HomeMy WebLinkAbout20200987 Ver 1_More Info Received_20210115Anchor QEA of North Carolina, PLLC ANCHOR 231 Haywood Street Asheville, North Carolina 28801 �•�/ 828.281.3350 January 15, 2021 Sue Homewood Department of Environmental Quality Division of Water Resources, Winston Salem Regional Office 450 W. Hanes Mill Rd, Suite 300 Winston Salem, North Carolina 27105 Re: Lake Adger Navigation Channel Maintenance Dredging Response to NCDEQ-DWR Request for Additional Information DWR #20200987 Polk County Dear Sue: On behalf of the North Carolina Wildlife Resources Commission (NCWRC), Anchor QEA of North Carolina, PLLC, is pleased to provide this response to the North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources — Water Quality Programs (DWR) request for additional information for the Lake Adger navigation channel maintenance dredging (DWR #20200987 Polk County). The request for additional information' was in response to the Application for Department of the Army Permit Form 4345 (dated June 12, 2020; received by the U.S. Army Corps of Engineers [USACE] June 16, 2020); Anchor QEA received them via email on September 2, 2020. NCDEQ-DWR approved extensions of the response date to December 31, 2020,2 and then January 15, 2021,3 to align submission with the response to comments to USACE. Anchor QEA provides the following additional information. 1. Monitoring Plan NCDEQ-DWR Comment Received September 2, 2020 The application notes that a wetland monitoring plan will be developed with input from the resource agencies. Please provide the wetland monitoring plan. The monitoring plan should include a detailed proposal for monitoring activities, a clear proposal for documentation and determination of future evaluations of wetland function, and a 1 North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources — Water Quality Programs, 2020. Letter to: Jeff Ferguson, North Carolina Wildlife Resources Commission. Regarding: Request for Additional Information — Lake Adger Channel Maintenance Dredging. August 26, 2020. 2 Sue Homewood (Department of Environmental Quality), 2020. Regarding: Lake Adger Dredging - 401 Request for Additional Information. Email to: Jeff Ferguson, Kaylie Yankura (NC Wildlife Resources Commission). September 18, 2020. 3 Sue Homewood (Department of Environmental Quality), 2020. Regarding: Lake Adger Dredging - 401 Request for Additional Information. Email to: Robert Cork (Anchor QEA). December 23, 2020. January 15, 2021 Page 2 mitigation to compensate for any inadvertent loss of wetland function withing wetlands to be impacted with dredge material. [75A NCAC 02H .0506(3)] Response on Behalf of NCWRC The Wetland Monitoring Plan is included as Attachment A. The Wetland Monitoring Plan was developed by NCWRC and Anchor QEA, in consultation with NCDEQ-DWR. 2. Phasing and/or Construction Sequencing Plan NCDEQ-DWR Comment Received September 2, 2020 Please provide a detailed phasing and/or construction sequencing plan proposed for this project. For instance, will dredging activities be confined within certain portions of the lake until completion/ before progressing to the next work area? How does the construction sequencing tie into the containment system design and turbidity monitoring proposals? [75A NCAC 02H .0506(2)] Response on Behalf of NCWRC Dredging and wetland establishment for the initial dredging episode is anticipated to follow the following approximate schedule: • Weeks 1 and 2: Mobilization to Site, marking of delineated wetland extents, preparation of wetland placement areas, and preparation for turbidity monitoring • Weeks 3 to 5: Dredging activities • Weeks 6 and 7: Demobilization and complete wetland placement activities • Week 7 for several months: Monitor wetland placement area settlement to determine planting timing, per wetland monitoring plan • Two weeks following adequate settlement: Wetland planting activities • Up to 2 years: Implement wetland monitoring plan The 90% Design Set (Attachment B) includes a Sequence of Construction for the dredging contractor. Means -and -methods for dredging activities will be submitted by the selected contractor for approval by NCWRC designees. It is anticipated that dredging activities will start on the eastern end of the navigation channel, and work back towards the public boat ramp. 3. Turbidity Monitoring NCDEQ-DWR Comment Received September 2, 2020: Please provide a more detailed and robust turbidity monitoring plan to ensure that water quality standards will be maintained during in -water activities. [75A NCAC 02H .0506(2)] January 15, 2021 Page 3 Response on Behalf of NCWRC The Turbidity Monitoring Plan is included as Attachment C. The Turbidity Monitoring Plan was developed by NCWRC and Anchor QEA, in consultation with NCDEQ-DWR. 4. Future Dredging NCDEQ-DWR Comment Received September 2, 2020: The applicant mentions future routine dredging activities to be covered by this approval. The Division recommends that prior to commencement of any future dredging or disposal activities the areas to be used for disposal should be re-evaluated by the regulatory agencies and may require updated jurisdictional determinations and/or NCWAM evaluations, and that updated [sic]. [15A NCAC 02H .0506(1)] Response on Behalf of NCWRC This comment has been noted. It is anticipated that USACE will address this comment with conditions to the permit, if approved. Closure Please do not hesitate to contact me at rcork@anchorgea.com or (828) 450-6435. Sincerely, Robert Cork, PE MEng Managing Engineer cc USACE — David Brown, David.W.Brown@usace.army.mil NCWRC — Andrea Leslie, and rea.leslie@ncwildlife.orq NCWRC — Jeff Ferguson, ieff.ferguson@ncwildlife.orq NCDEQ-DWR— Kaylie Yankura, kaylie.yankura@ncdenr.gov Attachments Attachment A Lake Adger Navigation Channel Maintenance Dredging Project Wetland Monitoring Plan Attachment B 90% Design Submittal for Lake Adger Navigation Channel Maintenance Dredging Attachment C Lake Adger Navigation Channel Maintenance Dredging Project Turbidity Monitoring Plan Attachment A Lake Adger Navigation Channel Maintenance Dredging Project Wetland Monitoring Plan Anchor QEA of North Carolina, PLLC ANCHOR 231 Haywood Street�z Asheville, North Carolina 28801 QEA �i 828.281.3350 WETLAND MONITORING PLAN January 12, 2021 Lake Adger Navigation Channel Maintenance Dredging Project Anchor QEA of North Carolina, PLLC, in Consultation with North Carolina Wildlife Resources Commission A plan for maintenance dredging of the public boat ramp and marina navigation channel has been developed by engineering consultant Anchor QEA of North Carolina, PLLC in consultation with North Carolina Wildlife Resources Commission (NCWRC). A component of this plan involves in -lake placement of dredged material to create stable habitat features in proximity to existing wetlands and transitional areas in the forebay of Lake Adger. The placement areas have been identified on sheet C4 of the 90% Design Set submitted with the Response to USACE Comments and Provision of Additional Information'. Monitoring the stability of the placement areas and the success of planted vegetation will be performed by NCWRC staff or a qualified contractor according to the following protocol: 1. Prior to any dredging or placement activity under this permit, NCWRC will send notification to the North Carolina Division of Water Resources (DWR) Environmental Specialists and the U.S. Army Corps of Engineers (USACE) representative with jurisdiction over this project. This notification will describe the proposed dates of dredging and placement activity and include a map identifying the locations and extents of the proposed maintenance dredge and material placement for habitat creation. 2. The dredging contractor will perform a certified as -built survey of the extents and topography of the completed placement area(s) at the end of the dredging and placement phase. The contractor's surveyor will set and locate a benchmark at the high point of each placement area. As -built surveys will be submitted to NCWRC for each dredging and placement operation for inclusion in the monitoring reports. 3. Prior to planting, the elevation benchmarks will be monitored to assess settlement and consolidation of the placed sediment over time. Monitoring of settlement on a weekly and/or monthly basis will allow project engineers to estimate that adequate settlement has occurred prior to planting. 4. Following adequate assessment, the planting contractor and project engineers will estimate total areas and numbers of each planting type, and submit a plan to NCWRC prior to initiating planting. 1 Anchor QEA, 2021. Letter to: David Brown, USACE. Regarding: Response to USACE Comments and Provision of Additional Information. Lake Adger Navigation Channel Maintenance Dredging Project. January 15, 2021. Att C_Wetland Monitoring Plan_2021-01-11.docx January 12, 2021 Page 2 5. Following planting, the planting contractor will prepare a report for NCWRC listing the date, species, and numbers of plantings at each placement area. Once this report has been received, DWR and the USACE will be notified that planting operations have been completed. 6. Six months following completion of planting operations, NCWRC (or contractor) will perform an assessment and report on the condition of the placement area(s) and any other related temporary impacts that will have been replanted. Starting with the initial report, this information will be compiled and forwarded to DWR and the USACE. A standard form will be developed to include the following information for planted placement areas associated with each dredging operation: a. The dredging contractor's as -built survey map, estimates of pre -planting settlement, and the planting contractor's record. b. A visual and photo assessment of the planted areas. Photos may be taken from a boat as viewed from different perspectives and/or from the air by an unmanned aerial system. If significant issues of plant community failure are observed, then NCWRC will map and note the problems in the report and will coordinate corrective actions, if needed. c. The elevations and coordinates of benchmarks previously set on the placement areas will be surveyed and recorded. The elevations and positions will be assessed relative to those surveyed and recorded for the contractor as -built report to measure the extent of any consolidation or movement of the placed material. Any apparent instabilities will be documented. 7. During the monitoring period, any observed problems, instabilities or significant plant mortalities will be noted and communicated to DWR and the USACE. NCWRC staff will begin an evaluation of problems and develop a plan for remediation, if required. 8. Subsequent monitoring of planted areas will take place at 6-month intervals for a period of 3 years after the initial report for the specific activity. Photos, survey data, and observations will be appended to the initial report. At the end of monitoring Year 2, NCWRC, DWR, and the USACE may review conditions of the wetland plantings and decide if the monitoring interval can be reduced to once per 12 months or if there is a need for additional monitoring. 9. Each new dredging episode will require monitoring reports for the resulting placement and planting. Subsequent placement area(s) will be subject to the monitoring plan and time frame described in the above steps. Attachment B 90% Design Submittal for Lake Adger Navigation Channel Maintenance Dredging 90% DESIGN SUBMITTAL LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING NORTH CAROLINA WILDLIFE RESOURCES COMMISSION i� s� ,aa bm F't Co�lar1s �Q Sunny V€ew pe9an �J p ynA rarme `�F70 NORTH CAROLINA Asheville • Charlotte Raleigh Project NOT TO SCALE DRAWING INDEX SHT # DWG # TITLE 1 G1 TITLE SHEET 2 G2 GENERAL NOTES, LEGEND, AND ABBREVIATIONS 3 E1 EXISTING CONDITIONS 4 C1 DREDGE PLAN 5 C2 PROFILE 6 1C3 ISECTIONS 7 C4 DREDGED MATERIAL PLACEMENT LAYOUT 8 C5 TURBIDITY MONITORING LOCATIONS 9 CIS IMPACTED AREAS 10 C7 DETAILS 11 C8 VEGETATION PLANTING DETAILS and Ra �� PROJECT LOCATION z ye Fo- � per ? qa �1un Rd 3 yi ,a NORTH z 0 4000 8000 Mill SPring 3 0 >w SCALE IN FEET o z SOURCE: ©2019 Microsoft Corporation ©2018 HERE z a Z o VICINITY MAP = <� V w a Z m Z O Z O s V z O w V - Z Z - V N w O � V w I QV Z_ DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH REV DATE BY APPD DESCRIPTION DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION G1 T p 7'y A �T� �-y ®p( ANCHOR al�vi` CAROLINA , , KROW whan, below. Call before yaudig. DRAWN BY: HOLMER, D. CHECKED BY: REEMTS, M. LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING - IDEA i �`/ /' RESOURCES APPROVED BE: DIN (COLA, W. COMMISSION SCALE: AS NOTED DATE: JANUARY 2021 TITLE SHEET SHEET# 7 OF 77 GENERAL NOTES FOR MAINTENANCE DREDGING 1. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS BEFORE BEGINNING CONSTRUCTION AND WILL IMMEDIATELY INFORM NCWRC OF ANY DISCREPANCIES FOUND BETWEEN THE PROJECT PLANS AND CONTRACT SPECIFICATIONS PRIOR TO PROCEEDING WITH THE WORK. 2. CONTRACTOR SHALL STRICTLY ENFORCE ALL APPLICABLE HEALTH AND SAFETY LAWS (I.E. OSHA) AND MAINTAIN SITE SECURITY. 3. CONSTRUCTION KICK-OFF MEETING WITH THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION, THE ENGINEER AND OTHER RELEVANT STAKEHOLDERS IDENTIFIED IS REQUIRED PRIOR TO ANY ONSITE WORK. 4. CONTRACTOR SHALL PROVIDE A SEQUENCE OF CONSTRUCTION TO BE APPROVED BY THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION, AND THE ENGINEER PRIOR TO SITE MOBILIZATION. 5. CONTRACTOR SHALL PROVIDE THE FOLLOWING SUBMITTALS TO BE APPROVED BY NCWRC PRIOR TO SITE MOBILIZATION: • HEALTH AND SAFETY PLAN • DREDGING AND DREDGED MATERIAL PLACEMENT WORK PLAN, INCLUDING MEANS -AND -METHODS TO PROTECT EXISTING WETLAND • SURVEY WORK PLAN • PROJECT CONSTRUCTION SCHEDULE • CONTRACTOR QUALITY CONTROL PLAN • SPILL PREVENTION PLAN • PRE -CONSTRUCTION SURVEYS. 6. CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS WITHIN THE LIMITS OF WORK AND WILL BE RESPONSIBLE FOR DETERMINING APPROPRIATE QUANTITIES AND REQUIRED MATERIALS TO COMPLETE THE WORK. 7. CLEARING TO BE LIMITED TO THE LIMIT OF DISTURBANCE AS SHOWN ON THE PLANS. WORK SHOULD LIMIT TREE REMOVAL BY WORKING AROUND EXISTING TREES AS POSSIBLE. CONTRACTOR MUST RECEIVE APPROVAL FROM NCWRC PRIOR TO REMOVAL OF ANY TREES. 8. ANY TREES DAMAGED OR REMOVED DURING THE WORK SHALL BE REPLACED BY THE CONTRACTOR WITH THE SAME SPECIES OR SIMILAR AS APPROVED BY NCWRC. 9. THE HORIZONTAL DATUM SHALL BE BASED ON NORTH CAROLINA STATE PLANE, NAD83, U.S. SURVEY FEET. THE VERTICAL DATUM SHALL BE BASED ON NAVD88. THE HYDROGRAPHIC SURVEY WAS COMPLETED BY HAYES, JAMES & ASSOCIATES, INC., IN OCTOBER 2018. 10. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS, BUT THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS AND ELEVATIONS OF THE LINES BY DIGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS, WELL IN ADVANCE OF TRENCHING. IF CLEARANCES ARE LESS THAN SHOWN OR SIX (6) INCHES, WHICHEVER IS LESS, CONTACT NCWRC IMMEDIATELY. 11. CALL "NORTH CAROLINA 811" AT 811 OR 1-800-632-4949 FORTY-EIGHT (48) HOURS PRIOR TO BEGINNING EXCAVATION OR DREDGING TO DETERMINE THE EXACT LOCATION OF EXISTING UTILITIES. 12. ADDITIONAL UNDERWATER UTILITIES MAY EXIST ELSEWHERE WITHIN THE PROJECT EXTENTS. CONTRACTOR SHALL FIELD VERIFY ANY IN -WATER UTILITIES, CROSSINGS OR POTENTIAL IMPEDIMENTS TO THE WORK AND TAKE ADEQUATE PRECAUTIONS TO AVOID THEM. 13. REPAIR TO UTILITIES OR PROPERTY DAMAGE AS A RESULT OF THE CONTRACTOR'S NEGLIGENCE OR METHOD OF OPERATION MUST BE MADE AT THE CONTRACTOR'S EXPENSE BEFORE CONTINUING WITH CONSTRUCTION. 14. ANY DAMAGES THAT MAY OCCUR TO REAL PROPERTY OR EXISTING IMPROVEMENTS SHALL BE RESTORED BY THE CONTRACTOR TO AT LEAST THE SAME CONDITION THAT THE REAL PROPERTY OR EXISTING IMPROVEMENTS WERE IN PRIOR TO THE DAMAGES. THIS RESTORATION SHALL BE SUBJECT TO THE OWNER'S APPROVAL; MOREOVER, THIS RESTORATION SHALL NOT BE A BASIS FOR ADDITIONAL COMPENSATION TO THE CONTRACTOR. RESTORATION SHALL INCLUDE, BUT NOT BE LIMITED TO, REGRASSING, REVEGETATION, REPLACING FENCES, REPLACING TREES, ETC. 15. ALL UPLAND GRADING SHALL BE DONE IN SUCH A MANNER AS TO PROVIDE POSITIVE DRAINAGE. 16. DISTURBED UPLAND AREAS SHALL BE GRADED AND RESTORED TO ORIGINAL CONDITIONS. DISTURBED AREAS ADJACENT TO ESTABLISHED LAWNS SHALL BE SODDED. OTHER DISTURBED AREAS SHALL BE SEEDED AND MULCHED. ALL DISTURBED AREAS ARE TO BE STABILIZED AND SEEDED WITHIN 14 DAYS OF DISTURBANCE UNLESS OTHERWISE NOTED. SLOPES STEEPER THAN 3:1 MUST BE STABILIZED IN 7 DAYS. INSTALL TEMPORARY SEEDING ON ALL AREAS THAT WILL BE LEFT IDLE FOR MORE THAN 14 DAYS. HARD WOOD MULCH IS AN ACCEPTABLE TEMPORARY COVER BUT MAY NOT BE BLENDED INTO THE SUBGRADE AND WILL BE REQUIRED TO BE REMOVED PRIOR TO CONTINUATION OF THE WORK. STRAW MULCH AND TALL FESCUE SHOULD NOT BE USED IN RIPARIAN AREAS. 17. THE CONTRACTOR SHALL PROTECT ALL UTILITIES, AND EXISITNG INFRUSTRUCTURE DURING CONSTRUCTION, AND ALL WETLANDS DURING CONSTRUCTION OPERATIONS. 18. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE WETLAND BOUNDARIES ARE UNDERSTOOD PRIOR TO BEGINNING WORK. 19. THE CONTRACTOR SHALL OBEY ALL COUNTY HEIGHT, WEIGHT AND UNDERCLEARANCE RESTRICTION S.TH E CONTRACTOR SHALL OBEY ALL APPLICABLE NOISE RESTRICTIONS. 20. ALL SITE ACTIVITIES INCLUDING BUT NOT LIMITED TO CLEARING, WATER LEVEL DRAWDOWN, DREDGING, DEWATERING, WATER TREATMENT, TRANSPORTATION, AND DISPOSAL, SHALL FOLLOW ALL APPLICABLE PERMITS AND CONTRACT DOCUMENTS. 21. IF DEBRIS IS ENCOUNTERED WHILE DREDGING, CONTRACTOR SHALL TRANSPORT DEBRIS TO THE STAGING AREA WHERE IT WILL BE TRANSPORTED OFFSITE TO AN APPROVED DISPOSAL LOCATION. VEHICLES TRANSPORTING DEBRIS OFFSITE MUST FOLLOW POSTED SPEED LIMITS, TRAFFIC SIGNS AND SIGNALS, AND ALL COUNTY HEIGHT, WEIGHT AND UNDERCLEARANCE RESTRICTIONS. CONTRACTOR SHALL NOT TRACK OR DISCHARGE SEDIMENT OR DEBRIS ONTO ROADS. 22. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS NECESSARY FOR CONSTRUCTION NOT SUPPLIED BY THE WILDLIFE RESOURCES COMMISSION. THIS MAY INCLUDE BUT NOT BE LIMITED TO: ANY REQUIRED EROSION CONTROL OR LAND DISTURBANCE PERMITS, ARMY CORP OF ENGINEERS PERMITS, STORMWATER PERMITS, NPDES, CITY OR COUNTY BUILDING PERMITS, OR ROADWAY PERMITS. THE COSTS FOR ADDITIONAL PERMITS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL NOT IMPACT THE PROJECT SCHEDULE. 23. CONTRACTOR SHALL IMPLEMENT EROSION AND SEDIMENT CONTROL AND MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY TO COMPLY WITH COUNTY, STATE, AND FEDERAL LAWS AND REGULATIONS. ANY SEDIMENT CONTROL MEASURES DISTURBED BY CONSTRUCTION WILL BE REPAIRED THE SAME DAY. 24. CONTRACTOR SHALL SUBMIT CONSTURCTION WORK PLAN AND ANCILLIARY WORK PLANS IN ACCORDANCE WITH THE SPECIFICATIONS. 25. STOCKPILES MAY ONLY BE PLACED IN APPROVED LOCATIONS. ALL STOCKPILES LEFT AT THE END OF THE DAY NEED TO BE STABILIZED UNTIL THE NEXT DISTURBANCE. 26. BARRICADING AND TRAFFIC CONTROL DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO THE NCDOT STANDARD SPECIFICATIONS AND DRAWINGS. PEDESTRIAN AND VEHICULAR TRAFFIC FLOW SHALL BE MAINTAINED DURING ALL PHASES OF THE CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON PROJECT. 27. WHERE EXISTING GRADE EXCEEDS 5:1 (HORIZONTAL:VERTICAL) AND THE DEPTH OF FILL EXCEEDS 5 FEET, BENCHING SHALL BE PROVIDED. A 2-FOOT DEEP BY 10-FOOT WIDE KEY SHALL BE PROVIDED AT THE TOE OF THE FILL SLOPE. REFER TO NC BUILDING CODE SECTION 107 FOR ADDITIONAL DETAIL. 28. CERTIFICATION OF CUT AND FILL SLOPES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE MADE BY GEOTECHNICAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF NORTH CAROLINA. UNLESS OTHERWISE NOTED, ALL CUT AND FILL SLOPES PROPOSED BY THESE PLANS SHALL BE 2:1 (HORIZONTAL:VERTICAL) OR FLATTER. 29. CUT AND FILL SLOPES (EMBANKMENTS) SHALL BE CONSTRUCTED IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATION SECTION 235 OR THE GEOTECHNICAL (SOILS) REPORT RECOMMENDATIONS, WHICHEVER IS MORE RESTRICTIVE. AT A MINIMUM, ALL FILL SLOPES SHALL BE PLACED IN 10-INCH MAXIMUM LIFTS COMPACTED TO NOT LESS THAN 95 PERCENT DENSITY (STANDARD PROCTOR). CONTRACTOR SHALL ARRANGE FOR INDEPENDENT COMPACTION TESTING RESULTS TO BE PAID FOR BY THE OWNER/DEVELOPER. 30. NO GRADING OR FILL SHALL OCCUR WITHIN 2 FEET OF A PROPERTY LINE WITHOUT WRITTEN PERMISSION FROM THE ADJACENT PROPERTY OWNER. 31. UNLESS OTHERWISE INDICATED IN THESE PLANS TERRACES SHALL BE PROVIDED AS FOLLOWS: WHERE GRADES EXCEED 3:1 (HORIZONTAL:VERTICAL), TERRACES AT LEAST 6 FEET IN WIDTH SHALL BE CONSTRUCTED AT NOT MORE THAN 30-FOOT VERTICAL INTERVALS ON ALL CUT OR FILL SLOPES. SWALES SHALL BE PROVIDED ON TERRACES IN ACCORDANCE WITH NC BUILDING CODE SECTION JI09. 32. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE WORK DOES NOT RESULT IN UNACCEPTABLE INCREASES IN TURBIDITY WITHIN THE LAKE OR SURROUNDING STREAMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING MEASURES TO CONTROL TURBIDITYAS NEEDED AND FOR FOLLOWING THE TURBIDITY MONITORING PLAN. 33. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHOULD BE INSPECTED AND MAINTAINED REGULARLY TO PREVENT CONTAMINATION OF STREAM WATERS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS OF OTHER TOXIC MATERIALS. 34. DISCHARGING HYDROSEED MIXTURES AND WASHING OUT HYDROSEEDERS AND OTHER EQUIPMENT IN OR ADJACENT TO SURFACE WATERS IS PROHIBITED. 35. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND AFTER ANY RAINFALL. DEFICIENCIES SHALL BE CORRECTED IMMEDIATELY. A DAILY RECORD SHALL BE MAINTAINED ON THE SITE BY THE CONTRACTOR. PROJECT SITE CONDITIONS MAY REQUIRE INSTALLATION OF ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES. EROSION CONTROL MEASURES AND MAINTENANCE SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL. 36. CONTRACTOR WILL MAINTAIN PUBLIC ACCESS TO BOAT RAMP AND FACILITIES AT ALL TIMES, OR LIMIT BLOCKING OF ACCESS WITH ADVANCED NOTICE TO THE PUBLIC. NORTH CAROLINA /� (\p,T�'�®R , , Knowwhaesbelow. ru /� R /' call before you dig. ��l i �L/ R^SOURCEu DATUMS: 1. HORIZONTAL DATUM: NORTH CAROLINA, NORTH AMERICAN DATUM (NAD83), U.S. SURVEY FEET 2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET SOURCES: 1. AERIAL PHOTOGRAPH ©2019 MICROSOFT CORPORATION ©2019 DIGITALGLOBE ©CNESS (2019) DISTRIBUTION AIRBUS DS 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES DATED AUGUST 27, 2018. GENERAL LEGEND: PROPOSED: 14+00 PROJECT STATIONING H I I I H DREDGE AREA (PRIMARY) 905 DREDGE CONTOURS (1' INTERVAL) - • - DREDGE AREA (CONTINGENCY) EXAMPLE COIR LOG OR HAYBALE LOCATION S EXAMPLE SILT CURTAIN OR SILT FENCE LOCATION LIMITS OF DISTURBANCE SITE ACCESS ROAD - - - - STAGING AREA EXISTING: 905 TOPOGRAPHY (1' INTERVAL) 00 CHANNEL MARKERS > ----{ CULVERT ROAD ---- ----- ----- SHORELINE (NORMAL POOL ELEVATION 911.61') DETAIL AND SECTION REFERENCING: DETAIL REFERENCE NUMBER 1 DRAWING ON WHICH DETAIL APPEARS C1 '-" INDICATES TYPICAL OR ON SAME DRAWING DETAIL REFERENCE NUMBER 1 DETAIL SCALE: 1" = 10' XA DICATES DIRECTION CUTTING PLAN SECTION "A" IS SHOWN ON DRAWING "C-2"_ C2 SECTION REFERENCE LETTER A SECTION PLAN NUMBER WHICH SECTION WAS TAKEN SCALE: r' = 10' ABBREVIATIONS: FEET, MINUTES " INCHES, SECONDS DEGREES 0 DIAMETER # NUMBER APPROX APPROXIMATE CONC CONCRETE CY CUBIC YARDS DIA DIAMETER DU DREDGE UNIT DWG DRAWING E EAST, EASTING ELEV ELEVATION EX EXISTING FG FINISHED GRADE FL FLOW LINE GALV GALVANIZED HOR HORIZONTAL L LENGTH LF LINEAR FEET MAX MAXIMUM MIN MINIMUM MLLW MEAN LOWER LOW WATER N NORTH, NORTHING NAD NORTH AMERICAN DATUM NAVD NORTH AMERICAN VERTICAL DATUM P.E.A. PROFESSIONAL ENGINEER R, RAIDRADIUS REINF REINFORCED, REINFORCEMENT ROW RIGHT-OF-WAY S SLOPE, SOUTH STA STATION SY SQUAREYARD TESC TEMPORARY EROSION AND SEDIMENT CONTROL TYP TYPICAL W WEST, WATER W/ WITH WSEL WATER SURFACE ELEVATION SEQUENCE OF CONSTRUCTION: SPECIFIC ACTIVITIES CONDUCTED BY THE CONTRACTOR TO COMPLETE THE WORK INCLUDE, BUT ARE NOT LIMITED TO: 1. PREPARE AND SUBMIT FINAL WORK PLANS AND ALL OTHER REQUIRED PRE -CONSTRUCTION SUBMITTALS. 2. ATTEND A PRE -CONSTRUCTION MEETING WITH THE OWNER, THE ENGINEER AND OTHER RELEVANT STAKEHOLDERS IDENTIFIED. 3. PERFORM AND SUBMIT ALL REQUIRED PRE -CONSTRUCTION SURVEYS. IDENTIFY AND FLAG ALL WETLANDS WITHIN 100 FEET OF THE LIMITS OF DISTURBANCE IDENTIFIED IN THE DRAWINGS. 4. ATTEND A CONSTRUCTION KICKOFF MEETING WITH THE OWNER'S REPRESENTATIVE AND OTHER RELEVANT STAKEHOLDERS IDENTIFIED. 5. MOBILIZE CREWS, FACILITIES, EQUIPMENT, AND MATERIALS REQUIRED TO COMPLETE THE WORK. 6. INSTALL AND MAINTAIN ENVIRONMENTAL CONTROLS AND APPROVED PLACEMENT AREA CONTAINMENT FEATURES. 7. PERFORM ALL REQUIRED DREDGING AND PLACEMENT WITHIN THE LIMITS SPECIFIED ON THE DRAWINGS. 8. PERFORM AND SUBMIT ALL REQUIRED POST -CONSTRUCTION SURVEYS. 9. PERFORM SITE RESTORATION AND DEMOBILIZATION IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. w� 10. PLANTING WORK WILL BE COMPLETED UNDER A SEPARATE z o z CONTRACT FOLLOWING ADEQUATE CONSOLIDATION AND o , SETTLING OF PLACED DREDGED MATERIAL. s Z - o V - V _ w O � V LL I QV Z_ DRAFT -NOT FOR CONSTRUCTION REVISIONS DESIGNED BY: CORK,R. DRAWN BY: HOLMER, D. CHECKED BY: REEMTS, M. APPROVED BY: DINICOLA, W. SCALE: AS NOTED NORTH CAROLINA WILDLIFE RESOURCES COMMISSION �� Z �� DESCRIPTION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING GENERAL NOTES, LEGEND, AND ABBREVIATIONS DATE: JANUARY 2021 SHEET# OF 0 J i, PUBLIC ACCESS BOAT RAMP i •. 0 FL_...... _ .909 DOCK .° � o EXISTING t ° CULVERT LAKEADGER ° r (FULL POOL ELEVATION 911.61) 0 Qom\ I P�CF� o LEGEND: —905— EXISTING TOPOGRAPHY (1' INTERVAL) — ---- — SHORELINE (NORMAL POOL ELEVATION 911.61') 00 CHANNEL MARKERS - SUMMER 2019 LAKEADGER O 0 nQ j' 0 on o °. i' NORTH i 0 100 200 .'; .. e O '��p''� : r �� � o �. .o► �).. �.:i ` i; ;... f' J � � SCALE IN FEET 70 r�^p i�ao�� �ii r. ?. ° r`p r: ♦.. y ,'i, ; / .:''y..: s �r'a ,'. !, �!� ° , f, .. • _ r ..r .p ,' •S r a ° 910 0 ,.. :: Rio - V i i J i �1 ♦.$� r: a r..._...1 0. °e r % • ` + 6 S »moo .;:• � ,.: ,. r� ' ��� ��• Ji <! .[dam �:d�.�t `�' o° �� � `r'� i L "� ��'Irr• ids � \ur���\� � ���� �� • � r.. d: � r.%r.J ��,:: �.... r ��� //� ., �' �O: ..T (7 ° - ,1 r. •' (7 wl O ° fi.r w !oi J' / ! a Q °• , 1 / a. °..1 'v - .r � �'� � 1 e. � � •`•°�1 � .;1 ° - �'��^per :I . J�. �•.3 r ± ° LiD „>, m v _ 70._..._ c a o r"+ i•L`'�•• I Sp ��A.; r fl o ° o n Sr46 �7opr:` z¢ �e • - r - J.. 9 A �...�;; " ...�:' ° •• _ , j .rl `d7% J't► L>, \ • t •r i�,`\ e ¢ m o o �.. t.. �. ..� /.: '1 ♦:i i' 1 r ' .r',0�' •j4:>e eoR or • 0 .-�f _ E ?Z r x. LPO , �. •: .r .�a-�..:.� :^c. ,�' 1 � O O .._ ..r��. y- a �t l':,( old 9' v. • �' j �; ..i, . _ `Q ;;.:� ! i t % , ...:ter.:: iv s ° 91� z . + oz 41 - z LL� r C r w J^.� `ab + �. r r J� �QQF i''r .� _s� ` QF� `i z • �t -- w ° �... :x :1, . _ :. ..t:a� \...� �.,.: ® _ DRAFT -NOT FOR CONSTRUCTION z REVISIONS NORTH REV DATE BY AP P D DESCRIPTION DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION E1 ANCHOR �•y CAROLINA DRAWN BY: HOrMER, D. LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING r-y ®Lr / , Know Whans below. CHECKED BY: REEMTS, M. a l�vi\ / ' CBII before you dig. - QEA �`/ RESOURCES APPROVED BE DIN (COLA, W. COMMISSION SCALE: AS NOTED DATE: IANUARY1011 EXISTING CONDITIONS SHEET# 3 of 11 ♦� —D--ACCESS BOAT RAMP PROPO D / - STAGIN AREA 4 �1 _ \ v 0 ����� �(O. ACRES) . m DU-8 DU-6 \ \ \ \ \ DU-5 \ x� O B• 1 DU-4 \ r 0 LAKE ADGER 1 r DU-1 DU-213 'I�+00 Ile11+00 12+00 13+00 14+00 I 15+00 2911 k Os \ DU-2A \ LEGEND: 14�� PROJECT STATIONING NAVIGATION CHANNEL DREDGE AREA APPROXIMATE EXTENTS • — • — DREDGE AREA APPROXIMATE EXTENTS — APPROXIMATE LIMITS OF DISTURBANCE - DREDGING AREA — — — WETLAND DELINEATION — —--- — SHORELINE (NORMAL POOL ELEVATION 911.61') 0 NORTH 0 60 120 SCALE IN FEET \ NOTES: o� 1. HORIZONTAL DATUM: NORTH CAROLINA, NORTH \ AMERICAN DATUM (NAD83), U.S. SURVEY FEET 50 ow V 2. VERTICAL DATUM. NORTH AMERICAN VERTICAL o a i DATUM OF 1988 (NAVD88), FEET o 0 w¢ SOURCES: z z o z o Q V 1. AERIAL PHOTOGRAPH 02019 MICROSOFT E� z y CORPORATION 02019 DIGITALGLOBEOCNESS R\JAR r \i (2019) DISTRIBUTION AIRBUS DS 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES DATED J o z r o = CIO �. AU AUGUST 27, 2018. z ? o o z °\) % J ' DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION REV DATE BY AP DESCRIPTION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING ANCHOR CAROLINA , , KROW Whans below. Call before you dig. DRAWN BY: HOLMER, D. CHECKED BY: REEMTS, M. - �v QEA --1`/ /' RESOURCES APPROVED B: DIN (COLA, W. COMMISSION SCALE: AS NOTED DATE: JANUARY 2021 DREDGE PLAN SHEET# 4 OF 11 LAKE ADGER CHANNEL CENTERLINE 920 920 z 910 910 w 1L— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Z_ 3 z O 900 ELEVATION 905.61' NAVD88 FROM STATION 9+90 TO END 900 w ELEVATIONS SLOPE FROM 905.61' TO 904.61' NAVD88 w z V H 890 890 -0+5C 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 HORIZONTAL DISTANCE IN FEET 5X VERTICAL EXAGGERATION LAKE ADGER CHANNEL CENTERLINE 920 920 _... _... ¢ 910 910 z w w z 0 � 900 900 w ELEVATION 904.61' NAVD88 z w V H 890 89C 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 HORIZONTAL DISTANCE IN FEET 5X VERTICAL EXAGGERATION o� V � O 0 Z z Q w I 0 z_ 0 Z 0 ¢ V Z m LEGEND: EXISTING MUDLINE w� NAVIGATION CHANNEL DESIGN DREDGE ELEVATION 0 z 0 — — — — NAVIGATION CHANNEL 6" ALLOWABLE OVERDEPTH s ° o V LL V NAVIGATION CHANNEL DREDGED MATERIAL TO BE REMOVED z N w 0 — --- _...— ..— LAKE ADGER FULL POOL ELEVATION 911.61' J LLs ¢ z NOTE: ALL DESIGN SLOPES ARE 3H:1V UNLESS OTHERWISE NOTED. DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION REV DATE BY AP DESCRIPTION CAROLINA DRAWN BY: HOMER, D. �� LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING �I AANCHOR , f ' , Kno/w�whaPsbelow. Call before youd19. CHECKED BY: DINICO, M. APPROVED BY : DIN (COLA, W. � RESORCES COMDATE: SCALE: AS NOTED IANDARV2011 PROFILE SHEET# 5 OF 11 STA 0+20 930 920 0 z " 910 z z H a 900 w 890 STA 2+00 920 920 920 920 ¢ DU-5 DU-6 ¢ z z w w ..4..._.. _... _... _... _... _..._.._ ... _... _.._..._..._..._..._ .._ .._..._... 910 910 z 910 910 z � a 3 � a 900 900 w 900 900 w 890 890 890 890 930 930 920 920 0 a z W W 910 910 z_ z 0 a 900 900 w 890 890 -20 -10 0 10 20 30 40 50 60 -20 -10 0 10 20 30 40 50 60 -20 -10 0 10 20 30 40 50 OFFSET IN FEET (NO VERTICAL EXAGGERATION) OFFSET IN FEET (NO VERTICAL EXAGGERATION) OFFSET IN FEET (NO VERTICAL EXAGGERATION) STA 12+00 STA 13+20 930 3 m 920 a z H - W W = z_ 910 = z - o _ a 900 w 890 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 - OFFSET IN FEET (NO VERTICAL EXAGGERATION) 920 910 900 89C -20 -10 0 10 20 30 40 50 60 70 80 90 100 -20 -10 0 10 20 30 40 50 -20 -10 0 10 20 30 40 50 OFFSET IN FEET (NO VERTICAL EXAGGERATION) OFFSET IN FEET (NO VERTICAL EXAGGERATION) OFFSET IN FEET (NO VERTICAL EXAGGERATION) 930 0 920 a z W W z_ 910 z 0 a 900 w 890 930 930 920 920 0 a z W W 910 910 z_ z 0 a 900 900 w 890 890 930 m 920 0 a z H W z_ 910 z 0 a 900 900 Y � O O Z � Q 890 89C 0 0 50 -40 -30 -20 -10 0 10 20 30 40 50 w OFFSET IN FEET (NO VERTICAL EXAGGERATION) z o oW Z V J Q - LEGEND: a Z m EXISTING MUDLINE DESIGN DREDGE ELEVATION 00 -_ 0 — — — — 6" ALLOWABLE OVERDEPTH s V ° o LL V DREDGED MATERIAL TO BE REMOVED z N w — --- _...— ..— LAKE ADGER FULL POOL ELEVATION 911.61' z 0 J LLs ¢ z NOTE: ALL DESIGN SLOPES ARE 3H:1V UNLESS OTHERWISE NOTED. DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH REV DATE BY AP P D DESCRIPTION DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION ^� CAROLINA DRAWN BY: HOLMER, D. LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING J ANCHOR / ' , , KROW Whans below. CBII before you dig. CHECKED BY: REEMTS, M. APPROVED BE DIN (COLA, W. RESOURCES COMMISSION SCALE: AS NOTED SECTIONS DATE: JANUARY 2021 SHEET# 6 OF 11 / O PROPOSEG D ; �P ° 2TF LEGEND: O STAGIN' j � � 4x• o•X � ! ♦ �� C 92 PROPOSED DREDGED MATERIAL PLACEMENT ♦e r �\� AREA i v \ \ Al AREA DESIGNATION 0 " d:' ♦: YYY ' i o 1 P� n.: \. f EXAMPLE COIR LOG OR HAYBALE LOCATION j�• Q° 14+00 PROJECT STATIONING 2p0 / / \ \ \ \ d NAVIGATION CHANNEL DREDGE AREA APPROXIMATE EXTENTS t o 907 ° � ' • � — • — • — DREDGE AREA APPROXIMATE EXTENTS .1 / JI ga$ D \ ok>� APPROXIMATE LIMITS OF DISTURBANCE - o C1 DREDGING AREA p Og EXISTING CHANNEL ° `• e \ MARKER (TYPICAL) < O \ '\'\ • — WETLAND DELINEATION � i f FLOATING DOCK � p ° \ SHORELINE (NORMAL POOL ELEVATION 911.61') Q 1 CULVERT p o 0 o O \ \ I S \ OP. Q NORTH 0 60 120 LAKEADGER ° = o Q rt� 'i�+00 SCALE IN FEET B1 p (FULL POOL ELEVATION 911.61) 4 r ck,q.7 NOTES: J s o c 1. PLACEMENT AREAS ARE APPROXIMATE, O ` ��� p 1 CONTRACTOR TO INSTALL SEDIMENT CONTROL ° ° FEATURES AS NEEDED TO CONTAIN SEDIMENT WITHIN TARGET AREAS TO THE ELEVATIONS SHOWN. r•rjr ��Jrrr.=.F 5�1 �, ° • APPROXIMATE AREA OF DISTURBANCE ° o o• 2. CONTRACTOR TO UTILIZE COMBINED COIR LOGS, c� r S' FOR MATERIAL PLACEMENT 17.3 ACRES HAYBALES, SILT CURTAINS, SILT FENCES, OR OTHER ♦ a ° CONTROL STRUCTURES TO MANAGE SEDIMENTS WITHIN PLACEMENT AREA EXTENTS. Q3. CONTRACTOR MAY ADJUST ALIGNMENTS AS NEEDED TO BALANCE PLACEMENT OPERATIONS D j ;.3 1 , :'+"J n ° ap AND SEQUENCE THE WORK. 4. CONTRACTOR SHALL NOT BLOCK FLOW FROM ° CULVERT AND GREEN RIVER BRANCHES DURING MATERIAL PLACEMENT OPERATIONS. O < v 5. ONLY BIODREGRADABLE FEATURES MAY BE LEFT IN ` PLACE FOLLOWING MATERIAL PLACEMENT. ANY / / J iE ♦. a J J Cl Q A. SILT CURTAINS, SILT FENCES, ANCHORS, METAL � _ /"' o i. ��e � • 1�.: �•� � � p .�O ` o STAKING, OR OTHER INSTALLED ITEMS MUST � `^ Q,OTHERWISE BE REMOVED. o ' S i O 1: Q• 3 1` :'`' 4`':'1 • A2 O , 0�� �� / ^ 6. CONTRACTOR MATERIAL TRANSPORT LINE SHOULD o w ♦ f r ^ p e� °•� BE ROUTED THROUGH WORK AREAS IDENTIFIED o a r�.(: .�.fJ ( !. �'' "y ° ^:� WHERE 1 POSSIBLE. , � ♦ ., ...; .``.,0 / i .° d ° l. • :.r .. 1 i; o n.n ��.:..\ Q_....�� o a :a r ...1 ...' ♦'. ..lr \ o i.r .:`i'� z ° e .:♦ ..♦. .. :_,:.../' SOURCES. °� ���<..A''�.�'' 1. AERIAL PHOTOGRAPH ©2019 MICROSOFT � z t: p ') �'S♦ .. (:: !' jam. GR p '_. ` r.. '.ti \ ji,i ` e� .Z e:;j .. ° o / CORPORATION ©2019 DIGITALGLOBE ©CNESS --/ p$'' .r' (2019) DISTRIBUTION AIRBUS DS 70 > v i ♦ ♦ 1 1 ' \ '1 / O z 1 a D ^1 O.1 a Q .� r.�f z0 c /o Or.: "' 1.:'�:w .i' QO . C• ,� C I .,. v / `o / r. • /t i' ; , 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES DATED o E WETLANDS EXTEND BEYOND i...♦ ". o ♦�' %' 1•:.1 1 r'' i r .i 1. !' /" O oQ Fe 4" r 0 / UJ AUGUST 27, 2018. z o LIMITS OF DISTURBANCE z LL i r' o '.^.g ,♦ \ veoQ r ; "�',� .i. WETLANDS EXTEND BEYOND ��/:r 1 ° / 1 1 �S / Q z z "Ao o r.:....\ ;, , LIMITS OF DISTURBANCE c�, '-r1 / ' DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH REV DATE BY AP DESCRIPTION DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION A T p �•y CAROLINA DRAWN BY: HOMER, D. LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING 4 A �T� �-y ®Lr r , Know Whans below. CHECKED BY: REEMTS, M. ANCHOR al�vi\ /' Call before you dig. - IDEA i �`/ RESOURCES APPROVED BE DIN (COLA, W. COMMISSION SCALE: AS NOTED DATE: JANDARY2021 DREDGED MATERIAL PLACEMENT LAYOUT HEET# 7 of 11 LEGEND: EXAMPLE COIR LOG OR HAYBALE LOCATION 8 EXAMPLE SILT CURTAIN OR SILT FENCE n LOCATION 14�� PROJECT STATIONING NAVIGATION CHANNEL DREDGE AREA OQO APPROXIMATE EXTENTS \ �..� O�<cQ' \ ' / • • ' • � - — • — • — DREDGE AREA APPROXIMATE EXTENTS APPROXIMATE LIMITS OF DISTURBANCE TURBIDITY MONITORING LOCATION CULVERT \\ \ �\ DOWNSTREAM TURBIDITY MONITORING \. LAKEADGER �'\ STATION: (FULL POOL ELEVATION 911.61') V N35.335345° I \ W82.2233970 NORTH LAKE ADGER 0 150 300 SCALE IN FEET � � F = PO _ �O O V r � O 0 Z UPSTREAM TURBIDITY MONITORING STATION: w N 35.330801 ° z o W82.235823° SOURCES: Q = a z m i 1. PHOTOGRAPH ©2019 AERIAL IMAGERY N RIVER (NC ONE MAP) Y i GREE _ r .... _ ;;. - _ ._. _ _ m 00 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES o 27 2 DATED AUGUST 018. z o LL J Z V w - N w - w V LL to DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION C5 REV DATE BY AP DESCRIPTION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING ��®� CAROLINA ' Knowwhaesbelow. Call betas you dig. DRAWN BY : HOLMER, D. CHECKED BY: REEMTS, M. 7 - QEA(`�, ® �`� �v RESOURCES APPROVED BY : DINICOLA, W. COMMISSION SCALE: AS NOTED DATE: JANUARY2021 TURBIDITY MONITORING LOCATIONS HEET# 8 of 11 CULVERT Aj B1 H / /-- PROPOSEDI ' STAGING o AREA ' O� T � 0 F \•� tea' �.� \ '\� / EXISTING CHANNEL \• MARKER (TYPICAL) \ '\ il FLOATING DOCK O \ x^ LAKEADGER CP \ LAKE (FULL POOL ELEVATION 911.61) � \ ' �00 / • "r+00 12+00 13+00 14+00 APPROXIMATE AREA OF DISTURBANCE . .. . .. FOR MATERIAL PLACEMENT 17.4 ACRES \ \ GR�E�R\vv / s I 15+00 MAXIMUM APPROXIMATE IMPACTED AREAS (ACRES) IMPACT TYPE AREA TYPE DESCRIPTION Al A2 31 C1 DREDGING PERMANENT DUE TO OPEN WATER AREA BETWEEN WETLAND DELINEATION EXTENTS 0.7 1.1 0.4 0.8 N/A PLACED MATERIALS AND CELL BOUNDARY TEMPORARY BY WETLAND AREA BETWEEN WETLAND DELINEATION EXTENTS 2.0 2.2 >0.1 N/A N/A CONSTRUCTION ACTIVITIES AND UPGRADIENT LIMITS OF DISTURBANCE TEMPORARY BY AREA BETWEEN CELL BOUNDARY AND CONSTRUCTION ACTIVITIES OPEN WATER DOWNGRADIENT LIMITS OF DISTURBANCE 1.8 4.5 LEGEND: PROPOSED DREDGED MATERIAL Al PLACEMENT AREA DESIGNATION EXAMPLE COIR LOG OR HAYBALE LOCATION S EXAMPLE SILT CURTAIN OR SILT FENCE LOCATION - — APPROXIMATE LIMITS OF DISTURBANCE - PLACEMENT AREA 14+00 I PROJECT STATIONING NAVIGATION CHANNEL DREDGE AREA APPROXIMATE EXTENTS - • — • - DREDGE AREA APPROXIMATE EXTENTS — • • — APPROXIMATE LIMITS OF DISTURBANCE — — — WETLAND DELINEATION 0 NORTH 0 80 160 SCALE IN FEET NOTES: 1. PLACEMENT AREAS ARE APPROXIMATE, CONTRACTOR TO INSTALL SEDIMENT CONTROL FEATURES AS NEEDED TO CONTAIN SEDIMENT WITHIN TARGET AREAS TO THE ELEVATIONS SHOWN. 2. CONTRACTOR TO UTILIZE COMBINED COIR LOGS, HAYBALES, SILT CURTAINS, SILT FENCES, OR OTHER CONTROL STRUCTURES TO MANAGE SEDIMENTS WITHIN PLACEMENT AREA EXTENTS. 3. CONTRACTOR MAY ADJUST ALIGNMENTS AS NEEDED TO BALANCE PLACEMENT OPERATIONS AND SEQUENCE THE WORK. 4. CONTRACTOR SHALL NOT BLOCK FLOW FROM CULVERT AND GREEN RIVER BRANCHES DURING MATERIAL PLACEMENT OPERATIONS. 5. ONLY BIODEGRADABLE FEATURES MAY BE LEFT IN PLACE FOLLOWING MATERIAL PLACEMENT. ANY SILT CURTAINS, SILT FENCES, ANCHORS, METAL STAKING, OR OTHER INSTALLED ITEMS MUST OTHERWISE BE REMOVED. 6. CONTRACTOR MATERIAL TRANSPORT LINE SHOULD BE ROUTED THROUGH WORKAREAS IDENTIFIED WHERE POSSIBLE. 7. TEMPORARY IMPACTS WILL BE MINIMIZED, WHERE o POSSIBLE, TO IMPACTS RELATED TO ALIGNMENT OF HYDRAULIC DREDGING DISCHARGE HOSES, > o PEDESTRIAN ACCESS, AND MINIMAL SEEPAGE OF PLACED MATERIAL THROUGH THE CONTAINMENT o w STRUCTURE. STOCKPILING OF SEDIMENT ON THE o a WETLANDS WILL NOT BE ALLOWED, AND NO E Z< EQUIPMENT WILL BE PLACED OR USED ON THE zo WETLAND WITHOUT PRIOR APPROVAL BY NCWRC. z o w Q V m a z SOURCES: 1. AERIAL PHOTOGRAPH ©2019 MICROSOFT CORPORATION ©2019 DIGITALGLOBE ©CNESS z� o z (2019) DISTRIBUTION AIRBUS DS o s V 0 1 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES DATED Z z V N w AUGUST 27, 2018. o 1 QV Z DRAFT -NOT FOR CONSTRUCTION ANCHOR �v - IDEA i �`/ NORTH CAROLINA , /' RESOURCES COMMISSION , KROW Whans below. Call before you dig. REVISIONS DESIGNED BY: CORK,R. DRAWN BY: HOLMER, D. CHECKED BY: REEMTS, M. APPROVED BE: DIN (COLA, W. SCALE: AS NOTED DATE: ,ANUARvzozi NORTH CAROLINA WILDLIFE RESOURCES COMMISSION C6 V SHEET# 9 OF 11 REV DATE By AP P D DESCRIPTION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING IMPACTED AREAS 20" DIAMEI COIR LOGS fv FAKE TO ONLY FE NETTING IEXISTING SURFACE JOINT DETAIL NOT TO SCALE 20" DIAMEI COIR LOGS MI STAKING DETAIL NOT TO SCALE NOTES: 1. COIR LOGS SHALL BE PLACED AS SHOWN ON DRAWING C4, AND IN A ROW WITH ENDS TIGHTLY ABUTTING ADJACENT COIR LOGS. COIR LOGS SHALL BE USED WITH SILT CURTAINS AS SHOWN IN THESE COIR LOG AND SILT CURTAIN DETAILS AND DRAWING C4. 2. COIR LOGS SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES DRIVEN THROUGH THE COIR LOG NETTING AS SHOWN IN THE COIR LOG DETAIL. STAKES SHALL BE DRIVEN FLUSH WITH THE COIR LOG. 3. INSPECTION SHALL BE DAILYAND REPAIR/REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 4. COIR LOGS SHALL BE REMOVED AS DIRECTED BY THE ENGINEER 1 COIR LOG DETAIL C07 SCALE: NOT TO SCALE . Y 1'8„ 't 't 't 't 't ' 'i.. % „IQ (TYP.) TF i 4i 4i 4i 4i 4i 4i 4i 4i 4i 4i 4i 4i 4i 4� 11 41 I I I I• 41 1 41 41 1 41 41 1' i 4i 4Qi 4i 4i 4j� 44i 4i 4i 4iI 41 ' 18" (TYP.) ,q r i 4i 4i 4i 4itl 41 4 41 41 CI 41 4i 4i 4i u � TOP VIEW 6" (APPROX) 0 H Al STAKE PROTECTED AREA AREA OF DISTURBANCE STAKE TO ONLY METAL CONNECTOR HEAVY DUTY CORD SEWN IN SILT SILT FENCE POST 2ATE NETTING CABLE 1/8"0 MIN FENCE FABRIC (TOP AND BOTTOM) AND LOOPED AROUND POST. (SEE MISTING DETAIL "A" FOR TOP CORD TO ;URFACE EVERY OTHER SILT FENCE POST) 2"x 2"x 4'-0" MAX OAK POST DRIVEN INTO SUPPORT NETTING (HEAVY DUTY SILT FABRIC AND TRENCH, SEE NOTE 2 PLASTIC MESH) LOOP CABLE OVER POST 0 SILT FENCE FABRIC DRIVEN COMPLETELY THROUGH BOTTOM ROW OF BALES CED SEDIMENT UP TO 2" BELOW HAYBALES :ES, 2 PER BALE, DRIVEN AT LEAST 1.5' OR SEDIMENT INTO COMPETENT GROUND 16" (TYP.) I ANGLE FIRST STAKE TOWARD PREVIOUSLY LAID BALE FRONT VIEW NOTES: 1. HAYBALES SHALL BE PLACED AS SHOWN ON DRAWING C4, AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT HAYBALES. HAYBALES SHALL BE USED WITH SILT FENCES AS SHOWN IN HAYBALES AND SILT FENCE DETAIL UNLESS OTHERWISE INDICATED ON DRAWING C4. 2. EACH HAYBALE SHALL BE PLACED SO THE BINDINGS ARE HORIZONTAL. 3. HAYBALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES DRIVEN THROUGH THE HAYBALE. THE FIRST STAKE IN EACH HAYBALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID HAYBALE AT AN ANGLE TO FORCE THE HAYBALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE HAYBALE. 4. INSPECTION SHALL BE DAILYAND REPAIR/REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 5. HAYBALES SHALL BE REMOVED AS DIRECTED BY THE ENGINEER. 6. KEY HAYBALES 6'' INTO SOFT SEDIMENT. 3 TYPICAL DOUBLE STACK HAYBALE DETAIL C07 NOT TO SCALE NORTH CAROLINA , ANCHOR � � Know Wnacsbelow. ' CBII before you dig. RESOURCES COMPACTED BACKFILL IN TRENCH EXISTING GRADE ANCHORBUOY BUOY — NYLON ROPE ANCHOR DEVICE 1 12" MIN FLOTATION DEVICE SILT CURTAIN CHAIN CIE1C \/IC\A/ GENERAL NOTES: 1. THE DETAILS SHOWN IN THESE ENGINEERING DRAWINGS ARE CONCEPTUAL IN NATURE. THE CONTRACTOR SELECTED METHODOLOGIES FOR CONTAINING DREDGED MATERIAL AND TURBIDITY CONTROL WILL BE DETAILED IN THE DREDGING WORK PLAN TO BE APPROVED BY NCWRC. 2. THE CONTRACTOR METHODOLOGIES FOR CONTAINING DREDGED MATERIAL AND TURBIDITY CONTROL SHALL BE ALTERED TO MEET PROJECT OBJECTIVES AND REQUIREMENTS, AS DETERMINED BY NCWRC DURING PERFORMANCE OF THE WORK. CONTAINMENT OF PLACED SEDIMENT WILL AIM TO PREVENT THE MIGRATION OF PLACED MATERIAL INTO DELINEATED WETLANDS ADJACENT TO THE PLACEMENT AREAS. REVISIONS DESCRIPTION FILTER FABRIC UNDISTURBED GROUND (TYP) DETAIL A BURY FLAP OF FILTER FABRIC NOTE: IN BOTTOM OF TRENCH POSTS FOR SILT FENCE MUST BE LOCATED EIGHT FEET MAXIMUM. ON -CENTER. z SILT FENCE DETAIL C07 SCALE: NOT TO SCALE SILT CURTAIN TOP LOAD LINE TOP LOAD LINE (OPTIONAL) WATER LEVEL (OPTIONAL) CONNECTOR WATER LEVEL ..jFLOTATION DEVICE 1'-5' (TYP) BALLAST LINE (GALVANIZED CHAIN) BOTTOM SEDIMENT CONNECTION GROMMETS 1'-5' (TYP) V-5 (TYP) ............ BALLAST LINE BOTTOM SEDIMENT (GALVANIZED CHAIN) .. .n. ... .. .. . ...:'.Y.! ... .. .. .. CC/'TInKI \/IC\A/ NOTE: IF THE SEDIMENT ALONG THE SILT CURTAIN ALIGNMENT IS EXPOSED DURING CONSTRUCTION, SILT FENCES SHALL BE USED IN PLACE OF SILT CURTAINS. TYPICAL SILT CURTAIN DETAIL o z C07 NOT TO SCALE O m zo V LL V z — V w O V LL� x Q V z DRAFT -NOT FOR CONSTRUCTION DESIGNED BY: CORK, R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION �� LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING DRAWN BY: HOLMER, D. CHECKED BY: REEMTS, M. APPROVED BY: DINICOLA, W. SCALE: AS NOTED DETAILS DATEJANUARY 2021 : SHEET# 10 OF ff TABLE 1: PLANTING ELEVATIONS TABLE 2: EMERGENT VEGETATION SPECIES TABLE 4: TREE AND SHRUB SPECIES PLANTING ZONE MIN. ELEVATION (FT, NAVD88) MAX. ELEVATION (FT, NAVD88) A 912.0 913.7 B 911.3 912.10 USE PILOT STAKE TO MAKE HOLE, AND PLANT PLUG DIRECTLY IN BACKFILL PLANT FLUSH 1 WETLAND PLANTING DETAIL NOT TO SCALE CONTAINERIZED TREE OR SHRUB (TYP) SET ROOT CROWN AT 1" ABOVE FINISHED GRADE SHRUB PLANTING PIT PREPARATION = ROOTBALL DEPTH & WIDTH PLUS V-0" MIN 3" MULCH ADDITIONAL ALL SIDES FINISH GRADE n ROOTBALL + + + + + + + TOPSOIL DEPTH `++++i +++++ + + + + + + + + + REMOVE CONTAINER + + + + COMPLETELY UNDISTURBED SUBGRADE ROOTBALL + V-0"MIN (PROVIDES FIRM BASE SO THAT ALL SIDES ROOTBALL WILL NOT SINK) NOTE: STAKE ALL TREES 4 FT & TALLER. z SMALL TREE/SHRUB DETAIL NOT TO SCALE NORTH CAROLINA /� %, CHO Know what'sb0I0W. r�.�call before youdig. QEA�v RESOURCES Common Name Scientific Name Planting Zone Broadleaf Cattail Typha latifolia B Common Arrowhead Sagittaria latifolia B Wool Grass Scirpus cyperinus A, B Soft Stem Bulrush Schoenoplectus tabernaemontani A B Fringed Sedge Carexcrinita A Pickerelweed Pontederia cordata B Soft Rush Juncus effusus A, B NOTES: 1. ALL LISTED PLANTS ARE OBLIGATED WETLAND PLANTS z. PLANTS SHALL BE 2-INCH PLUGS AND PLANTED AT A DENSITY OF 10,900 (z-FOOT SPACING) PER ACRE. 3. SIMILAR SPECIES CAN BE SUBSTITUTED BASED ON SITE CONDITIONS WITH APPROVAL OF THE CONSTRUCTION MANAGER. 4. A 1-YEAR WARRANTY SHALL APPLY TO ALL EMERGENT VEGETATION SPECIES. AT THE END OF 1-YEAR, ANY EMERGENT SPECIES THAT DOES NOT SURVIVE SHALL BE REPLACED BY THE CONTRACTOR WITH A SPECIES PERFORMING WELL AT THE SITE. TABLE 3: WETLAND SEED MIX Common Name Scientific Name Planting Zone Common Water Plantain Alisma subcordatum A, B Swamp Milkweed Asclepias incarnata A, B Common Hop Sedge Carexlupulina A, B Lance -Fruited Oval Sedge Carexscoparia A, B Brown Fox Sedge Carex vulpinoidea A, B Turtlehead Chelone glabra A, B Common Wood Reed Cinna arundinacea A, B Flat -Top Aster Doellingeria umbellata A, B Virginia Wild Rye Elymus virginicus A, B Common Boneset Eupatorium perfoliatum A, B Hollow Joe-Pye Weed Eutrochium fistulosum A, B Sneezeweed Helenium autumnale A, B False Sunflower Heliopsis helianthoides A, B Common Rush Juncus effusus A, B Great Blue Lobelia Lobelia siphilitica A, B Monkey Flower Mimulus ringens A, B Ditch Stonecrop Penthorum sedoides A, B Dark Green Rush Scirpus atrovirens A, B Wool Grass Scirpus cyperinus A, B Side -Flowering Aster Symphyotrichum lateriflorum A, B New England Aster Symphyotrichum novae-angliae A, B Marsh Shield Fen Thelypteris palustris A, B Blue Vervain Verbena hastata A, B Boneset Eupatorium perfaliatum A, B Needle Spikerush Eleocharis acicularis A, B Silky Willow Salixsericea A, B NOTE: A 1-YEAR WARRANTY SHALL APPLY TO ALL SEEDING AREAS. AT THE END OF 1-YEAR, ANY BARE AREAS GREATER THAN 5 SQUARE FEET SHALL BE RESEEDED BY THE CONTRACTOR WITH A SPECIES PERFORMING WELL AT THE SITE. REVISIONS VI DATE I BY IAPPDI DESCRIPTION Common Name Scientific Name Planting Zone Trees American Elm Ulmus americana A River Birch Betula nigra A Black Willow Salixnigra A Red Maple Acer rubrum A Box Elder Acer negundo A American Sycamore Plantanus occidentalis A American Persimmon Diospyros viginiana A Black Gum Nyssa sylvatica A Shrubs Spicebush Lindera benzoin A Smooth Alder Alnus serrulata A Silky Dogwood Comus amomun A NOTES: 1. TREES SHALL BE 5-GALLON CONTAINER AND INSTALLED ON 25 FT CENTERS. z. SHRUBS SHALL BE 1-GALLON CONTAINER AND INSTALLED ON 10 FT CENTERS. 3. A 1-YEAR WARRANTY SHALL APPLY TO ALL TREES AND SHRUBS. AT THE END OF 1 YEAR, ANY TREE OR SHRUB THAT DOES NOT SURVIVE SHALL BE REPLACED BY THE CONTRACTOR WITH A SPECIES PERFORMING WELL AT THE SITE. REFERENCE WETLAND DATA LOCATIONS NAVIGATION CHANNEL NORTH LAKE ADGER RP-9 s 1 At 1. • ..}�e .q S . �, s;,w: x >. SCALE IN FEET SOURCE: AERIAL PHOTOGRAPH ©2020 MICROSOFT CORPORATION ©2020 DIGITALGLOBE ©CNESS (2020) DISTRIBUTION AIRBUS IDS LEGEND: *RP_1 REFERENCE WETLAND DATA LOCATION AND DESIGNATION NOTE: VEGETATION SPECIES AND WETLAND SEED MIXES LISTED IN TABLES z AND 3 ARE GENERALLY BASED ON THE INFORMATION COLLECTED DURING THE REFERENCE WETLAND SURVEY COMPLETED BY CLEARWATER ENVIRONMENTAL CONSULTANTS, INC., ON AUGUST 21-22, z018. REFERENCE ELEVATION (FT, NAVD88) RP-1 913.2 RP-2 911.9 RP-3 913.7 RP-4 912.2 RP-5 913.4 RP-6 911.3 DRAFT -NOT FOR CONSTRUCTION DESIGNED BY: CORK, R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION C8 DRAWN BY: HOLMER, D. LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING CHECKED BY: REEMTS, M. APPROVED BY: DINICOLA, W. SCALE: AS NOTED DATE: JANUARY2021 VEGETATION PLANTING DETAILS SHEET# 11 OF 11 Attachment C Lake Adger Navigation Channel Maintenance Dredging Project Turbidity Monitoring Plan Anchor QEA of North Carolina, PLLC ANCHOR 231 Haywood Street�z Asheville, North Carolina 28801 QEA �i 828.281.3350 TURBIDITY MONITORING PLAN January 12, 2021 Lake Adger Navigation Channel Maintenance Dredging Project Anchor QEA of North Carolina, PLLC, in Consultation with North Carolina Wildlife Resources Commission, and North Carolina Department of Environmental Quality Division of Water Resources A plan for maintenance dredging of the public boat ramp and marina navigation channel has been developed by engineering consultant Anchor QEA of North Carolina, PLLC in consultation with North Carolina Wildlife Resources Commission (NCWRC), and North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources (DWR). It is proposed to remove 6,800 cubic yards of soft sediment from the navigation channel and place the soft sediment within the Lake Adger footprint as beneficial use for habitat creation. Turbidity will be monitored by the contractor during project dredging and sediment placement activities. Turbidity will be monitored using hand-held or automated turbidity meters to record Nephelometric Turbidity Units (NTU) at a fixed upstream location (near the sediment placement area but upstream of the influence of project activities) and a fixed downstream location that allows for some in -lake mixing; approximate monitoring locations are shown on sheet C5 of the 90% Design Set (attached) submitted with the Response to USACE Comments and Provision of Additional Information'. During the first week of operations, data will be collected daily at the upstream background location, and twice daily (once 2 to 3 hours after daily operations have started, and again during the last 1 to 2 hours of daily operations) at the downstream monitoring location. If turbidity levels of >50 NTU are not measured at the downstream monitoring location during the first week, then monitoring will be reduced to once daily, taken during the last 1 to 2 hours of in -lake work for the remainder of the maintenance dredging project or until excessive turbidity is measured. Turbidity will be recorded and a turbidity log of all turbidity measurements will be sent to NCWRC and NC Division of Water Resources (NCWWR) at the end of each work week. The North Carolina turbidity standard is 25 NTU; attempts to keep turbidity at or below this level will be made. An operations protocol that describes corrective actions and reporting requirements for various turbidity scenarios is outlined in Table 1. Corrective actions include adjustments to operations and best management practices (BMPs), examples of which are as follows: • Performing dredging operations within a turbidity curtain system • Adjusting the rate of the work to reduce suspended sediment 1 Anchor QEA, 2021. Letter to: David Brown, USACE. Regarding: Response to USACE Comments and Provision of Additional Information. Lake Adger Navigation Channel Maintenance Dredging Project. January 15, 2021. • Optimizing the number of dredge bites that will achieve target dredge depth to increase sediment capture • Controlling the rate of dredging, including the rate of raising and lowering of the mechanical dredge through the water, particularly when the dredge is close to the bottom of the river • Not performing excessive and rapid movement of the dredge, such as dragging the dredge on the bottom or reopening the bucket after initial closure • Conducting pre -dredging removal of debris that could interfere with dredging • Removing debris from the riverbed in a slow and steady manner • Minimizing over -penetration of the dredge bucket to prevent overfilling • Completely closing (to the extent possible) the dredge bucket before it is lifted through the water column • Moving dredge continuously and in the most efficient path to the barge once the dredge breaks the water surface • Conducting vessel operations in a manner that minimizes potential resuspension due to vessel propeller wash (propwash) Table 1 Turbidity Monitoring and Corrective Action Protocols for Lake Adger Dredging and Sediment Placement Turbidity Levels Corrective Action Reporting Background Downstream <_25 NTU _<25 NTU None Weekly <_25 NTU 26-50 NTU Evaluate, adjust BMPs to lower Weekly turbidity levels below 25 NTU. Evaluate, adjust BMPs. If turbidity Report to NCDWR within 24 hours <_25 NTU >50 NTU doesn't drop to <50 NTU within of turbidity measurement 24 hours, stop work <_25 NTU above Evaluate, adjust BMPs to lower >25 NTU background level turbidity levels to background levels Weekly or below Evaluate, adjust BMPs. If turbidity >25 NTU >25 NTU above doesn't drop to <25 NTU above Report to NCDWR within 24 hours background level background level within 24 hours, of turbidity measurement stop work Attachment Sheet C5 of 90% Design Set —Turbidity Monitoring Locations LEGEND: EXAMPLE COIR LOG OR HAYBALE LOCATION 8 EXAMPLE SILT CURTAIN OR SILT FENCE n LOCATION 14�� PROJECT STATIONING NAVIGATION CHANNEL DREDGE AREA OQO APPROXIMATE EXTENTS \ �..� O�<cQ' \ ' / • • ' • � - — • — • — DREDGE AREA APPROXIMATE EXTENTS APPROXIMATE LIMITS OF DISTURBANCE TURBIDITY MONITORING LOCATION CULVERT \\ \ �\ DOWNSTREAM TURBIDITY MONITORING \. LAKEADGER �'\ STATION: (FULL POOL ELEVATION 911.61') V N35.335345° I \ W82.2233970 NORTH LAKE ADGER 0 150 300 SCALE IN FEET � � F = PO _ �O O V r � O 0 Z UPSTREAM TURBIDITY MONITORING STATION: w N 35.330801 ° z o W82.235823° SOURCES: Q = a z m i 1. PHOTOGRAPH ©2019 AERIAL IMAGERY N RIVER (NC ONE MAP) Y i GREE _ r .... _ ;;. - _ ._. _ _ m 00 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES o 27 2 DATED AUGUST 018. z o LL J Z V w - N w - w V LL to DRAFT -NOT FOR CONSTRUCTION REVISIONS NORTH DESIGNED BY: CORK,R. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION C5 REV DATE BY AP DESCRIPTION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING ��®� CAROLINA ' Knowwhaesbelow. Call betas you dig. DRAWN BY : HOLMER, D. CHECKED BY: REEMTS, M. 7 - QEA(`�, ® �`� �v RESOURCES APPROVED BY : DINICOLA, W. COMMISSION SCALE: AS NOTED DATE: JANUARY2021 TURBIDITY MONITORING LOCATIONS HEET# 8 of 11