Loading...
HomeMy WebLinkAbout20070731 Ver 1_CAMA Application_200704271 i' r1 i~~_~ia. ~/~ e~~ _ ~ -Jy ,~~ . ,. ~- ~~~. NCDENR `~' North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Chartes.S. Jones, Director William G. Ross Jr., Secretary March 21, 2007 MEMORANDUM A Prt ~~ ~q07 p(~'pp 1~TLANGkaA,r'~ta w~''aaNV4~~r1 i~~~ TO: Noelle Lutheran 401-Wetlands Div. of Water Quality FROM: Doug Huggett, Major Permits Coordinator SUBJECT: CAMA /Dredge & Fill Permit Application Review Applicant: Ocean Isle Marina / TJM Ocean Isle Partners, LLC 20070731 Project Location: 2001 Sommersett Rd. SW, adjacent to the AIWW, near the town of Ocean Isle Beach, in Brunswick County Proposed Project: renovation of the existing Ocean Isle Marina Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 13, 2007. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423, when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comi~nent on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. . This agency objects to the project for reasons described in the attached comments. SIGNED _ _ DATE ~ ~~ MAR ~ 1 7 Cardinal Dnve Ext., Wilmington, North Carolina 28405-3845 i ~ ~h~~~ly1rJ i96-7215 irAX: 910-395-396411nternet: www.nccoastaimanagement.net `--- --- -----_ al Opportunity I Affirmative Aclion Employer - 50% Recycled 110% Posf Consumer Paper //~ ~D d ~ / DCM °/. DWD Development Type FEf_ (18300 1601 435100093 1625 6253 (24300 1602 4351000952341) dl,• I private, noncommercial " I 0 % (SO) . development That does not involve 525,1 100 % (5250) the filling or excavation of any wetlands or open water areas: II. Public or commert~al development 0 % (50) Thal does not involve the filling or ~t;D tOD % (5400) excavation of any wetlands or open water areas: '~;r'' III. For development that Involves the filling and/or excavation of up l0 1 acre of wetlands and/or open Water areas, determine if A, g, C, or D below applies; III(A). For Private, noncommercal 0°,0 (SO) development, If General water Quality 5-:c0 .100 % (5250) Cettifwtion No3490(see attached) pn be applied: III(B): For public or cummeroal 0 % (SO) ty development, if General water Ouali :.00 100°,6 (5-100) Certification No.3301 (see attached) can be appled: III(C). If General Water Duality Certification No. 3301 (see attached) ~ could be applied, but DGM staff / ~ ' ,C% 5160 determined that additional review and // ~ written DWD concurence is needed C because of concerns related to water quality or aquatic life: .~~ 111(D). If General Water Duality S SOD 60°: (5240) 40 % (5160) Certification No. 3301 (see attached) • can not be applied: N. For development that involves 40 ~ (S 1 ~0) the filling and/or ezcwaUon of mare Sy75 60°; (S2E5) than one acre of wetlands and/or open water areas: DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Ocean Isle Marina / TJM Ocean Isle Partners, LLC 2. LOCATION OF PROJECT SITE:2001 Sommersett Road SW, adjacent to the Atlantic Intracoastal Waterway, near the Town of Ocean Isle Beach, in Brunswick County Photo Index - 2006: 2-6203; I-K, 10-11 2000: 2-19; O-Q, 14-16 1995: 2-19; O-P, 14-1 S State Plane Coordinates - X: 2159971 Y: 51535 GPS - NU10920A Lat:33°53'25.52890"N Long: 78°28'22.73593"W 3. INVESTIGATION TYPE: CAMA / D&P 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - O1 /U9!07 Was Applicant Present -Yes 5. PROCESSING PROCEDURE: Application Received Complete - 03/16/07 Office -Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan- Brunswick County Land Classification From LUP -Transitional (B) AEC(s) Involved: ES, EW, PT (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing- Septic system Planned- None (F) Type of Structures: Existing- 25 slip marina, dry stack building, office building, parking area, travel lift, boat ramp, bulkheads. Planned- reconfigure existing docking facility, replace existing bulkhead, add boatlifts, demolish existing building, add additional dry stack units, fill boat ramp, construct new fork lift pad and additional parking, elevated boardwalk. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA) DREDGED PILLED OTfIER (A) Vegetated Wetlands (Coastal / 404) 320 sq. ft. (shaded) (B) Non-Vegetated Wetlands (Open Water) 30,000 sq. ft. 1,172 sq. ft 8,076 sd. ft. (incorporated) (C) Other - Highground disturbance 121,648 sd. it. (D) Total Area Disturbed: 2.5 acres (E) Primary Nursery Area: Yes (F) Water Classification: SA, HQW Open: No 8. PROJECT SUMII~ARY: The applicant proposes to reconfigure the existing docks, replace existing bulkhead, add boat lifts and dry stack units, demolition of existing buildings, filling the existing boat ramp, construction of a new fork lift pad and additional parking area, construction of an elevated boardwalk and basin dredging. Ocean Isle Marina March 19, 2007 Page 2 9. PROJECT DESCRIPTION The project site is located at 2001 Sommersett Landing, adjacent to the Atlantic Intracoastal Watei,~~ay, on the mainland side of the AIWW, between the Town of Ocean Isle Beach and Sunset Beach. in Brunswick County. To find the property from NC Highway 17 South, turn left onto NC 904 /Seaside Road SW. Travel approximately 3.5 miles to NC 179 /Beach Drive SW, turn left and travel approximately 0.6 miles to Sommersett Road SW. Turn right onto Sommersett Road SW, and travel approximately 0.4 miles until the road dead ends at the subject property. The property is an approximately 5-acre tract of land owned by TJM Ocean Isle Partners, LLC, c/o Tim Moon. The existing marina is a full service facility consisting of 25 wet slips, 270 dry storage racks with forklift haul out. The facility also includes a boat ramp, shower facilities, a full service boat yard and fuel. The existing facility consists of the following two main structures: a floating dock located just to the west of the boat ramp, which consists of 5 permanent slips on the west side and temporary tie-up slips on the east side for launching via ramp and forklift_ Located east of the boat ramp is a fixed pier which terminates in a "T-head" and has a floating dock located in the center of the main pier on the east side and a floating docks on the landward side of the east end of the "T-head". There is an existing boatlift on the west side of the main pier landward of the "T-head". The applicant states this entire structure will accommodate 17 slips. There is another floating dock located just east of the main pier adjacent to the bulkhead with an additional 3 slips creating a total of 25 existing slips for the entire docking system. The property is bordered by residential property to the west, north, and. east and the AIWW to the south. The marina facility has been in existence since originally permitted on January 14, l 982, permit #4-82 issued to Charlie Furr. A second permit #169-88 was issued on September 2, 1988 for maintenance dredging, a travel lift and extension of the pier. This permit was issued to M & J Marine Services. The marina was later sold and in recent years operated under the name of Pelican Point Marina. The facility has been issued several CAMA General Permits for a boatlift addition and bulkheads, (see, GP Nos. 17534, 18363, 38477 and 45823). The waters of the AIWW in this location are classified as "SA, HQW" by the North Carolina Division of Water Quality. The area is designated as a Primary Nursery Area by the North Carolina Division of Marine Fisheries and is closed to the harvest of shellfish. PROPOSED PROJECT TJM Ocean Isle Partners, LLC is currently proposing renovation of the Ocean Isle Marina by the replacement and reconfiguration of the existing fixed and floating docks, filling of the existing boat ramp, construction of a new fork lift pad, replacement of the existing bulkhead, addition of boat lifts and dry stack units, demolition of existing buildings, construction of additional parking areas. construction of an elevated boardwalk and maintenance dredging of the basin. The existing dock configuration, as counted by the applicant, includes approximately 25 docking spaces or slips and approximately 5 temporary tie-up slips. The applicant is not proposing any increase in the total number of penr~anent or temporary slips (see Sheets 6 & 7). As proposed, there w~~ulcl he ~~ n~~~~ floating dock measuring approximately 8 feet wide by approximately 108 feet Ocean Isle Marina March 19, 2007 Page 3 ~~~ long extending waterward from the bulkhead which would be accessed by a ramp measuring approximately 4 feet wide by approximately 20 feet long, located just west of the forklift pad. The east side of this structure ~~ould provideapproximately 4 temporary slips designated for the launching and retrieval of boats. There would be an "L" shaped floating dock on the west side of this structure measuring approximately 8 feet wide by approximately 190 feet long running parallel the AIW~~~. On the waterward side of this structure would be six (6) finger piers, each measuring approximately four feet wide by 35 feet long, extending perpendicular to the AIWW. These finger piers would accommodate thirteen (13) slips, including twelve (12) boatlifts. Slips #2-5 would each have a boatlift measuring approximately 12.5 feet wide by 12.5 feet long and the boatlifts for slips #6-13 would measure approximately 14 feet wide by 12.5 feet long. No slips are shown on the landward side of the proposed 8' by 190' floating dock. A second floating structure is proposed which would be located on the east side of the fork lift pad acid would be accessed by an "L" shaped ramp measuring approximately 4 feet wide by 32 feet in total length. The main floating dock would measure approximately 8 feet wide by approximately 112 feet long, extending waterward perpendicular to the AIWW. On the west side of this structure and adjacent to the bulkhead is proposed a finger dock measuring approximately 8 feet wide by approximately 88 feet long rumiing parallel to the shoreline. The west end of this structure is designated as a temporary slip for launching, retrieving and/or fueling. There would be another finger dock on the east side of~ the main floating dock adjacent to the bulkhead running parallel the shoreline, measuring approximately 8 feet wide by approximately 48 feet long, designated as one (1) slip. In the middle of the main floating dock would be two more finger docks, one measuring approximately 4.5 feet wide by approximately 40 feet long and one measuring approximately 4.5 feet wide by approximately 50 feet long. Both of these finger docks would run parallel to the shoreline and would be located on the west side of the main floating dock. The main floating structure would terminate in an "L-head" which would measure approximately 8 feet wide by approximately 64 feet long and would extend westward. This floating dock system is designated to accommodate a total of twelve (12) permanent slips. The applicant is also proposing to perform maintenance dredgin~~ of the original boat basin arra i ~~'~~ Sheet 8 & 10), which was originally permitted oil .lanuary 14, 1982 under State permit #~4-h_' anal ~-~-~~~ permitted at a final depth of -6 feet @ mean low water (MLW). The applicant is proposing to excavate an area measuring approximately 200 feet by 150 feet long, to a depth of -6 feet @ (MLW). The area to be excavated would be located from the east side of the temporary tie-up floating dock and would extend past the east side of the second main floating dock. Approximately 3,111 cubic yards of material would be removed by bucket and barge. The applicant is states that all spoil material be would be kept onsite and placed on the northwest portion of the property (see Sheet 6). The spoil disposal area would measure approximately 150' by 60' and would be contained by a silt fence (see Sheets 10.1 & 10.2). The applicant is also proposing to fill in the existing boat ramp and utilize this area for the expansion of the forklift launching pad (see Sheet 9). The area to be filled would measure approximately 35 feet by approximately 24 feet and would require approximately 125 cubic yards of clean sand as fill material. The applicant is also proposing to replace an existing bulkhead (see Sheet 1 l .l), which is located on the east side of the boat ramp area and extends eastward approximately 337 feet. The proposed bulkhead would also extend across the existing boat ramp, making the total length of the new bulkhead approximately 394 feet including the wing wall. The applicant states that the proposed bulkhead would be located an average of 2 feet and no more than 5 feet waterward of the existing bulkhead and would require approximately 80 cubic yards of clean sand fill material below MHW. The Ocean Isle Marina March 19, 2007 Page 4 applicant is proposing to use both vinyl and steel sheet pile for the construction of the bulkhead. Coastal wetlands, consisting primarily of Smooth Cordgarss (Spartina alternifloru) are located adjacent to the existing bulkhead along the east side of the property. The applicant has proposed that .the hull:head in this area be replaced in the same footprint, for a distance of approximately 1 12 linear meet. I h~ applicant does not to propose to place any fill material within coastal wetlands. The applicant is also proposing to construct an elevated wooden walkway to be located on the southwest side of the property, waterward of and adjacent to the existing bulkhead (see Sheets 9 & 1 1.3). The proposed walkway would measure approximately 6 feet wide by approximately 236 feet long and would provide access from the amenities area on the south west corner of the property to the floating dock containing Slips #1-13 and the temporary tie-up dock. This structure would extend over approximately 320 sq. ft. of coastal marsh consisting of Smooth Cordgarss (Spartinu ulternifloru). The applicant is also proposing to replace four the existing single level dry stack storage racl:s ~-~ ith nc~~ four level units. Three of these units will also have removable racks on the bottom level for allcrnati~ parking (see Sheets 15 & 15.1). These units would measure approximately 15 feet wide by approximately 40 feet tall and would very in length from approximately 34 feet to approximately 154 feet. These units would be located adjacent to the bulkhead (see Sheet 6) along the south and east side of the property. It is also proposed the existing fuel tanks be relocated fi-om the east side of the existing office building to the west side of the driveway adjacent to the existing metal dry stack building. New gas pumps would be installed adjacent to the bulkhead on the east side of the forklift pad. All of these structures would be located over existing impervious surface areas. The applicant is also proposing to remove two (2) existing structures located on the cast arcl ~r~ril~~~~~~.ti~ side of the property. The first structure is refers-ed to as the "small boat building°' which measures approximately 80 feet wide by approximately 126 feet long and the second structure is an existing single story house measuring approximately 24 feet by 48 feet. These areas will be converted to a driveway and additional parking. All of the existing graveled areas, (approximately 52,400 sq. ft.) will be converted to concrete (see Sheets 12 & 13). 10. ANTICIPATED IMPACTS: The filling of the existing boat ramp area would result in the filling of approximately 840 sq. ft. of open water. The proposed bulkhead would result in the filling of approximately 332 sq. ft. of open water. The new docking facility and associated slips would result in the incorporation of approximately 8,076 sc~. ti. of estuarine waters and public trust area within the existing boat basin. (It is estimated that the current marina design incorporates approximately 3,448 sq. ft.). The proposed docking system would extend approximately 120 feet into a waterbody, which measures approximately 525 feet across. This distance would conform with the 1/4 width rule and the established pier lengths. As proposed, approximately 6.5 feet of the floating docks would encroach into the U.S. Army Corps of Engineers 80-foot setback from the AIWW, however all pilings are shown to be landward of the 80-foot setback (see Sheet 9). The proposed structures would not encroach into the 15' riparian corridor setback. The floating docks would potentially provide docking space for up to twenty-five Ocean Isle Marina March 19, 2007 Page 5 (25) permanent vessels and approximately five (5) temporary tie up spaces. The proposed dredging would result in the excavation of approximately 30,000 sq. ft. of shallow bottom within a designated primary nursery area previously authorized for excavation. The area is closed to the harvesting of shellfish due to the presence of this marina. The proposed elevated walkway would result in the shading of approximately 320 sq. ft. of coastal marsh, primarily Smooth Cordgarss (Spartinc~ alterniflo~~a). As proposed, the total area of highground disturbance would be approximately 121,648 sd. ft., resulting in the redevelopment of approximately 32,384 sq. ft. of existing impervious surface area within the 75- Estuarine Shoreline AEC. This will result in a 65% impervious surface coverage within t he . A I however no additional impervious surface coverage is proposed. Minor increases in turbidity should be expected, but if construction is timed to avoid periods of peak biological activity impacts should be minimal. A state Stormwater Permit through the N.C. Division of Water Quality, (SW8 070106) was issued on 01/26/07. The application also states that a Sedimentation and Erosion Control Plan has been concurrently submitted to the Division of Land Quality by Norris, Kuske and Tunstall Consulting Engineers. Submitted by: Debra Wilson Date: March 19, 2007 Office: Wilmington Project Narrative CAMA Major Permit Ocean Isle Marina TJM Ocean Isle Partners LLC. The subject tract is located at the end of SR 1161 where it intersects the AIWW. This area is locally known as Sommersett Landing and is located between Sunset Beach and Ocean Isle Beach, Brunswick County. The site has been an operating marina since 1982 and is approximately 5 acres. Structurally there are two dry stack storage buildings, a smaller building that serves as an office, three houses, two small storage buildings, outdoor boat racks, fuel tank gas pumps, boat ramp, bulkhead, boat docks and forklift pad. Currently most of the site is impervious surface. The applicant proposes to fill in the existing boat ramp that measures approximately 26ft by 60ft to create a concrete launching dock (boat drop). On January 14~h, 1982 a permit was issued (#4-82) for the above referenced property and included the excavation of a boat basin in the open water measuring +/- 200ft by 150ft to the depth of -oft at mean low water. The applicant proposes to reactivate this maintenance dredging area with a modification to -6ft mean low water. Approximately 3,100 cubic yards of spoil will be dredged using barge and bucket and placed onsite within a silt fenced area. The applicant also proposes to remove all existing fixed and floating docks and replace them with a new floating dock system to accommodate 25 permanent slips and provide for temporary dockage for boats being launched and retrieved from the dry stack storage facility. Existing dock layout provides 25 permanent slips and approximately 130' of temporary tie-up dockage. Verbal approval was originally given by the USACE Navigation Division (Howard Varnum) for the floating docks to extend approximately 6.5' beyond the USACE Channel Setback as long as all pilings associated with the floating docks were installed landward of the setback. Written approval is forthcoming from James Hargrove, with the USACE Navigation Division. Upland development will consist of removing the small boat building on the eastern side of the property to accommodate parking requirements. Existing impervious areas consisting of gravel will be changed to concrete. The total area of impervious cover within the 30' CAMA buffer will not increase. The existing dry stack storage building and office building will have exterior renovations, and the existing concrete floor of the dry stack storage building will be replaced to the same existing dimensions. No modifications to the structure of the buildings are proposed. Existing utility infrastructure will be utilized for the marina and buildings. A general permit was granted on 7/12/06, #45823-D, for the installation of a new bulkhead along the south-west edge of the property. The applicant proposes to add a wood walkway along and attached to said bulkhead protruding 6' waterward. The walkway will provide access to an amenities area on an adjacent property, proposed slips one through thirteen, and the temporary tie-up dock. Existing one level dry stack boat storage racks on the southern portion of property will be replaced with new four level storage racks in the same location. Also the applicant proposes to re-bulkhead the south and east sides of the property as shown in Figure #6. ~?CI'~14~11LIL~1INGTQN, N~: Form DCM-MP-I APPLICATION (To be completed by alt applicants) 1. APPLICANT a. Landowner: Name TJM Ocean Isle Partners LLC c/o Tim Moon Address 6105 Bluestone Road Suite 302 Cjty Atlanta State NC Zip 30328 Day Phone 910.579.1008 Fax 910.401.1838 b. Authorized Agent: Name Land Management Group Inc Address P.O. Box 2522 Cjty Wilmington State NC Zip 28401 Day Phone 910-452-0001 Fax 910-452-0060 C. Project name (if any) Ocean Isle Marina NO7E: Pr-rw will i5r irsnud in r~mr,r of lrw~dowwer(s), od/or proled wame. 2. LOCATION OF PROPOSED PROJECT a, County Brunswick County b. City, town, community or landmark Sommersett Landing c. Street address or secondary road number 2001 Sommersett Rd. SW, Ocean Isle Beach d. Is proposed work within city limits or planning jurisdiction? Yes x No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Alww 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existing docks, construct new bulkhead, maintenance dredging, filling of existing boat ramp, and upland development. b. Is the proposed activity maintenance of an existing project, new work, or both? both c. Will the project be for public, private or commercial ~? Existing commercial marina since 1982 d. Give a brief description of purpose, use, methods of oonstrurxion and daily operations of proposed project. If more space is needed, please attach additional pages. ontin ~a~ of wet slip and drv storaq~ marina 6 ,sin se - ~_ -. M~ A /7J Form DCM-IVIP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 5 +/- acres b. Size of individual lot(s) NA c. Approximate elevation of tract above MHW or NWL ~ 2' +/_ d. Soil type(s) and texture(s) of tract Lakeland sand e. Vegetation on tract Coastal bermuda, oak trees ~ppcies of .oastal marsh f. Man-made features now on tract Dry stack storage buildings, bulkhead, docks, office, private residence g. What is the CAMA Land Use Plan land classification of the site? (~~ rlk I«nl lmd ~~ ~.~ Conservation x Transitional Developed Community Rural Other h. How is the tract zoned by local government? C-DL i. Is the proposed project consistent with the applicable zoning? x Yes No (Attaali zoning rnnipliance orrrificoare, if appiiaabk) j. Has a professional archaeological assessment been done for the tract? Yes x No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes x No 1. Are there wetlands on the site? x Yes No Coastal (marsh) x Other If yes, has a delineation been conducted? Yes (Aaoah docwnrnrarion, if avnilabloJ Delineation performed by Land Mangement Group Inc. November 2006 and submitted to USACE for review m. Describe existing wastewater treatment facilities. On-site septic. n.. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) yjmite~ Surface runoff o. Describe existing drinking water supply source. Public water 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A Dopy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrumenrt under which the owner claims title, plus written permission from the owner to carry out the project. • M acfiurate, dsted work plat including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1!2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7].0203 for a detailed description.) Pkase note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03195 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Pelican Pointe Marina Inc. Address 2000 Sommersett Rd SW Ocean Isle Beach. NC 28469 Phone Name Ralph King Address 4780 Whiteville Rd. NW Ash, NC 28420 Phone __ Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NCDCM Permits: #45823-D, #4-82 • A check for $40o made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the casts of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of oompGance with the N.C. Environmental Polic' Ad (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public land's, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERNIISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project wDl be subject to conditions and restrictions contained ;,1 the permit. I certify that ro the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner coasistcnt with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to eater oa the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the pfoject. I further certify that ffie information provided in this application is truthful to the best of my knowledge. This is the U?5 day of ,~a4`ar , 20 07 . Print Name .~~/i S Qirad4 ~ Signature - r or Authorized .lgeru Please indicate attachments pertaining to your proposed projoct. x DCM MP-2 Excavation and Fill Information x DCM MP-3 Upland Development x DCM MP-d Structures Information DCM MP-S Bridges and Culverts x DCM MP-t5 Marina Development NOTE: Please sign and daft cacti attaclunent in the spacc providcd at the bottom of each form. ~~GE;tV~D f ~~lt~ ~`t'~E..MII~C~f C~t~lr t~C~ `r ~~ of ~ ,~~-~ Revved 03195 Fort'n DCM-MP-2 EXCAVATION AND FILL Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. 13e sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final E~datiog ~tl~ Length wiam nepm t)epth Access channel (MLA or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding ehorctine etebiliza-ion) 150' 200' ~-3 6' MLW MLW -+2 MLW +6, 35' 24' (-4 to +6) ;.; .;. - MLW t ~~ .- .:~ 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards -3,111 c.y. MHW b. Type of material to be excavated Sand and mud (sediment sampling and testinQOerformed by ECS Carolinas LLP for CORPs approval) c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes x No d. Highground excavation in cubic yards nla Z. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area Onsite disposal area b. Dimensions of disposal area'150' by so' c. Do you claim title to disposal area? x Yes No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? x Yes No If yes, where? Currently orooosed site SUM W{LMiNGT~~I, ~~~ ~W~o~l ~ ~ Zi"-; Revised 03195 Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Docks} and/or Pier(s) (1) x Commercial -Community _ Private (2) Number 4 (3) Length 190.5', 108.5, 10.5',112.5 (4) Width 8', 8', 6', 8' (5) Finger Piers x Yes No (i) Number 11 (ii) Length san35', 88.5'. 40'. 50'. 64.5',48.5' (iii) Width 6(c~3.25, 8', 4.5', 4.5', 8', 8' (ti) Platform(s) x Yes No (i) Number 1 (for ramo landinal (ii) Length 12' (iii) Width 6' (7) Number of slips proposed 25 Permanent Slips (8) Proximity of structure to adjacent riparian property lines 15' to west and -90' to east (9) Width of water body ~525' (estimated from aerials) (l0) Water depth at waterward end of pier at MLW or NWL X1.75'-4.8' b. Boathouse (including covered lifts) (1) NA Commercial Private (Z) Length NA (3) Width NA c. Groin (e.g. wood, sheetpile, etc.) (1) Number NA (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length NA (2) Average distance from MHW, NWL or . wetlands NA (3) Maximum distance beyond MHW, NWL or wetlands NA_ e. Mooring buoys (1) NA Commercial -.Community ____ Private (2) Number NA (3) Description of buoy (Color, inscription, size, anchor, etc.) NA (4) Width of water body NA (5) Distance buoy(s) to be placed beyond shoreline NA f. Mooring structure (boatlift, mooring pilings, etc.) (1) X Commercial ,-Community -Private (2) Number 50 Mooring Pilings, 12 Boat lifts (3) Length 1 (q)35' (4) Width 4 (a~1~8na 14.75' (Boat Lifts) g. Other (rive complete de,criprion) (38 mooring pilings may be used instead of 50 if pilings are shared by lifts. Final determination to be per contractor) Ocean Isle Manna Applicant or i'roj -~ t 2 (,~ ~ Date i~11:'1 V~Y ~~_l V~iltl ~~. ~~~t t(.,,1. lli1 Revised 03195 ~}~r U`~ 07 12. t~ty L.-~r~~ ~1~r~a~;cr~ero~, ~:r~oulO 1rRC: `1C~4:~cu'+JC;f~ Form DCM-MP-6 MARINA DEVELOPIVI~I~T~' (Regraired fmr the mooring nag ~>mre t}~iain ~® vet) Attach this form to 30iTt Application ffizr C~lvlA T~ajor Permit, Farm DCA~I-A~'-l. Q~ ses,~e w c~~plete zfl! other sections of the Joiaat kpinlication that relate to finis pzopvsed project g. TypicaY t~rat l~gth ~a'-30' h, ?dl(~i~am ts~rat l~ ~~GO; tJ , f ~ r 1 f ¢'T ~ F E ~^ I ~ o ~[..' E ` ~ ~ ~ art ,~ Ira., Arc asiy floating struct-urev planiYal? r~`J.....,._._,__..__.. IF stn, describe _ ,___ Y. MARINA CH~2.AC71°]~~°g'~C~ a. Check below the type of u~ae'ima pro,~osed. _,~_ Commercial _~ Public kesadcnti.J b. W=;:.:he marina be open to the general public? X Yes IVo c. If there is residential Bevel®paneait ~soci2ted with the marina, flow many units or JotJ age planed arcd holy zraanv are currently dev'e?t,od? _.I~,_-____._ ____.._ _r________ -_~ d f. ClJr:ic all of the types of services too be provided. X_. _~ Pull service, including travel lift anrll6r rail x ~ Dockage, fuel, Arad marine supy,lies - .~~_ Dockage (wet cline"1 ~nEv Nuzober of slips _ 25 PPrrnanent slips x Dry storage Number of boats ~~~ Boat r8ID~(&~ OtJ!iu (describe.) C,.be'c;k below the pxopased r,Pp~e of si~ra~_ _ Lid cut and access cha>rnael X _~ Opem water with dredging for b;~iar anrl0or channel _~___-_._ water, t1o dredgc~g r~.aiir~ ~_ Other (describe} Describe the typical boats to lac serv®d (for example, open runabout, charter iroaas, sPCit boats, mixed typc*5)- Mixed Types a. Cl~~•~ eaG6 of the following sanitai-y.:aciiitit~ rhea will Tae iincluded in the proposed project. >, ~~, Vice todeis %~ Toilets for patrons Nutaber "~ L.QUation ?_ in r~'r,,r3~.~n h ,i~,l ldi~r, ___._.,._.~._-__, Showers x boat holding tank pUmgovt ~' SIDd }OC~ion Portable ca~im~out~tem to be .-_ used ~ - b. Deslze tre~tanerri type aru3 disposal loratiota frcir all '.~~iic.~j 6-f~C•^~'1'~t~,i. r1n_srie sv~sf,^A!rc~ati c ° ~ ._-.~_. ~ ttoata'7„t ..~ fir, ~l~;u!-Uti __._._..._,._.________~..____-w__..__..-.--- c. De~rr~e t9ae disposal of solid waste, .fish aa~l and te'asl~ disps;,sal, n-srte cumpsier~ J tl. ~$ow wi-1 dv~ard discharge of sevra~es ~,;,r,~ brims be czr>itmllew? _ __ _ hlariroa rn~ ranger wi91 nest and co~rrmurrir;atc~ a "loel'PCI ~.w~. head" p[alicy ~. Cive the locatipn nand number of 'Nn Sewage Disr~iarge" signs proposed. Two wi'~I tie posted at tr,e eastern and western entrances of the marina ltcrised Q3/9S Form DCM-MP-6 f. Describe the special design, if applicable, for containing indusvial type pollutants, such as paint, sandblasting waste and petroleum products. NA g. Where will residue from vessel maintenance be disposed of ? Oil and lubricants will b . containPri ~-, -,a~~Pi~ a~~ recycled. Oil-only absorbent Dads will be kept h. Give the number of channel markers and "No Wake" signs proposed. None i. Give the location of fuel-handling facilities, and desrxibe the safety measures planned to protect area water quality. Emergency shut-off valves. trained employee i~sa nniy anri spill clean-up kit will be utilized. See fiQUre 7 for location of fuel pumps. j. Describe design measures that promote boat basin flushing or circulation and that reduce water quality impacts. Open water basin design promotes flushing. k. What will be the marina policy on overnight and live-board dockage? Overnight dockage will be allowed, but live-aboard will_ not. 1. Is the proposed marina located near any shellfish leases? Yes X No If yes, give the name and address of the leaseholder. nod If this pmject is an expansion of an existing marina, what types of services are carrently provided? Wet slips, dry stack, boat ramp, fueling. and sjiq store. n. How many slips are now available? 25 permanent o. Is the marina proposed within a primary secondary nursery area? x Yes Nc p. Is the marina proposed within an area open shellfisb harvesting? Yes X No q. Give the location and number of "Pumps Available" signs proposed. Two, at the end of each main dock. Ocean Isle Marina Appiitaot or !'nujed Name tn~ o Date ~~~~~~~~ ~~~f ~al~~.~t~pN~~Q~, ~lr f r~. ~;~ '~ F~i ~ (~ ' ~ ; `~ 1 ~ ~ ., . ;y `, ,.~ , ~:. ~ ~ ,, ~.l ,,, , , w - , : /!~ 7 ~ it r :.:.~;:~ ~ ~- , ~r. ~~~ ~ ,~ ; _. ., .; 3` _ .. .. ~ . .: v la ... ff .gyn. .t.. ~~ , - ~ ~ i t ~~t ~, ~I t" , v... ~ ,.. _..,.. t '- ,.. ~ - , .. ~~ _ ~. .. SITE "- {l ;. F ,,,~ _ - :. ~ ! i.- f ~ti. ,. - _ :' l : a - 4 ~ i' t. pi '~j (.' j ~.. - - ~~. .-„ i. ~ .. .. ., r i _- j ~~ ~, t, ~ f 3 1 tea; ,~,,., , , f n,;~f ~~ t i..~,<, .~ h _. 'F .::~ i_ ._: }y _~ F ~ ~- ~ x: t ~ _~~ , J" L~ - i ~ ~ ~ ( ~ V a ~__ ~ ---~ Y Boundaries are approximate and are ~~~~ not meant to be absolute. SCALE 1" = 1 Mile Map Source: North Carolina Atlas & Gazetteer. Pg 86.2003 Tim Moon Ocean Isle Marina Z.MG Figure 1 of 16 Brunswick Count NC ` !'" "" "'''"' "' ` ""' ' y, ,,,,,,, Vicinity Map ,~ . 02-06-550 November 2006 ~: ~~ r• ~ ,' ~ ~ ~ ~ 1 * ~ . ~ ~~ _ '~ q . ~ M ' ~~ SITE ,, + " * M ,~, ~ i • * „ `" '*' ~ r' '~ o ~ _ ' ,.. M ~ ~ +f • ~ ' ' 1~ i ~' ~ ~ i t .. . ~ r --_ w .- i ~.. • 4 w ...,... ~ ~~ _ . , .. . y -~ n i }. a '¢ `( Y _, ~r ~ ". - ~ ~ r i s ~~ i ~6,p ~~: t c ~ ,r a a ~ .., w ,t ~ . ___ . e r a ~. ...,, , ~. _ ,.~' ~ ,~ [ _° ~ r, a ' .. . ~ Jay' ff ~ ~ ~~ r, h.~ R r. _ ~. ~1 r. ; l w. . ~ u .. ~ -, ,; [ t ~ .mow .., ..,.- f° Y~ ~+' i - - e ~ y .. x ~ r ` ~ y y4 ~ . t. k ... ~t ~'9 ' ~~~ ~ '. s t~a i .d ~ ~ -, ,, ~ ~ i i ~_ ~ ~~ ~ ~ ~ ~ Z _ r~ ~. ~ ~ ~ ~ -- L". ~~ Y '` ' Boundaries are approximate and are "``SITE not meant to be absolute SCALE 1" = 800' Map Source: Shallotte Quadrangle 7.5 minute (topographic) 1990. Tim Moon Ocean Isle Marina LMG Figure 2 of 16 Brunswick County, Nc '^"'"'~ "UL~,""' h~""~ , USGS Topgraphic Map 02-06-550 ~ ~~~„~ > ,,~, ,,. _~ November 2006 /^ ` p ' 2F. ^~ - " - wi^it ~,y.. ,q ,y, ,~r~ .. _ q,.. 3 _x,,;~;;;~ - _ ; ~ +~ o x & A~lY '~E r ,.. ~ ... ~ 1 c .~~ a54~` ~ etk vt ~ > •3s ~ ~: Wit! s ~ u , a q `~~ ~^'~ 1NaB * ~ ~. ~a~~~. ~. ~~~ ,~ ~ a'~` ~a~ ~,; ~ =4 #'. ed !~ ~:; ~ F ~ ~~ 1 ~ ~ t; b ~l - M. ~~} w`.'.r ~~ r v vi ,. .13. VM^'' 1u ., ~ ~ ~~ k a~ X ~ ~~ ~~ 4 T ~. e >~' :~,, , ~ ~ ~ . ~ i ~, " °~ ~~., f '~ q ~~~WS ~t.~. ~~; ~~~,, ~ SITE t ,- ~ ~.. v... .avvc.C~A:t 75 , . ~ .. ~ ~_-. ~_. ~ NhE ~, ~~~ ~-t (1~1~~~ , - ~' ` ~ C; ~ , ~- ~ ~ i~ ~,. y \ ~ ~ / _~ ~ ~ ~ i L- ~ ~ ~ti ~ ~ ~~~ i *Boundaries are approximate arrd are~~~~S17E not meant to be absolute Map Source: NRCS Soil Survey. SCALE 1" = 200' Tim Moon Ocean Isle Marina LMG Figure 3 of 16 ~ tW~ ~1 5~~1~„ ll ~ I GRUI )' i_ Brunswick County, NC , , , , ,,,; ,;, , , SOUS ap 02-06-550 -- November 2006 n 7 t/ 7~ 1 y ~ r 8 F. i f ~ ~• / t ~ ~-7~~- -~ ~1~~ t ~_,~ ~ ~ f _~, t ~ ~__1._ ~. ~-~+a~~f{pr 6~~ ~f. ~.~ R f~~;p4~ ~~~k~~'13 te~~~ t S S~Q ~~f~ {Boundaries are approxln~a~e ~~fl(3 are not meant to be absolute. Map Source: 1998 NAPP aerial photography Tim Moon Ocean Isle Marina Brunswick County, NC 02-06-550 -~'` sITE LMG SCALE 1" = 200' Figure 4 of 16 Aerial Photograph November 2006 FIGURE 14 of 16 PRELIMINARY PLAN: NOT FOR CONSTRUCTION NOTES: 1.PROPOSED FOUR LEVEL OUTDOOR DRY STACK RACKS TO REPLACE EXISTING ONE LEVEL DRY .STACK RACKS IN SAME LOCATION. 2.40' MAXIMUM HEIGHT CONSISTENT WITH BRUNSWICK COUNTY REGULATIONS. 3.EXISTING IMPERVIOUS UNDERNEATH EXISTING DRY RACKS TO BE RESURFACED. ~OiL~ VtiILRk~~f~~',r^' ' 1V [.irs r ANCHOREC __ 5 10 ___ 2 0 PROPOSED PROJECTPelican Point Marino Brunswick County LW016/,NnG~GRUUPa ;~~~~ ~° LAND MANAQEMENT QROUP INC ENVIRONMENTAL CONSULTANTS OUTDOOR RACKS CLIENT: Tim Moon ~oB # 02-06-550 ~~ PO t30% 2522 TEIE: (910) asz-ooo, DRAWN BY: ClC DATE: 1.24.07 _~ ti=dy .. NIUAINGTON, N.C. 28102 FAX (a,o, IS2_008G OCEAN ISLE M A R I N A s.,~l:;~~- EMAIL:Infogmgroup.nat SCALE: ~"=10' SHEET 15 of 16 (TYP.) ~ 15 --~ z c~ ~ f 0 ,r- 0 v ~ C4 ~ ~ ~ r > g ~ ~ ~ O ~ ~-~ >Q «R ~ In m ~ ~ ~ °..»._ = CL i ~ ~ O v 4 W N O (V N ~' ~ ~ a~ s~ m 0 O (n a o ° N ~ w N z Q o . _.. LL ~ o r~ - ~ ~- - ~y ~ ~ d z ~j (1) w LL P Q F- U ~ 7 ~ ~ Q z ~~ JJ da ~~ z > ~o m ~ I fv ~~ ~ ~~ 0 N 8PN Z a g ~ c o ~ a n a ~, N a Z o a n°rio ~ io ~ o~ o O Y ~Q , °w 6 ZZ' .u o U 00 ~, __ `5 ~ a ~ X ~ II ~ N N N \ 6opa ~ 3 f '- N oom ~ ~a231 z ff ~ ~ 23 g5~ ~ W1 ~ 5 6^3,35. f a ~ ~ tl l W H J Z ~ Q ~ _ ~ ~ ~ ~ ~ Z L~. 3 Q ..,oz' ~ Y O w O Q U 0 ~ J Q ~' - ~ =°s ~' rn ~ d U U O ~ o m~~ ~n. M Z "'oa ~ Y ~ a O= °°°^ U'C OO 268 ~ ~ ~ ~ ~~~ ~ ~ ~ N O U ~ o d ~'~ ~ O ~~ RIPARIAN UNE N ~ N m ~~ ~~ ~5' RIPARIAN SETBACK X ~ O m m ~~ ~ O Z; U. R ~ ~ a O Z I- z o o ~, w - - ~ z ~ Q U N N 9'~ ' U 2U 33' ~ V ~ ~ C~~\\ \\'[~ 1 ® ~ ~ O N 1 o in 1. II+ ~~ ~ ~ ~~ W O U? L W - /' ~ O cmm~ r 1, 2 _~ 3 Z T z r o z tZ I ~/ a ~ o e o~ ~ 0 w N M~ ~ v r 1. ~ r/"1• O „ ° ~ v H 1 > ~ 33'i2"W a ~~~ ~ ~ ~ Aa2Q' e 5 \ U ~ °f' ~i 6 ~ a ,py E in ~~~ ~ '' 7 w W .o~ °~.~,~ ~ Way aE ~ w i i yy< IAN ~.\\ ~ N~ '` 0 ~ V O Y ~ 7 ~~, Qm ~ s ~ a N ~ i ~ so y ~ i i ~ ~g RIPARIAN SETBACK ~ ~ ~ ~? ~ ~9 ~1 ~ O ~ J Q ~~ _ ~m 1 ~ Z k'~., m y~ ~ ~ o~ r1~ Q a~ _ab o ~ <~ ~ ~ V C a~ n ~` ~Zfi TAW d ~~`" Z m /~ 7E§ ~ ~ 8 m W ~~~ m r°v t ZS ~~ O ~ (n O~ lv~" 5cA WR ~~ mama R a9` ~~a ~~ ~~ 8 U c ~ 23 3 v,~,-Oi$ ~m n~ 2 o,H Ya J o ~m Q ~°'mN o~ -_~ o Yaa_$ ~m n 1Q Q ~, 55 ~m~ ~! o ~ rR Z W xa°ao ~mn~ LJ..I a a~ o a 1268 Str ee ~ Q p .~ ae°'~ y<oa C~ P~'(1 W ~ xa $~°., C ~~ nN ~o g(1n9 ~ W ~ °a CW L z U s m ~ wr~sP bo R ~ ~-, II w N Z om Z ~ ~? x z ~ ~ Z ~ " Z ~ ~ ~ CU". ~ N O z `. F- ~ ~ ~ o Z x C~ Q# $ O Z W N ~ ~ Ep ^' ry ~ m Vm1= ~y~ ~ ~ ' r O W z °d ~ Q L.J J a~ oZ ~~ ~ Z ~~ Td w ~Z ~a < pp ~ iX ~ ~ ail ~~ ~ ~~ _~~ ~ ~ ~` } Z< OWN ~~ F S~jU a.~ i~ 1.G ~~ ~ n 3 ~ ~° L__. ~^ G ~ iTOD E)OSnNO ASPHALT Ora1E o. ~i f , P / ~' NEW GRAw1 OPoVC ~ p C ' ~ NORRIS 8c WARD £ Daryl Pelersm DB B/B (~ ~ ~~ ~-~ G t P.A. Stree Land Surveyors ~ Z1PH~ AXLE FD. DIST. , d llre ~ REBAR FT) ~ p, 13D1 rnanaban Rood sw, CaaBo.A, N.c. 28487 SbvA 4. NaNA P.LS. Rmdy 0. wad, P,LS. Phmc M10-S7i-5808 Fac 810-578-8828 ' `° ENGINEERING BY: Daryl Palarson DB 1414, Pp 40 MeD Baok 9. Pp RO 5, PwfVATE ACCESS AQIEE7IDIT W/ ADJACENT LN4D ~ ~ . FD. ke and Tunsta K i N 249PG0J7 N us orr s, ~y maa MoVay, .1R Consulting Engineers ^ w ~~r, 3 1 r ~.,w~' r M 0 , Pp. 54B Kenneth C. Bryan 47PI011 08 2047 Pp 967 DB. 219, Pq, 15 NB. 2 1/2, Pq. 188 ~D/SITE PLANNING BY: w . . P MB 7 10 Z$IABDI2 nn Je8si5 L. Peiarson t/' ~ -0 p . AYD. K AND P TW 2/3P102E P A i t A D i Cli DB ,4, 5, Pp 96 1 ~ ~ ~ ~~ . . ssos a es • gn ne es ~ ~ MaD Baak B, Pp 120 Q ~ ~ dwylR Ulf OAN J6 263PG039 ~ ~ ~ ~ N8IANQIIE/1 N®E9 wTN ADJADa PAD~wTY DOCK DESIGN BY: ~ p ~ SILT FENCE ~ ~ , ~ ~ e~srac rr ~ a°~ ;1011 A>r~ ~° PROPERT'! BOUNDARY d Marine Inc S ;; ~ ~ ~ REAR ~. . oun o I i N ~ . Ralph c Klrp ~ y DB 1195, Pp. 189 ~ ~ ~ ~ ~ T hl EDONO ro RCTNN WA1Q-TW et Map Book B, Pp 120 ~ lrvE w. Stre za3PCD39 ~ ~ ~ nDnwK wa r wAm uNE ste I 14 A S IP. F0. 1 e ~ II D< DD IP. FD 1 q ~. Ralph C KJnp ' DB 119i. Pp 1B8 Map Book 9, Pp 120 217PG010 EB T 'd wAIX n1/5N 1 ' ^IN PAwiolr (~ y EgtSnNN ~O FlIQ T4K-g~OPO~ ~ y p Opytp[ 3 SPA . ~ PMa10521nc Edward P Pe1~DB 011 LMDUlrbur IV B~I~JN ~ ~~~ A ~~ ~? ~ , . 181 y~ z57ABOit01 DB 1598 P S µEM REC0IYFNDATIOIIS O GN X15t1N ~rMU•~ t0 ~ q, . , P UN 'Q Fua rANN ca4atl7E PAD PA 4ANUFACNwEwB _ O I ~ any /' • D H002 21J ~ ~ ~ - wEwkraDAnaNS . , RE P. FDA - _._ a6area • xORklk NMII ,~ ;~' ~ S . . JOri:T16 wATEN tx4E Atli RelphC qnp l d II STMAOE DB 11 B5, Pp 189 O,~ N ~ ~ ~ A •• ~•I ~ ' Map Book 9, Pp 120 P ~ 243PG041 ~- ~ '~ • .- - Y ~ 3 ~ ~ ~ ~ ~ yr wn ~ • . ~Dn srADN r f ~ ~ ' ~ ~ - ptV sr • ~~~ aar sroRAa . d ~~~`` s ~ S~•• ~ ~ ~ USAGE NON, T25-6 l SURVEY NOTES 7s LAVA ~ N ~~~~ ~ • ~' ~ ~ ~ II a4ppi.ao d ~ ~ I4PE~pN0UA1~ = GE InVa-Coasla htofWBY uNDnwrEerNEIOm U T N d . _ ~ d , ~ • e ~ ^ ~e~ ee~ayRlg . H A .DIS + BRAT RApfS TO BE ULK ADJOINING PROPERTY ONNER$ BASED ON RaipnC Kirk ^ •1rvf SS ~ RE9lwIfAt7D NG DB 1195, Pp. 1B9 INFORMATION Fg1ND IN THE BRUNSNICK CWN 120 Book 9 P (~ Me wk % ,fif TA% OFFICE. p , p. (T) 2d3PG012 rt Pu " ' O BASED ON BRUNSWICK CWNTY FL000 INSURAN ~ ~/1 m S ~ x To ~ v! A ~ D EDOC a V 4AR91 RATE MAPS THIS PARCEL FL000 ZONE 'C'. APPEARS TO BE IN / ~, cµA J aT Fv ea s --- _ _ _. K } ~ 41SA55 Aee~s ~ ~ A ro ~ ~ A11 DISTANCES ARE HOR IZONTAL GROUND gtBAa i ~ PRaDSm + -- D - i' A Z DISTANCES. E%. ADJ. ' _ ,- OAS PUMPS ~, "- _ ~ ~'s - (• Z ELEVATIONS BASED ON N AVD 1988. ~~ I';. 1 m PR ~~ NEw OONCRETF I IAUNdINC DOCK ~ `_. NawwAL Nla suwrrl rP a 6 ,~~ ~ _.__. ' WATER LRK PIRIAT h _ k , D ~ waKwAr - ~~ S tb ~' °ck ChoM I - _~ ~ . _U ~ACR .~ MIT 4F 4ARNA I .~ ~ ~_~ ~ _ y SE 4 WA~RB~D ~,i S LE ~~1 r ~ 1 E r RAP ~ I i I - ~ -- M I x ~ - 1~ APPRO ~~ , I I ;, i Ln i I ~ I , ~ I ,,, ~-- AAA-SIN h~,IV'. ~,, ~1r11.r I ~ f ~.,<« 10 80 I60 ' , I ~ Y l I Iv ~, ~ ~~ Yz . 80 0 a V ~ ~ 1fN t I M N ~ ~ _. ~ K > ~ ~ ~ i% _ Xy ~. f _ ~~ _ f ~, r , i~ _. 1, tl r, , 11 ~~.- w~ ~ -- ." - rwoY to l Wo j 5 -- -OOastD U SAGE Intro (IN FEET ) m ~ 1 inch = 80 ft. A x PRELIMINARY PLAN: NOT FOR CONSTRUCTION ~~a1 M^IyA~ B~^rt~~ ~A~~~ UP INC PROJECT: Pelican Point Marina OCEAN ISLE BEACH BRUNSWICK COUNTY ~ m~ E ~ LAND MANAGEMENT GRO PROPOSED SITE PLA CLIENT: nM MooN JOB # 02-06-550 tiu~r~.;a ENVIRONMENTAL CONSULTANTS ~ CADFILE: x16006_CD01_SITE ~,4TE; 12.06.06 --_ --a, `~~°; ~ PO BOX 2522 TELE: WILMINGTON N.C. 28402 FAX: (91D) 452-0001 (910) 452-0060 ~ ~ ~ ~ ~ (~ ~ ~ ~ A R ~ A DRAWN BY: CLC REVISIONS: 3.15.07 `~!~ ~~~~f ~,~: , EMAIL: info®Imgroup.net SCALE. ~ =80 SHEET 6 OF 16 Y ` v~~ U~ !, Q 80AT RACK c ~ ~'~ S R PO m ~9 ~~ P -~ RAC LIVE 80 FLOATING DOC ~ BSA OAK G ~~ 9s s O?• 13 1 6 lF `~ o ~ ~~ o Q ~ -~ TEMPORARY ~ ~ - Z TIE-uP O FLOATING DOC ~1 e°} ~ z r ~~ Q ~ z ~GP Q 18 19 ~, ~ P~~ ~ O ~ F ~ SEAWALL APPROVED ~ ~ ~ 00~,~ PERMIT 458 ~ ~ 17 ~ ~ FLOATING DOCK ~ tback_ ~ FLOATING DOCK ~ 1 6 Chanty _~- S -~- _- ~~ ~ 15___-____ ~5~~- _ ~ ~ __ - - D _-- - z _ . _.__ ~ TE ~ / 4 ~ __ 1 5/g8 - _ _ APPR~X~ __ _ -- __ -- 1 1 _1 ~P ~, - -' __ - __ ~ ~ R~~GE GRAPHIC SCALE __ - __ NP ~ B ASK M P~N~E ~o o ,5 30 60 ~. ~_ _ ~ 1 l - WATERBODY S ~ OX~IVi A I ~ ` / ~ a (IN FEET ). ~ ~~``~` `€ f !~ ~r Et~'s Pu hi ~' ! z APPR terw y ~ ~n~h = 30 ~~ asta~ Wa ~,. ~ ~~ antra-Co ~~_ rs w . r~ SSA ~ NORRIS & WARD ~n' PRELIMINARY PLAN: NOT FOR CONSTRUCTION Land Surveyors, P.A. \ Strw N. Nar1A P.LS. ~'~ n1p"a~baro Rood SM, Como/h, N.C. 2E197 Nmdy ~. N'ad, P.LS PAmc 910-579-5909 Fmc 910-519-5826 ""°'K^r'~G6MENT°9°uF,~< LAND MANAGEMENT GROUP INC PROJECT: Pelican Point Marina OCEAN ISLE BEACH BRUNSWICK COUNTY ```' ENVIRONMENTAL CONSULTANTS EXISTING DOCK LAYOUT CLIENT: nM MooN JOB # 02-06-550 '~ A~~~~s~~ CADFILE: xtsoos cool_S1TE DATE: 12.06.06 ~' ~~=~~ Po aOX 2522 TELE: (g,°' 452-°°°' OCEAN ISLE M A R I N A ' ~~"~ WILMINGTON, N.C. 28402 FAX: (910) 452-0060 DRAWN BY: cLC REVISIONS: 2.6.0 ~ „~r C~~~~~~f EMAIL: info®Imgroup.net 1~~=30~ SHEET 7 OF 16 _ SCALE: ~ , ~ u ,~ _- 4 a a a ,~ a d 4 a __ a ~` -- ~ ,. .--~---- - _ - ~ - ar ;~ ~ -""`yBQAd RACK ~ ~~ - _ ~ a ~~ 4 7. /,i 30' CAMA SETBACK EX. ADJ. BULKHEAD x 1157 NORMAL HIGH WATER LINE CONTRACTOR MAY USE SINGLE OR DOUBLE PILINGS FOR ADJACENT LIFTS USACE channel Approximate A -81 z ~,,~ Z ~ /~, Water ~ NORRIS 8c WARD Land Surveyors, P,A. Strom M. Nark P.LS 1301 Thanadaw Aood SW, CdaEadi, N.C. 281157 Aondy D. Wad, P.LS. Phmx B10-379-8808 For. 810-579-5825 DOCK DESIGN BY: Sound Marine Inc. N x -3. 6~D Setback ~_ D _ bod ~~ ,~ t, 1~ 5, x (~,~ x ~5 SJ4 x J~ ,,, ,,,,.,, ,,,,,,,,,, „ ,,,,,,,,,, // /// /// „ ,,, ,,,, ,,,, ,,,,, ,,,,,,, ,,,,,, ,,,,,, ~,~,,, iiiiii uiiii iiiiii iiiiii• iiiiii iiiii iiiii '~~~ SILT FENCE ~ ~~ ~ _ ~ ' ,_ '~, `~ __ ~ O X _ __ ~ y- , - _ ~ .~ ~~~ -__ ~~ I, CONCRETE •,~ , - - Iy I _ ~~ x 1,08 55 ~ Q LAUNCHING X ~, F Q ~~, DOCK -5.4~;~, ~ `C ~~ SEAWALL APPROVED X ~ X ~'~~ 3' ~ -4,89 ~ x -7,01 j ~` PERMIT 458 ~ ~. a - 3.41 ,I ' ~ ~ ,~_ _ _. - `r• ~ POSED WALKWAY - ~ ~~ x ___. __ II ~' - - _ ~ ~; _ x _ ' - ~ 8 I d X - 0 ' I I I .09 ' , I I ,1 ~i U~~ ~ _ _ Y ~ x -4.68 6,66 ~.. - - - _ - __ ~ -7~6~ Caas Intra_ x -12,88 x -1403 NOTES ON BOATLIFTS DIMENSIONS BOATLIFTS 2-5 :12.5' BY 12.5' BOATLIFTS 6-13: 14' BY 12.5' GRAPHIC SCALE 30 0 15 30 60 r ~.. ~r . iFt°~~~~'`i~ ~1 ~~~ i ~-, ~, ( IN FEET) f= ~ ~ (g ~ ~ #~-, 1 inch = 30 ft. PRELIMINARY PLAN: NOT FOR CONSTRUCTION J v i ~ ~ ~ - f/ ~, ~ " _ ~ _- - ~ ELEVATIONS BASED ON NAVD 1988. /~-~ -- _ .__ ;~ a MEAN t11G11 WATER ELEVATION = 19' tbQCk tal ~VaterW 1 MEAN LOW WATER ELEVATION=-2.9' _ X -6,35 1 x -9~2IUSAC~ 12 BOAT SLIPS WITH LIFTS ."`~~:~x,~~v>:Nft~r~~°DF~G LAND MANAGEMENT GROUP INC ~.~. `"`` r; ENVIRONMENTAL CONSULTANTS i ~,L>sy ~~` =~ PO BOX 2522 TELE: (910) 452-0001 _ WILMINGTON, N.C. 28402 FAX: (910) 452-0060 ~"' ~~„ EMAIL: infc~lm rou net ' ~IuJ ,~ 9 P• PROPOSED DOCKS OCEAN ISLE MARINA 4 ~ J ;..tr a ~~~ ~a ~~ GAS ~'~ s PUMP ~ PROJECT: Pelican Point Marina CLIENT: nM MooN CADEILE: Xlsoos coal_s1TE DRAWN BY: ac SCALE: ~ "=30' X - OCEAN ISLE BEACH BRUNS'MCK COUNTY J08 # 02-06-550 DATE: t2.o6.06 REVISIONS: 2.6.07 SHEET 8 OF 16 - ~~ ~h C. King' 195, Pg. 189 ok 9, Pg. 120 3PG042 ~, 30' CAMA I SETBACK EX. ADJ. BULKHEAD NORMAL HIGH WATER LINE d a d a i I _~-~-` ,~, LIVE _ f ... a~ a ~ AT RACK ~ OAK a ~ - - ~ ~~ - - - --., , CONTRACTOR MAY USE 51NGLE OR DOUBLE PILINGS FOR ADJACENT LIFTS ~~ Z ~~ anne~_ 5etba_kD USACE ~h ~ ~ terbody < -~ Z Approx. 4 a°k Setb ~ -~ I n ~I Slurs 4. Rart4, P.LS. 1701 ThaoroAaro Rood SW, Cddlmh, R.C. 1D187 Randy D. Ntrd, P.LS. Phony 91C-374-5e08 Fac 410-77Y-OE25 NOTES ON BOATLIFTS DIMENSIONS: BOATLIFTS 2-5 :12.5' BY 12.5' BOATLIFTS 6-13: 14' BY 12.5' UJh~~ DOCK DESIGN BY: Sound Marine Inc. ,,, ...... ,,,,,,,,,, „ ,,, ,,,,,,, „ ,,, ,,, „ ,,, ,,,, ,,,, ,,,,, ,,,,,,, ,,,,,, ,,,,,, ,,,,,, ,,,,,, ,,,,,, ,,,,,, ,,,,,,, ,,,,,, ,,,,, ,,,,, ,,,,,, \ ,~- 1 ~ ~ -- ~ - _ __ II d _- 18 __ - -- - --` - ~ ~_~ __ - _ __ __- ~- -- ~- FRE __ _ - _ -~ OR~~~E 1N~~N ANG MP Waterway 0 ~I rG~~-~88 ~_~ F ,07~07~~ GRAPHIC SCALE JO D 15 30 60 ~~~( ~~~E ~ t,~E ku Lrklllvlr~ ~ i" ( IN FEET) ~~' `' I "` 1 inch = 30 ft. .T~ iF {~ LiE~~, PRELIMINARY PLAN: NOT FOR CONSTRUCTION ~'~ ""``~NA4EMHhffGR6°F~~° LAND MANAGEMENT GROUP WC PROJECT: Pelican Point Marino OCEAN ISLE BEACH BRUNSWICK COUNTY ~,~ 2a. ~ ~ ~ ENVIRONMENTAL CONSULTANTS PROPOSED DOCKS II CLIENT: TIM MooN JOB # 02-06-550 ~_ ` -~ PO Box 2522 TELE: (910) 452-0001 CADFILE: X16006 c0a1_SITE DATE: 12.06.06 I " WILMINGTON, N.C. 28402 FAX: (910) 452-0060 0 C E A N I S ~ E MARINA DRAWN BY: CLC REVISIONS: 2.6.07 1~,~~Jjlll`I-1 EMAIL: info®Imgroup.net SCALE: ~"=3a' SHEET 9 OF 16 NORRIS 8c WARD l.ontl Surveyors, P.A. V."`f 4 J. a d '. d ~1 5. GAS s PUMP _/ `~ _, -~, -, _ _- ,~ _~ _ _ 14 ~-_- ~,, i_ CONCRETE LAUNCHING ! __' DOCK I ~%~- ` '~, ,i ; d ~~- TEMP RARY I TIE-UP -~,r a / '- TYPICAL SEDIMENT FENCE DETAIL NTS ~~ SIDE SLOPE TO BEAT 3V:1 H T G~FA~s 0 s sFO~Q~s ~q ~ c oT o~ti tic otis tir ~,9 a ,s ~,~ F,y9~ 'L .o GcOF9A~~~~~ T ~'L o~~~A~ OFO ,~~~ FT ~ F~ 9s F rtiG~l ~F~tiT s s ~~Fa ~tiy' ys~ o~sca~ ~ Ttia~y c '~~ 0,~~0 oFSC ~c ti TOTAL CAPACITY AS SHOWN: 3,600 CY SILT FENCE 3 SILT FENCE ~ 2 p °° 2 ~ ~ 3 ~ 12' ~ Z I W - - - - - - - - - - - - - - - - - - - W 5 = = = _ = =1= = = = = o - - - - - - - - - - - - - - - - - - - - 0 10 20 30 40 50 60 70 80 90 100 Ilp 120 130 140 150 160 170 180 190 200 210 SECTION B-B DISTANCE (ft) 0 10 20 40 APPROXIMATE EXISTING GRADE ~'~~~~k~ak'~~E~> t~;(1~ V~fiLr~IC~G T G~~, ~Jt; MPR ~ fi 2QOi ~l 0 Z `- ~ ~ o Y o ui V w '' o ri ~ ~ z x w w ~ m ~ w m ~ o ~ a z > d Q °o ° U ~ Z o W ~ U N 0. H U m ;?~ ~ ~ ~ U d U D N W _Jz LL Q O ~ W J Jz ^^0 W LrJ^. O VJ 0 U ~~ Z nh a ~~ ~ aW Q ~o L J ~° ~ ~ ~ E W° $ J of F Z \J~J Z ~ W Q ~ QO m 5 Z (.1 i w N Z a N 2 ~~ J 8: ,a`~_Jluo~a LICAMA12D06 CAMA FILES102-O6-55D --- PELICAN POINT MARINA, TIM MOON1Xi6DD6_CD01_SITE-12-18-O6.DWG ~'~,s • 0 7. 0 7 3 1 G FA ~S SF ~F~~ °~ ti°,~sF9'~ Da I Peterson ~'o f,°,~tiT.~tio ry tis~ ~°9 ~,°~SA DB. 1414, Pg. 40 ~Ltio~9 0 ~ ,~ Map Book 9, Pg. 120 5 o°T ~ ~'F c~ti BSA °F q 243PG037 ~ L VE '~o,~ FT,p"~T s GF NSF o K Tti~sAi~o% tiyTCtiF ~cT~ tiy~o%T 9 ~~~N,J~'„ soytio Jessis L. Peterson DB. 1415, Pg. 38 Map Book 9, Pg. 120 243PG038 r Ralph C. King DB. 1195, Pg. 189 Map Book 9, Pg. 120 243PG039 ~~ SP DISP AF SEE SHEET 10.1 OF 16 FOR PROFILE B-B 150' AXL a ~~ 26" LIVE OAK P. SILT FENCE Ralph C. King DB. 1195, Pg. 189 Map Book 9, Pg. 120 243PG040 ~, .~ EB 60' ~- ~` ' ; e ~ ^ } .~~ x`S-~~NG M 0 Bv~~~1 NG 0 15 30 60 gEM p,1 L 1CAMA12006 CAMA FILESl02-06-550 --- PELICAN POINT MARINA, TIM MOON1X16006 ~,. 2-16-06 DWG L~ 0 N 0 z ~ N O Y o ui U N ~o~ z u ui w ~ m ~- w m ~ o N Q z ~ } a. z U ~ 2 0 w ~ ~ `" a ~ ~ ~: m -~ Z ~ ~ ~ ~ ~ U a U o N J Qz ~~ OQ ~~ (n w J ~~ JQ O W ~o z ~~ - .. ~ ~s ~V Z ~~. a J ~ E Wo g ~ ~ J F 2 Z '~ W Zo ~ Q~ ~5 ~ w ~ Zz 0 NO 8~ N~\s ~ ~~ A~ l 1 PRELIMINARY PLAN: NOT FOR CONSTRUCTION ' ",~2~ COASTAL MARSH/"4o4" LAND MANAGEMENT GROUP INC. 11; ', LINE BULKHEAD NOTES AND CALCULATIONS ~~ ~~ i. NORMAL HIGH WATER RUNS ALONG '; ~~ EXISTING BULKHEAD EXCEPT `, ~t WHERE NOTED. ~1 ~~, PROPOSED 2. "404" LINE FOLLOWS BULKHEAD ~~ ~ BULKHEAD EXCEPT WHERE NOTED ~~ \`~ 3. LINEAR LENGTH OF PROPOSED ~~ `, BULKHEAD: ~394~ \ `~ 4. FILL AREA BEHIND PROPOSED `~` `, BULKHEAD: 36i FT2 `~ ~ ~' 5. AVERAGE DISTANCE WATERWARD ` ~ , ~~ OF NHW: ~i' ~~ 6. FILL AREA OF RAMP:35' BY 241 ~ PROPOSED BULKHEAD EXISTING~l7LKHEAD j r' ~ ~' NORMAL HIGH ' ~ WATER ~~ ~~ 1`~1 " `.\ ~ r i " ~'\, " ; - ~~ JOINT COASTAL - ~ - ~ ~ - - r " " FILL AREA BEHIND '; MARSH & "404" LINE ____~ i BULKHEAD BELOW 1 ENDS NHW (HATCHED) ' POUFFE ---,,, PROPOSED WALKWAY 3o C~"" " `, ~. ~, RAMP FILL `~ ~ ~~, " _ ~ ~ (1 XISTING BU~LKIi~AD NORMAL H W .NLW X66 PROPOSED BULKHEAD NORRIS & WARD Land Surveyors, P.A. law M. Nark, P.1.5. IJ01 Thanobao Raod SW, Cdobo~h, N.C. 18167 Rondy 0. Wad, P.LS, Phma~, 910-579-5608 Faa~. 910-519-5675 ENGINEERING BY: Norris, Kuske and Tunstall Consulting Engineers LAND/SITE PLANNING BY Cline Design Assosiates, P.A. DOCK DESIGN BY: Sound Marine Inc. S Pelican Pointe Marina ,Inc DB. 801, Pg. 1052 257AB01101 GRAPHIC SCALE 30 p 15 30 60 ( IN FEET ) inch = 30 ft. G r~~~ `~~I°~~= ~.Ftl~ ~.' ~f , ,' i;;; COAST H LINE ,P.NO INKIVRGHFdRhI'?GROUP rNc ~F ~_~~~-~) 'iii ~, ~r=,~a __ ' ~I,'J.~li LAND MANAGEMENT GROUP INC ENVIRONMENTAL CONSULTANTS PO BOX 2522 TELE: (910) 452-0001 WILMINGTON, N.C. 28402 FAX: (910) 452-0060 EMAIL: infoQ~lmgroup.net PROPOSED BULKHEAD OCEAN I SSE M AR N A PROJECT: Pelican Polnt Morino OCEAN ISLE BEACH BRUNSWICK COUNTY CLIENT: nM MpoN JOB # 02-06-550 CADFILE: xlspos cool_SITE DATE: i2.tt.os DRAWN BY: CLC REVISIONS: 2.6.07 SCALE: ~"=30' SHEET 11.1 OF 16 0'0731 GRAPHIC SCALE 0 2.5 5 ( IN FEET) Norris, Kuske and Tunstall 1 inch = 5 rt. Consulting Engineers ^"°M"""G~~T°R°°P~° LAND MANAGEMENT GROUP INC ,,.. SECTION 1"=5' CONT I1S5 6x4x U4 WALER FACE CF OLD S11EEfPILE FACE OF NEW 511f.ETPILF. e DETAIL s = I o'-o" e DETAIL 2 U2"CLEAR p6Q 18"O.C.(NORTh-50UiH) I I /2"CLEAR d6 n~6" O C_(EAST-WES 6_CO' DREDGE CEf'T!1 6R6 TOP d BO p4 71E5 (~ 12"0. cc((,,q~ x Coq ED0555 STEAL 511EE1'PILE ~ CS 55 ST~P~S~FE'PITING CONi 1155 6x4x i I4 WALER 9~~f~01~ElEV, - 15.0 `° `' ENVIRONMENTAL CONSULTANTS PROPOSED BULKHEAD DETAILS ~~~ ~ PO BOX 2522 TEIE: (910) 452-0001 ~~`'~ WILMINGTON, N.C. 28402 FAX: (910) 452-0060 O C E A N S ~ E M A R N A ~,~~'~~%~~~I jl EMAIL: info~lmgroup.net J U J Z Q 8 m /(~ _ ~ ~ V I P ~ / (~ n1 C E Z Vl m m 0 p' ~ W ~~y L(J Z ~ (~v _Z V rr rn~ a ~ o W V Y W - ~ ~ ~" ~ ~ N= Y Z ~o ~ J "off - ~ m~ (~ Z PROJECT: CLIENT: CADFILE: DRAWN BY: SCALE: DETAIL 3 e I " = 10'-0" Pellcon Point Marino nM MoDN X16006 CD01_SITE CLC MULTIPLE H U E-~ O U 1r-1O I"~ I"0 h D. GALV TiE ROD ~a 6'-10" 0 .,SCE PUN 1 D'0 Pilf BCYOND ~~0 I""'1 .. h~'1 (A55UMfC) '""~ '~" F~~'1 ~ x,.. i'Cf~ 1ti'k~~v~fl~'`T~ ~ , .~.~'~ ~ 1a.~3N,,!{.., ". p ~ ~,~ r .v Mfr{ .'~ ~ ~. 7 k bA ~ t' Ivy iyt u: OCEAN ISLE BEACH BRUNSWICK COUNTY JOB # 02-06-550 DATE: 12.11.as REVISIONS: 1.25.07 SHEET 11.2 OF 16 WOODEN SLAT WALKWAY I X6.00' (ASSUMED) GRAPHIC SCALE 4 p 2 4 8 -- - ( IN FEET ) 1 inch = 4 ft. c S~ C ~0 QQ- \~Q ~~ ~~~ ~G \pt~PQ ~C O~p~ ~ ~P~ G~~~ ~~~ Q~~ ~~ ~~~ J Q~ Jc~~~O~~~~ ~ G ~ off' ~IIEETPILE S1IEETPILE - 15.0 (TYP.) ~~F:~w"~~"~~~. t`1 t l... t.; EE 7~ Y,t. r.~~.i i• PRELIMINARY PLAN: NOT FOR CONSTRUCTION "y~"'~"~~~'~~~°°°w° ~ ~,.. LAND MANAGEMENT GROUP INC PROJECT: Pelican Point Morino ocEAN ISLE BEACH BRUNSWICK COUNTY ~~r-~~~~~ ~~~~ ~~ ENVIRONMENTAL CONSULTANTS CANTILEVERED WALKWAY cuENT: nM Moog J08 # 02-06-550 ~~' e PO BOX 2522 TELE: (910) 452-0001 CADFiLE: X16006 CD01_SITE DATE: 2.s.o~ =at . J sP ,~~' WILMINGTON, N,C. 28402 PAX: (910) 452-0060 0 C E A N IS L E MARINA DRAWN BY: CLC REVISIONS: 1~~~1~1~(~ ~~ EMAIL: info~lmgroup.net SCALE: ~"=4' SHEET 11.3 OF 16 HEAVY DUTY rnnirorTr- I ..~ „~~ LAND MANAGEMENT GROUP INC. AEC NOTES AND CALCULATIONS i. TOTAL AEC AREA AS PROPOSED: ~50,40o F'I'2 2, TOTAL IMPERVIOUS COVER WITHIN PROPOSED AEC: 32,834 FT2 (HATCHED) 3. PERCENT IMPERVIOUS IN PROPOSED AEC: 65 MORRIS & WARD Land Surveyors, P.A. Sl.w M. Nortl., P.15. IJOt Thoma.Awo pond SW, Cdaboeh, N.t. 28187 Rmay o. word, P.i.s Phonc o~o-sn-8808 v,~ elo-s7e-sass ENGINEERING BY: Norris, Kuske and Tunstall Consulting Engineers LAND/SITE PLANNING BY: Cline Design Assosiates, P.A. DOCK DESIGN BY: Sound Marine Inc. PRELIMINARY PLAN; NOT FOR CONSTRUCTION GRAPHIC SCALE 30 p 15 30 60 (IN FEET ) 1 inch = 30 ft. CONCRETE (HATCHED ) IMPERVIOUS COVER (HATCHED ~ ), 75' AEC LINE 9 D~ d a ° ~~ L °' ~° a ~ ° ° ~ S `, !, AEC LINE 75 q d a 5 ~ ~ I a y d , • a d a ~ ~a i 3 ACES _ ° a ;- ~ ° ~ ° A°;~ ~- _ a r. ° Q Q, i, ~~ ~ ° ~ ° _~~° ~~ ~ ,4 ° d,~ ~ ~ r, ---- - 4 4. J Q A ° ~ ° ~ Q ~ ~" r ~ ~ ~" ~ ° ~ ~ r r' ~~ ~ ° ° 4 j ~Q " ~ ° 4 4 ~ ~~ d ~ ~ 4 ~ ~ ~ - ° ~~~V //rrrr/rii i rr /rrr / i -~I" Q. ' ~ , 4, __ "' LIVE r i n i ,. ,,, ,,;.,/,., ~ 4 ~ ~ ~ „, A a _ _ ' " ~ ~ OAK "'" ,,,, ° . ,~ ~~a . ,~ ,,,,/ ,,,,,, _-- _ _. _/ 4', ` HW / ~~/ N TEMP ~ SIL F~ 4MD MA.Nk~&MAWT GkY^,Up mc. 6'-b ~J'`= ~' ~r 7L~~~~4~~.5J ,,,,,: ,,,,,, „/,.,, ,,,;,; ,,,,,/ ,,,~, i ~ 1 I I 1~ _~, a ~ GAS PUMP ~ ' P 0 OSE WALKWAY " ~ ' LAND MANAGEMENT GROUP INC PROJECT: ENVIRONMENTAL CONSULTANTS PROPOSED AEC IMPERVIOUS CLIENT: PO BOX 2522 TELE: (910) 452-0001 CADFILE: WILMINGTON, N.C. 28402 FAX: (910) 452-0060 0 C E A N IS LE MA RI NA DRAWN BY EMAIL: info~lmgroup.net SCALE G' 0 73 1 COASTAL M~ H ~ + ~4 ~~ i ~rE T`'. ~x ~~~~ ,,,~ .. .gib, I r~ ,~,~ ll ~I.,; ,~~~, I ., - _ ~ ~ I„,. Pelican Polnt Marlnc OCEAN ISLE BEACH BRUNSWICK COUNTY PM MOON JOB # 02-06-550 xlsoo6_cool_s1TE DATE: 12.itos cLC REVISIONS: 2.s.o7 t"=3o' SHEET 12 OF 16 LAND MANAGEMENT GROUP INC. AEC NOTES AND CALCULATIONS >,. TUTAL IMPERVIOUS COVER WITHIN EXISTING AEC; 33,684 FT2 (HATCHED) 2. TOTAL IMPERVIOUS COVER WITHIN PROPOSED AEC: 32,384 FT2 3. PERCENT IMPERVIOUS IN PROPOSED AEC; 65% 4. EXISTING IMPERVIOUS CONSISTS OF PACKED GRAVEL, CONCRETE AND BUILDINGS NORRIS ~c WARD ~ Land Surveyors, P.A. Stan M, NdrNd, P.LS. 1JOI Thpnaxboro Raad SW, Cdaboxh, N.C. 28187 Rmdy D. Mtrd, P.1.5. Phmc 910-579-5898 iax: 910-579-5825 ENGINEERING BY: Norris, Kuske and Tunstall Consulting Engineers LAND/SITE PLANNING BY: Cline DesignAssosiates,P.A. °- N DOCK DESIGN BY: Sound Marine Inc. ~ ~' PRELIMINARY PLAN: NOT FOR CONSTRUCTION GRAPHIC SCALE 1 30 0 15 30 60 CP (IN FEET ) 1 inch = 30 ft. 75' AEC LINE N 00 ,. ~~'~ ~~ ~ , ,~~' , G~'~ ~o IMPERVIOUS COVER (HATCHED ®), CAL MARSH ~I,IMI'I'S w ~5' AEC LINE s N !1 G 1 C 1 t t . FD. P. It 1 t t 1 1 NHW 0 l w ~~ N t~ 6~ .~ `>* N 74r C= AI' MARS LIMITS .~ ; ~PB,~ LIVE OAK 58.6 NLW S 0 1~ W (FLOATING DOCw - ~~~~~'~ f , <F r 1 ~, ~, . (FLOATING DOCK ~'~r"^k"~~~M`Nw°°°,J.~~x° LAND MANAGEMENT GROUP INC PROJECT: Pelican Polnt Marina OCEAN ISLE BEACH BRUNSWICK COUNTY z'.,~~ ~~~~~ `~ ENVIRONMENTAL CONSULTANTS EXISTING AEC IMPERVIOUS CLIENT, TIM MooN JOB # 02-06-550 ~ ~`-=~~_~ PO BOX 2522 TELE: (910) 452-0001 CADFILE: X16006_CD01_SITE SATE: 12.06.06 ._,~ -~' WILMINGTON N C 28402 FAX 910 452 0060 ~ ~ ~ ~ ~ ~ ~ ~ M ~ R ~ ~ ~ ti ~~ , . . : ( ) - DRAWN BY; CLC REVISIONS: 1.25.07 ~~~~~i((~i EMAIL: info®Imgroup.net SCALE: ~"=30' SHEET 13 OF 16 TEMPORARYIPERMANENT GRASS SPECIFICATION 0 7. 0 7 3 1 NOTES: 4 GA. 6x6 MESH o TANDARD FABRIC ~ N z _~ N~ ~m Q X Q ~w • J ~~ I ~~ i ~ - Z ANCHOR FABRIC SKIRT MIN. 8" DEEP & 4" WIDE. 1. SYN. FENCE FABRIC SHALL BE MIN. OF 30" IN WIDTH WITH 30 LB/IN TENSILE STRENGTH FOR STANDARD FABRIC AND 50 LB/IN FOR EXTRA STRENGTH. 2. FABRIC SHALL BE CONTINUOUS LENGTH. IF JOINTS ARE NECESSARY, LAP FABRIC POST TO POST. 3. STEEL POST SHALL BE MIN 4' IN HEIGHT AND BE OF THE SELF-FASTENER STEEL ANGLE TYPE. 4. WOOD POST SHALL BE A MIN. OF 4' IN HEIGHT AND 4" IN DIAMETER. FABRIC SHALL BE FASTENED TO WOODEN POST WITH NOT LESS THAN #9 WIRE STAPLE 1 " LONG OR TIE WIRES. TEMPORARY SILT FENCE NTS ENGINEERING BY: Norris, Kuske and Tunstall Consulting Engineers 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A 6 INCH DEPTH. 3. REMOVE ALL ROCKS, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACES SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND M!X WITH SOIL. LIME; 45 LBS. PER 1000 S.F. PHOSPHOROUS: 20 LBS PER 1000 S.F. FERTILIZER: 17 LBS. PER 1000 S.F. 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, UNIFORM SEED BED IS PREPARED 4-6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY. 2 - 3 LBS PER 1000 S.F. (SEE MIXTURE BELOW) 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. GRAIN STRAW & HAY AT 75 TO 100 LBS PER 1000 S.F. WOOD CHIPS AT 500 LBS. PER 1000 S.F. JUTE & MESH AS PER MANUFACTURER 8. ASPHALT FOR ANCHORING MULCH SHALL BE TYPE SS-1 EMULSION AND APPLIED AT A RATE OF 1000 GAL. PER ACRE FOR SLOPE STABILIZATION, AND 150 GAL. PER TON OF STRAW FOR ANCHORING STRAW. 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. IF GRASS STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 10. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE, TREATMENT, AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. 11. SEED FOR TEMPORARY AND PERMANENT APPLICATIONS SHALL BE: 20~ CARPET GRASS 24% BERMUDA GRASS 20~ TURF FESCUE 10~ CREEPING RED FESCUE 24% ANNUAL RYE GRAIN BERMUDA SEED SHALL BE HULLED FOR WARM WEATHER PLANTING. PURITY OF SEED SHALL BE A MIN. OF 98% AND GERMINATION SHALL BE A MIN. OF 85~. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 15 DAYS OF THE COMPLETION OF GRADING. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING SCHEDULES MAY BE POSSIBLE. ~~;;r~ro PRELIMINARY PLAN: NOT FOR CONSTRUCTION ,r,;~ ~ 1R ~,`„J, ;N~.°"`~.~F~EM~~R~°r~N~ LAND MANAGEMENT GRDUP INC t~~ '~,~ ~, ENVIRONMENTAL CONSULTANTS SEDIMENTATION AND EROSION CONTROL DETAILS GL=~--~ PO BOX 2522 TELE: (910) 452-0001 O C E A N S L E M A R i N A _~~~=~ WILMINGTON, N. C. 28402 FAX; (910) 452-D060 ~!,,~~~,j,~_~i EMAIL; info~imgroup.net STEEL OR WOOD POST WIRE MESH FOR STANDARD FABRI( STANDARD OR EXTRA STRENGTH FILTER FABRIC DIRECTION OF WATER FLOW PROJECT: Pelican Polnt Marina OCEAN ISLE BEACH BRUNSWICK COUNTY CLIENT: ¶M MOON JOB # 02-06-550 CADFILE: xl6oos_000t_sITE DATE: ~2.>>.os DRAWN BY: CLC REVISIONS, 1.25.07 SCALE: NA SHEET is of 1s EROSION CONTROL NOTES AND MAINTENANCE PLAN: DIVERSION STRUCTURE OUTLET STRUCTURE OR BYPASS IP-RAP FLOW `SPREADER I"'-- 50" MIN. ~. . SECTION A-A 9 DIVERSION STRUCTURE RIP-RAP~SPREADER / MANMADE 50 FOOT VEG. FILTER VEGETATIVE SWAGE NTS 1. INSTALL EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION OR AS SOON THEREAFTER AS POSSIBLE. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. MAINTAIN THE GRAVEL CONSTRUCTION ENTRANCES IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THE CONTRACTOR SHALL INSPECT THE CONSTRUCTION ENTRANCES ON A DAILY BASIS. THIS WILL REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL NO. 4 STONE. ANY OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS SHALL BE REMOVED IMMEDIATELY. 3. INSTALL EROSION CONTROL MEASURES AROUND THE DROP INLETS AS SHOWN ON THE PLANS TO TRAP SILT DURING CONSTRUCTION. INSPECT THE EROSION CONTROL AROUND THE INLETS AFTER EACH RAIN AND MAKE REPAIRS IMMEDIATELY. REMOVE SEDIMENT WHEN IT BECOMES 0.50' DEEP TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE AND APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE DROP INLETS. 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES 0,5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. SILT FENCE STAKES WILL 8E SPACED 6 FEET APART UNLESS A WIRE BACKING IS USED WITH 8 FOOT STAKE SPACING. 5. INSPECT TEMPORARY SEDIMENT TRAPS /CHECK DAMS AFTER EACH 9 PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP, PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT. BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUCT BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT-PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. 6. NO CUT OR FILL SLOPES SHALL EXCEED A SIDE SLOPE OF i VERTICAL TO 3 HORIZONTAL UNLESS OTHERWISE SPECIFIED ON THE PLAN. ALL SLOPES SHALL BE SEEDED AND STABILIZED WITHIN 15 DAYS. 7. THE STORMWATER PONDS WILL ACT AS SEDIMENT BASINS AND WILL BE CLEANED OUT WHEN THE LEVEL OF SEDIMENT REACHES 2.0 Ff. BELOW THE TOP OF THE RISER. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. 8. ALL DISTURBED AREAS SHALL BE SEEDED WITHIN 15 DAYS OF DISTURBANCE. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS DENSE VEGETATIVE COVER. PRELIMINARY PLAN: NOT FOR CONSTRUCTION 9. MORE STRINGENT MEASURES SHALL BE USED TO HALT EROSION IF THOSE SHOWN ON THIS PLAN ARE NOT EFFECTIVE. 10. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES BEFORE THE PROJECT IS COMPLETED, ENGINEERING BY 11. REMOVE TEMPORARY MEASURES UPON COMPLETION OF PROJECT. ALL % ~~ ; ~~a` ~ kW i : PERMANENT MEASURES WILL BE WELL ESTABLISHED BEFORE PROJECT ~~,,41 ~~ra ~ :, ~t ~~ Norris, Kuske and Tunstall CLOSE-OUT. , ~ ~' Consulting Engineers ~' ~`~ ~~" ` `~"I ^r'°r~' '~~JU`~`~~,~~~"°~~ D MANAGEMENT GROUP INC PROJECT: Pelicon Point Marina OCEAN ISLE BEACH BRUNSWICK COUNTY . LAN "° x NT T CLIENT: nM MooN JOB # 02-06-550 A ENVIRONMENTAL CONSUL S SEDIMENTATION AND EROSION CONTROL DETAILS L '~~`~~ CADFILE: X16006 cDO1_SITE DATE: 12.11.06 = `1~;'~ ~~---~ PO BOX 2522 TELE: (910) 452-0001 WILMINGTON, N.C. 28402 FAX: (910) 452-0060 OCEAN S L E M AR N A DRAWN BY: CLC REVISIONS: 1.25.07 ~~t' ~(~i7 EMAIL: info~lmgroup,net SCALE; NA SHEET ~ 6.2 OF ~ 6 J BUILDING I POSSIBLE FUTURE DEVELOPMEN AND HAS BEEN REMOVED FROM PLAN , AT T}iIS TIME ~ _ ~ , .. ~~ TEMPORARY CRAYEIFD Cp151RUCTN7N ENIAANCE INV INV INV •5.90 l ~ 1 N 'O ~ (D -~ O. ~ ~ ~ iREH~ }1G ~ ~ ~ £ ~. ~ M~' ~{NL) t~ Ln ~ST1~~~9 ~' t ~ tHE OOH ~ ~ S ~ 1~9~~A5 ~pA~OCE59~' THE 'M A{tE ~ ~ ~" ,~~, RN µ~I SURVEY NOTES AOJOININC PROPERTY ONNERS BASEO ON INFGRMA710N FOUND IN THE BRUNSNICN COUNTY TA% OFFICE BASED ON BRUNSNICN COUNTY FLOOD INSURANCE RATE MAPS THIS PARCEL APPEAA$ TO BE IN FLOOD ZONE 'C'. ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES. ELEVATIONS BASED ON NAVD 1986 USAGE Intr°-Cpp9tol W°terw°Y o. N ~ - p~N 40 ~ SITE STORMWATER NOTES: 1. THERE ARE NO WETLANDS WITHIN THE PROJECT `D d Street AREA. Al~re 2. ALL RUNOFF FROM EXISTING AND PROPOSED IMPERVIOUS AREAS WITHIN THE DRAINAGE BOUNDARY SHALL BE DIRECTED TO THE INFILTRATION TRENCHES. .07.0731 PROPERTY BOUNDARY ENGINEERING BY: Norris, Kuske and Tunstall Consulting Engineers LAND/SITE PLANNING BY: Cline Design Assosiates, P.A. DOCK DESIGN BY: Sound Marine Inc. r ~ t t.•, F.4. ~ , aD o +o Bo 160 - ~ ls~r`. ~F1 + a I I'' ( IN FEET ) 1 inch = 80 ft. PRELIMINARY PLAN: NOT FOR CONSTRUCTION AND M6NdDElAEIiT OA.9UF,~. ~~ LAND MANAGEMENT GROUP INC PROJECT: Pelicon Point Marina OCEAN ISLE BEACH BRUNSWICK COON ,, ~K~ ~ ENVIRONMENTAL CONSULTANTS S TO RMWATER PLAN CLIENT: nM MooN JOB # 02-06-550 ~_--i PO BOX 2522 TELE: (910) 452-0001 CADFILE: xtsoos_coal_slrE DATE: 2.s.o~ ~'`°°`'`'' ~ WILMINGTON N C 28402 FAX (910) 452-0060 0 C E A N IS L E MARINA RAWN _- ~~ ~° I~ A i , . . : BY: CLC D REVISIONS: ( ~ h li ~~,~~ti~, „ EMAIL: intoQlm rou net 9 P~ " ' , SCALE: ~ =80 SHEET 16.3 OF 16 SIL1 FEY+u SWALE B~PA55 ~` ~~ '~J C StiC eet sestet il~ GRAPHIC SCALE i i