Loading...
HomeMy WebLinkAbout20080788 Ver 2_More Info Received_20110615 June 14, 2011 L Ji 20 y - ? e G a n d v VY a sr.,, .... Quk THE Mr. Ian McMillan 401 Coordinator W O OT E N NCDENR - Wetlands, Buffers, Stormwater COMPANY Compliance and Permitting Unit401 WQ Certification 1650 Mail Service Center Raleigh, NC, 27699 ENGINEERING Re: Table Revision for P L A N N I N G Pre-Construction Notification Application Tyrrell County Water and Sewer Districts 1 &2 A R C H I T E C T U R E Pressure Sewer System Tyrrell/Washington County, North Carolina DWQ Project No. 08-0788 TWC No. 2876-B Mr. McMillan: Per our phone conversation on Friday June 10, 2011, and in response to your letter dated June 9, 2011, this letter is to confirm that the Pre-Construction Notification Application (PCN) Package, which your office received on June 2, 2011 from The Wooten Company, does not propose any additional impacts above and beyond the original application submitted to you in April of 2008. Due to an oversight, one (1) stream, which was shown on Plan Sheet 5 in the original application, was left out of the impact tables. The revised copy of the application received by your office on June 2, 2011 includes Stream Impact Number 33. Table "Vl- 4" on Sheet 9 of the PCN has been revised and includes a footnote stating: ""Stream missed in original submittal - resubmitted May 2011." Table "VI-6" (Cumulative Impacts Table) has also been revised due to the inclusion of Stream 33. Also, Stream 33 was highlighted and noted on Plan Sheet 5 in the revised PCN. We apologize for the confusion caused by resubmitting the documents without giving you prior notice. If you should have any questions or require additional information, please do not hesitate to contact us. Sincerely, THE WO TEN COMPANY 120 North Boylan Avenue Raleigh NC 27603-1423 ohn A. Core 919.828.0531 cc: TWC File fax 919.834.3589