Loading...
HomeMy WebLinkAbout20041135 Ver 1_Complete File_20040712W A rF9P? co > O `C Michael F. Easley Governor /f r; `') William G. Ross, Jr., Secretary t V?;Amont,of Environment and Natural Resources Gregory J. Thorpe, Ph.D. SFp ' / Acting Director Gy 2 Division of Water Quality tNn c?, 0R, N)48 Iy DWQ Project No.: 2oo4It15 County: AW*CA14 4Y Applicant: NcyoT Project Name: Nopor - SL 1151 Date of Issuance of 401 Water Quality Certification: 7 I27 120014 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's C rtification I, Oi"b LA I ?14112A G&-2 , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and sped ii tions, and other supporting materials. Signature: L Date: gam/ - ?Or Agent's Certification I, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date MOM NGDENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Wetlands/401 Unit: (919) 733-1786 cam,.. rniei,"n_ccrn V e?? NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F, Easley, Governor APPROVAL of 401 Water Quality Certification Mr. Mike Pettyjohn, P.E. Division Engineer, Division 11 N C Department of Transportation Post Office Box 250 North Wilkesboro, North Carolina 28659 Dear Mr. Pettyjohn: William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director July 27, 2004 Alleghany County DWQ Project No. 04-1135 SR 1151 (Cheek Mountain Rd) WETLANDS/ 401 GROUP 30L. 3 0 2UU4 WATER QUALITY SECTION You have our approval, in accordance with the attached conditions and those listed below, to impact 380 linear feet of five (5) different unnamed tributaries to Piney Fork Creek (330 feet of new pipe and 50 feet of rip-rap), in order to widen and improve traffic safety on SR 1151 (Cheek Mountain Rd) in Alleghany County. The project shall be constructed in accordance with your application dated July 8, 2004 (received July 12, 2004). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3404, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the Division of Water Quality (Division) and submit a new application. If the property is sold, the new owner must be given a copy of this approval letter and certifications, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and any additional conditions listed below. 1. Instream work and land disturbance within the 25 foot wide buffer zone are prohibited during the brown and brook trout spawning season of October 15 through April 15 to the egg and fry stages of trout from off-site sedimentation during construction. Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, North Carolina 27107 Phone: 336-771-4600 / FAX: 336-771-4630 / Internet: h2o.enr.state, nc.us An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarolina Aatural& Mr. Mike Pettyjohn, P.E. July 27, 2004 DWQ#04-1135 Page 2 2. Piney Fork Creek and its tributaries are classified as Trout waters. NCDOT shall strictly adhere to the Best Management Practices for the Protection of Surface Waters (NCDOT August 2003) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds [15A NCAC 413 .0124 (a)-(e)] throughout design and construction of the project. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 5. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 6. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 7. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow. 8. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48- inch in diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. These measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow through without freefalling or damming on either end of the culverts during low flow conditions, to maintain aquatic life and/or fish passage. 9. Due to extreme slopes at all pipe locations, all pipes will be perched and dissipater pads will be installed. Dissipater pads should be installed in a manner to provide a low flow channel if practicable to encourage aquatic life passage 10. The dimension, pattern and profile of the stream above and below all crossings should not be modified by widening the stream channel or reducing the depth of the stream. if Mr. Mike Pettyjohn, P.E. July 27, 2004 DWQ#04-1135 Page 3 It. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 12. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If rip-rap is necessary, it must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. Any rip-rap used must not interfere with aquatic life passage during low flow conditions. 13. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will lessen the change of altering the stream's water chemistry and causing a fish kill. 14. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 15. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 16. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 17. All work shall be performed during low flow conditions. 18. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood at 336-771-4600 extension 252 or Sue.Homewood@ncmail.net. Sincerely, U Alan W. Klimek, P.E. Attachment cc: Wilmington District Corps of Engineers John Thomas, USACE Raleigh Field Office Heath Slaughter, Division Environmental Officer, NCDOT Division I 1 Winston Salem Regional Office Central Files Mr. Mike Pettyjohn, P.E. July 27, 2004 DWQ#04-1135 Page 4 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Date: Partial Final I, , , as a duly registered Professional Engineer in the State of North Carolina, having been authorize to.dbserve`(periodically, weekly, full time) the construction of the project,for the Permittee hereby stAMat, to ft6 best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality-Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. If Date oY r o?, STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT GOVERNOR PHONE: 919-733-2520 SKRETARY 041135 July 8, 2004 Mr. John Thomas U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 Subject: Nationwide Permit #14 SR 1151 (Cheek Mountain Road) Alleghany County, North Carolina Project Number: 11C.003013 (DWQ Permit Fee: $475) Dear Mr. Thomas: WsT?NOS14o1 GROUP '/011 X004 W R Qtl T YSECTIQN The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1151, Cheek Mountain Road in Alleghany County. Total project length is approximately 0.92 miles. The roadway width will increase from 14' to 18' and will be paved. Impervious surface area will increase by 0.45 acres. This project will require the replacement of four (4) wet pipes and the addition of one (1) wet pipe as shown below: Station Number Existing Structure Size Proposed Pipe Size Riprap Impacts feet Total Impacts at this Station ft. 46+20 30'x 24" 100'x 24" 10 80 47+40 30'x 18" 60'x 24" 10 40 52+25 30'x 18" 80'x 24" 10 60 52+50 None 80'x 24" 10 90 52+75 30'x 18" 80'x 24" 10 60 Total Stream Impacts = 330 feet * Please note that all wet pipes are located in curves and are in steep terrain. As a result, the excessive pipe lengths are needed to establish 2:1 slopes. Due to pipe slope, all pipes will remain perched after replacement with energy dissipater pads placed underneath. P. O. Box 250, N. WILKESBORo, NC 28659 PHONE (336) 667-9111 FAX (336) 667-4549 Mr. John Thomas SR 115 1, Cheek Mountain Road, Alleghany Page 2 July 8, 2004 Construction of this project will require impacts to waters of the United States in the New River Basin. Each of the above noted wet pipes carry different unnamed tributaries to Piney Fork (Class: B, Trout +). This project was reviewed for the presence of threatened and endangered species on June 8, 2004. This project will have no effect on any federally listed endangered plant or animal species. Historic compliance work will be scheduled and concurrence with the State Historic Preservation Office will be obtained if required. The proposed impacts are minor in nature and should not remove or degrade existing water quality uses. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this letter, I am forwarding seven (7) copies of this application package to John Hennessy, NCDENR, Division of Water Quality, 401/Wetlands Unit, for his review. It is requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, Heath Slaughter Division Environmental Officer Enclosures cc: John Thomas, US Army Corps of Engineers (1 additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC John Hennessy, Division of Water Quality (7 copies) Sue Homewood, Division of Water Quality Mike Pettyjohn, PE, Division Engineer Brandon Whitaker, PE, District Engineer Jim Sloop, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Office Use Only: Form VeNion April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW # 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name:_ North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9202 Fax Number: (336) 667-4549 E-mail Address: hslaughter(a]dot.state.ne.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slaughter, Division Environmental Officer Company Affiliation: North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9202 Fax Number: (336) 667-4549 E-mail Address: hslau h? tern dot.state.nc.us Page 3 of 12 111. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1151, Cheek Mountain Road 2. T.I.P. Project Number (NCDOT Only): 1 I C.003013 3. Property Identification Number (Tax PIN): N/A 4. Location County: Alleghany Nearest Town: Sparta Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): See attached SR map. 5. Site coordinates, if available (UTM or Lat/Long): 46+20 DD: 36.4545 ° N, 81.2230 ° W, 52+50 DD: 36.4555 ° N, 8l .2213 ° W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximately 5.5 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): UTs to Piney Fork Class: B, Trout +l. 9. River Basin: New (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://li2o.enr.state.nc.us/adniin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Grade, drain, base and pave SR 1151. 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor grader and dump trucks. 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** cs/no Distance to Nearest Stream linear feet Type of Wetland*** N/A List each impact separately and identity temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at fenla.?ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of lmpact* Length of Impact (linear feet) Stream Name** Average Width of Stream h fore (nt act Perennial or Intermittent? (please specify) Station No. 46+20 Pipe replacement 70 feet UT #I to Piney Fork 3 feet Perennial Station No. 47+40 Pipe replacement 30 feet UT 42 to Piney Fork 3 feet Perennial Station No. 52+25 Pipe replacement 50 feet UT #3 to Piney Fork 2 feet Perennial Station No. 52+50 Pipe addition 80 feet UT 44 to Piney Fork 3 feet Perennial Station No. 52+75 Pipe replacement 50 feet UT 45 to Piney Fork 2 feet Perennial All of the above Miscellaneous rip-rap placement for stabilization 50 feet UTs to Piney Fork 2-3 feet Perennial - List each impact separately and identity temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated strums must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at \vAvAv.uses.eov. Several Internet sites also allow direct download and printing of USGS maps (e.g., \VAWJonozone.com, w,\»v.mapquestColn, etc.). Cumulative impacts (linear distance in feet) to all streams on site:_ 330 In. ft. of new permanent impacts Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres (if Name applicable) Wat) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to streams in the area will be minimized. Since this is an existiny, roadway, the stream impacts cannot be avoided. However, the replacement pipe lengths will be the minimum needed to safely construct the paved roadway. All appropriate BMPs will be used during construction. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://l12o.enr.state.nc.us/ncwetlands/strmgide.litin]. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:/J12o.cnr.state. nc.usAv!p/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 tect perpendicular from near bank of cnannei; Gonc i cxicnas an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Impervious surface area will increase by 0.45 acres. All appropriate best management practices for sediment and erosion control will be implemented during construction. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 10 of 12 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Sign re Date (Agent's signature is va td only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 t - ?' P 7 C^ L= SWER LIZ! 7 ?- .v L= o L,rl :.Z' ARTA ?? I?• 1 ? 'y/• r.CnOM? ' - r.? I.i• 116` f O 1 11 ? ,? ?Q•y'? ?J 1 ee ?7• I I t ia7 '1 ? L? ,_? I - f . ? ..-y.• .?.wa Hwy •• o I LL.1 f „?? Cn Mt Iln I mij. al _ ,s?t„Y ,Ix _ ? t '`' `•••1 :,r.^ y,• 1.7 CHEEP Ytn. J \ v Lam' ' .J (le) -?2/I '-? \? 1171 , t v _I ( II 1.! o uzc -k F-e 1i"1>•w. Z F / DOUC:HTON pAXK RECREATIONAL AREA G lies. ±? N C` I r` / .r I" /?1y /• 1 LITTLE La.11.1: LTIIER ?' -uA /A G.c % ?Ir4175 `Catheri e%/ - , ' l'x') -.Knob 52+50' f 6 Ao--!1 ,\ ?\ J ?/_ `.? ; , I ?• ?I -F. li 46+20 ' `? ??/-'?=?J %.,"??'"?, `" ` ";i;? t`? ` ) , i' '• 1r .00 SR 1151 00 \ r . ,?1 \`.y ; / '? /•:` y! ?X 30861 • I`` I ?' •? j` -??._ ?`• . ??? ??i?4 ?f? ?f t rim? - .-` NnFy_ Fork ?\\r' /; \?? :1( -` ?l ?? .,\ \`? ?\, ?• ? r j' II / ? ,_ ?-?'.r /ice/ ?? I to ?rripCt` C ?` i 1 ? ? ? •. ? ' ?` i t .4 . ???rz` l?" ! ?G' ,? w Ocb G Coovrieht (C) 1998. MaDtech- Inc- 'DITCH LINER REQUIREMENTS' ROAD NAME: SR 1151 (CHEEK MOUNTAIN ROAD) STATION STATION RT. / LT. TYPE LINER REQUIRED 10+30 12+20 RT RIP RAP 12+30 15+00 RT RIP RAP 13+00 13+26 LT RIP RAP 17+00 18+10 RT RIP RAP 21+75 24+00 LT RIP RAP 21+75 24+00 RT RIP RAP 24+00 29+00 RT MAT 29+00 31+50 RT RIP RAP 29+00 42+00 LT RIP RAP 48+00 52+00 LT RIP RAP 53+00 58+63 LT RIP RAP ?D:-DN C Jilt Basin Tie 3,5 1tii1Constructed tD the dimenSionloi six =L'e't by . t1`.ree feet by three "-eet ulnl eSS otherwise noted on the 712.^_S . ' I;ener ally, the order Di in5ia21 at i on o Lhe e=Dss Dn con ?rol measi --es w-,22 be as follows: Te??Drar? silt basins s hal] be irsta]2ed before =tearing and grubbing begins. J.] t fences and tempDrary S21t zait=h°_s Shall be fnsta21ed of per =fear Amq and be_Dre gr301ng. Ten--,)Drary stone ditch checks shall be -;.stalled as sDDn as ditchl'ine is established. Dutlet and islet- ?rotectiDn w122 he done as SDDIl as th_ is `nstalled. Jeering am a D-Lner Permanent erDsion con-=2 m?ZSlY"eS are to he implemented as Soon as MraCtiCal_ . A,j . Alwens 5?U?tDk'a_ d di =h lino as a _ _ . _ temporary IDeZSL'_"e in this Sii11at1Dn? on Coaiso-l ?? !`tea ? X111 g r KC Ler !,--Vpl?/Y? ? ? fy L R---D Line= ?_ ical _or use a=' cress 1-;-ne =ujv;--=s . an ,e ne_ --e a= a is me stream- above? _ pr -CDn St.rACt-1Dn y.1d`ns and dew=hs_• should be nz--C-n -a1-neL rJ_ =aS-D=Ad long seam hams Wze=-e Ilrac:t-; =a . EROSION CONTROL DETAILS AND SPECIFICATIONS Szd. T Drscrintion Svmboj 153D.D3 Temporary Silt Fence II 1 n3MIS Temporary Silt Ditch T? 13DS.D1 Temporary Diva ,ion ?n 1 E622-D1 Temporary Slope Drain -- ?-- IS3101 Silt 52sin Type-A j 'la3D.D2 Silt $2sin Typr-$ 7 ?33.D1 Temporary Rock Silt Check Type-A 'f ?33.c2 T emporary Rock Silt Check Type-BB c34.o1 Temporary Rock Sediment Dam Type-A 1 6,34.D2 Temporary Rock Sediment Dam Type-$ 1635.01 Rock Yip-- Inlet Sediment Trap Type-A RDCk Pipe -iniet Sediment Trap Type-3 7 336:D1 dock Sift Screen I a31).D4 Stilling $zsin T RDCk Inlet Sediment Trap: 'f ?32D1 T vD -„ A 1 ""2.D2 ?? i ype-5• t? J t? ?i F _. op, "T ? Ill - 3 CT: o z y O N y' 1 1 1 1 1 1 ? ° b c zxxx i a x z a b A n Y 7 o m $ eb E o w S ? ??7 13 a F L i ? 5 Y I S• ??a z l? a a rb'N i M ab A"8 ?til? ~x n z rJ; 7 j d . zz Z ? r? ?T: rr z aIi V 0 oN. j V ? x; an--ao:??us??tc:rs• \ Q \ ?? \\ O $J? trsr ti \s 4 J qf \ F ` ? 4 r'?ra.. O? ? o? G 4 i 04? \ ?. Dorn ??r ?. o u \ \ \ n n ?? n ° cn co r\) N O lp Q \?' n u35odod° F's =,F\ y oo % 7 O N ? N r zn El? 4. 1 Lx Osl 1S •? A l o 03_ : ` o ? N m © a ` A " r ?ryy 4f?, ®W N 'oS cl 9b} 0 w opK ? z ? N g O F N • ?s?d ? o 2, L6k?' e s ?s s N ".W :.., 5? ,5.q C•,5. MATCHUNE " SEE SHEET 3 1 ..1rt-uliwic •• cGG fLdFFT _°?: MATCHUNE " SEE SHEET 6 /'RCSto 43 fg/S/ ??, oD? ??rop? n u"n l'N a n"n °cn C13 (4 (.n ZZ (A (A Q?` 1]O?l y?DiONv A O?Nco N ? W C? cr) CW) to 1T II II " II " ? 01 V O II II II II II v Ova N??oNcq° O NA Z (-4 y O ID -4 C.i a4 ?:L.iO ONN?d -I- o a ? O N ?OCC4 y ?y?oD? 1C u II n n II Ln Oin?N?? ONC,??`? q c I < O "0 Q O `? 1 0 I 3Nap'13Md? / o° \m 0 N V ? m m cgf.Er ? a •. z 5y pSL 0 m o? N U - ? i Fx. , N W A? v N MATCHUNE " SEE SHEET ° E 7 T z 1 p o - i r I I -A i i t I ' I i I I I I I 1 I I i i 1 1 t I N 0 C? ? ? II o m m ? ? v \ m C) 0 O 1 o 1 24, 70 o \ in \ Z \ q \ 4 ? \ 0 N \ r F a \ \ < O ?u m a1 ? I I 8 ' - cn ri, o tbm y 1.?A ® ,. j c xx C) x b I r a www ` a F? a o 1 r i i O O ?G ? ? O ql F 9?i N ? N r„ rn N h o c , O m f Q rTl o .. ip 13/+89 N A 3 i ? ? b r .71 i L A t V ° + v Al NNI, m ` o ? l ` cn 0 En z z 0 0 ? Lnr- ?? rng 0 w 0 2 2 o? ?z kT I ? Y t S ? bO ? °a OhE ? b ? p a \ n '' ? u tz zz o -i r 1 1 1 1 1 i 1 1 1 1 i i i 1 1 1 i i 1 1 1 1 U 1 i J 1 1 O y ' II = V Q v O ( ? O W a \ \ m t \ Ln \ \ -i n V - - ' 94 1 PE Cr ? - z m d 0 1 z;i rri o Rl ?+ ? N a 1 C„j 1 .. t b Ln 1 ? ova r 35 ? ? 0 ' o ' o t? C Ch ? ' e ~ ? z c r, ? z o 0 w ?' '? N C ?O r` z a p I i o ° .'Z ? b ik Fag !? pp i ? $ F Q o ? ? ? r i i 1 1 1 1 i i i i 1 1 1 1 i i i i 1 1 1 1 N i i 1 1 O I? o ? O i o ? N ? \ M p \d 54 PE y tv TQ ` \ \ N 1 1 C') Ci 35 / 0 ? o 5 03 ? z z ° to m - es V1 ~ ~_3 0 Di CD ?' y e z x ? ? a 4 - k o $ M Q O 2 ?p ? ? ' y ? ? b b v , b P J 4?Z r o - I r i i U O 91A \ ? O O ? ww tt a 'i- a z ? N , N 1 4 cry \ rO C? c??F \? \\ C nl ? C 7 I t cr) 5 o Q3 ? C ? ?? C ch ? o z C) O o t-q , ? + .. ry ? o l o > N ? 0 ? k a. C 6 J v ° ? z O C ? y O A C ? _ rn ? v m Clj rr, C) n (J) Z ` Ul pZ < C ? ? T o m cn ? m rnL ? Q° nl i e n Z y o A ? Z r ? Q r(_A '` O rn rn k Z G) n n r ? n rri n y Z ? rn ` J m o ? Ln y a ? x ? y n R' ni cam, r ? L l.. J N O f N o C p rri .. rr, D m m o Q i Z ? o w n o w N g m n o m ? r T n o C N ? ?p r rn m O rri m ca ~ m rn m -TJ rn a ? o m >c s CHEEK MOUNTAIN ROAD . SR 1151 u ALLEGHANY COUNTY %>?\ M.5-SECTIONS FOR STATIDMS 44+00 THRU 46 t30 46+30 moo' \\ JUME 09.2004: F1ETD CREWSQDWLTJR. ? SORKISHA SET2C TOTAL STATrOM USED p?'Sfp ? 9$,??J,3 r 1Iv- REVISED..RILY O6aD04 - AOUTION OF 1 N PROPOSED 24'P1PE AT STATION 46f30. 5 zit- pT.Sla ( TOE OF PR?OSED Y,23 J ( sfcn 2d SLOPE 2 r / r / O r ??P 2 I I 1-5 44400 dim ,- i o r r t r r i r SHEET lOF 6 TOE OF EXISTINV 19 SLOPE g??n X12 xx 0 O ' ? ' ? o b !a • o ? J4 ? tf ? '.Qt7 µ o -i r 0 ++ { { } F+++++.{ # w N Na Opp V 0% ?. O ? ?"Qb ?" ? NOV oo to O N p to o ?C W Q1 r? 6,3 .61 Al O b o ' O w ?p Q '? ` rr-- vJ lR V ? V aN y A + U 0 O O ti O v ??.. Q. - A& x yy V T 7 I r--1 o 1 J ? 6 ? z z o ? ? xx o C 11 ? Y 0 2 ? O O t s;, C) p < gR?Q ~?j r+ ?yy r `C t5 ? y ? ? y -PA OP. GL- 0 ?.. 7tY R 0 MG ILY O o O O o 0 0 0 o O O O ?b4Nb Q Q ? N • C/? o / h 0 W b `" N 0 N .? o o ? N 0 O ti w o cn Y v o ? d h C ?`. .0-+ v ` h 0.-1 ^^ 11 z xx V n O rye O `ti ?a O cn z . ? MOPu SED ` 1 ? ? fi?Qg bra b ha 0 P E T S PE 8 y Q 6 camm . u ? C7 :U mx ? ' t" IT 0 00000 000000 ? 00000 ++++++++++++++++ V V V g q t1 ly ly N ?v p O O 0o NN ?-. V F ?• ? ? n . Q i O. ? b ? O 4 o ?6 ?v 0 v? pp yy ?? jj y yy yy u ;a OClCJO?b06?C b??b p b nbbn??vboc„ ? C7 ?y.? b ? b W y??hh,?.,bp!(y? t - O o ` 9 N V N ` ? ° R7 ? °r Cn U ti q O O ? ?b O y o y ??. 6 ° 6 z z $ y 6 ?x o ,2 b ° ' 3 N '? 'b y t? [ F u WW l o ? E DGE CIU EX ii 4GN = W ° ° o0 O 00ooca ooCC ..... -+++++ ! 4 t? N N ?. b x O O po ; [0 Va w V ?A V O T W Z. °` v G7 ?1 a 4 ? h? '?? V O v ti vJ o Q + N 0 O ' o 0 C y 0 P d y z? z o? xy cn .? z o yo -I x CIL O y O 1 ? _ 3Sp ? U 1 r I I ? 1 + i t I I 1 I I I I 1 1 I I y ? 1 1 1 1 1 1 RO .TO S PE I I 1 I b u i? ° H ' L LOr r 000 000000 o O o ON?•?. V O a?ONAa $ O v p J `J y GQ .4 O y ?? p??j p e 0 v 6 ?A?? y o 0 b ? W b G7 + O ?^ v - ` Q W ? th, o : ? t2J ?+ N Os q Eft ? W N +? In 1^n V Q ' O O w kp O M X V b O r C h z