Loading...
HomeMy WebLinkAbout20041764 Ver 4_More Info Received_20110614BUDGET COURIER SERVICE, INC. 10 pvE 0140 905-D 5TH AVENUE 1"lE SoME GARNER, N.C. 27529 (919) 779-3320 License No. C-1634 Date To: From: Company Name . Company Name Contact Contact Street Street City State Zip Code City State Zip Code Job # or Description SAME DAY DELIVERY TOTAL CHARGES: No. of Pieces Weight Declared Value* IIII?$ BILL TO: Shipper (PRINT NAME) ? Shipper X TIME: ? Consignee Received by (PRINT NAME) F1 Third Party X TIME: *Budget Courier Service, Inc. Insures all shipments for loss or damage to actual value (limit $100.00). Shipper will be responsible for shipment valued in excess of $100.00, unless prior arrangements have been made. C4-'-1L,4 Vq PRIEST, CRAVEN & ASSOCIATES, INC. LAND USE CONSULTANTS PLANNERS/LANDSCAPE DESIGNERS/ENGINEERS/SURVEYORS LETTER OF TRANSMITTAL Attention: Annette M. Lucas, PE Date: June 10 2011 Environmental Engineer , To: Regarding: NCDENR I DWQ Wetlands and Stormwater Branch 512 N. Salisbury St, Raleigh, NC 27604 19th Floor Shiloh Crossing - Phase 2 Sending Attached By: ( )Mail ( )Fax (X )PC&A ( )Overnight ( )Pickup ( Other ( )Specifications ( )Computer Disk (See Note) ( )Contracts (X )Plans/Prints ( )Letters ( )Other Number of Copies Number of Sets Project Number Description 1 2009.009 Final Construction Plans (Approved by the Town of Morrisville) D lu" JV DENR - nVATI=Ft QUAL Wepantiu stet &ancfi These Are Being Sent: ( )For Your Approval ( )For Review/Comment (X )As Requested By: Natalie Landry (X )For Your Use/Information ( )For Your Signature ( )Other Notes: Annette, per m email on Thursday. If you have an questions or require an additional information, lease let me know. Thank You. Note: Priest, Craven & Associates, Inc. accepts no liability, expressed or implied ' for the accuracy or the currentness of my infonnation/data transmitted by comput disk to others. z one T gnatare: brad I ?{ howl nq, h? --r» ?• I'll - , ?.,,1,6,,, ?.? crw7 rnvttc t7i7)/ot-v3vv rax t7171i6/-iz66 tsmatl: I)wwltnga,)pnesteraven.eom Alpha: Numeric: Town of Morrisville Post Office Box 166 Morrisville, North Carolina 27560 Phone: 919.463.6191 Fax: 919.468.6o> i www.townofinorrisville.org January 14, 2010 Shiloh Morrisville, I..LC 9830 Colonnade Boulevard Suite 600 San Antonio, TX 78230-2209 Attn: Jim Speake RE: Shiloh Crossing-Phase 2 Town Project No. 07-80000014 Letter of Construction Plan Approval Mr. Speake, Please find enclosed one (1) executed copy of the approved construction plan set entitled, "Shiloh Crossing Phase 2, Construction Plan Submittal, Morrisville, North Carolina, SUP #05-01", consisting of 60 sheets, prepared by Priest, Craven and Associates, Inc., signed/sealed January 7, 2011. The Town has approved this plan set with the understanding it is the applicant's responsibility to properly construct the project in accordance with the approved plans and attached standard provisions, and also complying with any condition of approval placed on the project by Town Council. In accordance with the Town's Design and Construction Ordinance prior to commencing any construction activities a pre-construction meeting must be conducted, however, the following items must be submitted prior to this meeting being scheduled: 1. The infrastructure fee must be provided, the check is to be made payable to the Town of Morrisville. 2. The performance guarantee must be provided in accordance with Chapter 4.12 ofthe Town of Morrisville Design and Construction Ordinance. 3. The stormwater operation and maintenance agreement must be recorded with Wake County. 4. Two (2) full-sized and two (2) half-sized copies with signatures. 5. Two (2) copies of a TIFF file with signatures and two (2) copies of AutoCAD files with the corresponding pen settings and shape files. The files should be placed on separate CD- ROM's. These CD-ROM's shall include the name of the project, the Town Project Number, the name of the engineering firm providing the CD-ROM, and a paper insert with an index listing the contents of the CD-ROM. Utn- Xlissioii: The TOJ? 11 ojRtnrrisldNe is dedicoled to ellhoucing the quality cal hle brt presercmy our post w0 protec"my our /i111rrc through o enileciwc roomminty partncrship. By balolicing responsihlc gro -th 11401 ( of e uohlt,t. Irc 1.1111(i' (11,11 £i scils( i)/ lilPRll,)Pl.Ship. co71)11 unWatioll. (l)1d .4upp orl. Once the above referenced items are submitted, contact the project reviewer James Meyer (919) 463-6192, to request a pre-construction meeting, allowing a minimum of three (3) weekdays for coordination. Sincerely, Keith P. Billy, PE Town Engineer Town of Morrisville Attachments cc: B. Bowling, Priest, Craven and Associates BKO14295PGO1755 WAKE COUNTY, NC 297 LAURA N RIDDICK REGISTER OF DEEDS PRESENTED 8 RECORDED ON 83/1412611 AT 14:55:53 BOOK:814295 PAGE:8175S - 61763 STORMWATER OPERATION AND MAINTENANCE AGREEMENT AND SECURITY Project Name: SI{ I l-o H CItor SrN y - PEASE 2- Town Project Number: 07 - 8 000 00 1A- PINNumber: 07+(AA7 8 1aS Mail after recording to: Town of Morrisville Engineering Department P.O. Box 166 Morrisville, NC 27560 NORTH CAROLINA WAKE COUNTY This STORMWATER OPERATION AND MAINTENANCE AGREEMENT AND SECURITY, made this day 1-- of ? k P,-h 120 It by 50ILo14 MORRIEVILt-r 0L.IG whose principal address is `1830 C0L0NCI4p9: 8L11D_ Sa ITE (,00 SAID ANT01I10 , TX 7?13o - ZZoq with, to, and for the benefit of the Town of Morrisville, a municipal corporation of the State of North Carolina, whose address is P.O. Box 166, Morrisville, North Carolina 27560. Page I o£7 BKO14295PGO1756 Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. - Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will he available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is resent. Remove the trash/debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove gullies have formed. the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the Swale sediment offsite. The pipe is cracked or otherwise Replace the pipe. damaged ifa livable. Erosion is occurring in the Swale Regrade the Swale if necessary to (if applicable). smooth it over and provide erosion control devices such as reinforced turf mailing or riprap to avoid future problems with erosion. Page 2 of 7 BKO14295PG01757 BMP element: Potential problem: How I will remediate the problem: Forebay Sediment has accumulated in the Search for the source of the sediment forebay to a depth that inhibits the and remedy the problem if possible. forebay from functioning well. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow Algal growth covers over 50% of Consult a professional to remove and water and shallow land the deep pool and shallow water control the algal growth. areas areas. Cattails, phragmites or other Remove invasives by physical removal invasive plants cover 50% of the or by wiping them with pesticide (do deep pool and shallow water areas. not spray) - consult a professional. Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the round cover if necessary. Best professional practices show Prune according to best professional that pruning is needed to maintain practices. o lima] plant health. Sediment has accumulated and Search for the source of the sediment reduced the depth to 75% of the and remedy the problem if possible. original design depth of the deep Remove the sediment and dispose of it pools. in a location where it will not cause impact., to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to embankment. remove the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver Consult a professional to remove activity is resent. muskrats or beavers. Micropoel Sediment has accumulated and Search for the source of the sediment reduced the depth to 75% of the and remedy the problem if possible. original design depth. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is dama ed Re air or replace the outlet device. Receiving water Erosion or other signs of damage Contact the NC Division of Water have occurred at the outlet. Quality 401 Oversight Unit at 919-733- 1786. Page 3 of 7 BKOW93PG01758 BMP Inspection and Maintenance Security Performance Security The Town of Morrisville requires the submittal of a performance security or bond with surety, cash escrow, letter of credit or other acceptable legal arrangement prior to issuance of a permit in order to ensure that the structural BMPs are 1. installed by the permit holder as required by the approved stormwater management plan, and/or 2, maintained by the owner as required by the operation and maintenance agreement Amount 1. Installation The amount of an installation performance security shall be the total estimated construction cost of the BMPs approved under the permit, plus 50%. 2. Maintenance The amount of a maintenance performance security shall be the present value of an annuity of perpetual duration based on the total estimated construction cost of the BMPs approved under the permit. Saecial Requirement for Homeowners' and Other Associations For all structural BMPs required pursuant to this ordinance and that are to be or are owned and maintained by a homeowners' association, property owners' association, or similar entity, the required operation and maintenance agreement shall include all of the following provisions: 1. Acknowledgment that the association shall continuously operate and maintain the stormwater control and management facilities. 2. Establishment of an escrow account, which can be spent solely for sediment removal, structural, biological or vegetative replacement, major repair, or reconstruction of the structural BMPs. If structural BMPs are not performing adequately or as intended or are not properly maintained, the Town of Morrisville, in its sole discretion, may remedy the situation, and in such instances the Town of Morrisville shall be fully reimbursed from the escrow account. Escrowed funds may be spent by the association for sediment removal, structural, biological or vegetative replacement, major repair, and reconstruction of the structural BMPs, provided that the Town of Morrisville shall first consent to the expenditure. 3. Both developer contribution and annual sinking funds shall fund the escrow account. Prior to plat recordation or issuance of construction permits, whichever shall first occur, the developer shall pay into the escrow account an amount equal to fifteen (15) per cent of the initial construction cost of the structural BMPs. Two-thirds (213) of the total amount of sinking fund budget shall be deposited into the escrow account within the first five (5) years and the full amount shall be deposited within ten (10) years following initial construction of the structural BMPs. Funds shall be deposited each year into the escrow account. A portion of the annual assessments of the association shall include an allocation into the escrow account. Any funds drawn down from the escrow account shall be replaced in accordance with the schedule of anticipated work used to create the sinking fund budget. Page 4 of 7 BW4295PG01759 4. The percent of developer contribution and lengths of time to fund the escrow account may be varied by the Town of Morrisville depending on the design and materials of the stormwater control and management facility. 5. Granting to the Town of Morrisville a right of entry to inspect, monitor, maintain, repair, and reconstruct structural BMPs. 6. Allowing the Town of Morrisville to recover from the association and its members, any and all costs the Town of Morrisville expends to maintain or repair the structural BMPs or to correct any operational deficiencies. Failure to pay the Town of Morrisville all of its expended costs, after forty-five days written notice, shall constitute a breach of the agreement. The Town of Morrisville shall thereafter be entitled to bring an action against the association and its members to pay, or foreclose upon the lien hereby authorized by the agreement against the property, or both, in case of a deficiency. Interest, collection costs, and attorney fees shall be added to the recovery. 7. A statement that this agreement shall not obligate the Town of Morrisville to maintain or repair any structural BMPs, and the Town of Morrisville shall not be liable to any person for the condition or operation of structural BMPs. 8. A statement that this agreement shall not in any way diminish, limit, or restrict the right of the Town of Morrisville to enforce any of its ordinances as authorized by law. 9. A provision indemnifying and holding harmless the Town of Morrisville for any costs and injuries arising from or related to the structural BMP, unless the Town of Morrisville has agreed in writing to assume the maintenance responsibility for the BMP and has accepted dedication of any and all rights necessary to carry out that maintenance. Uses of Performance Security 1. Forfeiture Provisions The performance security shall contain forfeiture provisions for failure, after proper notice, to complete work within the time specified, or to initiate or maintain any actions which may be required of the applicant or owner in accordance with this ordinance, approvals issued pursuant to this ordinance, or an operation and maintenance agreement established pursuant to this ordinance. 2. Default Upon default of the owner to construct, maintain, repair and, if necessary, reconstruct any structural BMP in accordance with the applicable permit or operation and maintenance agreement, the Stormwater Administrator shall obtain and use all or any portion of the security to make necessary improvements based on an engineering estimate. Such expenditure of funds shall only be made after requesting the owner to comply with the permit or maintenance agreement. In the event of a default triggering the use of installation performance security, the Town of Morrisville shall not return any of the unused deposited cash funds or other security, which shall be retained for maintenance. 3. Costs in Excess of Performance Security If the Town of Morrisville takes action upon such failure by the applicant or owner, the Town of Morrisville may collect from the applicant or owner for the difference should the amount of the reasonable cost of such action exceed the amount of the security held. Page 5 of 7 BK014296PGQ1160 4. Refund Within sixty days of the final approval, the installation performance security shall be refunded to the applicant or terminated, with the exception of any amount attributable to the cost (plus 25%) of landscaping installation and ongoing maintenance associated with the BMPs covered by the security. Any such landscaping shall be inspected one (1) year after installation with replacement for compliance with the approved plans and specifications and, if in compliance, the portion of the financial security attributable to landscaping shall be released. Page 6 of 7 BK014295PG01761 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify the Town of Morrisville of any problems with the system or prior to any changes to the system or responsible party. Project name: SA LLO ? CROSS IMtq - P RACE 2 BMP drainage area number: LX7ENpE0 bETfNTiON WETeAku ' B." (Dar?4• ?Kr? lkl) (iE-6 ExtJ1B,r#I) EXT6HP1FD DE1'EniTt•ri WE'TLA, > "Cl' CDILM, AAaAAV v ( Print name:_ BRUCE C PETFR4FN Title: Executive Managing Director ;: '1630 C01-0N44Dt: Uvo. Surr>r too (uo) u 41 - 848? /) O Date: M 4&& A ( f 1, 2.p Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, meld C-6a R amn a Notary Public for the State of :r(2 XQS County of BOO r do hereby certify that 3ru e e 0. PV-- I %- personally appeared before me this ?? day of m oreh , 2-ol) , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, MELISSA A. ROSCOE Notary Public State of Texas My Comm. Exp. 01-11-2012 SEAL 3o -2Zo9 pu&ia 0 My commission expires-/ 1// -ZO/ Z Stormwater Wetland Agreement 10-30.09 Page 7 of 7 BKO14295PGO1762 n ?" ,? day ? eO? i N X ?u yt y s? . s, . M 11\ . \A; a l1? ? r .l t1 i J? I I I1, ? j ?: j ill Z ?1 r 1. ? 1 ? f f, 1? . BK014296PG01163 BOOK:014295 PAGE:01755 - 01763 Yellow probate sheet is a vital part of your recorded document. Please retain with original document and submit for rerecording. Own Wake County Register of Deeds WAKE Laura M. Riddick COUNTY Register of Deeds This Customer Group # of Time Stamps Needed This Document New Time Stamp 9 # of Pages .1 22.ca4-1n0r06