Loading...
HomeMy WebLinkAbout20051822 Ver 1_Complete File_20051010, 75 C: AUG 3 0 2006 DENR - WATER QUALITY WETLANDS AND STORMWATEk BRANCH DWQ Project No. Certificate of Completion OS-- \S:)O? County: UW(W\ Applicant: M CD Q T -XbW Sl ov% ko Project Name: S R VS i 9? ( eI"A 1r-. a") Date of Issuance of 401 Water Quality Certification: 10- 1 O -- X 006- Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, L c? % "a sd., , hereby state that, to the best of my abilities, due care and diligence wassed in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials . , Signature: jam- ?,?14 Date: _ e-ZZ 2- -1/ d & If this prVct was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: WAT ?9PG f ? -f Mr. Benton Payne, P.E. NCDOT Division 10 716 West Main Street Albemarle, NC 28001 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources gpF ? a? Alan W. Mimek. P.E. Director Division of Water Quality October 10, 2005 DWQ# 05-1822 Union County APPROVAL of 401 Water Quality -Certification with Additional Cronditions Dear Mr. Payne: 'You have our approval, in accordance with the attached conditions and those listed below, to permanently impact 0.37 acres of an isolated wetland for the purpose of constructing the Faith Church Road Extension as described in your application received by the Division of Water Quality (DWQ) on September 28, 2005. The location of the project is State Road 1518 (Faith Church Road) in Union County. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number IWGP 100000. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval' is valid solely for the;purpose and design that you described in your application (unless modified below) and will expire on September :30, :2008, when the IWGP expires unless otherwise specked in the Water ;QualityCertification. 'Should your project change, you -must notify the DWQ in writing and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval 'letter and is thereby-responsible for complying with all conditions. If total wetland fills for this ,project .(now or in thefuture) exceed one acre, or if total impacts to -streams (now or in the future) exceed 150 linearfeet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval to remain valid, you must adhere to the conditions in the attached certification and those listed .below: 1. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full compliance with all specifications governing the proper design, installation, and operation and maintenance of such `BMP.in order to protect surface water standards: a. The design, installation, :operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the: requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. The reclamation measures and implementation of these measures must be in accordance with the requirements of the Sedimentation Pollution Control Act. ? Carolina turally North Carolina Division of Water Quality 610 East Center Avenue,.Sui_te 301 Internet: h2o.encstate.nc.us Mooresville, NC 28115 Phone (704) 663-1699 FAX (704) 663-6040 An Equal Opportunity/Affirmative Action Employer- 509/6 Recyded/l0% Post Consumer Paper Page 2 2. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has released the-project. 3. The .North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this project within waters and/or wetlands, except as authorized by this Certification, or any modification to this Certification (e.g., no work shall occur outside of the footprint of the plans,provided). In addition, there shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this Certification without appropriate modification. If this occurs, compensatory mitigation.may be required since it is a direct impact from :road construction activities. 4. Upon completion of the project, the applicant.shall complete and return the-enclosed "Certificate of Completion" form to notify DWQ when -all work included in the 401 Certification has been completed. Please include,photographs;upstream and downstream of the structure to document correct installation. 5. Continuing Compliance. _NCDOT shall conduct its activities in :a -manner so .as not to contravene any state water quality standard `[including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not'.being met (including the failure to sustain ,a designated or achieved use) orthat state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certificationto include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify NCDOT and the'USACE, provide public notice in accordance with 15A'NCAC 2H.0503, and provide .opportunity °forpublic,hearing in accordance with -1.5A NCAC 2H.0504. Any new or revised conditions shall 'be provided to "NCDOT.in writing, shall be provided to the `USACE:for reference in any permit issued pursuant to°Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit forthe project. If you -do not accept any-of the conditions of this certification, you may ask for an adjudicatory hearing. You must .act within 60 days of the date that you receive this letter. To-ask-for a hearing, send a written :petition that conforms `to Chapter 1508 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a'hearing. This letter completes .the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Polly Lespinasse in the -Mooresville Regional Office at 704-663- 1699. Sincerely, for Alan W. Klimek, P.E. Attachments cc: Steve Lund, USACE Asheville Field Office Rob Ridings, DWQ Wetlands Unit Central Files File Copy d?a`.iA}Ea? STATE OF NORTH CAROLINA F@[ROW20 SEP 2 8 2005 DENR WETLANDS AN STORMWA ER BRANCH DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS GOVERNOR September 26, 2005 North Carolina Division of Water Quality 401 Wetlands Certification Unit 2321 Crabtree Boulevard 051822 Raleigh, NC 27604-2260 W. LYNDO TIPPETF SECRETARY Subject: Union County - Faith Church Road Extension. WBS Element No. 35980 (DWQ Minor Permit Fee $200.00). Dear Sir or Madam: The North Carolina Department of Transportation (NCDOT) has entered into an agreement with the town of Indian Trail to extend SR 1518 (Faith Church Road) from its intersection with SR 1367 (Unionville- Indian Trail Road) to US 74. The total length of the proposed extension is 0.42 mile. The project area has been reviewed for the presence of listed threatened and endangered species and it has been determined that the construction of the roadway will have no effect on any listed plant or animal species. Faith Church Road is located within the Yadkin River Basin (Hydrologic Unit # 03040105) and cannot be completed without impacts to waters of the United States. There will be approximately 0.37 acre of permanent impacts to a 0.927 acre isolated wetland as a result of the proposed construction. The purpose of this letter is to request authorization to construct the proposed project under a Section 401 IWGCP 100000. If you have any questions or need any additional information concerning this project, please feel free to contact Mr. Larry Thompson, Division Environmental Supervisor, at (704) 982-0101. Sincerely, c , ?r U Benton G. Payne, P. E. Division Engineer BGP/LBT CC: Ms. Polly Lespinasse, NCDWQ Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC Mr. Dennis Cloud, RE Mr. Larry Thompson, DEO i 7 3 4 C 716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 • Fax (704) 982-3146 SR 15 18 (Faith Church Road) Union County Office Use Only: Form Version March 05 20051 822 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ® Isolated Wetland Permit from DWQ ? 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: IWGP 100000 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: N C Department of Transportation Mailing Address: 716 West Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Benton G Paine P E Company Affiliation: Division rngmeer Mailing Address: 10th Highway Division 716 W. Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: bpayne9dot state nc us 1 of 9 SR 1518 (Faith Church Road) Union County III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided- 1. Name of project: SR 1518 (Faith Church Road) Union County 2. T.I.P. Project Number or State Project Number (NCDOT Only 3. Property Identification Number (Tax PIN): N/A 4. Location County: Union Nearest Town: Indian Trail Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From the intersection of US 74 (Independence Boulevard) and SR 1520 (Indian Trail Fairview Road) travel east to the Intersection of US 74 and Faith Church Road Turn left (North) onto Faith Church Road. Project is located 0.2 miles ahead. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35°04' 24.26" N / 80° 38' 14.86"W 6. Property size (acres): 7. Name of nearest receiving body of water: South Fork Crooked Creek 8. River Basin: Yadkin (Hydrologic Unit 03040105) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://`h2o.enr.state.nc.us/admin/mg-5/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The majority of the surrounding land has been disturbed due 2 of 9 SR 1518 (Faith Church Road) Union County to the construction of a business park and apartment complex which borders the project.- A portion of the project crosses an isolated wetland which lies north of the apartments ands south of South Fork Crooked Creek. The north side of South Fork Crooked Creek is bordered b a subdivision. 10. Describe the overall project in detail, including the type of equipment to be used: New road construction that would require the filling of 0.37 acres of an isolated wetland. The following equipment will be used: track hoe grader dump truck, paving equipment and vibratoKy roller- 11. Explain the purpose of the proposed work: To extend SR 1518 (Faith Church Road) from its intersection with Unionville-Indian Trail Road to US 74. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. This project was previously permitted by a private developer (Benderson Development Co Inc.) under Section 404 of the (Clean Water Act 33 U.S.C. 1344 using a Nationwide Permit Number 26 Action Id. 20030616 which was issued on June 5 2000. The permit authorization allowed for the filling of 0.317 acres of wetlands in conjunction with the extension of Faith Church Road The permit has since expired and the NW 26 is no longer issued by the USACOE It has been determined that the wetland in question is an isolated wetland and not the headwaters of an unnamed tributary to South Fork Crooked Creek. Division 10 was requested to oversee the construction of this project and was not aware of the fact that the project was permitted under a Nationwide 26 until after construction had begun. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. 3 of 9 SR 1518 (Faith Church Road) Union County VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: There will be 037 acres of isolated wetlands filled due to the extension of Faith Church Road Please note that the retaining wall shown on the plans will not be constructed. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For Jams ..toy., list ir"partc rile to both ctnlctnre and flooding. uQl u.?, JV Ql i hi d tance to Di Area of Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) t n w Locate 100-year Floodplain es/no) s Nearest Stream (linear feet) Impact (acres) Site 1 Fill Isolated YES i 110' .37 ? I Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 0.927 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. 4 of 9 SR 1518 (Faith Church Road) Union County Stream Impact Number indicate on ma Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length linear feet Area of Impact acres Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not --l - r.» ArPr4rr;na flnndinu clrnina¢e_ bulkheads. etc. 11LIU Open Water Impact Site Number indicate on ma) LGU LV 1111, %-V+" Name of Waterbody if applicable) ( Type of Impact Type of Waterbody lake, pond, estuary, sound, bay, ( ocean, etc.) Area of Impact (acres) Total Open Water Impact (acres) 6 List the ilntivP imnnet to all Waters of the U.S. resulting from the project: Stream Impact (acres): N/A Wetland Impact (acres): 0.37 Open Water Impact (acres): N/A Total Impact to Waters of the U.S. (acres) 0.37 Total Stream Impact (linear feet): N/A 7. Isolated Waters Do any isolated waters exist on the property? ® Yes ? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. As previously mentioned there is an 0.927 acre isolated wetland located within that project limits. There will be 0.37 acres of wetlands filled due to the extension of Faith Church Road. 5 of 9 SR 1518 (Faith Church Road) Union County 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The surface waters not affected by the construction of this project will be protected from unnecessary encroachment The staging of construction equipment will not be allowed near the jurisdictional stream crossing. Strict enforcement of the sediment and BMP's for the protection of wetlands and surface waters will be enforced during all phases of protect construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. 6 of 9 SR 1518 (Faith Church Road) Union County An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strrnaide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. There is no mitigation plan proposed for this project however, any required mitigation for this project will be pursued through the EEP 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o enr state nc us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): • Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) fiords or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so,. please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? 7 of 9 SR 15 18 (Faith Church Road) Union County IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multi liers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0244, or.0260. N/A X. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. There will be an increase of 46 acres of impervious area due to construction of this project. All appropriate best management practices for sediment and erosion control will be uMplemented during work activities. 8 of 9 SR 1518 (Faith Church Road) Union County XI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. • Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fast permit application? Yes ® No ? XII. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o enr state nc.us/ncwetlands. If no, please provide a short narrative description: XIM Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Age is Signat a Date (Agent's signature is valid only if n authorization letter from the applicant is provided.) 9 of 9 ? INDEPENDENCE VILL e?°e ? oeo N ACR `iv 0.000 J\d ¢`OO? o VC ° ' S' 9•y ? H ?9 <v O< °J °9q0 °9 St. l9 o ? o 3 ° y B C ? P.oyI?A a QO C1 0 ?L QO wAY J? 0 } ,y if Gj/ 3 FAL N 9I x?- ?// V C 4 Church of i a 0 W \524\ 3 M s ?P y the Savior $ ° q °Po A EMBYW00 v ,: Soy 9Q 4 d O ° ., s 1 iSq?S y_ 00 UNION C? P? 9y 4 /N °%4N TRAIL- 19 ham, ROAD COUNTY BUS PK °PO ?? 9 \ /`r Sta 23 P 0 9 Hembv 10 A oo \c ? / as Bridge FORE T \t? 1 C °.yF ' c /9 4 P K LA _?. s f.: 9 h O? e ?Q?P tiQ ZO Oq\ FF 74 / UNION EST x4 D v . FoQ? i P pl\ I' o FOLD Ao r•. LS RC I ? ' ? '9F o I ?O /? ?' v -: CORN 2!(-WOODS °Po ° \ 'OS 09 F A °Oy9 RE EMA D yF0 < ? 1/ ? . J ASHLEY HALL EFCU 90 v ;` y T w 0 \ 3? ?i ?? ?p q0 S° \ \ \ S tt SSEL \ OS M RY\\?AkZ ? t cr :l?? A `"? I P NO sell RTHGAT 0l, y H I$ ... ' ? FPPM BI-LO Q?\A s9? \y9 y \9;j . t / ?F}l? •\? 9 9/ akd' I y~ C0? O 1>R y ICE l RL-S ? S?\ / ;n R Shoo Ctr ? ndian $ 09 FJ0 ?F qA p °q ° nl 1 ?ly \ 5? •' ? 4R o e / n ?1?.r?r r v Je ?: i I / to op :try H ? ,e 11 Ba o c q °q??S O Qo Q9 J0 Bapt 0 y oos 11/,\-21 oN yo o? DEI 5 ROSEMAR ' EN v-? sy? q`?° e `UNeth ??a,?o? N 0...'?` ?s? - pa of ys DY I Qo ?,I° II Leo ?Q4, °?RVYYE ° eP PCW? PARK z 1 BOG?'? - ROUCY -'S?d' e P? o Rio aK i+ Ce?'.Y?\y l4 09F Fq o? \? PARK EN E oR Q po / OC ?'yF p \ao?la ,C`O, G P ,f, 4 ° ASHLAND /yCS ?,O S o Fy R?' ?P 19 \ _ / ° / SRCCKI CT CREEL( _. C711' o NS 't7 ICE 0? OQ` la PdTI( e \P? y? aR SS 'Z Q a fK ci` 4y J? 9 ?Q' <F o ndian Trail ° °q s1ENR_I0 /NF Pw CR SUB B o?\ 3 N BROOKS VILL W ' °'? ?W'(/ z/ ?Iloi u ''1 i a P 2 URCHHILL 1 1 p ' Tra qqf. ow all ? HGTSI o INDIA a n Ro WAY ? e sb \o? 9°S? ti I di n Tr n NI°NV1LLE- U N ?i y I ? o (SR 13671 Bell `?0?, ¢ <sq/?? 0 5Q 0f a a i elh 1 ¦ C < ?A ?g '? mpP ?I ¢??° 9 YJ ASH J ?C` 4 CRO Q'0 P Nx O \ fZ I am 0 ti ?? o .? >a ANY I ?Q`o 9° LLAGE OF NDI IL x y+'? Edna.:. Love- Parkes _ e ~ e ?Q 9, °cF? ebble Cr 9 DOWNS ? 0 e C A 0 s ?oQ ° ?? C 43 ROAD F?s? ° rr -, EHE ROW S9 ??rnESlwatyc oqo of \ 1DGEFiEL Cem 74 su ° ?P? X09°? cr °s 0 \ ' eG9 o\`t?` cqq ? e ?a ?y` SUN VALLEY ?? yy JQV? ?P e° t o° y 4y ? , ?ARK Q? ? , =?n 1 o= o S/ ° O ? ?^ ?Cy Busines ill ? 4 9 '9 Cqy y \ °q s I o \o k P??o q r Shop Ctr 1 1 °q O 1.500.000 F C D 2 Qo 3 4 5 cz? ?r Q Ca .c 7 0 5 oa m a +U z 0 80°39145' Joins Map 437 80°39100 8CIO..R'15' CALEXANDRIA DRAFTING CO. ??? E F G G X GRD 1.510.000 FT j ¦' 50'37317' *.° + ,.f' y ? • It ' ` ` rr?r + ? _ -.- _ - ,. (a be, - r' r zt s T- _ 635 67 -- - Isolated WetWid:,, . 'park .. ?,•! ? - _ -.,•%! ,i tip: _ _ r /"642 417* W All Name: MATTHEWS Location: 035° 04' 25.3" N 080° 38' 15-71 W Date: 9/26/2005 Caption: Union County Scale: 1 inch equals 1000 feet Faith Church Road Extension Union County - Faith Church Road Extension r Legend Q permit site Prepared by: North Carotiata Department of Transpertatieo L. B. Thomps Envvoamentaf Unit, Divbiee It Date: April 25, 2905 This map is intended for hner®! DOT use only. i For all other mes, as warrandes of any sort, including accuracy, flurm or murciantabitity accompany this producL 600 1,200 2,400 3,600 4,800 Feet ?EP.Z?"GW? l?:lb eve ao? u?sv 04:47pm Prom-ENGINIERING CONSULTIM8 SRVS LTD +288687180 T-040 P.DO AOZ F-M all U.S. AMY CORPS OF ENGINE - w,1voTGTON DISTRACT - COMW Y1A10Ia a Id. 200030616 pENEVAL PERK M (REGIONAL AND NA`Y'IONWME) VERiFICA1'IOI?t 3TdMoA Dev*PMOA CO., be" Att'>q: ?Vir. Ivaq i $ ew. 576 Dde AYedve (O)PY Rto?, NY 14M T Md of )roux (water body, road. lanaabet, UtM c=): . north of tbre alth Church Road MCMAW P a located Olt aPPrw- 8 WC trait _ -- a of Faith Church Rd- and UX 74; so of YndJ+= nail of unrtgm ?itti an aC[eagon 0.317 arre of wetlsads in con an locma is the beadwatcrs of IM Unuu. Uib. to Swath FOF)4 Cmalmd Cke*- Thu stern Of South Fork will be brit - > b? _S60aon 404 (Clean Wator Ad, 33 U.5.C.134d). gecLIM 10 (River sad Hexbor Apt of i899)• t Egdw apply) `' Rcgianal Genera! Petmlt Number. oriz??a~ _6 Nauouw? Petm? N Pe it is ItG1? or NAG Permit COP) P M work is authorized by this ( ad your mbm?md Pte- Fat gq activity bshed In strict a=orda= Wah the you tauu a rho N.C. Division Of Coasts! before beg?8 work - (919)133-2293. _ candid= tc of the RGP or NWP, Any vas of tile -- read grid ==fj UY comply wuh thm attachotl ? m a ? Work order. a udidm of the RGP or the NWP refetw=d ?"e ?y subjeat ft pew ard=, and/or awroprim lepi actim pe'rso? of dx sb'iry ft dogs not V*" the Army RGP or 14WP Yer °a s m Con= Depgonmt local approvIWPe:mW- Thu P? othtr of kCM es before begimtitu$ `01'L Prop mP to ?$ col?diTi?s of she G Permit or the this atttbo or say of any There gyegt;one Offcl pe °• oano a COpRekl=' atlonsv?de Psnrtir. TeleghM No. 14 orpa R?rY 2002 lraiwr< bate of V - UIL ECS Mg. Dwse M. Paula? w Pam Qil ktr 1416 S d 16Sti 'ON WdES:l S00Z '9l 'd3S