82 (N/A) 0.00 135.41 (N/A) 0.00 144.03 (N/A) 0.00 153.27 (N/A) 0.00 162.19 (N/A) 0.00 171.42 (N/A) 0.00 181.15 (N/A) 0.00 191.41 (N/A) 0.00 202.24 (N/A) 0.00 213.64 (N/A) 0.00 225.63 (N/A) 0.00 238.23 (N/A) 0.00 251.42 (N/A) 0.00 265.23 (N/A) 0.00 279.66 (N/A) 0.00 Bentley S ystems, Inc. Haestad Method s Solution Center 27 Si emon Company Drive Suite 20 0 W Waterto wn, CT 06795 USA +1-203-7 55-1666 Bentley PondPack V8i [08.11.01.54] Page 50 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Water Surface Flow Tailwater Elevation Elevation (ft3/s) (ft) (ft) 132.90 I 294.70 I (N/A) 133.00 310.36 (N/A) Contributing Structures (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) Storm Event: TypeII 24hr (3.0 in) Convergence Error (ft) 0.00 0.00 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 51 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Storm Event: TypeII 24hr (3.0 in) Bentley PondPack V8i [08.11.01.54] Page 52 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Storm Event: TypeII 24hr (3.0 in) Bentley PondPack V8i [08.11.01.54] Page 53 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) Bentley Systems, Inc. Haestad Methods Solution 98_1702_01 Basin 1 May2010.ppc Center 6/9/2011 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Storm Event: TypeII 24hr (3.0 in) Bentley PondPack V8i [08.11.01.54] Page 54 of 65 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1, Drawdown,Culvert,Spi l lway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 55 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Drawdown,Culvert (no Q: Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 56 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Drawdown,Culvert (no Q: Riser - 1,Spillway) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert (no Q: Spillway) Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 57 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Composite Rating Curve Return Event: 1 years Label: Basin 1 Outlet Composite Outflow Summary Contributing Structures Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert (no Q: Spillwa y) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert (no Q: Spillwa y) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert (no Q: Spillwa y) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert (no Q: Spillwa y) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert (no Q: Spillwa y) Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1,Riser - 1,Drawdown,Culvert,Spillway Weir - 4,Weir - 3,Weir - 2,Weir - 1.Riser - 1.Drawdown.Culvert.SDillwav Storm Event: TypeII 24hr (3.0 in) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 58 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Outlet Input Data Return Event: 10 years Label: Basin 1 Outlet Storm Event: TypeII 24hr (3.0 in) Requested Pond Water Surface Elevations Minimum (Headwater) 120.00 ft Increment (Headwater) 0.10 ft Maximum (Headwater) 133.00 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall E1 E2 (ft) (ft) Rectangular Weir Weir - 4 Forward Culvert 128.60 133.00 Rectangular Weir Weir - 3 Forward Culvert 128.60 133.00 Rectangular Weir Weir - 2 Forward Culvert 128.60 133.00 Rectangular Weir Weir - 1 Forward Culvert 128.60 133.00 Inlet Box Riser - 1 Forward Culvert 130.80 133.00 Orifice-Circular Drawdown Forward Culvert 127.00 133.00 Culvert-Circular Culvert Forward TW 123.00 133.00 Irregular Weir Spillway Forward TW 131.40 133.00 Tailwater Settings Tailwater (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 59 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Outlet Input Data Label: Basin 1 Outlet Return Event: 10 years Storm Event: TypeII 24hr (3.0 in) Structure ID: Riser - 1 Structure Type: Inlet Box Number of Openings 1 Elevation 130.80 ft Orifice Area 25.0 ft2 Orifice Coefficient 0.600 Weir Length 20.00 ft Weir Coefficient 3.00 (ft^0.5)/s K Reverse 1.000 Manning's n 0.000 Kev, Charged Riser 0.000 Weir Submergence True Orifice H to crest False Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 60 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Outlet Input Data Return Event: 10 years Label: Basin 1 Outlet Storm Event: TypeII 24hr (3.0 in) Structure ID: Culvert Structure Type: Culvert-Circular Number of Barrels 1 Diameter 48.0 in Length 64.00 ft Length (Computed Barrel) 64.00 ft Slope (Computed) 0.010 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.500 Kb 0.005 Kr 0.500 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0098 M 2.0000 C 0.0398 Y 0.6700 T1 ratio (HW/D) 1.155 T2 ratio (HW/D) 1.302 Slope Correction Factor -0.500 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... T1 Elevation 127.62 ft T1 Flow 87.96 ft3/s T2 Elevation 128.21 ft T2 Flow 100.53 ft3/s Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 61 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Outlet Input Data Return Event: 10 years Label: Basin 1 Outlet Storm Event: TypeII 24hr (3.0 in) Structure ID: Drawdown Structure Type: Orifice-Circular Number of Openings 1 Elevation 127.00 ft Orifice Diameter 3.4 in Orifice Coefficient 0.600 Structure ID: Spillway Structure Type: Irregular Weir Station Elevation (ft) (ft) 0.00 133.00 4.80 131.40 24.80 131.40 29.60 133.00 Lowest Elevation 131.40 ft Weir Coefficient 3.00 (ft^0.5)/s Structure ID: Weir - 1 Structure Type: Rectangular Weir Number of Openings 1 Elevation 128.60 ft Weir Length 2.00 ft Weir Coefficient 3.00 (ft^0.5)/s Structure ID: Weir -2 Structure Type: Rectangular Weir Number of Openings 1 Elevation 128.60 ft Weir Length 2.00 ft Weir Coefficient 3.00 (ft^0.5)/s Structure ID: Weir -3 Structure Type: Rectangular Weir Number of Openings 1 Elevation 128.60 ft Weir Length 2.00 ft Weir Coefficient 3.00 (ft^0.5)/s Structure ID: Weir -4 Structure Type: Rectangular Weir Number of Openings 1 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 62 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Subsection: Outlet Input Data Label: Basin 1 Outlet Return Event: 10 years Storm Event: TypeII 24hr (3.0 in) Structure ID: Weir -4 Structure Type: Rectangular Weir Elevation 128.60 ft Weir Length 2.00 ft Weir Coefficient 3.00 (ft^0.5)/s Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0 01 ft (Minimum) . Tailwater Tolerance 0 50 ft (Maximum) . Headwater Tolerance 0 01 ft (Minimum) . Headwater Tolerance 0 50 ft (Maximum) . Flow Tolerance (Minimum) 0.001 ft3/s Flow Tolerance (Maximum) 10.000 ft3/s Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 63 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Index B Basin 1 (Developed) (Runoff CN-Area, 10 years)... 19 Basin 1 (Developed) (Time of Concentration Calculations, 10 years)... 13, 14 Basin 1 (Developed) (Unit Hydrograph Summary, 1 years) ...22, 23 Basin 1 (Developed) (Unit Hydrograph Summary, 10 years) ...24, 25 Basin 1 (Developed) (Unit Hydrograph Summary, 100 years) ...28, 29 Basin 1 (Developed) (Unit Hydrograph Summary, 25 years) ...26, 27 Basin 1 (Elevation-Area Volume Curve, 10 years) ...46 Basin 1 (Volume Equations, 10 years) ...47 Basin 1 Outlet (Composite Rating Curve, 1 years) ...48, 49, 50, 51, 52, 53, 54, 55, 56, 57,58 Basin 1 Outlet (Outlet Input Data, 10 years)... 59, 60, 61, 62, 63 F Fayetteville (Time-Depth Curve, 1 years) ...5, 5,6 Fayetteville (Time-Depth Curve, 10 years) ...7, 7,8 Fayetteville (Time-Depth Curve, 100 years)... 11, 12 Fayetteville (Time-Depth Curve, 25 years) ...9, 10 M Master Network Summary ...3, 3,4 N Not Tributary 2 (Runoff CN-Area, 10 years) ...20 Not Tributary 2 (Time of Concentration Calculations, 10 years)... 15, 16 Not Tributary 2 (Unit Hydrograph Summary, 1 years) ...30, 31 Not Tributary 2 (Unit Hydrograph Summary, 10 years) ...32, 33 Not Tributary 2 (Unit Hydrograph Summary, 100 years) ...36, 37 Not Tributary 2 (Unit Hydrograph Summary, 25 years)... 34, 35 Not Tributary 3 (Runoff CN-Area, 10 years) ...21 Not Tributary 3 (Time of Concentration Calculations, 10 years)... 17, 18 Not Tributary 3 (Unit Hydrograph Summary, 1 years) ...38, 39 Not Tributary 3 (Unit Hydrograph Summary, 10 years) ...40, 40,41 Not Tributary 3 (Unit Hydrograph Summary, 100 years) ...44, 44,45 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 64 of 65 Watertown, CT 06795 USA +1-203-755-1666 FAIRFIELD FARMS - Basin 1 Developed Condition Not Tributary 3 (Unit Hydrograph Summary, 25 years) ...42, 42,43 U User Notifications ...2 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i 98_1702_01 Basin 1 May2010.ppc Center [08.11.01.54] 6/9/2011 27 Siemon Company Drive Suite 200 W Page 65 of 65 Watertown, CT 06795 USA +1-203-755-1666 Designed By: BGB Date: Checked By: JMKjr Date: Company: MKR, Inc. Project Name: Fairfield Farms Section 4-6 Project No.: 98-1702-01 Site Location (City/Town) Fayetteville, NC Culvert Id. OF1 Total Drainage Area (acres) 45.6 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter. it is classified nunimdun tailwater condition. If it is greater than half the pipe diameter. it is classified maxmi nun condition. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a mi'm'ni un tailwater condition unless reliable flood stage elevations shoe- otherwise- Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 48 21 Min TW (Fig. 8.06a) 110.4 13.5 Step 2. Based on the tallwater conditions determined in step 1. enter Figure 8.06a or Figure 8.06b, and determine d5o riprap size and minimum apron length (L',). The d,. size is the median stone size itn a well-graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step Z. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 1.25 User Input Data Calculated Value Reference Data Minimum apron length, La (ft.) 26 Apron width at pipe outlet (ft.) 12 Apron shape Apron width at outlet end (ft.) 30 Step 4. Determine the nlaximtuln stone diameter: dl,%=1.5xdFo Minimum TW Max Stone Diameter, dmax (ft.) 1.875 Step 5. Determine the apron thickness: Apron thickness = 1.5 x d.. Apron Thickness(ft.) Minimum TW 2.8125 12 4 Maximum TW 0 Maximum TW 0 Step 6. Fit the riprap apron to the site by making, it level for the 11111111 UM length, Ld. from Flowe 8.06a or Figure 8.06b. Extend the apron farther downstrearn and along channel banks tintil stability is assured- Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight- Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (9ppV7(*a- 3.05). Waere overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered, see page 806.8 13-Jun-11 13-Jun-11 Designed By: BGB Date: Checked By: JMKjr Date: Company: MKR, Inc. Project Name: Fairfield Farms Section 4-6 Project No.: 98-1702-01 Site Location (City/Town) Fayetteville, NC Culvert Id. OF2 Total Drainage Area (acres) 6.13 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter. it is classified nunimdun tailwater condition. If it is greater than half the pipe diameter. it is classified maxmi nun condition. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a mi'm'ni un tailwater condition unless reliable flood stage elevations shoe- otherwise- Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) 24 11 Min TW (Fig. 8.06a) 11.7 12.2 Step 2. Based on the tallwater conditions determined in step 1. enter Figure 8.06a or Figure 8.06b, and determine d5o riprap size and minimum apron length (L',). The d,. size is the median stone size itn a well-graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape. and the apron width at the outlet end from the same figure used in Step Z. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 0.75 User Input Data Calculated Value Reference Data Minimum apron length, La (ft.) 13 Apron width at pipe outlet (ft.) 6 Apron shape Apron width at outlet end (ft.) 15 Step 4. Determine the nlaximtuln stone diameter: dl,%=1.5xdFo Minimum TW Max Stone Diameter, dmax (ft.) 1.125 Step 5. Determine the apron thickness: Apron thickness = 1.5 x d.. Apron Thickness(ft.) Minimum TW 1.6875 6 2 Maximum TW 0 Maximum TW 0 Step 6. Fit the riprap apron to the site by making, it level for the 11111111 UM length, Ld. from Flowe 8.06a or Figure 8.06b. Extend the apron farther downstrearn and along channel banks tintil stability is assured- Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight- Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (9ppV7(*a- 3.05). Waere overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered, see page 806.8 13-Jun-11 13-Jun-11