STATE OF NORTH CAROLINA
WETLANDS / 401 GROUP
AUG 1 7 2004
WATER QUALITY SECTION
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
August 13, 2004
Ms. Beth Barnes
Wetlands/401 Unit
NC DENR Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699
(Courtesy Notification - Two Copies)
Mr. John Thomas
US Army Corps of Engineers
6508 Falls of the Neuse Suite 120
Raleigh, NC 27615-6814
(Two Copies)
LYNDO TIPPETT
SECRETARY
041356
Subject: Alamance County, Pipe Replacement on Durham Street (SR 1529)
Project Number # 7.200111
To Whom It May Concern:
The North Carolina Department of Transportation (NCDOT) proposes to replace an undersized
pipe on Durham Street near Burlington, North Carolina, in order to eliminate flooding which will
reduce future maintenance needs and increase traffic safety. In an effort to obtain the necessary
permits for the subject pipe replacements, we are providing a pre-construction notification
application with supporting documentation. We believe this project can be permitted under the
Nationwide Permit numbers 3 and 33 from the Army Corps of Engineers. This application is also
intended as a courtesy notification to the North Carolina Division of Water Quality as according to
the General Water Quality Certification. The following information is being provided to satisfy
condition I of General Water Quality Certificate #3376 and #3366.
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
PROJECT INFORMATION
Road Name SR Number Project Length
miles Classification
Durham Street SR 1529 N/A Rural
River Basin: DWQ
ID Water Quality
Designation % Impervious
Surface
Cape Fear 18-(1) C;NSW N/A
Buffer Rulesa Buffer Rule Conditions where applicable)
No equest Exemption
Protected Species
Presentb Mapped Historic
Properties' CAMA
AEC Essential Fishery
Habitat
No No No No
a Separate documentation attached as needed:
Species Review Sheet for further information:
Historic Review Letter for further information
b See the attached Endangered
When Applicable - See the attached
PIPE REPLACEMENT INFORMATION
Site Coldwater Stream Type Perennial
Station
Existing Pipe (1) 80' X 24" RCP Proposed (1) 80' X 48" RCP
Pipes
Construction Pump around with offsite detour Dewatering Sandbags & rock silt dam
Method Device*
Burial Depth Minimum of 20% of pipe diameter E/C Plan
Date
Construction As soon as practicable Duration Four weeks
Date
Impacts (ft.) 0 ft-enclosure; 20 linear ft-rip-rap dissipaters; 30 sf -temporary sandbags and rock
silt dam
Special
Conditions
Restoration Within 15 working days of the pipe replacement the natural stream contours will
Plan be restored and seeded. Temporary silt screens will be cleaned and removed
fonowin vegetation establishment.
RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA - Corrugated metal pipe arch; E/C = Erosion
control. *A less intrusive dewatering device may be used in lieu of the one proposed.
P. O. Boa 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
MINIMIZATION INFORMATION
Impacts will be minimized by strict enforcement of Best Management Practices for the protection of
surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters
of the US, and coordination (including a pre-construction meeting) with the Division Environmental
Officer.
MITIGATION INFORMATION
Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150 feet
Wetland mitigation is not anticipated, as wetland impacts do not exceed 0.10 acres and do not
occur in a unique natural wetland.
APPLICATION INFORMATION
Enclosed please find the Pre-construction Notification Form and supporting documentation for the
above referenced project. If you have any questions or need any additional information, please
contact Jerry Parker at (336) 256-2063. Your time and effort are appreciated.
Mills, P.E.
Engineer, Division 7
Enclosures
CC: Jerry Parker. NCDOT
Chuck Edwards, NCDOT
Barry Harrington, NCDOT
Mike Venable, NCDOT
Sue Homewood, NCDWQ
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
Office Use Only: Form Version May 2002
413 56
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
X Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 3 and 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: E4
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: Mr. J.M. Mills. P.E. Division Engineer - Division 7
Mailing Address: P.O, Box 14996
Greensboro. NC 27415
Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673
E-mail Address: mmills@,dot.state.nc.us
2. Agent/Consultant Information (A signed and dated copy of the- Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Jerry A. Parker
Company Affiliation: NC DOT
Mailing Address: P.O. Box 14996
Greensboro. NC 27415
Telephone Number: (336, 2) 56-2063 Fax Number: (336) 334-4149
E-mail Address: jparkerna,dot.state.ne.us
Pagel of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plates are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Replacement of an undersized pipe with a larger diameter pipe.
2. T.I.P. Project Number or State Project Number (NCDOT Only): 7.200111
3. Property Identification Number (Tax PIN): Not Applicable
4. Location
County: Alamance Nearest Town:_ Burlin on
Subdivision name (include phase/lot number): Not Applicable
Directions to site (include road numbers, landmarks, etc.): Project site is north of Burlington
in Alamance County. From I-85/40, take Exit 147 (NC 87 exit) in Burlington and head north
on NC 87 for approximately 5 1/2 miles. Turn right on Flora Avenue (Flora Avenue is
located just east of the NC 87 & NC 100 split). Drive 1/2 mile to Durham Street and turn left.
Site is 0.7 miles after turning onto Durham Street just south of Pride Street.
5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): Not Applicable
7. Nearest body of water (stream/river/sound/ocean/lake): UT to Haw River
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Light Residential
Page 2 of 8
10. Describe the overall project in detail, including the type of equipment to be used:
The project will involve replacing an existing 80' long 24" RCP with an 80- ft long by 48"
RCP. The increase in pipe size has been recommended by the hydraulics section of NCDOT
in order to maintain stream stability and to eliminate flooding Proposed right-of-way width
is illustrated on the attached site plan. Equipment used will be standard road construction
equipment (trackhoe, grader, backhoe, and bulldozer).
11. Explain the purpose of the proposed work: To maintain traffic safety, eliminate flooding
and reduce future maintenance costs.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Not Applicable
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Not Applicable
VI. Proposed Impacts to Waters of the United States/Waters of the State
it is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 3 of 8
1. Provide a written description of the proposed impacts: Permanent stream impacts will
result from placement of 20 linear feet of rip--rap energy dissipaters. Temporary stream impacts
will result from placement of cofferdams and silt screens. Silt screens will be cleaned and
removed following _vegetation establishment.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at bM://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:_
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
Pipe replacement 0 ft(en)
30 sgtmp)
20ftr
UT to Haw River Two to four
feet
Perennial
* List each impact separately and identity temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usas.aov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mayguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site:_ 30 square feet- temporary
ftp), 20 linear ft- rip rap (rp)
Page 4 of 8
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name Waterbody
applicable) )
(if ap Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):. Not Applicable
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): Not Applicable
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Pine replacement activities are necessarv to bring the Droiect uv to current construction standards
and to decrease the possibility of flooding due to the undersized pipes. Impacts will
be
minimized by strict enforcement of Best Management Practices for the protection of wetland and
surface waters, restrictions against the staging of equipment in or adjacent to waters of the US,
and coordination (including a pre-construction meeting) with the Division Environmental
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 5 of 8
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strrnizide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
A finding of insignificant impact is anticipated; therefore, a mitigation plan is not provided.
Cumulative impacts are less than 150 feet. The maximum amount of impact to a single
stream is 20 linear feet. No Outstanding Resource Waters, federally protected species or
their habitats, or essential fishery habitats occur in the project area. The project is not located
in a High Quality Water.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index,htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): Not Applicable
Amount of buffer mitigation requested (square feet): Not Applicable
Amount of Riparian wetland mitigation requested (acres): Not Apli
cable
Amount of Non-riparian wetland mitigation requested (acres): Not Applicable
Amount of Coastal wetland mitigation requested (acres): Not Applicable
Page 6 of 8
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No N
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No N
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), I SA NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No N If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
s uare feet Multiplier Required
Mitigation
1 N/A 3
2 N/A 1.5
Total N/A
• Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
Page 7 of 8
Lf buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
Not Applicable
X1. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Not Applicable
XH. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Not Applicable
XHL Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes No X
Is this an after-the-fact permit application?
Yes No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
-/o-®Fr
Agent's Signature Date
is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8
N.C. D.O.T.
DISTRICT OFFICE
EROSION CONTROL SEQUENCE
ALAMANCE CO. 336 570 6833
SR. 1529
DURHAM STREET EXT.
PIPE No. NIA
PROJECT
No.
7.200111
DESCRIPTION: REMOVAL OF EXISTING PIPE STRUCTURE 80' LONG 24" RCP & REPLACE WITH
SINGLE LINE OF 80' LONG 48" RCP.
1 INSTALL A ROCK SILT DAM DOWNSTREAM FROM THE WORK AREA TO PREVENT
INCIDENTAL SEDIMENT LOSS.
2 INSTALL ABC AGGREGATE OR A LESS INTRUSIVE DEWATERING DEVICE TO
ALLOW DEWATERING OF THE WORK AREA.
3 INSTALL PUMPS TO DIVERT FLOW AROUND THE WORK AREA.
4 REMOVE ONE EXISTING LINE 80' LONG 24" RC PIPE.
5 EXCAVATE TO SUFFFICIENT DEPTH TO ALLOW 1' BURIAL OF THE PIPE TO
1' BELOW STREAMBED, PLACE BASE STONE, AND SINGLE 80' LONG 48" RC PIPE.
6 BACKFILL THE NEW LINE OF PIPE AND PLACE RIP RAP ONLY AS NEEDED.
7 STARTING FROM THE DOWNWARD END, REMOVE THE DEWATERING
STRUCTURE, AND RESTORE THE NATURAL STREAM CONTOURS.
8 NOTIFY LANDSCAPE DEPARTMENT FOR FINAL SEEDING.
9 SILT FENCES TO BE PLACED AS SITE CONDITIONS REQUIRE.
10 A 10'X15' DIRT BAG WILL BE USED TO REMOVE EXCESS WATER IN THE HOLE
WHERE THE NEW PIPE IS BEING REPLACED.
11 SITE CONDITIONS AND WEATHER MAY ALTER THESE PLANS.
12 A METHOD LESS INTRUSIVE THAN A PUMP AROUND SYSTEM MAY BE UTILIZED
IF SITE CONDITIONS ALLOW.
APPROXIMATE PROJECT START DATE N/A
PREPARED BY D,K. WAGONER TRANSPORTATION TECH. III DATE 1/27/2004
kwagoner
January 24, 2004
Construction Sequence and Erosion Control Plan for Replacement of Pipe- Alamance County
ALAMANCE CO.
SR. 1529
DURHAM STREET EXT.
PIPE No.
N/A 1 Installl a rock silt dam downstream of the work area to prevent incidental sediment loss.
2 Install ABC aggregate or a less intrusive dewatering device to allow dewatering of the
work area.
3 Install pumps to divert flow around the work area.
4 Remove one existing line 80' long 24" RC Pipe.
5 Excavate to sufficient depth to allow 1' burial of the pipe to 1' below streambed,
place base stone, and single line of 80' long 48" RC Pipe.
6 Backfill the new line of pipe and place rip rap only as needed.
7 Starting from the downward end, remove the dewatering structure and restore the natural
sream contours.
SR 1529
20'
PAVEMENT
60'
PIPE 1
PUMP
10'X15'
DIRT BAG
kwagoner
ALAMANCE CO.
SR. 1529
8 Notify landscape department for final seeding.
9 Silt fences to be placed as site conditons require.
10 A 10'X15' dirt bag will be used to remove excess water in the hole where new pipe
PIPE No. is being replaced.
N/A 11 Site conditions and weather may alter these plans.
12 A method less intrusive than a pump around system may be utilized if site conditions
allow.
SILT FENCE
AS NEEDED
SILT FENCE
AS NEEDED
W K/W
4---SILT FENCE
AS NEEDED
4----SILT FENCE
AS NEEDED
kwagoner
L6 L4 °? 334 1
C! to,7
d , 9
:b { 1107 61 103
1457 9.
J&H Y
- ,
1540
13.6
a 1484
19
'p? r- r
Q tl
1
MO1GA1
NNII
4 A
?.?.?
noll 315
i '?
!41 . ? 1 1 .1° a 1161 loge
n u 334 a, O
>o } " --- -
-- ? - ?G
u6w - - -•-
f.7 4 a 4 a 9
2. .ro 1439
t
•` { ? 320 a 1 ?y ' loll
3_ 394 9
a
s?yd . ??--
` a
1514
or
n 3e?
- -/
1514 a 3? 45 1 Il14 1896 d
4 W A
?_-
3. .'e 4,Q E7
I
. 9
43 { A !5
3
••
I1
r-•
,d . f. loop
J341 y A?
u d
1316 ?? A l y ....
r 6
,`.1530
a I I
,
303 1643
I
I p 1109
A R 9
{ 6, 1e
. ? ' 19 ' '0
d f / I L
V -
IM7 a ?
1
/
I I
33 7E
{
I I ? .''d 332 /
76 ,. d M1 o? GLEN IUVEN
I
4 \
J
13]7
- y 1311 C r, Sit N
'GAO NINC.1
S, I •?' s
1117 21
1607 "q ii
-
y
/ I
\
34! 7 9 } 1401 J
f 1
-L 141E A
M2
4 I j -.
31
.1 4a '_• ` "' - - - - - 1721 i •b a '0 a? '-S27
.... r
1344 ? t 334
a a s ;a
-3
? • os 4 f
d
1 .°
n 1508
I " _ _
^ 5 ] ?
_ _ _ ' 729 ?
A'I]SI %
d.'i44
1579 ..
\
\ I ?
..- " `
.os
d y
,
1330
m 1
.0
1329
-
a _
y. 1727
l • 'E+ ?, 1
a '0 a
i 1347
_ 71
'7 GANT
m
I LAKE oo, 4
"
_ 1522
N 13.4 p y -
r ,
y _ I
1 u?
Hm' m
I 14 44 M
sourNEM
J
'
ETON t. -•'
COLLEGE _
u!7 7 _ ?, r' u? a
"' •?'
POP.3.760
l?3 •?
y
, r. ?...
a 1377
o .
I '? off.
d
1-52
MA?S
LAKE BURLIN
3cp
/1303 GTON
43.210
1997, MWIsch, I=
,?_.-
I
? ? ? ?_
??-?
s;:
:,
,?.
i .