Loading...
HomeMy WebLinkAbout20040115 Ver 1_Complete File_20040203\O? QG North Carolina OeQarxnenC ci Environment and Natural Resources Uj Alan W. Idimek, P.E. Director Division of Water Quality DWQ Project No.: County: Applicant: + r - ?^ Project Name: ' Date of Issuance of 401 Water Quality Certificate r 2 ?TQ q: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 NW Service Center, Raleigh, NC. 27699-1650. This form may be returned to DWQ by the applicant_ the applicant's authorized agent. or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was obs--n-ed to be built within substantial compliance and intent of the 401 Water Quaiity Certification and Buffer Rules, the approved plans and specifications, and other suppordna :-nateriais. Signature: Date: Agent's Certification a., herebv state t:,.aL to the best of m?- - abilities. due care I Lu-rr LA ) and diligence was sed in the ob ervation of the construction such that the construction was observed to be built within su to ti mpliance and intent of the 401 W:uer Quality Certification and Buffer Rules, the appr I d specifications, and other supporag mate nais_ / Signature Date: If thi oject was designed by a Certified Professional as a duly re--mered Professional (i.e-. Engineer, Landscape Architect, Surveyor, etc.) in the State of -Norm Carolina. haying been authorized to observe (periodically, weekly, full time) the construction of dhe arojecL for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in dtic observation of the construction such that the construction was observed to be built within sub .y n6al compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specific2dons. and other supporting materials. Signature Registration No. Date V"Q N?EA? North Carolina Division of Water Quality, 401 Wets Cenfta aon Unit; 1650 Mail Service Center, Raleigh, NC 27599-1550 (llairtg Acdress) 2321 Crabtree Blvd., Raleigh, NC 27604-2250 (taration) 919-733-1786 (phone), 919-733-6893 (fax), http•1Ri2o.oxr ?sn rr. us(rcwedanas/ DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 REPLY TO ATTENTION OF WETLANDS i 401 GROUP Permit Number: Permit Type: Name of County: 200430477 NW14 Cabarrus Name of Permittee: NCDOT/SR2113/Penninger Road Date of Issuance: May 13, 2004 JUL 2 3 2004 WATER OUALITY SECTION Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Attention: CESAW-RG-A 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date O?O? W A T ?9QG O ? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality February 3, 2004 Cabarrus County DWQ Project No. 040115 After-the-fact; Replacement of cross pipe on SR 2113 (Penninger Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. Benton G. Payne, P.E., Division Engineer NCDOT Division 10 716 West Main Street Albemarle, North Carolina 28001 Dear Mr. Payne: You have our approval, in accordance with the attached conditions and those listed below, to incur 50 linear feet of permanent and 20 linear feet of temporary impacts to an unnamed tributary to Cold Water Creek in order to replace a cross pipe on SR 2113 (Penninger Road) in Cabarrus County. The Division of Water Quality understands that this is an "after-the-fact" application and that the project has been constructed in accordance with your application dated January 26, 2004 (received January 28, 2004). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3366 and 3404 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 33 and 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying §404 permit unless otherwise specified in the Water Quality Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us in writing, and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if stream impacts exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 211.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. 2. NCDOT shall include photographs upstream and downstream of the structure to document correct installation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ Mr. Benton Payne, P.E. DWQ 040115 February 3, 2004 Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions-are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Michael Parker of the Mooresville Regional Office at 704.663.1699. Sir-ely, Alan W. Klimek, P.E. Attachment Pc: Wilmington District Corps of Engineers Steve Lund, USACE Asheville Field Office NCDWQ Mooresville Regional Office Central Files File Copy STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS W. LYNDO TIPPETT CiovERNOR SECRETARY January 26, 2004 U. S. Army Corps of Engineers WETLANDS /401 GROUP Asheville Regulatory Office Attn: Mr. Steve Lund, MS, PWS SAN ?_004 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 WATER QUALITY SECTION Subject: Cabarrus County, Replacement of Cross Pipe located on SR 2113 (Penninger Road) - "After The Fact". WBS Element No. 10B. 200411 (DWQ Minor Permit Fee $200.00) Dear Mr. Lund: The North Carolina Department of Transportation (NCDOT) has replaced an existing cross pipe on SR 2113 (Penninger Road) in Cabarrus County due to a failure that could not be repaired in place. The purpose of this letter is to request authorization from the U. S. Army Corps of Engineers after the fact, under a Section 404 Nationwide 14 permit authorization. The existing 60" x 40' corrugated metal pipe was replaced with a 60" x 80' corrugated metal pipe. The re lacement i was placed on a skew in order to eliminate a sharp bend located on the outlet end of the existing pipe, hence the forty feet of additional lengt . Traffic was maintained using an off-site detour during the replacement project. The project area was reviewed for the presence of listed threatened and endangered species and described in a Minimum Criteria Checklist prior to beginning any construction. There were no wetlands present, although there were impacts to surface waters. There were 50 linear an unname to utary to Cold Water Creek, Yadkin A permit drawing and post-construction notification The NCDOT requests that this permit application be authorized under a Section 404 Nationwide 14. We are also hereby requesting 401 Water Quality Certification, GC 3404, from the Division of Water Quality. We are providing seven copies of this application to the North Carolina Department of Environment and Natural Resources, Division of Water Quality, for their review. 716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 • Fax (704) 982-3146 form are attached to this letter. Thank you for your assistance with this project. If you have any questions or need any additional information concerning this project, please contact Mr. Larry Thompson, Division Environmental Officer, at (704) 982-0101. Sincerely, Z-?&b4V1 b7 4:ex--o-' Benton G. Payne, P. E. Division Engineer LBTBGP Enclosures cc: Mr. John Dorney, NCDWQ Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC Mr. Garland Haywood, Bridge Maintenance Engineer Mr. Larry Thompson, DEO Area Field Operations Unit 2 Office Use Only' Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW 14 and GC3404 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: N. C. Department of Transportation Mailing Address: 716 West Main Street Albemarle, NC 28001 Telephone Number: (704) 982-0101 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Benton G. Panne P. E. Company Aff iliation: Division Engineer Mailing Address: 10th Highway Division 716 W. Main Street Albemarle, NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: bpayne dot state nc us Fax Number: (704) 982-3146 Pagel of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 2113 (Penninger Road) 2. T.I.P. Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): N/A 4. Location County: Cabarrus County Nearest Town: Concord Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Concord travel southeast on NC 136 East to SR 1002 (Old Salisbury-Concord Rd), turn left. Travel approximately 1.4 miles turn left onto SR 2113 (PenninSer Rd) - crossing is approximately 0.3 miles ahead. 5. Site coordinates, if available (UTM or Lat/Long): 35' 26' 9.46" N/80° 33' 32.55" W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Farm and rural residential 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Cold Water Creek 9. River Basin: Yadkin (Hydrologic Unit 03040105) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:/ih2o.enr.state.nc.us/admin/maps/.) Page 2 of 9 10. Describe the purpose of the proposed work: Replacing existing 60" x 40' CMP with a 60" x 80' CMP Existing pipe experienced a failure on one end that could not be repaired in place The new pipe was installed on a skew to eliminate ninety degree bend in stream channel on the outlet end. 11. List the type of equipment to be used to construct the project: Heave construction equipment (backhoe trackhoe excavator, boom truck dump trucks etc.). 12. Describe the land use in the vicinity of this project: Forested on one side of road with a farm on the opposite side IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site Page 3 of 9 plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** • List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. •• 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httn'/h%,N,tiv.fem-Lgov. ••• List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh. forested wetland. beaver pond. Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name" Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) S1 60" CMP 40' Cold Water Creek Approx. 4' Intermittent SI(a) Inlet Stabilization 5' Cold Water Creek Approx. 4' Intermittent SI(b) Outlet Stabilization 5' Cold Water Creek Approx. 4' Intermittent * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included Page 4 of 9 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at %vww.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tonozone.com, w1v%v.m3rxtuest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 50 feet permanent, 20 feet temporary. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Name Waterbody ) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. • List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. All surface waters not impacted by the nroiect were protected from unnecessary encroachment. No staging of construction equipment was allowed in or near wetlands or waters of the United States. Strict enforcement of sedimentation and erosion Best Management Practices for the protection of wetlands and surface waters was enforced during all phases of project Page 5 of 9 construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. No mitigation is proposed for this project Page 6 of 9 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at httn://ti2o.cnr.st.ite.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federaUstate/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify. )? Yes ? No ® If you answered "yes", provide the following information: Page 7 of 9 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone' Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total ' Zone I extends out 30 feet perpendicular from near bank of channel; Lone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. All appropriate best management practices for sediment and erosion control was implemented during; the pipe replacement activities. There will not be a net increase in storm water runoff as a result of this project having been constructed. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 8 of 9 XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ® No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant%Agent's Sig?ture l`T Date (Agent's signature is v lid only if /authorization letter from the applicant is provided.) Page 9 of 9 fM ,, _ enn i ! t m fi CaRU Coy l p ? t',??EGOfjor"IC COPPfITfIEL{f cQ? e Sr / c9 ve pUSINESS PARK ,' I a J ? r"? 'P ' a` \ 0.?? 2j,3 h9er 5 c? 29 v µ ? C3 - DEV. CTP a°o • ? w !'u, '' ' aye \ ?-n ? •p . Sal < ©.5"-04 ?? ?' t ?RTfili?G a EAST CDEST? ¢ < caiolinav 6EYcRLY31L'r €i1DGE ESTATE Com Park, ?avCLOVERLEAF ¢?+Qa? ??o> ,HILLS Syl/7& flnc: Flay' eats SHOP CT j ,NA000ET CLB o G, ?F?i 7 it .Oil G° ?` Ica Rd . IB?ry ?11a1r ? C3. ?CfL'Tnj?// d,?`'•U?W ?, J ?;' J?' /ow ? .1 ?v eat a f\\>( RfJfi?y'oa \ O ! 1 e' Fielder 7 q I? C e1 HF Z r¢\ CRC Gt o 64d char PI I Oak I T, ne } ¢ i J'? 1?t deb `c 9 2245 a; eIIQLS Brick Sur a PORTS m CO r 'o r F? `Le` - l ' - R? NE ?cc t ?l Ct _ h to ^i TR Z: °QQ c oh { C/? S er Rc, d G v G ?.` r?? r? Gv I t r p ar Kt`•',` \I 4Jt??n3R?Df9 % Q?!" w?' t\e r. ` l! ?GT. ai„ ?Livingstane t G' S oct? i ??`' AST o C SerRd??/: r n BRANCHVIEV ,? •?.,.:Jr 1 Ct? LO° K s?j?/ ?{ ^ SO'OfFICE ?e Sn l n 1Jen/ o ht G°' N? o C$STRIDGE sr? 2iCJ ( r, ( / C+ Dr r t y )11, ? SZ Cdr Ot 6 /r a - -- - SO` q ?CTR K^ sF0 0; )' Ta rKr Rat moc rl C°: _ ryFa ^. \br1J C L y\ 0:,1 m L'rU5! :Irl`l f (e Fh r/vr c'J- ?G © Barrage. ?a? i ?p/,: \O itl?I ?iJiJ r' ' EM fi a t I 1 L L Q` CI^/c/J I Or Soy , l \J? n p / 't AEin MINE ?toR? 1i"i J r} •1.) _ - 1? --~ NE 2 G ,- a 1 %m °•I 1 9?a \c?, NE Wd?b? ? ? ? \ GO` i? \/a!nu151u m do, 29 H\3\? ?Gi ?o oI/ \ o ?? eri I I= /Do O`-• c'o Jtt hd-ae \ 1 .. )-,I 01 Or 0` o .'; G G t Gtw: UCADARRUS` .9311 I 1AE1.1. HOS. o t? \? t ec^"oo d -???rr/77 ?!ai ? t ? P ;O` ?.e. i v m Gc?`?.i„ r° j - - - •.`? noucresl _ / .d oti - ;i Cr Pre?? SSoLJJ? ?b•_O', c° A, ?? Lit °d' w- w Ca K. :aO r ?o o o`r O ,O ?? '? ,G Z D 1 !? J+, C t 1 , ?+ ' Z{ cESA m m 4. cr+v1? c0 b R` U °:• r 'S v i i, O^I P?I:R? a; Pd?n off' SI?TO 'S? ?rii ? Concord e •4 , \ n p, sJOO 'G^ o : Bevelly Hills" ? } 'Z n 1 \d High Seh. e . co3\ 00d I;zd o G Ele Sch. \y ?Ice TP•a SC P COL Te;bu y \ G Old / aso nor Ave NEooC ?^ r cc ro c` % H vj 73 ;s crto { aY.?C? _" ?,p Si 7 6:4:,YCY? G? NE ooµw E p ' NW Qyy'a¢ n z hfLLS c4 z- aG o \ © 0tr1 I t Vloc a:;n ??y? --i a Cc'1LL_-- 3tf e Fua" ;3 v - F`,yo Zrt 73 !0V Tf . Vi• ?\ a fruiril pv i U au hlon/?? 1 r . IO PNW vo° ?a e'? JCOr 2ti /? wo-a Q J - - r KT )`,. ?5,• \ P S FS Z? \a, f: t: \m ye -?I,\ r, 7C J v°c \1 ,tn a? r a 8T-r? \cP \ : /. lJ? r ,ii AS2` J•`v \b Pie n3 v°tu.?S' As?,gr9 ? ° LV, ttg. Ct \? \i N?o t° ( '{ rd' dL o Pv I i °o 3, tO ° \sr \S G r 2 tF,. 1I ?o ?m,p? P G}°?o?S, /?- m C?io an 6O r ie i Go G Q 10? yi` oak. co %nec ft,sP i?cc¢?;1, r cd4 :v?.\^ } CtNE- ICihc 1 1 I eKPeto ?? /I I ?'? `7 Ave1 ,e ?j\, o? •S?r e ?iBUS tov. < d`'c??? O ?? :,.-^? \ t.0 \?oNllChael 1;? ,ta ' ° F td,ej ?? d,pt \° ti 5. GPie 'r \ ? c°Z i e?.r y i f '+ ,\ ? ••,. / ., 601 Amc.can tee ° I\ 190 a \ t 6rHoSd ?_ 9ry R \Scotia Ave V` `fi 'o r t ^r C1 NW, O ?,.o ?_ ?`t- ° U's° ` :::'Q ?\•? r Q,aGO',, Q' Q\°1 t Stricker'.N 2 ?"•,o, p ?' f, °6 ' } ?e Pve \?? t - 2 ,tcect 5 rOSO. t µN0,,t? pQG Gs ¢ ?, d; ?O t;;,i?:... F, Ga Dr PJVT vJ- Z )off IS Z o ye av° r° fF 1p° z\?cr `', ` F= 20 AZa. P G <\t o y eN'Oakwoodt:4t•°sP. 3F ,oP o r cS F °F `y\ e t :1 N, a ,- ,N ,'Gt Cem. ,J o9 eG P 4' \rn!• Ae ¢ H 1?: 1_36c?n J.... O r \\? q i ' ¢?o O s /P P \va r Concord Eastside a y ?o \ P n 3 c ?• \NI t'1 •r?G tj' c !,e 'o\o ?E YS! R,ed m °r / `Z'/.'' O G? t \. U,K )ohes arro fNi ?.¢e? 1.'„'y¢ e?/ \'' s. ?°? P 4,-:Si v¢ [n`- PI. NEy Mid. Elem. ,i? l ? \G uiP i ct` ? 5 t t \? ? c t ` -Z. \ eP. 6 / m°, (?N i?? R,. ?iICi4 ?_'? '(5. /ro N ,O r 9 N N ao e.< ri!G, Q o ?5rul' _?S' F J ??' \ m SCh. SCh. a 1 ?' p4"/fit m r,a° ` \ un5 .1q •j v, °m c ? 2 e fLAZ4 !ti eoo0 ?\ tr o Fr-e;e / QtaP'eh t?1mr I ?'\?? 2 C T. ° F c IsNe / P pH Fkns St E 5 ?3 ?pr o ??aA}e N,V NW = 1 / O v f ` tS ?e^r O $ ?? A? qo ¢eF ??_ J`-tGut?e? A P \L 1?- ..I z, a F o "<„ 42 ? ,, _riHudsonSt$ roI,F c 4 _.-..__ C C eAS / Y G 4 o°r ° C y P ?? a z F Co ,5 9 -'? Qar}C?]I}? ,? t? d ',' i \ Eud/ Dr '-tenroora??a tr-HCr-- i LrSE---- 73 ' v- F > .- ? •'/ r F Gta ?x P{eschoo)t •? 1 ?' ¢i.s rz\? G ¢¢ P. 2,\cP 'Z ° p9? Go Qa ' cu ? e to' 1 o \al %7 F tG,. :i P v5 Ga ?? °t r 5 a / 'Ise E 4` ? _ _ \\? ?? 1111 t" \ of o r N 3?' PJ ??2 ¢Z?A -Coltrane r ". ?' vv'? P1 asl?/brs ASARRU A, 24 ,pe`6C'SSJ', o?jS: Tk a; t L, `\YweSCbhE3em\ rJ P?O9/`Od J P`SEFASARRUSC\ Y!CEN ORCS c. \ 1 P?tt? P`3i `\1 °.P ?d'•' ° hid? 1/ 'A o,?•vSC ??4^9io °S F CSHFR/ff? O? Cr S?@rr?t yQl?o 0.\ FALL tC. ,i 1 PARK t 1 G ° tJ ''A- .CTS /?Cec'1'fj? P' ?'.Pr !• `'S?h?asSvlk?nn-EDr'P???? '? ?ropd O,°°,.J T / c y \ DUeachery CtV, v° `OOQ,?.o.lS/ Owo 0 Rr ca5ls?1 ^? ZISE?U GL JTC?c?c ? 0 Bee on r' ??l 3-1 ' &,ckPIN'N G+ .u' o-h St N: d>r. ? iTthf? i G/. P?\ r rC ?? v?l J rs o Y a i' tf 5? r O ?' 4 Coo °° \ J`/Z ?_ c f , \\? ?!• %' •Ba}ber 1 /,5,, QsPe Cat . ut? tJC¢. G?`'?? °A \o ?d; )I c Corn._ sr ,rpck. 10• ; of Seo Ga $, < ?, i 1 H ?( y rJ.}. `e0' j t net??e?\NCd?e oO Cotle? ?' ysi J/i •? ?? \ {0 'Si r ¢C? o Gr cv GCSE d? k? l 2i _ ?\ 5?'m 2 ?O CAB-CON + eQ ?C / ., r? v J:v P G ? Sea\5 s? P: e PS , t,- Or g? 8;. A° i \? Pve r c P cl?k .1? a P \e s . Ce: S ' a \ ¢\d \\ o ds!` f s J PS ;,% 0 $ G(i ?i \ te.?,J, c?`° o pc 6 c \ P° o ST- \o P? { I ke ??••' 'INDUSTRIAL 1! 29 PARR f? ,rC of a c tries/ G\t e t ° ?, rSJZ???\ ,oN ° 3'QF SP \ LtS? t. .•-•• \.••. e? rrar'c0 V 1 <r ap y'i'J` M,l S \ 7 \s \? U r? r" ?,or o .y 501 %0"1CnnT?' ami' ° oy ''S c?u ,15 P. FnGSVS? O t 4 O ?.?? .`]?? r7.tt r \ N g a rorw9cd y I N.. •.?y/ r FS3\O?tr! ?r c' r ?Pv N`r Y S <Z' ?.P kc. ss Fve-?1•? L'' `n , S'J ev ?f' J' apC VLSt?S r°i \\ m7> Dr / \l Qe ?,. }.•. \' = O ^..,t, o P sc"?.• EQ.n A'b - a 5 0 \ ' Z, -?rSh"3-=y-.- eai 1COBl ?-p _G 1r- V s1 c. 5N vro n tS? r pc E o` \ n a . E cc C a -t3 r-.\r._?. u + Eca 5 n F Ora, r oo ro Ft 1 r 1 Ri(AUE J. C °, S tr?\ .ti' 1' s:n R.B. r a '? s s cr R h' c ° •31 - -_ m , ,a. ° ?o-f 1 s o ?? Hqh or SV l s N Gz" t°. ?. 5 ¢`? t S' 1 _ / c` I • Pam HOPI Pie 4 \ 2 4 Pi Joc°ct Q ao et. S,Avy ?tih s . i e o? McAllister a S? i0r 1 S'` r o ?J 3 a o c S ?y , 19 cker iQeOk n r p c c ?.or Elem. Sch. t'1a TR , nsc r ey%% 5 5 / QrSwt e,° r c, LE3P.IYERS )oh t ora Z g r .Pv u° \^ ?¢ ca, to a Z. f S( d S `2d O?c \ w??.. - ? - edT J' (?a??4 !? 01: aP L?cP C, c LC as Ave SW >j PAR,f Swim CCL°c£ Dr S 1 ?St e ? a ?' o r - ! 17i.?'Jl - .>? P v ??+ F \Fa, a t r 1 , t p .+`Qt ??s?na ?,ca OvC2 e vJ?'N L \\% e. 5 , y k¢P, a a ¢5 Carr+ord .,e.. 3 \P o LNdsag, L _ti. ! p e P / O aAa?1 P \\ !al/-\ PI SE p? to \< ' ?. _o Ct St'! j N c ?\ , 'Jhlm 5 A Pc'+Ave r P r e""pi "e 2 `' N r•. m ,o l` St C° J`r? S O Pewck U?- v o ct3 P'¢ n ! 1A;64R ??? !-5'.y a `P!°? .t 4 G' ^ F t o / gec LiIANGL ? N \. \ L S. % T x E z ° t St / v p r?,a T CALO :'ElC PCTR Ar7NRn"USCO?o enrCY-Sxr,eAve P,:R:( ?I?1.?•cav ci/?HPie Qa/- m c??, d a /o?? Ln i o,. ?? Or t •P c? J 5?r so G a - a? r ?o`'? A a? A •p YPHEALTFI Pame?Ri• f artsell ,lcrch,rAve arkmee •Haro:d N \/ - Fa;rv:ewA? DEPT. N a`n / s \o \ O 1- -qenter a Ct P S,V' Goodman /?/?e ae ¢ o IDS 70* d S, Cazat e 3P P i \ + edv+ t i s 601 w. und9rar it Loo q+- SPJ C S 5?%`q ¢ Pcw P1?r`bi nG .° ?T0 ?. Pb God ?vgCa,a / ?SIY ?`'? I ` oo?J?\\ct ,? O°,e a\r tS? ?`,Sc o? r Ut?? f i y? N 1 ' Crr ?d `1r^ / ? ??c 9r.r'`` tyr S, \d1P'' S t G ) P?d9° e h ' - /Hwt;ell <? ?\ P? ?o a r,':. ?o° c e oo / tort eke 4?EE Sur.C '' r P F . F = W Scheol `f9? O!!cn Dr ? `,?? Pe c'e Ave ?, Rd S'N nrriae _ bn ,a ?_ •??, .\ds P,y. u $'. r i 9. xr3. l l (O ?4, ur ,t` j , ` 11- 01111TUW 7- 1JOINS NI AP 158 C Cleveland Enterprises H W E 8 Y North Carolina Departmei Typical Plan and Elevation of Crown of Roadway to Creek Bed 15-0 FT ? a 9 4 'C ? CCCdtl O O y ? C? C7 ? yU ,Q N U ? a L bO d o? o A? b a A.; Vo 0 0 ?Qza 4 Typical End Elevation I Line of ( With Class Lor lI Rip Rap Slc t of Transportation 'ipe Installation Permits Asphalt Crown Amount of Fill over Pipe ra offin Class I or Class II Rip Rap Slope tection evation •agated Metal Pipe Protection on Inlet and Outlet end I Rip Rap r 'lass II Rip Rap Typical Plan View j With Class I or II Rip Rap nn TnlPt anti (hitlPt Pnrl F r North Carolina Department of Transportation Typical Plan and Elevation of Pipe Installation Permits net Crown Crown of Roadway to Creek Bed 15• Amount of Fill over Pipe 101 of Fill Rip Rap on ? a L 4 c ? O ? o O V -? ? te r , y U ? ? N U ?°o a d U A Q o g . q? o a ? a M _ Qn V 0 o° o a ? ' a d ?Q CL z a I or Class II Rip Rap Shoulder Roadway I 22 Ft. 60' Long 53 -? Shoulder 98 Class Class II Rip Rap Typical Plan View With Class I or II Rip Rap nn TnlPt nnri (lntlPt Pntl Typical End Elevation Elevation 1 Line of Corragated Metal Pipe With Class Lor II Rip Rap Slope Protection on Inlet and Outlet end