DWQ Project No. _b5 - oDLz County: l? ?5"f'(ty? Re,?y?cy
Applicant: I V cD c a, [)t'V rZ
Project Name:
2
Date of Issuance of 401 Water Quality Certification:f
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the
401 /Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh,
NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized
agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, M -G 14-old ttr , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: W 04 ZA&&0-4801 Date: 1;2-a8 -p (o
Agent's Certification
1, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature:
If this project was designed by a Certified Professional
Date:
1, , as a duly registered Professional
(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time) the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications, and other supporting materials.
Signature: Registration No.: Date:
, Bridge #27, SR 2424, Thompson Road
r
F j
1
i i
r ,
O0? WAT?g0
61
co
r
Mr. Mike Holder, P.E.
NCDOT Division 12
P.O. Box 47
Shelby, NC 28151
Nt ael P. I aslcN. Governor
I?. Ross it.. Scerctary,
North Carolina Department ol'Envininmctlv'atural Resources
NN. 1: V F.. Director
IN Mot cr Quality
Opp `
,pJan 1 5
?p?# 12
'????aston County
ti
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Holder:
You have our approval, in accordance with the attached conditions and those listed below, to permanently
impact 40 linear feet (If) (for riprap bank stabilization) and to temporarily impact 40 If (for temporary work
benches) of Crowders Creek for the purpose of replacing an existing one (1) lane bridge with a 30 foot wide
bridge, to be located 40 feet downstream of the existing bridge location, as described in your application
received by the Division of Water Quality (DWQ) on January 3, 2005. The location of the project is State
Road 2424 (Thompson Road) in Gaston County. After reviewing your application, we have determined that this
project is covered by Water Quality General Certification Number 3404. This certification corresponds to
Regional General Permit 1982000031 issued by the U.S. Army Corps of Engineers (USACE). Please note that
you should get any other federal, state or local permits before proceeding with your project, including those
required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed
regulations. This approval will expire with the associated 404 permit unless otherwise specified in the Water
Quality Certification.
This approval is valid solely for the purpose and design that you described in your application (unless modified
below). Should your project change, you must notify the DWQ in writing and you may be required to submit a
new application. If the property is sold, the new owner must be given a copy of this Certification and approval
letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in
the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval
to remain valid, you must adhere to the conditions listed in the attached certification and those listed below:
1. The riprap used to stabilize the area around the bents and the stream banks under the bridge must not
interfere with thalweg performance and aquatic life passage during low flow conditions.
2. Disposal of old bridge material into surface waters is not allowed. Strict adherence to the USACE guidelines
for bridge demolition will be required.
3. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full
compliance with all specifications governing the proper design, installation, and operation and maintenance of
such BMP in order to protect surface water standards:
North Carolina Division of Water Quality 610 East Center Avenue, Suite 301
Internet h2o.enr.state.nc.us Mooresville. NC 28115
Phone(704)663-1699
Fax (704) 663-6040
Coe
No
Caro ina
Naturally
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Page 2
a. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of
the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or
leased borrow pits associated with the project.
b. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina Surface
Mining Manual.
c. The reclamation measures and implementation of these measures must be in accordance with the
requirements of the Sedimentation Pollution Control Act.
4. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in
order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream.
5. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic
conditions can be provided.
6. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened.
7. The dimension, pattern and profile of the stream above and below the crossing should not be modified.
Disturbed floodplains and streams should be restored to natural geomorphic conditions.
8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
9. All work shall be performed during low or normal flow conditions.
10. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to
surface waters is prohibited.
11. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within 30 days after the Division of Land Resources
released the project.
12. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not
excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this
project within waters and/or wetlands, except as authorized by this Certification, or any modification to this
Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there sha
be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this
Certification without appropriate modification. If this occurs, compensatory mitigation may be required sin(
is a direct impact from road construction activities.
13. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Plea
include photographs upstream and downstream of the structure to document correct installation.
14. Continuing Compliance. NCDOT shall conduct its activities in a manner consistent with state water quality
standards [including any requirements for compliance with section 303(d) of the Clean Water Act] and any
other appropriate requirements of state and federal law.
Page 3
If DWQ determines that such standards or laws are not being met (including the failure to sustain a
designated or achieved use) or that state or federal law is being violated, or that further conditions are
necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions
appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC
2H.0507(d). Before codifying the certification, DWQ shall notify NCDOT and the USACE, provide public
notice in accordance with 15A NCAC 21-1.0503, and provide opportunity for public hearing in accordance with
15A NCAC 21-1.0504. Any new or revised conditions shall be provided to NCDOT in writing, shall be provided
to the USACE for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall
also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless
you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663-
1699.
Sincerely,
Alan W. Klimek, P.E.
Attachments
cc: Steve Lund, USACE Asheville Field Office
Rob Ridings, DWQ Wetlands Unit
Central Files
File Copy
? 3D
a.afMlto
JAN 0 3 2005
DENR - WATER QUALITY
WETLANDS AND STORMWATER BRANCH
A r d .a °r V
70
D
wcr? ' ?' : ?
SANS rQHM ArfRBR,gNCH
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY DIVISION OF HIGHWAYS
GOVERNOR
December 23, 2004
Mr. Steve Lund - NCDOT Projects
US Army Corp of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, N. C. 28801-5006
SUBJECT: Bridge #27 replacement, SR 2424 (Thompson Rd), Gaston County
Dear Mr. Lund:
050012
The North Carolina Department of Transportation requests authorization to replace a deteriorating and
functionally obsolete one-lane bridge on SR 2424 in Gaston County. NCDOT proposes to replace the
existing 70-foot long, one-span, one-lane bridge with a 120-foot long, three-span, 30-foot wide bridge
on new alignment, approximately 40 feet downstream of existing alignment. Forty feet of Class II riprap
will be utilized under the bridge on the bank slope for scour protection of the interior bents. The existing
bridge will be removed in accordance with NCDOT BMP's for bridge demolition. The sections of SR 2424
approaching the old bridge will be abandoned and the area seeded. The scope of work will result in
permanent impacts to the banks of Crowder Creek, which is classified as Class C waters by the Division of
Water Quality. Temporary work benches will be necessary on each side of the stream channel for
construction of the interior bents. Upon construction completion, areas impacted by the temporary
workbenches will be restored.
This office has conducted a GIS and field survey for this project and is recommending a finding of "no
effect" for T&E species and historical structures.
The project is not located within '/z mile of a critical watershed area; therefore, hazardous spill basins are not
required. Enclosed is the hazardous spill basin checklist.
LYNDO TIPPETT
SECRETARY
Enclosed is a pre-construction notification for GP 31, a sketch of planned activities, and location maps
relative to the project. If you have any questions or concerns, please feel free to contact me at (704) 480-
9044. Thank you for your time and consideration to this matter.
Bridge #27, SR 2424
Page 2
December 23, 2004
Respectfully yours,
M.L. Holder, P.E.
Division Engineer
Twelfth Division
BY: `2Ac4-4
Trish Simon
Division 12 Environmental Supervisor
Enclosures
CC: John Hennessy, DWQ, 401/Transporation Permitting Unit (7 Copies)
Polly Lespinasse, DWQ, Mooresville Regional Office
Ron Linville, Wildlife Resources Commission (Courtesy Copy)
Office Use Only: 050012 Form Version May 2002
USACE Action ID No. DWQ No. 1
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
L Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ?Riparian or Watershed Buffer Rules
? Section 10 Permit ?Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: GP31
If this notification is solely a courtesy copy because written approval for the 401
Certification is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed
for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN),
complete section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: Mike Holder, N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704-480-9020 Fax Number: 704-480-5401
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Trish Simon
Company Affiliation: N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704-480-9044 Fax Number: 704-480-5401
E-mail Address: tsimon a,dot.state.nc.us
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans
should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the
property boundaries outlined. Plan drawings, or other maps may be included at the applicant's
discretion, so long as the property is clearly defined. For administrative and distribution
purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-
inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size
construction drawings rather than a sequential sheet version of the full-size plans. If full-size
plans are reduced to a small scale such that the final version is illegible, the applicant will be
informed that the project has been placed on hold until decipherable maps are provided.
1. Name of project: Bridge #27 Replacement, SR 2424
2. T.I.P. Project Number or State Project Number (NCDOT Only): 37862
3. Property Identification Number (Tax PIN): NA
4. Location
County: Gaston Nearest Town: Gastonia
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers, landmarks, etc.): From Gastonia south on Us
321, left onto SR 2416, right on SR 2423, right on SR 2424 to bridge.
5. Site coordinates, if available (UTM or Lat/L.ong): 35°09'42"N/81°10'36"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists
the coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 0.50 (NCDOT right of wav).
7. Nearest body of water (stream/river/sound/ocean/lake): Crowder Creek, Class C Waters
(from source to North Carolina-South Carolina State line).
8. River Basin: Catawba
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the
project at the time of this application:Existing Conditions -bridge on paved secondary road.
General Land Use- Wooded. Residential.
10. Describe the overall project in detail, including the type of equipment to be used: Replace
existing one lane one span timber bridge with a three span concrete bridge on new
Page 2 of 8
alignment 40 feet downstream of existing alignment). Temporary work benches will be
used on each side of stream channel at interior bents during construction. Class II riprap
will be installed at bents for scour protection. The existing bridge will be removed
following NCDOT BW's for bridge demolition. The equipment utilized will include a
trackhoe, crane, and drilling rig.
11. Explain the purpose of the proposed work: The purpose of the project is replace a
structurally deficient and functionally obsolete one lane bridge with a new 30 foot wide
concrete bridge. The existing bridge is located in a sharp curve; therefore, the new
alignment is needed to reduce the curvature of the road at the bridge.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT
project, list and describe permits issued for prior segments of the same T.I.P. project, along
with construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No permit requests are anticipated at this site in the immediate future.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 40 feet of Class II riprap will be
used at bridge ends slopes for scour protection. Temporary work benches will be used at
the waters edge _during construction of interior bents.
Page 3 of 8
2_ Individually list wetland impacts below: NO WETLAND IWACTS
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized
clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both
structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance
Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service
Center at 1-800-358-9616, or online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland,
beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE
only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed: 0
3. Individuallv list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Before Intermittent?
(indicate on map) (linear feet) Impact (please specify)
I Class A riprap 40 feet Crowder Creek 30 Perennial
on embankment
Temporary work 40 feet each
1 benches side (
stream) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and
associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet
before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation,
ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the
original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to
the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-
9616, or online at www.usgs.eov. Several internet sites also allow direct download and printing of USGS maps (e.g.,
www.tot)ozone.com, www.manauest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: Permanent Riprap
Impacts = 40 feet, TemporaU impacts = 40 feet (in same area as permanent impacts)
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U. S.) below: 0
Open Water Impact Area of Name of Waterbody Type of Waterbody
Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound,
indicate on ma acres bay, ocean, etc.
• List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation,
dredging, flooding, drainage, bulkheads, etc.
Page 4 of 8
Pond Creation: NO POND IMPACTS
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ?
wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to
provide information related to site constraints such as topography, building ordinances,
accessibility, and financial viability of the project. The applicant may attach drawings of
alternative, lower-impact site layouts, and explain why these design options were not feasible.
Also discuss how impacts were minimized once the desired site plan was developed. If
applicable, discuss construction techniques to be followed during construction to reduce
impacts.
The bridge must be replaced for the safety of the travelling public. Riprap is needed on the
embankment under the bridge for scour protection. The 70 foot one span bridge with vertical
abutments will be replaced with a 120 feet bridge, three span bridge with bents. The
embankment under the new bridge will be sloped back to natural ground. Coir fiber matting
will be utilized at this location, if needed.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable
include, but are not limited to: reducing the size of the project; establishing and maintaining
wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing
losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving
similar functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
Page 5 of 8
incomplete. An applicant may also choose to review the current guidelines for stream
restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http:Hh2o enr state nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach
directions and/or map, if offsite), affected stream and river basin, type and amount
(acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or
preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation
easement, etc.), and a description of the current site conditions and proposed method of
construction. Please attach a separate sheet if more space is needed.
SPANNING STRUCTURE W/ RIPRAP EMBANKMENT IMPACTS: MITIGATION NOT
ANTICIPATED.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP
at (919) 733-5208 to determine availability and to request written approval of mitigation
prior to submittal of a PCN. For additional information regarding the application process
for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wM/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes N No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No N
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach
a copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed
Page 6 of 8
herein, and must be clearly identifiable on the accompanying site plan. All buffers must be
shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the
DWQ Regional Office may be included as appropriate. Photographs may also be included at
the applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers
mitigation is required calculate the required amount of mitigation by applying
multipliers. Required
Zone* impact
uare feet
Multiplier
Mitigation
1 3
2 1.5
Total
Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer
the buffer
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement,
Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all
appropriate information as identified within 15A NCAC 2B .0242 or .0260.
NA
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
The realignment of the bridge and approach on each side will result in impervious surface on
new location However, the existing bridge is to be removed and the existing, sections of SR
2424 approaching the existing bridge will be abandoned and the area seeded. Therefore, there
will onlv be the minor increase in impervious surface associated with increasing the bridge
width from a one lane to two lane bridge.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
No wastewater is generated from the project.
Page 7 of 8
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
7J
-?3-0
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8
` `114 e13 116 po?r<< ND 147 e J Ala.;/
-- .] 173 207 ,
]- 113 •?n)] HIGH SHOALS =7
112 Sep _ / \`r•In19
5 FOP
-. ^ 178
)ICy'e)J •. I.J. I IPIJ ' 0110 lee) sio I _ 1 . 11]] ` v
55 saM,L. may; 145 ?A ) Mordm 177
36 f bem I jok
278 343
`;A? 91 c? Ili eel •,b11 - rune gee _. 171 = STANLEY: IS Iv',
..1 POC 7J4 Igo]
7.7 Lei] A: . =?, >e.7 ev
I ' `]79 7 _ leJ. ere e nc /° lem
?f? uvv r Lev) ? leap ? G C _ ? ne/
IAS?' ] MSODR 1 202
y," , ?I °.MOUrn I?i?l] ^ 161 170 ip r. 1 rv
:•% ?C18 e 9 277_
1? X 157
IA'1
NJV e . r.el +,p ihv 152 --
L1_6 .)] T O .... ?. \ ED _ ;,e •-] '/)e 111] + 1?,
?j a.°, 6 1.>.5 ".,3 1?,5 ?,•J . IIEJ ' I.0 337 , 1001 lh. ?lo?/ \? •t
373
716
W J 162 11 72 MATCH LINE
}il ..q] ; 153 - 1.07
77
w: c,
e`\ 1
?? ?? '_ u/ ? ?/ \? ' \ 7001 n.
v° '? ? L -
i Bann7ade s=T
.e]l ` e I • ''0 .: ` 779
J7 DALLAS E SPRI NODAL \
/ PO . 7.7.0 •? IuNINC.I k ?• ?'•
Lin ` I 775 POP 7.443 F ''.SPENCER MIN.
ny / ' ?? Or, IpD
] e
w•Si ?. /
GASIONIA h71 CLuq
•?
BESSEME _.SPENCER y \
,, / 7Y ~ f kA LO MOUNTAIN t \ 1G
rur
CITY . ( ?'+. •.:/ a Q I.7)e ?VR \??
-? \ 1 v \ fh e° -
eJ, '.-' "'01 v5 °' . U :lei i I] f . AN[IH C r e MrADOP. E
.ec -• ` A ? 1 .:. -_ ai? '.•IQ NirSiC l' 1 ?_ o- e _ r07
_ .9p /, ` --•'•],,' ? 11]) O; `OV OP 1.150 JOV,NNn,'
"1 e0 I I \ \\\ T' ` 7 ror
!_I I- \' `? , . J 11 J f er LOWE 7917 ?..l}
vAVI j7 \ `` 7 ' '? ("r B-' 7- P (?.
IhV v`. 7.5 fW •y" I \ /
°I Yom-' wFt 1 1 \ ° /, AV/GASTONIA
1 POP47.737
F4o
vI .,
71
Creek 37 t3 \ 7p tv , ;L I.kD]t•ti;?
DEL,
... v ^ CROWDERS \.• 1 .. C .. A
Gv" 79 M1 N. t. _ 774 I r S.. CRAMERTO
v1. ^? E1E 167e
POP,
r. ? Inror . ? _
2 _
E
\ 1/
LNG MTN. .`P I Ica %J\ \ I A'? ? SAl
PINNACLE BELM
ELEV. 1705 J i °01 IUN.
SOUTH kr• E.fT, POP.;
-' GASTONIA G.o-ia Municipal V / - -
IUNe/C1 JACKSON i. Awpo - . • v • \
F,,u KNOB
5 IIlO y ? J???o
IIDe tr ? ?-`/ 1
Il ?. sir / I
?h ,? liob ?
/Y t Ilo] ?. z? 1?
\ fA5 Crowder \T. ??Re_ l-p L71 'F'
,?1] A I
I Icc` i1=0]a ^ ' 1?0]^ I1 ° rev Je°) Z? FE•U?EL 7571 7.]1
I70f \ ^ 'J / ry 7.eQ W 779
Unif7• 110 O 1171 J IID) \ ? ('1] 7? 4feb7 77i Leb J Lr.]] ,?,• T
70 ° ,10°63 _]eel]., _.e
rG4 ^ PP^ 7es4 1?'u ? 2e67
?. 1101 .I " ? • ° ^ ? ie.?1 LZ f
"P-10] '? 1-73 .J I .r60 64 7.}I
N Ilcl 65; '? /7 - 71 1 b f.:e n ?? ]P^.
\ 113 M\ "?.. ?? b5 7.]e ] p
SDOSZ
7 7t eA t A .']? "-7-71 1?ID24 .e 1?? ]
r
271-7' :ev,F=J?.77 •5]°_.. ]e]4 s JV? 2519
7
Y p R ti 711 ??.. tees 9
K 2650 1 ?'y f
O J°
I\ o C O u PA T Y ? 1 PJ?
Gvf - ° e
S O U T Fi ? C A? R
d
4,457v4-;? ce -ivTzy
Z4z?l-
5z-
/Z?/?G?'fcL?Gcai cF ???. ? z7
i I 1 IV] I
x'l
L
Name: GASTONIA SOUTH
Date: 12/21/2004
Scale: 1 inch equals 1000 feet
1 i
Bridge #27
Replacement
1 ? 2r
V,2?1,'-' Location: 035° 09' 42.81 N 081° 10' 36.1 W
Caption: Bridge #27 Replacement, SR 2424, Crowders Creek, Class C
Waters, Catawba River Basin
98,
KEY TO MAP
.ZONE A
\ LIMIT I
STUDY Y`
LIMIT OF \l?
STUDY {
'_ONE
00-Year Flood Boundary- ZONE B
00-Year Flood Boundary
!one Desitnations* With po ;
)ate of Identification y?t? t
12/2/74
100-Year Flood Boundary-' ZONE B
500•Ycar Flood Boundary--- I
Base Flood Elevation Line
With Elevation in Feet**
Base Flood Elevation in Feet
WherwUniform Within Zone**
-- 513 ^--"^'
(EL 987)
RM7 x
Elevation Reference Mark
• M1.5
River Mile
River to the National Geodetic Vertical Datum of 1929
**Referenced
*EXPLANATION OF ZONE DESIGNATIONS
EXPLANATION
base flood elevations and
factors flood; not determined.
Areas of ()O-year
flood hazard Areas of 100-year shallow flooding where depths
are between one (1) and three (3) feet; average depths
of inundation are shown, but no flood hazard factors
are determined. where
depths
Areas ar sand° three o(3) feet; base flood
arc betw between one e (1)
elevations are shown, but no flood hazard factors
are determined.
Areas of 100-year flood; base flood elevations and
flood hazard factors determined, flood
Areas of 100-year flood to be protected by
protection system under construction, base flood
elevations and flood hazard factors not determined.
Areas bet.vccn limits of the 100-year flood and 500-
year flood; or certain areas subject to 100-year flood-
ing with average depths less than one (1) foot or where
the contributing drainage area is less than one square
mile; or areas protected by levees from the base flood.
(Medium shading)
Areas of minimal flooding. (No shading)
Areas of undetermined, but possible, flood hazards.
Areas of 100-year coastal flood with velocity (wave
action); base flood elevations and flood hazard factors
not determined.
Areas of 100-year coastal flood with velocity wave
action); base flood elevations and flood hazard factors
determined.
NOTES TO USER
II
1
1
i
t
1
Q
\ o \
1
m
T0 66
Izr-3•
Cl-k'nNti 52 Z4z4 3r r 6o r 31'-I•
7,0 i36
- -- - ? -?"--------?,- -- 101-0' CLASS II RIP RAP
TO SHOULDER l1TPJ-_
STA. 15?93.81
r 11 BRIDGE STA. Q ENO BENT 11 - - - /I I . 170 EN \
- FILL FACE S1A.16.55.00 FILL A ENO BENT •2 3'
FILL FACE PC STA.IT.74.43 \
I
EBI•A B -A I 11 ? I !EB2- \ \
l , I
_N 5. 53'02YE -L----- -- -7`\ - I E-$? ---?-- --? \
16#00 I I III
I ? ? STA.17?2T.12 10 SR 2423 18+00
STA.15•82.8T EBI B, BI B B - I i EB2- ENO AFPROACH SLAB
BEGIN APPROACH SLAB _ I B2
I ??P??? 5?2 Z4Zl?
? 90.00'00'
CLASS II RIP RAP ' I I 5 ???
TO SHOULDER (TTPJ STA.16-24.96 STA.16?85.01
W.P. •2 BENT 11 I I I ?P. •3 BERT •2
i I 10' 0'
IO'•0' ?
I
PLAN
FILL FACE
GRACE POINT EL.101.006
STA. 15.82.87
BEGIN APPROACH SLAB
STA. 16-24.96
W.P. 12 BENT 11
UNCLASSIFIED
STRl1CTURI
EXCAVATION
ITTPJ
EXPI FIX
S?OPE -
I \
I:I ITTPJ
14P 12 x 53
STEEL PILES 2'-0-CLASS II
EST. L=IS'! RIP RAP ITTPI
STA.16+85.04
W.P. •3 BENT •2
i STA. 16+55.00
CR. CR. EL. 101.438
I
?0.T062% EXPIEXP FIX
I
==L
I
42.0
DRILLED PIER
)0 15450 16+00 16#50 17+00
PROFILE ALONG SURVEY
SGT[:. / ?? ¢oT
STA. 17.16.12
IIP.•4 Q END BENT •2
FILL FACE
GRADE POINT EL. 101.914
A?r6l
•0.T • .1.
P.I.18.55.00
EL. 102.85
L : 320'
GRADE DATA
C STA.IT.2T.12
I[ x"
EL PILE
.L : 25't
I?2v
,/, 3 706,,
I??STix, Gor?,4,?
52 ZCj,?
??+fcC-r»G?T of r?2. '0?2?
iz?o¢
+ rn I i K
ro ?
ce a M
olc
44
m
ox o3
C
N
Q -" ') •
h?
r
w Nc
1
N
L
,4,
0
U-
NCDOT
HAZARDOUS SPILL BASIN CHECKLIST
Division: ?_ County: r L) Project ID: -37f3& Z
River Basin: Bridge No: 27
Route : -5e 0tk?4 Stream: ,f--,ovw ne, ??G G (L
a
w 7 -S
Water Quality Criteria: e --L-A,,!5
Yes No
Stream Crossing Blue Line On USGS r? r
ORW r r?
WSI r r?
WS 11,111 OR IV, Crossing Within 0.5mi of W. S. Critical Area F F/
Roadway Criteria:
Route Designation-
Yes No
Arterial Urban r r-'
Arterial Rural r r?
Additional Site Information:
Yes No
Is a Hazardous Spill Basin Required?
r- r?
Criteria Based Upon NCDOT "Best Management Practices for the
Protection of Surface Waters" (March, 1997).
D
WE DENR - WA- E _?
iNDS q?yp STORA4 A rER 6RANCH
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GovE,RNOR SECRENARY
050012 CIO -15
@m vi C,
JAN () 3 'to05
MEMO TO: John Hennessy, DENR/DWQ/401 /Transportation Permitting Unit
WAf CFA QUALITY
? f ?1?DS AND STORMWAtER BRAPICH
FROM: Trish Simon, Division 12 Environmental Supervisor i
DATE: December 23, 2004
SUBJECT: Pre-Construction Notification/401 Automated Payment
Enclosed are seven copies of a pre-construction notification for a NCDOT bridge project in
Gaston County for your review.
Project information for the 401 Automated Payment Procedure
• Work order number: 150464-55120005-378624685-36027
• TIP #: NA
• Project Category: $200.00 Fee
is
PAYMFNT
R C,FIVED