HomeMy WebLinkAboutNCC201896_NOT Closeout Documents_20210114North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Harnett Project: Forest Oaks - Phase 5, Lots 258 & 297 River basin: Cape Fear
Person financially responsible: Caviness Land Development, Inc. - Watson G Project #: HARNE-2020-128
Caviness, President NCC201896
Address: 1041 B Robeson Street, Fayetteville, NC 28305
1. Project Location: Angel Oak Drive, Anderson Creek
Pictures: No
2. Weather and soil conditions: sunny/workable soils Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: January 13, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process
Reported by: Penny Markle Others present:
Date of inspection: January 12, 2021 Time arriving on site: 3:42 PM Time leaving site: 4:00 PM
cc: